Bridge mounting and reinforcing device
By installing reinforcement devices on the bridge and reinforcing the bridge with mounting frames and reinforcement components, the problem of difficulty in pouring concrete under environmental limitations is solved, and the convenient reinforcement and simplicity of the bridge is achieved.
Patent Information
- Application Number
- CN202323434141.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-16
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-16
AI Technical Summary
Due to environmental limitations, it is difficult to pour concrete into the special construction environment of the bridge for reinforcement, resulting in limited bridge reinforcement work.
A bridge installation and reinforcement device is designed, including bridge pier and bridge body. The bridge pier is equipped with a mounting frame and reinforcement assembly. The reinforcement assembly is fixed through the mounting frame, and the bridge is reinforced by using reinforcement plates and support plates to avoid the step of pouring concrete. .
The convenience and simplicity of bridge reinforcement are achieved, and the bridge body is not required to be poured, which can effectively support and reinforce the bridge body, simplifying the reinforcement process.
Smart Images

Figure CN221989130U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge reinforcement, in particular to a bridge installation reinforcement device. Background Art
[0002] Bridges generally refer to structures built across rivers, lakes, and seas to allow vehicles and pedestrians to pass smoothly. In order to adapt to the modern high-speed development of the transportation industry, bridges are also extended to buildings that cross mountain streams, poor geology, or meet other transportation needs to make passage more convenient; bridges are affected by heavy traffic and natural disasters and other emergencies during long-term use, which will greatly reduce the service life of the bridge; therefore, bridges need to be repaired, reinforced, and renovated;
[0003] The existing bridge reinforcement method is to plant reinforcement on the original foundation and then pour concrete around it to increase the bearing area of the foundation; however, due to the special construction environment of the bridge and the limitations of the surrounding environment, it is difficult to pour concrete, which makes the bridge reinforcement work difficult to carry out.
[0004] To this end, we designed a bridge installation reinforcement device. Utility Model Content
[0005] The utility model aims to solve the problem in the prior art that due to the limitation of the surrounding environment, concrete cannot be poured to reinforce the bridge, and proposes a bridge installation reinforcement device.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A bridge installation and reinforcement device includes a pier and a bridge body, wherein two first mounting frames and a second mounting frame are provided on the pier, two first reinforcement components and a second reinforcement component are provided between the pier and the bridge body, and the first reinforcement component and the second reinforcement component are both connected to the first mounting frame and the second mounting frame, the first reinforcement component includes a plurality of first reinforcement plates for reinforcing the bridge body, and the second reinforcement component includes a plurality of second reinforcement plates for reinforcing the bridge body.
[0008] Preferably, fixing bolts and fixing nuts are provided between the two first mounting frames and the second mounting frames, and insertion holes are provided on the two first mounting frames and the second mounting frames, and the fixing bolts pass through the insertion holes and are threadedly connected with the fixing nuts.
[0009] Preferably, the first reinforcement component further comprises:
[0010] A plurality of first support plates, wherein the plurality of first support plates are rotatably connected to the first reinforcement plate via a first connecting member;
[0011] The first bearing plate is movably connected to the first reinforcing plate, and the first bearing plate abuts against the bridge body.
[0012] Preferably, the second reinforcement component further comprises:
[0013] A plurality of second support plates, wherein the plurality of second support plates are rotatably connected to the second reinforcement plate via a second connecting member;
[0014] The second bearing plate is movably connected to the second reinforcing plate, and the second bearing plate abuts against the bridge body.
[0015] Preferably, the first mounting frame, the second mounting frame, the first supporting plate and the second supporting plate are all fixedly connected with a plurality of connecting platforms, and through holes are formed on the connecting platforms.
[0016] Preferably, a connecting bolt and a connecting nut are provided on the connecting platform, and the connecting bolt passes through the through hole and is threadedly connected to the connecting nut.
