Railway roadbed section contact net pillar foundation reinforcement cage positioning tool

By designing the steel cage positioning tooling for the contact network pillar foundation of the railway subgrade section, the problem of inaccurate positioning of the steel cage of concrete cast-injected piles has been solved, the accurate installation of the steel cage and the improvement of the construction quality has been achieved, the cost and labor demand have been reduced, and the demand has been improved. Construction efficiency and safety.

CN221972385UActive Publication Date: 2024-11-08ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420522049.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-11-08
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

In the construction of the contact network pillar foundation of the railway subgrade section, the steel cage positioning of the concrete cast-injected piles is inaccurate and is prone to deviation, affecting the construction quality and safety.

Method used

A steel cage positioning tool for the contact network pillar foundation of railway roadbed section is designed, including vertical cylinder frame, hat brim frame, fixing plate, adjustment screw and flower basket screw hook to ensure the accurate installation and positioning of the steel cage, through the integral structure and adjustment device Achieve the stability and flexibility of the framework.

Benefits of technology

It effectively improves the positioning accuracy and construction quality of the steel cage, reduces costs and manpower demand, improves construction efficiency and safety, and ensures the compliance of construction specifications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972385U_ABST
    Figure CN221972385U_ABST
Patent Text Reader

Abstract

The utility model discloses a railway subgrade section contact net pillar foundation reinforcement cage positioning tool, which belongs to the technical field of railway subgrade section contact net pillar foundation construction, and comprises a vertical cylinder frame arranged in a pile hole, and the top of the vertical cylinder frame is provided with a brim frame positioned outside the pile hole; at least three evenly-distributed fixing plates are arranged on the outer edge of the brim frame, adjusting screw rods are arranged on the fixing plates, and a plurality of turnbuckle hooks used for hanging a reinforcement cage are arranged on the vertical cylinder frame. According to the tool, various indexes such as the positioning accuracy, the reinforcement protection layer and the perpendicularity of the contact net strut foundation reinforcement cage are guaranteed, the construction quality is effectively guaranteed, and potential quality hazards are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of railway roadbed section contact network pillar foundation construction, and provides a railway roadbed section contact network pillar foundation reinforcement cage positioning tool. Background Art

[0002] Concrete bored pile construction has many advantages, including high single pile bearing capacity, fast construction speed, high construction precision, low construction noise, low cost, easy management, and a wide range of height and diameter selection for bored piles, which are suitable for construction in various stratum conditions and widely used in highway bridges, municipal administration, railways, water transportation, housing construction and other fields. For example, the design of the contact network pillar foundation of the railway subgrade section adopts concrete bored piles, with a pile length of 4.5m and a pile diameter of 700mm. The main reinforcement of the foundation steel cage adopts 16-diameter threaded steel, and the spiral stirrup adopts 8-diameter round steel, and C30 concrete is used for pouring. However, during the construction process, the accurate positioning of the steel cage of the concrete bored pile is one of the problems that need to be solved, that is, the steel cage is prone to offset during installation and concrete pouring, and the elevation and protective layer are not properly controlled, which has quality risks and is not easy to meet the design and construction specifications.

[0003] Therefore, in order to solve the above technical problems, it is necessary to design the hoisting and positioning of the concrete cast-in-place pile reinforcement cage to overcome the above defects in the prior art. Utility Model Content

[0004] In view of this, the purpose of the utility model is to provide a railway roadbed section contact network support foundation steel cage positioning tool with a simple structure and easy operation. The tool can effectively ensure the accuracy of the steel cage positioning, the thickness of the steel cage steel protection layer, the steel cage elevation, and the verticality, so as to improve the construction quality of the cast-in-place piles.

