System for reducing first-time gas injection temperature rise of artificial chamber gas storage
By filling the gas storage in the artificial chamber with water first, and then injecting air with the compressor system to keep the air pressure and temperature constant, the problem of temperature rise during the first injection process is solved and the stability of the gas storage is improved and gas storage capacity and reduce electricity bill costs.
Patent Information
- Application Number
- CN202420612313.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-03-27
AI Technical Summary
During the first gas injection process of the artificial chamber gas storage, the air temperature rises greatly, resulting in thermal expansion and uneven temperature distribution of the steel plate seal layer affecting the stability and sealing of the gas storage, and reducing the effective gas storage capacity, and the gas injection time is long. High power.
Using a solution including a compressed gas injection system and a water injection system, the chamber is filled with water before the first gas injection, and then the air is pressed into the chamber through the compressor system. The water is squeezed out to keep the air pressure and temperature basically constant. The turbine recycles energy and reduces electricity bills.
It reduces the air temperature rise in the chamber, improves structural stability and sealing, increases effective gas storage capacity, simplifies the gas injection process, and reduces the electricity cost.
Smart Images

Figure CN221973597U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to an artificial cavern gas storage reservoir of a compressed air energy storage power station and a first gas injection scheme, more specifically a system for reducing the temperature rise of the artificial cavern gas storage reservoir during the first injection. Background Art
[0002] Against the background of the increasing proportion of renewable energy power generation, the trough difference of power generation at the grid end also increases. In order to absorb the unstable output of renewable energy, energy storage can play a key role. Among the existing energy storage technologies, compressed air energy storage has the advantages of large single-machine power, high energy storage efficiency, environmental friendliness, short construction period, and flexible site selection. It is a new type of energy storage with good development prospects. Compressed air energy storage power stations need to use large gas storage facilities to store high-pressure air. Large compressed air energy storage power stations of 100MW and above usually use salt caverns or artificial chambers as gas storage facilities. Among them, the newly excavated hard rock artificial chamber gas storage facilities do not rely on salt cavern resources, making the site selection range of the power station more flexible.
[0003] In order to reduce the volume of the excavated chamber and the construction cost of the chamber, the air storage pressure of the artificial chamber gas storage is relatively high, and the minimum storage pressure is generally higher than 10MPa. After the artificial chamber gas storage is built, during the first gas injection process, the air pressure in the chamber is gradually increased from atmospheric pressure to above 10MPa, and the air temperature rises greatly. In addition, the heat dissipation capacity of the artificial chamber gas storage is limited, and the heat in the chamber is difficult to conduct to the surrounding environment. According to theoretical calculations, the artificial chamber gas storage is injected from the ambient atmospheric pressure to 10MPa for the first time. During the process of a, the temperature rise of the air in the chamber will exceed 140℃. The huge temperature rise will cause a large thermal expansion of the steel plate sealing layer of the chamber, and the uneven temperature distribution in the chamber will cause thermal expansion differences in steel plate sealing layers at different heights, seriously affecting the stability and sealing of the gas storage. At the same time, the higher temperature rise will also reduce the effective gas storage capacity of the chamber. In addition, the first gas injection process of the gas storage uses a compressor for gas injection, which has a large gas injection volume, a long gas injection time, and a large power consumption, which will result in a higher electricity cost for the first gas injection.
[0004] Therefore, in order to solve the technical problems that the high temperature rise of air during the first gas injection process of the existing artificial chamber gas storage affects the sealing and stability of the chamber, and the high temperature rise leads to a reduction in the effective gas storage capacity of the artificial chamber, it is necessary to develop a system to reduce the temperature rise of the first injection of artificial chamber gas storage. Utility Model Content
[0005] The purpose of the utility model is to overcome the shortcomings of the above-mentioned background technology and to provide a system for reducing the temperature rise of the first injection of an artificial cavern gas storage.
