Construction joint treatment device for tunnel engineering construction
By using thread shear lifting base and motor-driven scraper system in the tunnel construction joint treatment device, the problem of scraper inconvenient scraper scraper is solved, rapid smoothing of construction joints and colloid recycling is achieved, and construction is improved efficiency.
Patent Information
- Application Number
- CN202323584837.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-27
AI Technical Summary
When the existing tunnel construction joint treatment device fills the construction joint, the scraper is not convenient to scrape off excess colloid, which affects the construction efficiency.
A scraper system including threaded shear lifting base, connection plate, and motor-driven scraper system is designed. The angle adjustment and left and right movement of scraper are realized through electric telescopic rod and worm gear-worm mechanism, and the recovery of excess colloid is carried out in combination with the receiving plate.
It realizes rapid smoothing of tunnel construction joints, improves construction efficiency, and can effectively scrape down and recover excess filler colloids outside the construction joints.
Smart Images

Figure CN221973527U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel engineering construction, in particular to a construction joint processing device for tunnel engineering construction. Background Art
[0002] The circumferential V-shaped construction joint of the tunnel lining refers to the process of cutting the lining ring into a V-shaped groove along the circumference during the tunnel lining construction process, and then pouring concrete into the V-shaped groove to form a V-shaped construction joint. This construction method helps to increase the stability and sealing of the lining ring.
[0003] The patent application CN202320673394.1 discloses a caulking device for annular V-shaped construction joints of tunnel linings, which relates to the technical field of tunnel construction. It includes a tunnel construction trolley with a lifting function, which is used to move in the tunnel; and a caulking assembly, which is installed at the lifting end on the top of the tunnel construction trolley and is used to caulk the V-shaped construction joints; the caulking assembly includes: an assembly frame, which is fixed at the lifting end on the top of the tunnel construction trolley, and an assembly arm is fixed at one end of the two sides of the outside; a connecting rod that can adjust the angle by rotation is installed between the two assembly arms; and a colloid injection component that can be used to fill the V-shaped construction joint is fixed on the outside of the connecting rod. The utility model improves the caulking efficiency of the V-shaped construction joint to a certain extent by installing a scraper that can fit the inner wall of the tunnel on the tunnel construction trolley with a lifting function, and inserting a colloid injection component that can spray to fill the V-shaped construction joint in the scraper.
[0004] However, after research, it was found that the above patent still has the following problems: the scraper of the above device is not convenient for scraping off the excess colloid filled in the construction joint, and is not convenient for quickly smoothing the construction joint, which affects the construction efficiency.
[0005] Based on this, this scheme proposes a construction joint treatment device for tunnel engineering construction. Utility Model Content
[0006] The utility model aims to provide a construction joint treatment device for tunnel engineering construction to solve the problems raised in the above-mentioned background technology.
[0007] To achieve the above purpose, the utility model provides the following technical solutions: a construction joint treatment device for tunnel engineering construction, comprising a threaded shear lifting base,
[0008] A connecting plate is hingedly installed on the top of the threaded shear lifting base, and universal wheels are rotatably installed on the four corners of the bottom of the threaded shear lifting base;
[0009] A first motor is fixedly installed on the top of the connecting plate, and a second electric telescopic rod is fixedly installed on one side of the connecting plate, the first electric telescopic rod is fixedly sleeved on the output shaft of the first motor, and a connecting plate is fixedly installed on the output shaft of the first electric telescopic rod, and installation boxes are fixedly installed on both sides of the connecting plate, and sliding rods are fixedly installed in the two installation boxes, and sliders are slidably sleeved on the two sliding rods, and sliding holes are opened on the two sliders, and sliding blocks are slidably installed in the two sliding holes, and worm gears are rotatably installed in the two installation boxes, and the second motor is fixedly installed on one side of the two installation boxes, and double-section connecting rods are rotatably installed between the front ends of the two worm gears and the corresponding sliding blocks respectively;
[0010] A worm is fixedly sleeved on the output shafts of the two second motors, and the two worms are respectively meshed with corresponding worm wheels;
[0011] A connecting rod is fixedly installed at the front end of the two sliding blocks, one end of the two connecting rods extends to the outside of the corresponding installation box, and a scraper is fixedly installed at one end of the two connecting rods.
[0012] Preferably, a brake pad is rotatably mounted on any universal wheel.
[0013] By adopting the above technical solution, the brake pads are used to facilitate the braking and fixing of the entire device.
[0014] Preferably, two U-shaped push rods are fixedly mounted on one side of the connecting plate.
[0015] By adopting the above technical solution, the entire Zhuyang Town can be easily pushed through the U-shaped push rod.
[0016] Preferably, the two slide bars are sleeved with return springs, one end of the two return springs is fixed on the corresponding slide bar, and the other end is fixed on the corresponding slide block.
[0017] By adopting the above technical solution, the reset spring facilitates the reset of the slider.
[0018] Preferably, a receiving groove is provided on one side of the connecting plate close to the scraper, a receiving plate is slidably installed in the receiving groove, and the output shaft of the second electric telescopic rod is fixedly connected to the receiving plate.