[0005] In order to achieve the above object, the utility model provides the following technical solutions:

[0006] The utility model provides a positioning tool for a steel cage of a contact network support foundation of a railway roadbed section, comprising a vertical cylinder frame arranged in a pile hole, a brim frame arranged outside the pile hole on the top of the vertical cylinder frame, at least three evenly distributed fixing plates arranged on the outer edge of the brim frame, an adjusting screw rod arranged on the fixing plate, and a plurality of flower basket screw hooks for hanging the steel cage arranged on the vertical cylinder frame.

[0007] By adopting the above scheme, the tooling can ensure the accurate installation and positioning of the steel cage. The design of the brim frame and the fixing plate can ensure the stability of the vertical tube frame, the use of the adjusting screw can realize the horizontal adjustment of the brim frame, and the basket screw hook can fix the position of the steel cage. In this way, the problem of accurate positioning of the steel cage in concrete cast-in-place pile construction can be effectively solved, and the construction quality can be improved.

[0008] Furthermore, the vertical tube frame and the brim frame adopt an integral structure and are made of 14mm diameter threaded steel. This can ensure the strength and stability of the tooling, thereby ensuring the accurate positioning and construction quality of the steel cage. At the same time, the 14mm diameter threaded steel has a small volume and weight, which is easy to carry and install.

[0009] Furthermore, the fixing plate is provided with a positioning hole for the fixing rod to pass through. The positioning hole on the fixing plate and the fixing rod can be used in combination to improve the stability of the tooling, ensure that the position of the steel cage is fixed during the construction process, and meet the design and construction specifications.

[0010] Furthermore, a support plate is provided at the lower end of the adjusting screw rod, so that the pressure surface of the adjusting screw rod can be enhanced, and the tooling can be ensured to be more accurate and stable during the adjustment process of the adjusting screw rod.

[0011] Furthermore, a cylinder is arranged inside the vertical cylinder frame, and the cylinder is made of a steel plate. The cylinder made of a steel plate can provide better structural support, making the entire frame more solid and stable.

[0012] Furthermore, the cylinders are integrally arranged or spaced apart in the vertical cylinder frame.

[0013] Furthermore, the turnbuckle screw hook is configured as a hooking structure or a hinged structure at one end connected to the vertical tube frame.

[0014] The beneficial effects of the utility model are:

[0015] (1) Simple operation, convenient processing and low cost are the advantages of using this positioning tool. The design of this positioning tool usually takes into account the actual needs of the construction, making the operation process simpler and reducing manpower and time costs. In addition, the materials used to process the positioning tool are relatively simple and cheap, which reduces costs.

[0016] (2) Through the application of positioning tools, the protective layer of the steel cage, the plane position, verticality and elevation of the pile body can be effectively controlled. The positioning tool can provide accurate positioning and fixation to ensure that the position and shape of the steel cage and pile body meet the design requirements. This helps to improve the construction quality and accuracy and avoid deviations or errors.

[0017] (3) The positioning tool is easy to use and can be recycled, effectively improving construction efficiency and progress. The positioning tool can be quickly installed and removed, reducing construction time and labor requirements. The use of positioning tool can also ensure construction quality, avoid rework or correction, and further improve construction efficiency and progress. In addition, the positioning tool can also play a safety protection role in preventing people from accidentally stepping into the hole, ensuring the safety of construction workers.

[0018] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and will be apparent to those skilled in the art based on the following examination and research, or can be taught from the practice of the present invention to some extent. The objectives and other advantages of the present invention can be achieved and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be described in detail below in conjunction with the accompanying drawings, in which:

[0020] Figure 1 This is a schematic diagram of the structural positioning tooling for the steel cage of the contact network support foundation of the railway roadbed section of the utility model;

[0021] Figure 2 This is a schematic diagram of the application of the positioning tooling for the steel cage of the contact network support foundation of the railway roadbed section of the utility model;

[0022] Figure numerals: 1. vertical tube frame; 2. brim frame; 3. fixing plate; 4. positioning hole; 5. support plate; 6. adjusting screw; 7. basket screw hook. DETAILED DESCRIPTION