[0006] In order to achieve the above-mentioned purpose, the technical solution of the utility model is: a system for reducing the temperature rise of the first injection of an artificial cavern gas storage reservoir, characterized in that it includes an artificial cavern gas storage reservoir, a compressed gas injection system and a water injection system;
[0007] The compressed gas injection system comprises a motor, a compressor, a compressed gas injection pipeline and a compressed gas exhaust pipeline;
[0008] The motor is connected to the compressor; one end of the compressed air injection pipeline is connected to the compressor, and the other end is provided with a heat exchanger and a compressed air injection shut-off valve in sequence, connected to the compressed air exhaust pipeline and then extended into the artificial chamber gas storage reservoir; a water injection and exhaust valve is provided on the compressed air exhaust pipeline;
[0009] The water injection system includes a water source, a first injection and drainage pipeline, and a second injection and drainage pipeline; one end of the first injection and drainage pipeline is connected to the water source, and the other end is connected to the water pump device and the injection and drainage shut-off valve in sequence, and then extends into the bottom of the artificial chamber gas storage reservoir through the second injection and drainage pipeline;
[0010] The first injection and drainage pipeline, water pump device and injection and drainage shut-off valve are all detachably installed outside the artificial chamber gas storage reservoir; the second injection and drainage pipeline is located inside the artificial chamber gas storage reservoir.
[0011] In the above technical solution, the water pump device is a water pump turbine, and the water pump turbine is connected to the electric generator.
[0012] In the above technical solution, the water injection system also includes a turbine and a generator;
[0013] The water pump device is a water injection pump, the first injection and drainage pipeline includes a water injection pipeline and a drainage pipeline, and the injection and drainage shut-off valve includes a water injection shut-off valve and a drainage shut-off valve;
[0014] One end of the water injection pipeline is connected to the water source, and the other end is connected to the water injection pump and the water injection shut-off valve in sequence, and then extends into the bottom of the artificial chamber gas storage reservoir through the second injection and drainage pipeline;
[0015] One end of the drainage pipeline is connected to the water source, and the other end is connected to the turbine and the drainage shut-off valve in sequence, and then extends into the bottom of the artificial cavern gas storage reservoir through the second drainage pipeline.
[0016] In the above technical solution, a gas injection port is provided at the top of the artificial cavern gas storage reservoir, and a water collection pit is provided at the bottom of the artificial cavern gas storage reservoir;
[0017] The second injection and drainage pipeline extends into the sump through the gas injection port;
[0018] The compressed gas injection pipeline extends into the gas injection port.
[0019] In the above technical solution, the water source is a reservoir, a river or other water sources.
[0020] Compared with the prior art, the utility model has the following advantages:
[0021] 1) The utility model fills the interior of the cavern with water before the first gas injection into the gas storage reservoir, and injects compressed air into the artificial cavern gas storage reservoir through the compressor system of the compressed air energy storage power station. The water in the artificial cavern gas storage reservoir is squeezed out by the compressed air; during the entire gas injection process, the air pressure in the artificial cavern gas storage reservoir remains basically constant, so the air in the cavern will basically not produce temperature rise, thereby reducing the thermal expansion effect on the steel plate sealing layer of the artificial cavern, and improving the structural stability and sealing of the cavern.
[0022] 2) The utility model injects water into the cavity of the artificial chamber gas storage reservoir so that the pressure and temperature of the air in the artificial chamber are kept basically constant during the first gas injection process, thereby reducing the impact on the structural stability and sealing of the chamber; in addition, the basically constant air temperature of the gas storage reservoir can also improve the effective volume utilization rate of the gas storage reservoir, increase the gas storage capacity of the gas storage reservoir, reduce the volume of the gas storage reservoir, and save the construction cost of the gas storage reservoir.
[0023] 3) During the first gas injection process of the utility model, the air pressure at the compressor outlet remains basically constant. The exhaust pressure of the compressor of the traditional first gas injection scheme gradually increases with the increase of the air pressure in the cavern chamber, and the range of variation is large. The compressor needs to be adjusted in real time during the entire gas injection process, and the operation and regulation are complicated. In comparison, the operation of the compressed gas injection system of the utility model is simpler.
