Fabricated water conservancy construction cofferdam device
By adopting dovetail grooves, limiting convex strips and threaded rods in the water conservancy construction cofferdam, the splicing and fixing of steel plates at different depths is solved, and the problems of different buried depths and insufficient anti-overturning ability in the existing technology are improved. The stability and use scenarios of cofferdams.
Patent Information
- Application Number
- CN202420444897.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-07
AI Technical Summary
The existing water conservancy construction cofferdam steel plates cannot be buried at the same depth under different geological conditions, resulting in the inability to splice and fix the adjacent main steel plates and limited anti-population ability.
A prefabricated water conservancy construction cofferdam device is designed, adopting a combined structure of a first dovetail groove and a limiting convex strip, a fixed block, a limiting pin, a threaded rod and a mounting block that is opened in a vertical direction, and is inserted and rotated by sliding. The insertion realizes horizontal and vertical splicing and fixing of adjacent main steel plates, and the support structure is adjusted through telescopic rods and hydraulic push rods to adapt to different depths and geological conditions.
The stable splicing and fixation of adjacent steel plates with different buried depths is achieved, which improves the anti-population capability and use scenarios of the cofferdam, and enhances waterproof performance and stability.
Smart Images

Figure CN221989367U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of construction cofferdams, and in particular relates to an assembled water conservancy construction cofferdam device. Background Art
[0002] A cofferdam refers to a temporary retaining structure built during water conservancy project construction to prevent water and soil from entering the construction site of a building. Cofferdams are usually made of different materials, such as earth and stone, wooden piles, concrete or steel sheet piles. Steel sheet pile cofferdams are widely used. During installation, the steel plate needs to be inserted into the ground, but due to the influence of the insertion depth and the thickness of the steel plate itself, the steel plate's ability to resist overturning after installation is limited.
[0003] A Chinese patent with publication number CN215669609U discloses a detachable cofferdam for preventing collapse of water conservancy construction. The solution includes a main steel plate, a supporting structure, a connecting structure and a limiting structure. The connecting structure includes connecting plates fixedly arranged at the front and rear ends of both sides of the main steel plate, and a fixing screw rod penetrating between the two connecting plates. The above solution uses the supporting structure to support the main steel plate, thereby solving the problem that the existing cofferdam steel plate is prone to tilt or collapse due to its limited supporting capacity during use.
[0004] When using the above solution, the two adjacent main steel plates need to be aligned through the limiting structure before the fixing bolts can be inserted one by one into the two aligned connecting plates. However, when the main steel plates cannot be buried at the same depth due to different geological conditions at their locations, the two adjacent main steel plates cannot be spliced and fixed. Utility Model Content
[0005] The utility model aims to provide an assembled water conservancy construction cofferdam device, which can splice and fix adjacent steel plates at different buried depths.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] The cam is secured to the upper and lower sides of the ladder system, and the ladder system is configured to lock the ladder by a user pushing the ladder into position relative to the ladder by a user pushing the ladder into position on the ladder by a user pushing the ladder into position relative to the ladder system.
[0008] The principle and effect of this technical solution:
[0009] During installation, first bury the bottom of a main steel plate underground, and unfold the supporting structure to support the main steel plate, then hoist another main steel plate and move it to the top of the side of the previous main steel plate, and align the limiting convex strip with the first dovetail groove, slowly lower the other main steel plate, so that the limiting convex strip slides and is embedded in the first dovetail groove until the bottom of the other main steel plate is buried underground, rotate the first threaded rod to move the mounting block until the first socket is aligned with the adjacent limiting pin, rotate the limiting pin to move it in the direction close to the mounting block until one end of the limiting pin is inserted into the first socket.
[0010] Through the above-mentioned arrangement, the limiting convex strip is slidably embedded in the first dovetail groove so that the two adjacent main steel plates are spliced with each other in the horizontal direction. At the same time, the limiting pin is inserted into the first insertion hole so that the two adjacent main steel plates are locked with each other in the vertical direction, thereby achieving the purpose of splicing and fixing adjacent steel plates at different buried depths.
[0011] In the utility model, a second dovetail groove is vertically opened on the inner wall of the main steel plate close to the first dovetail groove, and the limiting protrusion can be slidably embedded in the second dovetail groove. The mounting block is recessed on the side away from the inner wall of the main steel plate with a second socket that cooperates with the limiting pin.