[0017] The beneficial effects of the utility model are:
[0018] The utility model adopts the first reinforcement component and the second reinforcement component to reinforce the bridge body, fixes the first reinforcement component and the second reinforcement component on the bridge pier through the first mounting frame and the second mounting frame, and then reinforces the bridge support through the first bearing plate and the second bearing plate in the first reinforcement component and the second reinforcement component, without pouring concrete, and the first mounting frame and the second mounting frame are installed on the bridge pier through fixing bolts, and the first reinforcement component and the second reinforcement component are connected through connecting bolts, which is simple to operate and easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a structural schematic diagram of a bridge installation reinforcement device proposed by the utility model;
[0020] Figure 2 This is a partial structural diagram of a bridge installation reinforcement device proposed by the utility model;
[0021] Figure 3 This is a left view of a bridge installation reinforcement device proposed by the utility model;
[0022] Figure 4 The utility model is a structural schematic diagram of a bridge installation reinforcement device proposed by the utility model.
[0023] In the figure: 1, bridge pier; 2, bridge body; 3, first mounting frame; 4, second mounting frame; 5, first support plate; 6, first reinforcement plate; 7, first bearing plate; 8, second support plate; 9, second reinforcement plate; 10, second bearing plate; 11, connecting platform; 12, connecting bolts; 13, fixing bolts. DETAILED DESCRIPTION
[0024] Reference Figure 1-Figure 4 A bridge installation and reinforcement device includes a pier 1 and a bridge body 2, two first mounting frames 3 and a second mounting frame 4 are provided on the pier 1, two first reinforcement components and a second reinforcement component are provided between the pier 1 and the bridge body 2, and the first reinforcement component and the second reinforcement component are both connected to the first mounting frame 3 and the second mounting frame 4, the first reinforcement component includes a plurality of first reinforcement plates 6 for reinforcing the bridge body 2, and the second reinforcement component includes a plurality of second reinforcement plates 9 for reinforcing the bridge body 2.
[0025] Reference Figure 2 As shown, a fixing bolt 13 and a fixing nut are provided between the two first mounting frames 3 and the second mounting frames 4, and a plug hole is provided on the two first mounting frames 3 and the second mounting frames 4, and the fixing bolt 13 passes through the plug hole and is threadedly connected with the fixing nut;
[0026] During use, the operator uses tools to fix the first mounting frame 3 and the second mounting frame 4 on the pier 1 through the fixing bolts 13 and the fixing nuts, so as to subsequently install the first reinforced component and the second reinforced component.
[0027] Reference Figure 2 , Figure 3 and Figure 4 As shown, the first reinforcement assembly further includes a plurality of first support plates 5, which are rotatably connected to the first reinforcement plate 6 through a first connecting member; the first reinforcement assembly further includes a first bearing plate 7, which is movably connected to the first reinforcement plate 6, and the first bearing plate 7 is against the bridge body 2;
[0028] The second reinforcement assembly also includes a plurality of second support plates 8, which are rotatably connected to the second reinforcement plate 9 through a second connecting member; the second reinforcement assembly also includes a second bearing plate 10, which is movably connected to the second reinforcement plate 9, and the second bearing plate 10 is against the bridge body 2; it should be noted that the first connecting member and the second connecting member have the same structure, both of which are pillow blocks and rotating shafts, and the pillow blocks are respectively fixed on the first reinforcement plate 6 and the second reinforcement plate 9, and the first support plate 5 and the second support plate 8 are rotatably connected to the pillow blocks through a rotating shaft.