[0024] 4) The solution of the utility model can recover part of the energy in the gas injection process by adding a turbine or a pump turbine, thereby reducing the electricity cost of the gas injection process. According to theoretical calculations, the gas injection power consumption can be reduced by more than 15% compared with the case without a recovery system after adopting the utility model.
[0025] 5) The utility model only requires the additional installation of a water injection system and related power generation equipment on the basis of newly built above-ground and underground projects of compressed air energy storage power stations, wherein the turbine or water pump turbine, generator or electric generator, and water injection pump are provided as a complete set and are detachable, and can be temporarily leased or permanently purchased. It can be put into operation after the first gas injection and each overhaul of the artificial cavern gas storage reservoir, and can be used in other similar projects to earn rental fees, which is conducive to recovering investment costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the structure of Example 1 of the utility model.
[0027] Figure 2 This is a schematic diagram of the structure of Example 2 of the utility model.
[0028] Among them, 1-artificial chamber gas storage reservoir, 11-gas injection port, 12-water collection pit, 2-compressed gas injection system, 21-motor, 22-compressor, 23-compressed gas injection pipeline, 24-compressed exhaust pipeline, 25-heat exchanger, 26-compressed gas injection shut-off valve, 27-water injection exhaust valve, 3-water injection system, 31-water source, 32-first injection and drainage pipeline, 321-water injection pipeline, 322-drainage pipeline, 33-second injection and drainage pipeline, 34-water pump device, 341-water pump turbine, 342-water injection pump, 35-injection and drainage shut-off valve, 351-water injection shut-off valve, 352-drainage shut-off valve, 36-electric generator, 37-turbine, 38-generator. DETAILED DESCRIPTION
[0029] The following is a detailed description of the implementation of the utility model in conjunction with the accompanying drawings, but they do not constitute a limitation of the utility model and are only used as examples. At the same time, the advantages of the utility model will become clearer and easier to understand through the description.
[0030] Referring to the attached drawings, it can be seen that: a system for reducing the temperature rise of the first injection of an artificial cavern gas storage reservoir is characterized in that it includes an artificial cavern gas storage reservoir 1, a compressed gas injection system 2 and a water injection system 3;
[0031] The compressed air injection system 2 includes a motor 21, a compressor 22, a compressed air injection pipeline 23 and a compressed exhaust pipeline 24; the compressor system of the compressed air energy storage power station is the compressed air injection system 2;
[0032] The motor 21 is connected to the compressor 22; one end of the compressed gas injection pipeline 23 is connected to the compressor 22, and the other end is provided with a heat exchanger 25 and a compressed gas injection shut-off valve 26 in sequence, connected to the compressed gas exhaust pipeline 24 and then extends into the artificial chamber gas storage reservoir 1; the compressed gas exhaust pipeline 24 is provided with a water injection and exhaust valve 27;
[0033] The water injection system 3 includes a water source 31, a first injection and drainage pipeline 32 and a second injection and drainage pipeline 33; one end of the first injection and drainage pipeline 32 is connected to the water source 31, and the other end is connected to a water pump device 34 and an injection and drainage shut-off valve 35 in sequence, and then extends into the bottom of the artificial chamber gas storage reservoir 1 through the second injection and drainage pipeline 33;
[0034] The first injection and drainage pipeline 32, the water pump device 34 and the injection and drainage shut-off valve 35 can all be detachably installed outside the artificial chamber gas storage reservoir 1. The first injection and drainage pipeline 32, the water pump device 34 and the injection and drainage shut-off valve 35 are all temporary measures and are arranged on the ground in a container-like manner; the second injection and drainage pipeline 33 is located inside the artificial chamber gas storage reservoir 1.
[0035] The water pump device 34 is a water pump turbine 341, which is connected to the electric generator 36; the utility model actively injects water into the artificial cavern gas storage reservoir 1, which solves the problem of excessive temperature rise of the artificial cavern gas storage reservoir 1, and also uses the water pump turbine 341 to recover part of the energy.