[0023] The utility model is further described below in conjunction with specific implementation methods. The drawings are only used for exemplary descriptions, and are only schematic diagrams, not actual pictures, and cannot be understood as limitations on this patent; in order to better illustrate the embodiments of the utility model, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0024] like Figure 1-2As shown, the utility model of the railway roadbed section contact network support foundation steel cage positioning tool comprises: a vertical cylinder frame 1, which is arranged in the pile hole and is used to support and position the steel cage. It can be a cylindrical structure with sufficient strength and rigidity to bear the weight of the steel cage; a brim frame 2, which is located at the top of the vertical cylinder frame 1 and is arranged outside the pile hole. It can be an annular structure for supporting and positioning the vertical cylinder frame 2 and plays a fixing role; at the same time, the vertical cylinder frame 1 and the brim frame 3 adopt an integral structure and are processed from threaded steel with a diameter of 14 mm. The diameter of the contact network support foundation pile is used as the size basis. The inner diameter of the upper and lower stirrups is about 1 cm larger than the outer diameter of the steel cage. The frame is assembled by welding. The design of this integral structure can increase the strength and stability of the frame, ensuring that it can withstand the weight of the steel cage and the force during construction; and the threaded steel with a diameter of 14 mm has high strength and durability, and is suitable for making a frame structure. In this way, by processing the threaded steel, a vertical cylinder frame and a brim frame integral structure with a certain rigidity and bearing capacity can be formed, which is convenient The invention simplifies the manufacturing and installation process and improves the construction efficiency; the fixing plate 3 is provided with at least three evenly distributed fixing plates 3 on the outer edge of the brim frame 2, and these fixing plates 3 are used to fix and stabilize the brim frame 2 to ensure that it does not move or tilt during the construction process; the adjusting screw 6 is provided on the fixing plate 3 to adjust the position and height of the fixing plate 3. For example, if a 20cm long bolt is prepared, a steel plate with a length of 20cm, a width of 10cm, and a thickness of 1cm is taken as the fixing plate 3, and a hole with the same diameter as the long bolt is opened on the fixing plate 3, and the long bolt with the same diameter is inserted. The nuts are welded to the corresponding holes of the fixing plate 3, and a round steel with a diameter of 8 cm is welded to the end of the long bolt as a rotating wrench. The long bolt wrench is rotated to pass the long bolt through the nut. After the processing is completed, the fixing plate 3 is welded to the outside of the brim frame 2. The brim frame 2 can be adjusted by adjusting the screw 6 to ensure the accurate positioning of the steel cage; a basket screw hook 7 is provided on the vertical cylinder frame 1 for hanging the steel cage. These basket screw hooks 7 can be used to fix the position of the steel cage and hang it on the vertical cylinder frame 1.

[0025] In this embodiment, the fixing plate 3 is also provided with a positioning hole 4 for the fixing rod to pass through. That is, by providing a positioning hole 4 with a diameter of 3 cm on the fixing plate 3, a fixing rod (not shown) can be inserted through the positioning hole 4 and then inserted into the ground around the pile hole to position the fixing plate 3, thereby positioning and fixing the brim frame 2 and the vertical cylinder frame 1, so as to facilitate the subsequent positioning of the steel cage. In this way, the use of the fixing rod can increase the stability of the tooling and prevent it from moving or tilting during the construction process.

[0026] In this embodiment, a support plate 5 is provided at the lower end of the adjusting screw 6. The function of the support plate 5 is to provide stable support and fixation during the adjustment process of the adjusting screw 6 to enhance the pressure surface of the lower end of the adjusting screw. The support plate is made of steel plate to ensure sufficient strength and stability.

[0027] In this embodiment, a cylinder is provided inside the vertical cylinder frame 1, and the cylinder is made of a steel plate. Thus, the cylinder is provided inside the vertical cylinder frame 1, on the one hand, to increase the stability and bearing capacity of the structure, and on the other hand, to provide an inner wall inside the vertical cylinder frame 1 for the lowering of the steel cage. At the same time, if the cylinder is provided as a whole, it means that the cylinder will cover the height of the entire vertical cylinder frame. If the cylinder is provided at intervals, such as Figure 2 As shown in , this means that the cylinders are only spaced apart in height within the vertical cylinder frame.