[0029] A plurality of connecting platforms 11 are fixedly connected to the first mounting frame 3, the second mounting frame 4, the first bearing plate 7 and the second bearing plate 10, and through holes are provided on the connecting platforms 11; connecting bolts 12 and connecting nuts are provided on the connecting platforms 11, and the connecting bolts 12 pass through the through holes and are threadedly connected to the connecting nuts;
[0030] When in use, the operator uses tools to fix the first reinforcement plate 6 and the second reinforcement plate 9 to the second mounting frame 4 through the connecting bolts 12 and the connecting nuts, and then fixes the first bearing plate 7 and the second bearing plate 10 to the first reinforcement plate 6 and the second reinforcement plate 9 respectively through the connecting bolts 12 and the connecting nuts. At the same time, the first bearing plate 7 and the second bearing plate 10 are against the bridge body 2 to support and reinforce the bridge body 2, and then the first support plate 5 and the second support plate 8 rotatably connected to the first reinforcement plate 6 and the second reinforcement plate 9 are fixed to the first mounting frame 3 through the connecting bolts 12 and the connecting nuts;
[0031] The bridge body 2 is reinforced by the first reinforcement component and the second reinforcement component, and the first reinforcement component and the second reinforcement component are fixed to the pier 1 by the first mounting frame 3 and the second mounting frame 4 without pouring concrete, and the first mounting frame 3 and the second mounting frame 4 are installed on the pier 1 by fixing bolts 13, and the first reinforcement component and the second reinforcement component are connected by connecting bolts 12, which is simple to operate and easy to implement.
[0032] The working principle of the utility model is as follows:
[0033] First, fix the second mounting frame 4 to the pier 1 by means of fixing bolts 13 and fixing nuts, and then fix the first reinforcement plate 6 and the second reinforcement plate 9 to the second mounting frame 4 by means of connecting bolts 12 and connecting nuts, and then fix the first bearing plate 7 and the second bearing plate 10 to the first reinforcement plate 6 and the second reinforcement plate 9 respectively by means of connecting bolts 12 and connecting nuts. At the same time, the first bearing plate 7 and the second bearing plate 10 are abutted against the bridge body 2 to support and reinforce the bridge body 2, and then fix the first support plate 5 and the second support plate 8 rotatably connected to the first reinforcement plate 6 and the second reinforcement plate 9 to the first mounting frame 3 by means of connecting bolts 12 and connecting nuts, and finally fix the first mounting frame 3 to the pier 1 by means of fixing bolts 13 and fixing nuts.
[0034] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A bridge installation and reinforcement device, comprising a bridge pier (1) and a bridge body (2), characterized in that: The bridge pier (1) is provided with two first mounting frames (3) and a second mounting frame (4); two first reinforcement components and a second reinforcement component are provided between the bridge pier (1) and the bridge body (2); the first reinforcement component and the second reinforcement component are both connected to the first mounting frame (3) and the second mounting frame (4); the first reinforcement component includes a plurality of first reinforcement plates (6) for reinforcing the bridge body (2); and the second reinforcement component includes a plurality of second reinforcement plates (9) for reinforcing the bridge body (2).
2. A bridge installation and reinforcement device according to claim 1, characterized in that: A fixing bolt (13) and a fixing nut are provided between the two first mounting frames (3) and the second mounting frames (4); both the first mounting frames (3) and the second mounting frames (4) are provided with a plug hole, and the fixing bolt (13) passes through the plug hole and is threadedly connected to the fixing nut.
3. A bridge installation and reinforcement device according to claim 1, characterized in that: The first reinforcement component also includes: A plurality of first support plates (5), wherein the plurality of first support plates (5) are rotatably connected to the first reinforcement plate (6) via a first connecting member; A first bearing plate (7), wherein the first bearing plate (7) is movably connected to the first reinforcing plate (6), and the first bearing plate (7) abuts against the bridge body (2).
4. A bridge installation and reinforcement device according to claim 3, characterized in that: The second reinforcement component also includes: A plurality of second support plates (8), wherein the plurality of second support plates (8) are rotatably connected to the second reinforcement plate (9) via a second connecting member; A second bearing plate (10), wherein the second bearing plate (10) is movably connected to the second reinforcing plate (9), and the second bearing plate (10) abuts against the bridge body (2).
5. A bridge installation and reinforcement device according to claim 4, characterized in that: The first mounting frame (3), the second mounting frame (4), the first carrying plate (7) and the second carrying plate (10) are all fixedly connected with a plurality of connecting platforms (11), and through holes are provided on the connecting platforms (11).
6. A bridge installation and reinforcement device according to claim 5, characterized in that: The connecting platform (11) is provided with a connecting bolt (12) and a connecting nut, and the connecting bolt (12) passes through the through hole and is threadedly connected to the connecting nut.