[0036] The water injection system 3 also includes a turbine 37 and a generator 38;
[0037] The water pump device 34 is a water injection pump 342 , the first injection and drainage pipeline 32 includes a water injection pipeline 321 and a drainage pipeline 322 , and the injection and drainage shut-off valve 35 includes a water injection shut-off valve 351 and a drainage shut-off valve 352 ;
[0038] One end of the water injection pipeline 321 is connected to the water source 31, and the other end is connected to the water injection pump 342 and the water injection shut-off valve 351 in sequence, and then extends into the bottom of the artificial cavern gas storage reservoir 1 through the second injection and drainage pipeline 33;
[0039] One end of the drainage pipeline 322 is connected to the water source 31, and the other end is connected to the turbine 37 and the drainage shut-off valve 352 in sequence, and then extends into the bottom of the artificial cavern gas storage reservoir 1 through the second drainage pipeline 33; the utility model actively injects water into the artificial cavern gas storage reservoir 1, thereby solving the problem of excessive temperature rise of the artificial cavern gas storage reservoir 1, and also uses the turbine 37 to recover part of the energy.
[0040] The top of the artificial chamber gas storage reservoir 1 is provided with a gas injection port 11, and the bottom of the artificial chamber gas storage reservoir 1 is provided with a water collection pit 12;
[0041] The second injection and drainage pipeline 33 extends into the sump 12 through the gas injection port 11;
[0042] The compressed gas injection pipeline 23 extends into the gas injection port 11 .
[0043] The water source 31 is a reservoir, a river or other water sources.
[0044] An operating method of a system for reducing the temperature rise of the first injection of an artificial cavern gas storage reservoir, characterized in that it comprises the following steps:
[0045] Step 1: After the artificial cavern gas storage reservoir 1 meets the gas injection conditions, water is first injected, the compressed gas injection shut-off valve 26 is closed, the injection and drainage shut-off valve 35 and the water injection and exhaust valve 27 are opened, the water pump turbine 341 is started, and the water in the water source 31 is injected into the artificial cavern gas storage reservoir 1 through the first injection and drainage pipeline 32 and the second injection and drainage pipeline 33 in sequence. After the water level of the artificial cavern gas storage reservoir 1 reaches above the gas injection port 11, the water pump turbine 341 is stopped, the injection and drainage shut-off valve 35 and the water injection and exhaust valve 27 are closed, and the water injection process of the artificial cavern gas storage reservoir 1 is completed;
[0046] Step 2: Open the compressed gas injection shut-off valve 26, start the compressed gas injection system 2, and drive the compressor 22 with the motor 21 to compress the air. The outlet air of the compressor 22 is cooled by the heat exchanger 25 and then injected into the compressed gas injection pipeline 23 to increase the pressure.
[0047] Step 3: When the air pressure in the compressed gas injection pipeline 23 reaches the rated pressure, the injection and drainage shut-off valve 35 is opened, and at the same time, the motor 21 drives the compressor 22 to continuously operate the gas injection, and the water in the artificial chamber gas storage reservoir 1 enters the water pump turbine 341 through the second injection and drainage pipeline 33 and the first injection and drainage pipeline 32 in sequence, and the water flow drives the water pump turbine 341 to drive the electric generator 36 to generate electricity, and the drainage of the water pump turbine 341 returns to the water source 31 through the first injection and drainage pipeline 32;
[0048] Step 4: After all the water in the artificial cavern gas storage reservoir 1 is discharged, stop the compressor 22 and the water pump turbine 341, close the compressed gas injection shut-off valve 26 and the injection and drainage shut-off valve 35, and complete the first gas injection of the artificial cavern gas storage reservoir 1.