[0012] The principle and effect of this technical solution:
[0013] When installing at the corner, hoist a main steel plate and move it to the top of the inner wall of the previous main steel plate, and make the main steel plate perpendicular to the previous main steel plate, and align the limiting convex strip with the second dovetail groove, slowly lower the main steel plate, make the limiting convex strip slide and embed in the second dovetail groove until the bottom of the main steel plate is buried underground, rotate the first threaded rod to move the mounting block until the second insertion hole is aligned with the adjacent limiting pin, rotate the limiting pin to move it in the direction close to the mounting block until one end of the limiting pin is inserted into the second insertion hole.
[0014] Through the above arrangement, two adjacent main steel plates that are perpendicular to each other can be spliced and fixed, which broadens the application scenarios of the utility model and improves the practicality of the utility model.
[0015] In the present invention, the side walls of the first dovetail groove and the second dovetail groove are fixedly provided with a sealing rubber layer. Through the above arrangement, the airtightness of the connection position between two adjacent main steel plates can be ensured, and the waterproof performance of the present invention can be improved.
[0016] In the utility model, the support structure includes a telescopic rod and a fixed plate. The telescopic rod can rotate relative to the main steel plate and the fixed plate respectively, and a plurality of drill rods are slidably penetrated on the top of the fixed plate.
[0017] In the utility model, the telescopic rod includes a sleeve rod, a second threaded rod and a movable block, one end of the sleeve rod is rotatably connected to the inner wall of the main steel plate, the other end of the sleeve rod is threadedly sleeved on one end of the second threaded rod, the other end of the second threaded rod is rotatably inserted into the top of the movable block, and the bottom of the movable block is rotatably connected to the top of the fixed plate.
[0018] In the utility model, a handle is fixedly provided at the bottom of the side wall of the second threaded rod along a direction perpendicular to the axis of the second threaded rod.
[0019] The principle and effect of this technical solution:
[0020] Hold the handle tightly to rotate the second threaded rod. Since the sleeve rod and the movable block cannot rotate with the second threaded rod, the relative length of the sleeve rod and the second threaded rod changes with the rotation of the second threaded rod. According to the actual situation of the site, the fixed plate is contacted with the underwater ground at an appropriate position, and multiple drill rods are slidably penetrated on the top of the fixed plate to fix the fixed plate to the underwater ground.
[0021] Through the above arrangement, the relative lengths of the sleeve rod and the second threaded rod can be changed to facilitate fixing the fixing plate to the underwater ground, provide support for the main steel plate, and further improve the stability of the utility model.
[0022] In the utility model, the telescopic rod is configured as a hydraulic push rod, one end of the hydraulic push rod is rotatably connected to the inner wall of the main steel plate, and the other end of the hydraulic push rod is rotatably connected to the top of the fixed plate.
[0023] The principle and effect of this technical solution:
[0024] The hydraulic push rod is extended to make the fixing plate contact with the underwater ground at an appropriate position according to the actual situation of the site, and a plurality of drill rods are slidably penetrated on the top of the fixing plate to fix the fixing plate to the underwater ground.
[0025] Through the above arrangement, the length of the hydraulic push rod is changed to facilitate fixing the fixing plate to the underwater ground, provide support for the main steel plate, and further improve the stability of the utility model. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a top view of the first embodiment of the utility model;
[0027] Figure 2 This is an axonometric diagram of the first embodiment of the utility model;
[0028] Figure 3 for Figure 2 Enlarged view of point A in the middle;
[0029] Figure 4 This is an axonometric view of some components of the first embodiment of the utility model;
[0030] Figure 5 This is an axonometric view of some parts of the second embodiment of the utility model. DETAILED DESCRIPTION
[0031] The present invention is further described in detail below in conjunction with the accompanying drawings and implementation examples:
[0032] The figure marks in the drawings of the specification include: 10, main steel plate; 20, supporting structure; 21, telescopic rod; 211, sleeve rod; 212, second threaded rod; 213, movable block; 214, handle; 215, hydraulic push rod; 22, fixed plate; 221, drill rod; 30, connecting structure; 31, first dovetail groove; 32, limiting convex strip; 33, second dovetail groove; 40, limiting structure; 41, fixed block; 42, limiting pin; 43, first threaded rod; 44, mounting block; 441, first socket; 442, second socket.
