Tunnel clear water drainage and discharge device

By installing a clean water diversion and discharge device inside the tunnel, and using water pipes and T-junctions to separate clean water and sewage, the problem of increased sewage volume during tunnel excavation was solved, achieving the separation and collection of clean water and sewage, and reducing sewage treatment volume and construction costs.

CN221973593UActive Publication Date: 2024-11-08CHINA RAILWAY ERJU 2ND ENG CO LTD CHENGDU +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323555992.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-11-08
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

During tunnel excavation, groundwater seeps into the tunnel along the joints and fissures of the surrounding rock, resulting in an increase in the amount of wastewater. The wastewater mixed with construction wastewater and tunnel debris forms a large amount of sewage, increasing the amount and cost of treatment.

Method used

Design a tunnel clean water diversion and discharge device. By setting up a first water inlet pipe, a water collection tank, a second water inlet pipe, a clean water ditch and a sewage ditch, clean water and sewage are diverted and collected separately. The first tee and the second tee are connected to the drain hole. Clean water is directly introduced into the water inlet pipe, and sewage flows into the sewage ditch along the slope. Temporary partition walls separate the clean water and sewage to reduce mixing.

Benefits of technology

It achieves the separation and collection of clean water and sewage, reduces the amount of sewage to be treated, and saves construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221973593U_ABST
    Figure CN221973593U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tunnel construction, and provides a tunnel clear water drainage and discharge device, a tunnel sequentially comprises a primary support section, an inverted arch section, a secondary lining section and a hole opening from inside to outside, first water diversion pipes are arranged on the side walls of the two transverse sides of the primary support section, and the first water diversion pipes are connected with a water collection tank; the inverted arch section is provided with a second water guide pipe connected with the water collecting tank, the second lining section is provided with a clean water ditch connected into the second water guide pipe, sewage ditches are formed in the road surfaces of the two transverse sides of the second lining section, temporary partition walls are arranged between the sewage ditches and the clean water ditch, the clean water ditch and the sewage ditches flow out of the hole along the slope, and the first water guide pipe, the second water guide pipe, the clean water ditch and the sewage ditches are longitudinally arranged. Through the arrangement of the first water conduit, the water collecting tank, the second water conduit, the clean water ditch and the sewage ditch, clean water is independently collected from the source, the sewage treatment capacity is reduced, and the construction cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to a tunnel clean water drainage and discharge device. Background Art

[0002] During the tunnel excavation process, groundwater will seep into the tunnel along the joints and cracks of the surrounding rock, forming a good water collection environment in the tunnel. At the same time, the tunnel construction distance is long. Once the groundwater reaches the ground, it will mix with the construction sewage, cave slag, etc. in the tunnel to form a large amount of sewage, causing the amount of sewage to increase. The amount and cost of wastewater treatment also increase accordingly. Therefore, it is particularly important to collect clean water, reduce the amount of sewage discharged and treated, and do a good job of environmental protection during construction. Utility Model Content

[0003] The utility model aims to provide a tunnel clean water drainage and discharge device to solve the above technical problems, reduce the amount of sewage treatment and save construction costs.

[0004] The embodiment of the utility model is realized through the following technical scheme: a tunnel clean water drainage and discharge device, the tunnel comprises an initial branch section, an inverted arch section, a second lining section and a cave entrance in sequence from the inside to the outside, a first water diversion pipe is provided on the side walls on both sides of the initial branch section, the first water diversion pipe is connected to a water collecting tank, the inverted arch section is provided with a second water diversion pipe connected to the water collecting tank, the second lining section is provided with a clean water ditch connected to the second water diversion pipe, sewage ditches are opened on the road surface on both sides of the second lining section, a temporary partition wall is provided between the sewage ditch and the clean water ditch, the clean water ditch and the sewage ditch both flow down the slope to the outside of the cave entrance, and the first water diversion pipe, the second water diversion pipe, the clean water ditch and the sewage ditch are all arranged longitudinally.