[0049] An operating method of a system for reducing the temperature rise of the first injection of an artificial cavern gas storage reservoir, characterized in that it comprises the following steps:
[0050] Step 1: After the artificial cavern gas storage reservoir 1 meets the gas injection conditions, water is first injected, the compressed gas injection shut-off valve 26 and the drainage shut-off valve 352 are closed, the water injection shut-off valve 351 and the water injection exhaust valve 27 are opened, and the water injection pump 342 is started to inject water from the water source 31 into the artificial cavern gas storage reservoir 1 through the water injection pipeline 321 and the second injection and drainage pipeline 33 in sequence. After the water level of the artificial cavern gas storage reservoir 1 reaches above the gas injection port 11, the water injection pump 342 is stopped, the water injection shut-off valve 351 and the water injection exhaust valve 27 are closed, and the water injection process of the artificial cavern gas storage reservoir 1 is completed;
[0051] Step 2: Open the compressed gas injection shut-off valve 26, start the compressed gas injection system 2, and drive the compressor 22 with the motor 21 to compress the air. The outlet air of the compressor 22 is cooled by the heat exchanger 25 and then injected into the compressed gas injection pipeline 23 to increase the pressure.
[0052] Step 3: When the air pressure in the compressed gas injection pipeline 23 reaches the rated pressure, the drainage shut-off valve 352 is opened, and at the same time, the motor 21 drives the compressor 22 to continuously operate the gas injection, and the water in the artificial chamber gas storage reservoir 1 enters the turbine 37 through the second injection and drainage pipeline 33 and the drainage pipeline 322 in sequence, and the water flow drives the turbine 37 to drive the generator 38 to generate electricity, and the drainage of the turbine 37 returns to the water source 31 through the drainage pipeline 322;
[0053] Step 4: After all the water in the artificial cavern gas storage reservoir 1 is discharged, stop the compressor 22 and the turbine 37, close the compressed gas injection shut-off valve 26 and the drainage shut-off valve 352, and complete the first gas injection of the artificial cavern gas storage reservoir 1.
[0054] Example 1
[0055] like Figure 1 As shown, a system for reducing the temperature rise of the first injection of an artificial cavern gas storage reservoir in this embodiment includes an artificial cavern gas storage reservoir 1, a compressed gas injection system 2 and a water injection system 3; the compressed gas injection system 2 includes a motor 21, a compressor 22, a compressed gas injection pipeline 23 and a compressed exhaust pipeline 24; the motor 21 is connected to the compressor 22; one end of the compressed gas injection pipeline 23 is connected to the compressor 22, and the other end is sequentially provided with a heat exchanger 25 and a compressed gas injection shut-off valve 26, which is connected to the compressed exhaust pipeline 24 and then extends into the artificial cavern. In the gas storage reservoir 1; a water injection and exhaust valve 27 is arranged on the compression and exhaust pipeline 24; the water injection system 3 includes a water source 31, a first injection and drainage pipeline 32 and a second injection and drainage pipeline 33; one end of the first injection and drainage pipeline 32 is connected to the water source 31, and the other end is connected to the water pump device 34 and the injection and drainage shut-off valve 35 in sequence, and then extends into the bottom of the artificial cavern gas storage reservoir 1 through the second injection and drainage pipeline 33; the first injection and drainage pipeline 32, the water pump device 34 and the injection and drainage shut-off valve 35 can be detachably installed outside the artificial cavern gas storage reservoir 1. The water pump device 34 is a water pump turbine 341, and the water pump turbine 341 is connected to the electric generator 36.
[0056] The water pump device 34 of this embodiment adopts a water pump turbine 341, which can be used as a water pump to inject water into the artificial chamber gas storage reservoir 1, and can also be used as a turbine to generate electricity; the electric generator 36 can be used as an electric motor to drive the water pump turbine 341 to inject water, and can also be used as a generator driven by the water pump turbine 341 to generate electricity. The system is highly integrated.