[0019] By adopting the above technical solution, the receiving plate is driven to move outward by starting the second electric telescopic rod, and the scraped excess filling colloid can be received by the receiving plate for recycling.
[0020] Preferably, a control panel is fixedly mounted on the top of the threaded shear lifting base.
[0021] By adopting the above technical solution, a series of electrical structures can be easily controlled and started through the control panel.
[0022] Preferably, the first motor is a servo motor whose output shaft rotation angle can be adjusted at will.
[0023] Compared with the prior art, the beneficial effects of the utility model are:
[0024] 1. By providing a threaded shear lifting base, a connecting plate, a first motor, and a first electric telescopic rod, the angles and positions of the two scrapers can be adjusted according to the construction joints at different positions of the tunnel, which is easy to adjust and has strong applicability.
[0025] 2. By providing an installation box, a scraper, a second motor, a worm, a worm gear, a double-section connecting rod, a sliding hole, a sliding block, and a connecting rod, the two second motors can be started to drive the two scrapers to move back and forth left and right, so that the excess filling colloid outside the construction joint can be quickly scraped off reciprocally and smoothed.
[0026] 3. By providing a second electric telescopic rod and a receiving plate, the receiving plate is driven to move outward by starting the second electric telescopic rod, and the scraped excess filling colloid can be received by the receiving plate for recycling. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a three-dimensional diagram of the structure of the utility model;
[0028] Figure 2 This is a three-dimensional diagram of the internal structure of two installation boxes of the utility model;
[0029] Figure 3 This is a schematic diagram of the structure of Part A of the utility model;
[0030] Figure 4 This is a top view of the receiving plate of the present invention.
[0031] In the figure: 1. Threaded shear lifting base; 2. Control panel; 3. U-shaped push rod; 4. Second motor; 5. Connecting plate; 6. Second electric telescopic rod; 7. First electric telescopic rod; 8. First motor; 9. Connecting plate; 10. Mounting box; 11. Scraper; 12. Receiving plate; 13. Sliding block; 14. Sliding rod; 15. Connecting rod; 16. Reset spring; 17. Worm; 18. Worm wheel; 19. Double-section connecting rod; 20. Sliding hole; 21. Sliding block. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0033] See also Figure 1-4 The utility model provides a technical solution: a construction joint processing device for tunnel engineering construction, comprising a threaded shear lifting base 1, a connecting plate 5 is hingedly installed on the top of the threaded shear lifting base 1, and universal wheels are rotatably installed at the four corners of the bottom of the threaded shear lifting base 1, and a brake pad is rotatably installed on any universal wheel, two U-shaped push rods 3 are fixedly installed on one side of the connecting plate 5, a first motor 8 is fixedly installed on the top of the connecting plate 5, and a second electric telescopic rod 6 is fixedly installed on one side of the connecting plate 5, a first electric telescopic rod 7 is fixedly sleeved on the output shaft of the first motor 8, a connecting plate 9 is fixedly installed on the output shaft of the first electric telescopic rod 7, and installation boxes 10 are fixedly installed on both sides of the connecting plate 9, sliding rods 14 are fixedly installed in the two installation boxes 10, and sliders 13 are slidably sleeved on the two sliding rods 14, and reset springs 16 are sleeved on the two sliding rods 14, one end of the two reset springs 16 is fixed on the corresponding sliding rod 14, and the other end is fixed on the corresponding slider 13, and sliding holes are opened on the two sliders 13 20, a sliding block 21 is slidably installed in each of the two sliding holes 20, a worm gear 18 is rotatably installed in each of the two installation boxes 10, and a second motor 4 is fixedly installed on one side of each of the two installation boxes 10, and a double-section connecting rod 19 is rotatably installed between the front ends of the two worm gears 18 and the corresponding sliding blocks 21, and a worm 17 is fixedly sleeved on the output shafts of the two second motors 4, and the two worm gears 17 are respectively meshed with the corresponding worm gears 18, and a connecting rod 15 is fixedly installed at the front ends of the two sliders 13, and the two connecting rods 15 One end of each of the two connecting rods 15 extends outside the corresponding installation box 10, and one end of each of the two connecting rods 15 is fixedly installed with a scraper 11. Through the above structure, the positions of the two scrapers 11 are adjusted by the threaded shear lifting base 1, the connecting plate 5, the first motor 8, and the first electric telescopic rod 7, so as to facilitate the treatment of construction joints at different positions, and then the two second motors 4 are started to drive the two scrapers 11 to move back and forth left and right, so that the excess filling colloid outside the construction joint can be quickly scraped off reciprocally for rapid smoothing.
[0034] Combination Figure 1As shown, a receiving groove is provided on one side of the connecting plate 5 close to the scraper 11, and a receiving plate 12 is slidably installed in the receiving groove. The output shaft of the second electric telescopic rod 6 is fixedly connected to the receiving plate 12. Through the above-mentioned structural arrangement, the receiving plate 12 is driven to move outward by starting the second electric telescopic rod 6, and the receiving plate 12 can receive the excess filling colloid scraped off for recycling.