[0005] Furthermore, a first tee is provided on the first water diversion pipe, and the middle interface of the first tee is connected to the first drainage hole opened on the side wall of the initial branch section through a hose, or the first tee is connected to a drainage board for intercepting and collecting water seeping from the inner wall of the initial branch section, one end of the drainage board is in contact with the inner wall of the initial branch section, and the other end is connected to the middle interface of the first tee.

[0006] Furthermore, a second tee is provided on the second water diversion pipe, and a middle interface of the second tee is connected to a second drainage hole opened on the side wall of the inverted arch section through a hose.

[0007] Furthermore, a temporary plug is provided at one end of the clear water ditch close to the second water diversion pipe.

[0008] Furthermore, a plurality of fixed shafts are extended inwardly from the inner walls of the primary branch section and the inverted arch section, and the first water diversion pipe and the second water diversion pipe are both placed and fixed on the fixed shafts.

[0009] Furthermore, the water collecting trough can be movably arranged at one end of the primary support section close to the invert section.

[0010] Furthermore, the clear water ditch is surrounded by a temporary partition wall and the inner wall of the second lining section.

[0011] Furthermore, the temporary partition wall is a reinforced concrete structure, and the top of the temporary partition wall is flush with the road surface of the second lining section.

[0012] Furthermore, temporary trenches connected to the sewage ditch are opened on the road surface of the primary support section and the invert arch section.

[0013] The utility model has at least the following advantages and beneficial effects: through the arrangement of the first water diversion pipe, the water collecting box, the second water diversion pipe, the clean water ditch and the sewage ditch, the clean water is collected separately from the source, the sewage treatment volume is reduced, and the construction cost is saved. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 A plan view of a tunnel clean water drainage and discharge device provided by the utility model;

[0016] Figure 2 For this utility model Figure 1 The cross-section of the initial branch segment at the middle AA;

[0017] Figure 3 For this utility model Figure 1 The cross-section of the inverted arch section is shown at the middle BB;

[0018] Figure 4 For this utility model Figure 1 The cross-section of the second lining section is at CC in the middle;

[0019] Icons: 10-mast face, 11-primary support section, 110-first drain hole, 12-invert arch section, 120-second drain hole, 13-second lining section, 14-tunnel entrance, 2-first water diversion pipe, 21-first tee, 22-drainage board, 3-collecting tank, 4-second water diversion pipe, 41-second tee, 51-clean water ditch, 511-temporary plugging, 52-sewage ditch, 53-temporary partition wall, 6-fixed axis, 7-temporary trench. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0021] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] Embodiment 1

[0023] like Figure 1-4 As shown, in this embodiment, a tunnel clean water drainage and discharge device is mainly disclosed, which realizes that clean water and sewage are drained and collected separately during tunnel excavation. Usually, the tunnel includes a heading face 10, an initial branch section 11, an inverted arch section 12, a secondary lining section 13 and a cave entrance 14 from the inside to the outside. A first water diversion pipe 2 is provided on both lateral side walls of the initial branch section 11, and the first water diversion pipe 2 is connected to a water collecting tank 3. The inverted arch section 12 is provided with a second water diversion pipe 4 connected to the water collecting tank 3. The secondary lining section 13 is provided with a clean water ditch 51 connected to the second water diversion pipe 4. Sewage ditches 52 are opened on the road surface on both lateral sides of the secondary lining section 13. A temporary partition wall 53 is provided between the sewage ditch 52 and the clean water ditch 51. The temporary partition wall 53 can effectively separate clean water and sewage, avoid the pollution of clean water by sewage, and keep the drainage system clean. The ditches 52 all flow down the slope to the outside of the tunnel entrance 14. The first water diversion pipe 2, the second water diversion pipe 4, the clean water ditch 51 and the sewage ditch 52 are all arranged longitudinally. It should be noted that the seepage water from the tunnel face 10 to the invert arch section 12 is clean water, which can be directly drained and discharged into the local water system, reducing the generation of sewage from the source and avoiding the mixing of clean water and sewage into the sewage treatment plant. Considering the explosion range of the tunnel face 10, it is determined that the clean water of the primary branch section 11 is collected within a range of 40m behind the tunnel face 10. The first water diversion pipe 2 and the second water diversion pipe 4 are both arranged on the inner wall of the tunnel, so that the clean water can be directly introduced into the first water diversion pipe 2 and the second water diversion pipe 4 along the inner wall of the tunnel without falling to the ground, while the sewage is retained along the slope of the tunnel pavement and collected into the sewage ditch 52, realizing the separate drainage of clean water and sewage, reducing the amount of sewage treatment and saving construction costs.