[0028] In this embodiment, the turnbuckle hook 7 is configured as a hook structure or a hinged structure at one end connected to the vertical cylinder frame 1. If the turnbuckle hook is configured as a hook structure, it means that one end of the turnbuckle hook 7 will have a hook shape and can be hung on the vertical cylinder frame 1. This structure is usually used in situations where convenient installation and disassembly are required, and the turnbuckle hook can be quickly hung on the vertical cylinder frame for easy maintenance and replacement. If the turnbuckle hook 7 is configured as a hinged structure, it means that one end of the turnbuckle hook 7 will be connected to the vertical cylinder frame 1 to form a hinge, so that the turnbuckle hook 7 can be rotated or tilted within a certain range. This structure is usually used in situations where the position or angle of the flower basket needs to be adjusted, and can be adjusted as needed.

[0029] The construction process of the positioning tool is explained below: first, the positioning tool is assembled and welded according to the above-mentioned components; then, after the bored pile is drilled, the positioning tool is installed at the hole mouth of the pile hole, and the hole mouth elevation and plane position are measured and laid out on site, and a cross line is drawn on the upper mouth of the vertical cylinder frame 1 of the positioning tool to determine the center position of the pile; then, according to the requirements of the plane position, the elevation is adjusted using the fixed plate 3 and the adjusting screw 6 on the outer edge of the brim frame 2 of the positioning tool to determine the elevation of the steel cage hole mouth; then, a fixed plug rod is inserted into the positioning hole 4 of the fixed plate 3 to fix the positioning tool to ensure that its position is stable and reliable; finally, the truck crane lifts and lowers the steel cage, and after passing through the positioning tool, the open-body flower basket screw hook 7 is used to hang the hanging rod of the steel cage, and after waiting for the concrete pouring to complete the initial setting, the open-body flower basket screw hook 7 is taken out, and the positioning tool is removed to complete the construction.

[0030] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the utility model.

Claims

1. A positioning tool for the steel cage of the contact network support foundation of a railway subgrade section, characterized in that: The utility model comprises a vertical cylinder frame (1) arranged in a pile hole, a brim frame (2) located outside the pile hole is arranged on the top of the vertical cylinder frame, at least three evenly distributed fixing plates (3) are arranged on the outer edge of the brim frame, and an adjusting screw (6) is arranged on the fixing plate, and a plurality of turnbuckle hooks (7) for hanging a steel cage are arranged on the vertical cylinder frame.

2. The railway subgrade section contact network support foundation steel cage positioning tool according to claim 1 is characterized in that: The vertical tube frame and the brim frame adopt an integral structure and are made of threaded steel with a diameter of 14 mm.

3. The railway subgrade section contact network support foundation steel cage positioning tool according to claim 1, characterized in that: The fixing plate is also provided with a positioning hole (4) for the fixing rod to pass through.

4. The railway subgrade section contact network support foundation steel cage positioning tool according to claim 1, characterized in that: A supporting plate (5) is provided at the lower end of the adjusting screw.

5. The railway subgrade section contact network support foundation reinforcement cage positioning tool according to claim 1, characterized in that: A cylinder is arranged inside the vertical cylinder frame, and the cylinder is made of a steel plate.

6. The railway subgrade section contact network support foundation reinforcement cage positioning tool according to claim 5, characterized in that: The cylinders are arranged integrally or at intervals in the vertical cylinder frame.

7. The railway subgrade section contact network support foundation reinforcement cage positioning tool according to claim 1, characterized in that: The turnbuckle screw hook is configured as a hooking structure or a hinged structure at one end connected to the vertical cylinder frame.