[0033] First embodiment:
[0034] As attached Figure 1-4 As shown, the utility model discloses an assembled water conservancy construction cofferdam device, including a main steel plate 10, a connecting structure 30 and a limiting structure 40, wherein the inner and outer sides of the main steel plate 10 are respectively provided with supporting structures 20, the connecting structure 30 includes a first dovetail groove 31 vertically opened on one side of the main steel plate 10 and a limiting convex strip 32 fixedly arranged on the other side of the main steel plate 10, the first dovetail groove 31 is through-through, the limiting convex strip 32 is slidably embedded in the first dovetail groove 31, and the limiting structure 40 includes a fixing block 41, a limiting pin 42, The first threaded rod 43 and the mounting block 44, the fixed block 41 is fixedly arranged on one side of the inner wall of the main steel plate 10, the limit pin 42 is penetrated through the fixed block 41 along the transverse thread, the first threaded rod 43 is vertically arranged on the other side of the inner wall of the main steel plate 10, and the first threaded rod 43 can rotate relative to the main steel plate 10, the mounting block 44 is threadedly sleeved on the first threaded rod 43, and the mounting block 44 is recessed with a first socket 441 that cooperates with the limit pin 42 on one side close to the limit pin 42, and the side wall of the mounting block 44 slides against the inner wall of the main steel plate 10.
[0035] In this embodiment, a second dovetail groove 33 is vertically opened on the inner wall of the main steel plate 10 near the first dovetail groove 31, and the limiting protrusion 32 can be slidably embedded in the second dovetail groove 33. The mounting block 44 is recessed on the side away from the inner wall of the main steel plate 10 with a second socket 442 that cooperates with the limiting pin 42.
[0036] In this embodiment, a sealing rubber layer is fixedly disposed on the side walls of the first dovetail groove 31 and the second dovetail groove 33 .
[0037] In this embodiment, the support structure 20 includes a telescopic rod 21 and a fixed plate 22. The telescopic rod 21 can rotate relative to the main steel plate 10 and the fixed plate 22 respectively. A plurality of drill rods 221 are also slidably penetrated on the top of the fixed plate 22.
[0038] In this embodiment, the telescopic rod 21 includes a sleeve rod 211, a second threaded rod 212 and a movable block 213. One end of the sleeve rod 211 is rotatably connected to the inner wall of the main steel plate 10, and the other end of the sleeve rod 211 is threadedly sleeved on one end of the second threaded rod 212. The other end of the second threaded rod 212 is rotatably inserted into the top of the movable block 213, and the bottom of the movable block 213 is rotatably connected to the top of the fixed plate 22.
[0039] In this embodiment, a handle 214 is fixedly provided at the bottom of the side wall of the second threaded rod 212 in a direction perpendicular to the axis of the second threaded rod 212 .
[0040] The specific implementation process is as follows:
[0041] During installation, first bury the bottom of a main steel plate 10 underground, and unfold the supporting structure 20 to support the main steel plate 10, then hoist another main steel plate 10 and move it to the top of the side of the previous main steel plate 10, and align the limiting convex strip 32 with the first dovetail groove 31, slowly lower the other main steel plate 10, so that the limiting convex strip 32 slides and is embedded in the first dovetail groove 31 until the bottom of the other main steel plate 10 is buried underground, rotate the first threaded rod 43 to move the mounting block 44 until the first socket 441 is aligned with the adjacent limiting pin 42, rotate the limiting pin 42 to move it in the direction close to the mounting block 44 until one end of the limiting pin 42 is inserted into the first socket 441.
[0042] When installing at the corner, hoist a main steel plate 10 and move it to the top of the inner wall of the previous main steel plate 10, and make the main steel plate 10 perpendicular to the previous main steel plate 10, and align the limiting convex strip 32 with the second dovetail groove 33, slowly lower the main steel plate 10, so that the limiting convex strip 32 slides and is embedded in the second dovetail groove 33, until the bottom of the main steel plate 10 is buried underground, rotate the first threaded rod 43 to move the mounting block 44, until the second socket 442 is aligned with the adjacent limiting pin 42, rotate the limiting pin 42, and move it in the direction close to the mounting block 44, until one end of the limiting pin 42 is inserted into the second socket 442.