[0035] Combination Figure 1 As shown, a control panel 2 is fixedly installed on the top of the threaded shear lifting base 1. Through the above-mentioned structural setting, the control panel 2 is used to conveniently control a series of electrical structures, which is convenient for operation.
[0036] Combination Figure 1 As shown, the first motor 8 is a servo motor whose output shaft rotation angle can be adjusted at will. Through the above-mentioned structural setting, the angles of the two scrapers 11 can be adjusted by the first motor 8.
[0037] The working principle of the utility model is as follows: first, the device is moved to a suitable position in the tunnel, and then the position to be scraped is determined, and then the angle of the first electric telescopic rod 7 is adjusted by starting the first motor 8, and then the lifting structure of the threaded shear lifting base 1 is started to drive the entire connecting plate 5 to move upward, and then the first electric telescopic rod 7 is started to drive the entire connecting plate 9 and the two scrapers 11 to move upward, so that the two scrapers 11 are close to the construction joint, and then the two second motors 4 are started, and the two second motors 4 drive the rotation of the two worms 17, and the two worms 17 The two worm gears 18 are driven to rotate, and the two worm gears 18 drive the two double-section connecting rods 19 to rotate. The two double-section connecting rods 19 drive the two sliding blocks 21 to slide back and forth in the corresponding sliding holes 20, which can pull the two sliders 13 back and forth to move back and forth, and drive the two scrapers 11 to move back and forth to scrape off the excess filling colloid outside the construction joint. During this period, the receiving plate 12 is driven to move outward by starting the second electric telescopic rod 6, and the excess filling colloid scraped off can be received by the receiving plate 12 for recycling. The utility model has a simple structure and is easy to use. The construction joint processing device for tunnel engineering construction can quickly scrape off the excess colloid filled in the tunnel construction joint on the basis of the existing technology, so as to facilitate the rapid smoothing of the tunnel construction joint and increase the construction efficiency.
[0038] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in the field. Although the embodiments of the utility model have been shown and described, it is understandable to those of ordinary skill in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principle and spirit of the utility model. The scope of the utility model is defined by the attached claims and their equivalents.
Claims
1. A construction joint treatment device for tunnel engineering construction, comprising a threaded shear lifting base (1), characterized in that: A connecting plate (5) is hingedly mounted on the top of the threaded shear force lifting base (1), and universal wheels are rotatably mounted on the four corners of the bottom of the threaded shear force lifting base (1); A first motor (8) is fixedly installed on the top of the connecting plate (5), and a second electric telescopic rod (6) is fixedly installed on one side of the connecting plate (5); a first electric telescopic rod (7) is fixedly sleeved on the output shaft of the first motor (8); a connecting plate (9) is fixedly installed on the output shaft of the first electric telescopic rod (7); installation boxes (10) are fixedly installed on both sides of the connecting plate (9); sliding rods (14) are fixedly installed in the two installation boxes (10); sliding blocks (13) are slidably sleeved on the two sliding rods (14); sliding holes (20) are provided on the two sliding blocks (13); sliding blocks (21) are slidably installed in the two sliding holes (20); worm gears (18) are rotatably installed in the two installation boxes (10); a second motor (4) is fixedly installed on one side of the two installation boxes (10); and double-section connecting rods (19) are rotatably installed between the front ends of the two worm gears (18) and the corresponding sliding blocks (21); A worm (17) is fixedly sleeved on the output shafts of the two second motors (4), and the two worms (17) are respectively meshed with corresponding worm wheels (18); A connecting rod (15) is fixedly mounted at the front end of each of the two sliding blocks (13), one end of each of the two connecting rods (15) extends outside the corresponding installation box (10), and a scraper (11) is fixedly mounted at one end of each of the two connecting rods (15).
2. A construction joint treatment device for tunnel engineering construction according to claim 1, characterized in that: A brake pad is rotatably mounted on any universal wheel.
3. A construction joint treatment device for tunnel engineering construction according to claim 1, characterized in that: Two U-shaped push rods (3) are fixedly mounted on one side of the connection plate (5).
4. A construction joint treatment device for tunnel engineering construction according to claim 1, characterized in that: The two slide bars (14) are sleeved with a return spring (16), one end of the two return springs (16) is fixed on the corresponding slide bar (14), and the other end is fixed on the corresponding slide block (13).
5. A construction joint treatment device for tunnel engineering construction according to claim 1, characterized in that: A receiving groove is provided on one side of the connection plate (5) close to the scraper plate (11), a receiving plate (12) is slidably installed in the receiving groove, and the output shaft of the second electric telescopic rod (6) is fixedly connected to the receiving plate (12).
6. A construction joint treatment device for tunnel engineering construction according to claim 1, characterized in that: A control panel (2) is fixedly mounted on the top of the threaded shear lifting base (1).
7. A construction joint treatment device for tunnel engineering construction according to claim 1, characterized in that: The first motor (8) is a servo motor whose output shaft rotation angle can be adjusted at will.