Cast-in-situ bored pile supporting structure in pebble stratum
By adopting a combination of support methods in pebble formations, including the design of crown beams, reinforced support structures and waist beams, the problem of failure of a single support structure in complex formations is solved, and cost-effective improvement and support are achieved Enhancement of capability.
Patent Information
- Application Number
- CN202420553080.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-21
AI Technical Summary
In pebbled formations, a single support structure is difficult to effectively solve the support problem of complex formations, which easily leads to support failure, and the cost of drilling and cast-injected piles is high and easy to damage.
A combination of support methods is adopted, including setting up crown beams between the drilled cast piles and PHC pipe piles, strengthening support structures such as soil anchors and rear piles, connecting steel nooses, and drilling cast piles and PHC pipes. The top of the pile is equipped with a steel cage and a waist beam, and the waist beam is connected by hinges to enhance shear resistance and bending resistance.
By reducing the number and cost of drilling holes, the shear and bending resistance of the pile body is enhanced, the overall performance of the support structure is improved, the support capacity is weakened, and the construction cost is reduced.
Smart Images

Figure CN221989341U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of building construction, and in particular relates to a bored cast-in-place pile support structure in a pebble stratum. Background Art
[0002] Pebbles are mainly composed of rock fragments or primary minerals such as quartz and feldspar with different particle sizes, irregular shapes and weathering degrees. They have single-grain structure, blocky structure and pseudo-porphyritic structure. They have the characteristics of large porosity, low compressibility, strong permeability and high shear strength.
[0003] Drilling holes in the pebble stratum and setting up cast-in-place pile support structures is an effective foundation treatment method. It forms a pile foundation with a certain bearing capacity and anti-deformation ability by drilling holes in the pebble stratum and injecting concrete. This support structure is usually used in deep foundation pit projects to prevent the collapse and deformation of the soil around the foundation pit. Concrete cast-in-place piles can be used for support in the pebble stratum: drill holes in the pebble stratum, inject concrete into the holes, form concrete cast-in-place piles, and form a continuous support structure through connection.
[0004] However, in the prior art, due to the complex structure of the pebble stratum, the use of a single support form often cannot achieve good results and easily causes the problem of support failure. Utility Model Content
[0005] The purpose of the utility model is to provide a bored cast-in-place pile support structure in a pebble stratum, by changing the support structure style of the cast-in-place pile, adding different forms of support combinations on the basis of the cast-in-place pile, and enhancing the support capacity to meet the use requirements of complex strata.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is specifically as follows:
[0007] A bored cast-in-place pile support structure in a pebble stratum comprises a support mechanism, wherein the support mechanism comprises a plurality of bored cast-in-place piles, PHC pipe piles arranged between the plurality of bored cast-in-place piles, and an upper cap beam is arranged between the plurality of bored cast-in-place piles and the PHC pipe piles; a reinforced support structure is arranged on one side of the cap beam, wherein the reinforced support structure comprises soil anchor nails and rear row piles, and a connecting steel rope is arranged between the rear row piles and the cap beam, and one end of the soil anchor nail is connected to the cap beam, and the other end is nailed into the soil layer.
[0008] Furthermore, a steel cage is provided between the bored pile and the top of the PHC pipe pile.
[0009] Furthermore, the steel cage is filled with concrete to form a crown beam.
[0010] Furthermore, a waist beam is provided in the middle of the bored cast-in-place pile and the PHC pipe pile.
[0011] Furthermore, the waist beam is connected to the PHC pile via a hinge.
[0012] Furthermore, a waist beam anchor cable is provided at the waist beam, and the waist beam anchor cable is connected with a waist beam anchor nail.
[0013] Compared with the prior art, the utility model has the following advantages: First, the utility model adopts a combination of multiple support methods, by setting PHC pipe piles, which is a type of prestressed high-strength concrete pipe piles, and the pipe piles are hollow cylindrical slender concrete prefabricated building materials. The combination of PHC pipe piles can reduce the number of holes required for drilling, thereby reducing the required period and cost for drilling holes in the pebble stratum. At the same time, the bored cast-in-place piles and waist beams are used to enhance the shear resistance and bending resistance of the pile body at key positions, which can reduce costs while ensuring support capabilities. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 This is a schematic diagram of the structure of the bored pile support structure in the pebble stratum provided by the utility model. Figure 1 .
[0016] Figure 2 This is a schematic diagram of the structure of the bored pile support structure in the pebble stratum provided by the utility model. Figure 2 .
[0017] Figure numerals: 1. bored cast-in-place piles; 2. crown beam; 3. waist beam; 4. PHC pipe piles; 5. rear row piles; 6. connecting steel cable; 7. soil anchor; 8. waist beam anchor. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0020] In the description of the present utility model, it should be noted that if the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the accompanying drawings, or is the orientation or position relationship in which the utility model product is usually placed when used. It is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model.
[0021] In addition, the terms “first”, “second”, “third”, etc., if used, are merely used to distinguish the descriptions and should not be understood as indicating or implying relative importance.
[0022] In addition, the terms "horizontal", "vertical", "overhanging", etc. do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0023] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", "connection", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.
[0025] like Figure 1-Figure 2 As shown, a bored cast-in-place pile support structure in a pebble stratum includes a support mechanism, the support mechanism includes a plurality of bored cast-in-place piles 1, PHC pipe piles 4 arranged between the plurality of bored cast-in-place piles 1, and an upper cap beam 2 is arranged between the plurality of bored cast-in-place piles 1 and the PHC pipe piles 4; a reinforced support structure is arranged on one side of the cap beam 2, the reinforced support structure includes soil anchor nails 7 and rear row piles 5, and a connecting steel rope 6 is arranged between the rear row piles 5 and the cap beam 2, and one end of the soil anchor nail 7 is connected to the cap beam 2, and the other end is nailed into the soil layer.