[0043] The handle 214 is held tightly to rotate the second threaded rod 212. Since the sleeve rod 211 and the movable block 213 cannot rotate with the second threaded rod 212, the relative length of the sleeve rod 211 and the second threaded rod 212 changes with the rotation of the second threaded rod 212. According to the actual situation of the site, the fixing plate 22 is made to contact the underwater ground at an appropriate position, and a plurality of drill rods 221 are slidably penetrated on the top of the fixing plate 22 to fix the fixing plate 22 to the underwater ground.
[0044] Second embodiment:
[0045] As attached Figure 5 As shown, compared with the first embodiment, the difference of this embodiment is that: in this embodiment, the telescopic rod 21 is configured as a hydraulic push rod 215, one end of the hydraulic push rod 215 is rotatably connected to the inner wall of the main steel plate 10, and the other end of the hydraulic push rod 215 is rotatably connected to the top of the fixed plate 22.
[0046] The specific implementation process is as follows:
[0047] The hydraulic push rod 215 is extended to make the fixing plate 22 contact the underwater ground at an appropriate position according to the actual site conditions, and a plurality of drill rods 221 are slidably penetrated on the top of the fixing plate 22 to fix the fixing plate 22 on the underwater ground.
[0048] The above is only an embodiment of the utility model, and the common knowledge such as the known specific technical scheme or characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the technical scheme of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. An assembled water conservancy construction cofferdam device, characterized in that: include: A main steel plate, wherein support structures are respectively provided on the inner and outer sides of the main steel plate; A connecting structure comprising a first dovetail groove vertically provided on one side of the main steel plate and a position-limiting convex strip fixedly provided on the other side of the main steel plate, wherein the first dovetail groove is vertically continuous, and the position-limiting convex strip is slidably embedded in the first dovetail groove; The limiting structure includes a fixed block, a limiting pin, a first threaded rod and a mounting block, the fixed block is fixedly arranged on one side of the inner wall of the main steel plate, the limiting pin is passed through the fixed block along a transverse thread, the first threaded rod is vertically arranged on the other side of the inner wall of the main steel plate, and the first threaded rod can rotate relative to the main steel plate, the mounting block is threadedly sleeved on the first threaded rod, and the mounting block is recessed with a first socket that cooperates with the limiting pin on one side close to the limiting pin, and the side wall of the mounting block slides against the inner wall of the main steel plate.
2. The assembled water conservancy construction cofferdam device according to claim 1, characterized in that: A second dovetail groove is vertically opened on the inner wall of the main steel plate near the first dovetail groove, and the limiting protrusion can be slidably embedded in the second dovetail groove. The mounting block is recessed on the side away from the inner wall of the main steel plate with a second socket that cooperates with the limiting pin.
3. The assembled water conservancy construction cofferdam device according to claim 2, characterized in that: The side walls of the first dovetail groove and the second dovetail groove are both fixedly provided with a sealing rubber layer.
4. The assembled water conservancy construction cofferdam device according to claim 3, characterized in that: The supporting structure includes a telescopic rod and a fixed plate. The telescopic rod can rotate relative to the main steel plate and the fixed plate respectively. A plurality of drill rods are slidably penetrated on the top of the fixed plate.
5. The assembled water conservancy construction cofferdam device according to claim 4, characterized in that: The telescopic rod includes a sleeve rod, a second threaded rod and a movable block. One end of the sleeve rod is rotatably connected to the inner wall of the main steel plate, and the other end of the sleeve rod is threadedly sleeved on one end of the second threaded rod. The other end of the second threaded rod is rotatably inserted into the top of the movable block, and the bottom of the movable block is rotatably connected to the top of the fixed plate.
6. The assembled water conservancy construction cofferdam device according to claim 5, characterized in that: A handle is fixedly provided on the bottom of the side wall of the second threaded rod along a direction perpendicular to the axis of the second threaded rod.
7. The assembled water conservancy construction cofferdam device according to claim 4, characterized in that: The telescopic rod is configured as a hydraulic push rod, one end of the hydraulic push rod is rotatably connected to the inner wall of the main steel plate, and the other end of the hydraulic push rod is rotatably connected to the top of the fixed plate.