[0024] Furthermore, in the specific implementation, Figure 1 , Figure 2As shown, the first water diversion pipe 2 provided in the embodiment of the utility model is provided with a first tee 21, and the middle interface of the first tee 21 is connected with the first drainage hole 110 opened on the side wall of the primary branch section 11 through a hose. It should be noted that when streams of water appear in the primary branch section 11, a plurality of first drainage holes 110 are opened on the side wall of the primary branch section 11, and a hose with a diameter of 50 mm is inserted into the first drainage hole 110 and connected to the middle interface of the first tee 21, so that the streams of water are introduced into the first water diversion pipe 2 with a diameter of 200 mm 3 m away from the road surface. The first water diversion pipe 2 can adopt a PVC pipe, and then the water is collected in the water collecting tank 3.

[0025] like Figure 1 , Figure 3 As shown, the second water diversion pipe 4 is provided with a second tee 41, and the middle interface of the second tee 41 is connected with the second drainage hole 120 opened on the side wall of the inverted arch section 12 through a hose. It should be noted that, considering that the second lining trolley occupies the ditch space, the inverted arch section 12 does not have the conditions for setting up a temporary partition wall 53, so a plurality of second drainage holes 120 are drilled at intervals of 3m on the inner wall of the inverted arch section 12, and the water in the second drainage holes 120 is introduced into the second water diversion pipe 4 with a diameter of 100 from the middle interface of the second tee 41 through a hose, and flows down the slope to the clean water ditch 51 together with the clean water in the water collecting tank 3.

[0026] Furthermore, in the specific implementation, Figure 1 As shown, the above-mentioned clear water ditch 51 provided in the embodiment of the utility model is provided with a temporary plugging 511 near one end of the second water diversion pipe 4, which can be blocked or released as needed to flexibly control the discharge of clear water.

[0027] Furthermore, in the specific implementation, Figure 1-3 As shown, a plurality of fixed shafts 6 are extended inwardly from the inner walls of the initial branch section 11 and the inverted arch section 12 provided in the embodiment of the utility model, and the first water diversion pipe 2 and the second water diversion pipe 4 are placed and fixed on the fixed shafts 6. Specifically, the first water diversion pipe 2 and the second water diversion pipe 4 can be wound and fixed on the spaced fixed shafts 6 by iron wire to enhance the stability of the drainage system.

[0028] Furthermore, in the specific implementation, Figure 1 As shown, the water collecting trough provided in the embodiment of the utility model can be movably arranged at one end of the primary branch section 11 close to the invert arch section 12, and the water collecting trough can move forward as the tunnel drilling process advances, which is convenient and quick.

[0029] Furthermore, in the specific implementation, Figure 1 , Figure 4As shown, the above-mentioned clean water ditch 51 provided in the embodiment of the utility model is formed by a temporary partition wall 53 and the inner wall of the second lining section 13. The temporary partition wall 53 is a reinforced concrete structure, and the top of the temporary partition wall 53 is flush with the road surface of the second lining section 13. Specifically, the temporary partition wall 53 is 10 cm thick and is filled to the same height as the road surface of the second lining section 13, separating the clean water ditch 51 and the sewage ditch 52. The clean water ditch 51 is close to the inner wall, and the sewage ditch 52 is close to the road surface. The sewage on the road surface flows into the sewage ditches 52 on both sides through the cross slope.