[0026] Compared with the prior art, in the prior art, due to the physical properties of the pebble stratum, the single particle strength is high and the bearing layer has good properties. However, due to the poor cementation between particles, the pebble gaps are many and the structure is loose, so it is also a typical sensitive stratum, which is very sensitive to stratum deformation. When excavating a subway tunnel in a pebble stratum, the soil deformation caused by the loss of soil is easily transmitted to the surface, causing surface deformation. Therefore, it is necessary to adopt the form of bored pile 1 to improve the shear and compression resistance of the support. However, when drilling and other underground engineering constructions are carried out in the pebble stratum, the cutter disc and the tool are easily affected by uneven cutting and impact, resulting in abnormal damage. In addition, the friction of the sand will also cause the cutter disc, the tool and the screw conveyor to wear more seriously, thereby causing the high cost of bored pile 1. In the present invention, the support is carried out in the form of a combination of bored cast-in-place piles 1 and PHC pipe piles 4. The PHC pipe piles 4, which is the full name of prestressed high-strength concrete pipe piles, are a kind of slender hollow equal-section precast concrete components made by pre-tensioned prestressed centrifugal forming process and steam curing at 10 atmospheres (about 1.0Mpa) and about 180°C. The concrete strength grade of the PHC pipe piles 4 is usually not less than C80, the standard section length is 10m, and the diameter ranges from 300mm to 800mm. This pipe pile has many advantages, such as high single pile bearing capacity, wide application range, fast construction speed, reliable pile quality, good hammer resistance and crack resistance of the pile body, strong penetration, low cost, etc. By arranging the PHC pipe piles 4 and bored cast-in-place piles 1 at intervals, the bored cast-in-place piles 1 are arranged at the position with greater shear force, and the PHC pipe piles 4 are used instead at the position with less shear force, which can effectively reduce the number of holes required during construction, thereby saving economic costs. In addition, a reinforced support structure is provided on both sides of the crown beam 2, and a waist beam 3 is provided in the middle of the bored piles 1 and the PHC pipe piles 4, and a plurality of support combinations are used to enhance the overall performance of the support, thereby avoiding the problem of weakened support capacity after reducing the number of bored piles 1.
[0027] A steel cage is arranged between the bored pile 1 and the top of the PHC pile 4. The steel cage is filled with concrete to form a crown beam 2. The top of the bored pile 1 and the top of the PHC pile 4 are formed by arranging a steel cage and filling it with concrete. The overall support capacity is enhanced by connecting the two sides of the crown beam 2 to the rear piles 5 of the auxiliary support.
[0028] A waist beam 3 is arranged in the middle of the bored pile 1 and the PHC pile 4. The waist beam 3 is connected to the PHC pile 4 by a hinge. The PHC pile 4 needs to avoid being subjected to a large shear force, so as to avoid affecting the safety of the pile body of the PHC pile 4. Therefore, the waist beam 3 is closely attached to the pile body of the PHC pile 4. Therefore, during the manufacturing process of the waist beam 3, the waist beam 3 cannot be cast together with the pile body of the PHC pile 4. The two form a hinged connection mode. Of course, other mechanical connection forms can also be used.
[0029] The waist beam 3 is provided with a waist beam 3 anchor cable, and the waist beam 3 anchor cable is connected with a waist beam 3 anchor nail. Before the construction of the soil anchor nail 7 and the waist beam 3 anchor nail, the detailed positions of various underground pipelines within their incident range should be fully investigated, and they should be avoided during the construction of the soil anchor nail 7 to avoid accidental damage to them. And during the construction of the soil anchor nail 7 lead hole, in order to prevent the soil and water loss outside during the construction of the soil anchor nail 7, the preventive measures taken are as follows: when it is found that the support is leaking or the soil is gushing, the steel pipe mouth is sealed in time, and the back pressure needs to be backfilled immediately. The back pressure earthwork can be excavated from the foundation pit nearby by a hook machine, or it can be made of sand bags prepared in advance, and then the leaking and gushing parts are reinforced with sand grouting, and the sand gushing parts are used to restore the landslide caused by water and sand loss to their original state in time.
[0030] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. The bored pile support structure in the pebble stratum is characterized by: The invention comprises a support mechanism, wherein the support mechanism comprises a plurality of bored cast-in-place piles (1), PHC pipe piles (4) arranged between the plurality of bored cast-in-place piles (1), and an upper cap beam (2) is arranged between the plurality of bored cast-in-place piles (1) and the PHC pipe piles (4); a reinforced support structure is arranged on one side of the cap beam (2), the reinforced support structure comprises soil anchor nails (7) and rear row piles (5), a connecting steel rope (6) is arranged between the rear row piles (5) and the cap beam (2), and one end of the soil anchor nail (7) is connected to the cap beam (2), and the other end is nailed into the soil layer.
2. The bored pile support structure in pebble strata according to claim 1, characterized in that: A steel cage is arranged between the bored cast-in-place pile (1) and the top of the PHC pipe pile (4).
3. The bored pile support structure in pebble strata according to claim 2, characterized in that: The steel cage is filled with concrete to form a crown beam (2).
4. The bored pile support structure in pebble strata according to claim 1, characterized in that: A waist beam (3) is arranged in the middle of the bored cast-in-place pile (1) and the PHC pipe pile (4).
5. The bored pile support structure in pebble strata according to claim 4, characterized in that: The waist beam (3) is connected to the PHC pipe pile (4) via a hinge.
6. The bored pile support structure in pebble strata according to claim 4, characterized in that: The waist beam (3) is provided with a waist beam (3) anchor cable, and the waist beam (3) anchor cable is connected with a waist beam (3) anchor nail.