[0057] Example 2
[0058] like Figure 2 As shown, the difference between this embodiment and embodiment 1 is that the water injection system 3 also includes a turbine 37 and a generator 38; the water pump device 34 is a water injection pump 342, the first injection and drainage pipeline 32 includes a water injection pipeline 321 and a drainage pipeline 322, and the injection and drainage shut-off valve 35 includes a water injection shut-off valve 351 and a drainage shut-off valve 352; one end of the water injection pipeline 321 is connected to the water source 31, and the other end is connected to the water injection pump 342 and the water injection shut-off valve 351 in sequence, and then extends into the bottom of the artificial cavern gas storage reservoir 1 through the second injection and drainage pipeline 33; one end of the drainage pipeline 322 is connected to the water source 31, and the other end is connected to the turbine 37 and the drainage shut-off valve 352 in sequence, and then extends into the bottom of the artificial cavern gas storage reservoir 1 through the second injection and drainage pipeline 33.
[0059] Other parts not described belong to the prior art.
Claims
1. A system for reducing the temperature rise of the first injection of an artificial chamber gas storage, characterized in that: It comprises an artificial chamber gas storage reservoir (1), a compressed gas injection system (2) and a water injection system (3); The compressed gas injection system (2) comprises an electric motor (21), a compressor (22), a compressed gas injection pipeline (23) and a compressed gas exhaust pipeline (24); The motor (21) is connected to the compressor (22); one end of the compressed gas injection pipeline (23) is connected to the compressor (22), and the other end is provided with a heat exchanger (25) and a compressed gas injection shut-off valve (26) in sequence, connected to the compressed gas exhaust pipeline (24), and then extends into the artificial chamber gas storage reservoir (1); the compressed gas exhaust pipeline (24) is provided with a water injection and exhaust valve (27); The water injection system (3) comprises a water source (31), a first injection and drainage pipeline (32) and a second injection and drainage pipeline (33); one end of the first injection and drainage pipeline (32) is connected to the water source (31), and the other end is connected to a water pump device (34) and an injection and drainage shut-off valve (35) in sequence, and then extends into the bottom of the artificial chamber gas storage reservoir (1) through the second injection and drainage pipeline (33); The first injection and drainage pipeline (32), the water pump device (34) and the injection and drainage shut-off valve (35) are all detachably installed outside the artificial chamber gas storage reservoir (1); and the second injection and drainage pipeline (33) is located inside the artificial chamber gas storage reservoir (1).
2. A system for reducing the temperature rise of the first injection of an artificial chamber gas storage according to claim 1, characterized in that: The water pump device (34) is a water pump turbine (341), and the water pump turbine (341) is connected to the electric generator (36).
3. A system for reducing the temperature rise of the first injection of an artificial chamber gas storage according to claim 1, characterized in that: The water injection system (3) further comprises a water turbine (37) and a generator (38); The water pump device (34) is a water injection pump (342), the first injection and drainage pipeline (32) comprises a water injection pipeline (321) and a drainage pipeline (322), and the injection and drainage shut-off valve (35) comprises a water injection shut-off valve (351) and a drainage shut-off valve (352); One end of the water injection pipeline (321) is connected to the water source (31), and the other end is connected to the water injection pump (342) and the water injection shut-off valve (351) in sequence, and then extends into the bottom of the artificial chamber gas storage reservoir (1) through the second injection and drainage pipeline (33); One end of the drainage pipeline (322) is connected to the water source (31), and the other end is connected to the turbine (37) and the drainage shut-off valve (352) in sequence, and then extends into the bottom of the artificial cavern gas storage reservoir (1) through the second injection and drainage pipeline (33).
4. A system for reducing the temperature rise of the first injection of an artificial cavern gas storage according to claim 2 or 3, characterized in that: The top of the artificial chamber gas storage reservoir (1) is provided with a gas injection port (11), and the bottom of the artificial chamber gas storage reservoir (1) is provided with a water collection pit (12); The second injection and drainage pipeline (33) extends into the sump (12) through the gas injection port (11); The compressed gas injection pipeline (23) extends into the gas injection port (11).
5. A system for reducing the temperature rise of the first injection of an artificial cavern gas storage according to claim 1, characterized in that: The water source (31) is a reservoir, a river or other water sources.
Citation Information
Cited By
System for reducing first-time gas injection temperature rise of artificial chamber gas storage and operation method
CN118242140A
Compressed air energy storage power station artificial chamber first-time air injection temperature control method
CN120386405A