[0030] Furthermore, in the specific implementation, temporary grooves 7 connected to the sewage ditch 52 are opened on the road surfaces of the above-mentioned primary branch section 11 and the invert arch section 12 provided in the embodiment of the utility model, so that the sewage of the primary branch section 11 and the invert arch section 12 can be led down the slope into the sewage ditch 52 of the secondary lining section 13.

[0031] Embodiment 2

[0032] like Figure 2 As shown, in this embodiment, the main structure is exactly the same as that of the first embodiment, and the difference is that the first tee 21 is connected to a drainage board 22 for intercepting and collecting water seepage from the inner wall of the primary branch section 11. One end of the drainage board 22 is in contact with the inner wall of the primary branch section 11, and the other end is connected to the middle interface of the first tee 21. The drainage board 22 can be funnel-shaped, which intercepts and collects scattered seepage water and introduces it into the first water diversion pipe 2 through the middle interface of the first tee 21, thereby improving the drainage efficiency.

[0033] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A tunnel clean water drainage and discharge device, the tunnel comprising, from inside to outside, a primary branch section (11), an invert section (12), a secondary lining section (13) and a tunnel opening (14), It is characterized in that The first branch section (11) is provided with a first water diversion pipe (2) on both lateral side walls, the first water diversion pipe (2) is connected to a water collecting box (3), the inverted arch section (12) is provided with a second water diversion pipe (4) connected to the water collecting box (3), the second lining section (13) is provided with a clean water ditch (51) connected to the second water diversion pipe (4), the second lining section (13) is provided with a sewage ditch (52) on both lateral side roads of the second lining section (13), a temporary partition wall (53) is provided between the sewage ditch (52) and the clean water ditch (51), the clean water ditch (51) and the sewage ditch (52) both flow along the slope to the outside of the cave entrance (14), and the first water diversion pipe (2), the second water diversion pipe (4), the clean water ditch (51) and the sewage ditch (52) are all arranged longitudinally.

2. A tunnel clean water drainage and discharge device as claimed in claim 1, It is characterized in that The first water diversion pipe (2) is provided with a first tee (21), and the middle interface of the first tee (21) is connected to a first drain hole (110) provided on the side wall of the primary branch section (11) through a hose; Alternatively, the first tee (21) is connected to a drainage plate (22) for intercepting and collecting water seeping from the inner wall of the primary branch section (11); one end of the drainage plate (22) is in contact with the inner wall of the primary branch section (11), and the other end is connected to the middle interface of the first tee (21).

3. A tunnel clean water drainage and discharge device as claimed in claim 1, It is characterized in that The second water diversion pipe (4) is provided with a second tee (41), and the middle interface of the second tee (41) is connected to a second drainage hole (120) provided on the side wall of the inverted arch section (12) through a hose.

4. A tunnel clean water drainage and discharge device as claimed in claim 1, It is characterized in that The clear water ditch (51) is provided with a temporary plug (511) at one end close to the second water diversion pipe (4).

5. A tunnel clean water drainage and discharge device as claimed in claim 1, It is characterized in that A plurality of fixed shafts (6) are extended inwardly from the inner walls of the primary branch section (11) and the inverted arch section (12), and the first water diversion pipe (2) and the second water diversion pipe (4) are both placed and fixed on the fixed shafts (6).

6. A tunnel clean water drainage and discharge device as claimed in claim 1, It is characterized in that The water collecting trough is movably arranged at one end of the primary branch section (11) close to the inverted arch section (12).

7. A tunnel clean water drainage and discharge device as claimed in claim 1, It is characterized in that The clear water ditch (51) is formed by the temporary partition wall (53) and the inner wall of the second lining section (13).

8. A tunnel clean water drainage and discharge device as claimed in claim 1, It is characterized in that The temporary partition wall (53) is a reinforced concrete structure, and the top of the temporary partition wall (53) is flush with the road surface of the second lining section (13).

9. A tunnel clean water drainage and discharge device as claimed in claim 1, It is characterized in that The road surfaces of the primary support section (11) and the inverted arch section (12) are provided with temporary grooves (7) connected to the sewage ditch (52).