Temporary board room prefabricated foundation with strip foundations combined with raft foundations
Through the prefabricated foundation design of strip foundation combined with raft foundation, the problems of high construction difficulty and resource waste in traditional temporary board houses are solved, prefabricated construction in factories is realized, reusable rate and construction efficiency are improved, and the benefits of green and environmental protection are provided.
Patent Information
- Application Number
- CN202420574306.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-22
AI Technical Summary
The construction difficulty of traditional temporary slab houses is high, the concrete pouring cycle is long, and it is not suitable for temporary house structures, which has problems such as low reusability and large waste of resources.
The prefabricated foundation design of strip-based and raft-based is realized through the combined structure of raft-based base, transverse strip-based, longitudinal strip-based, assembly holes, prefabricated rods, slots, coupling columns, reinforcement parts and metal connecting sheets. The butt and assembly and reinforcement between the foundation and the house body reduce the cast-in-place concrete method and improve the reusable rate.
The factory prefabricated temporary board building construction has been realized, which reduces the amount of soil excavation and backfill, saves costs, shortens construction period, and has green and environmentally friendly benefits.
Smart Images

Figure CN221989378U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of temporary board houses, and more specifically, to a prefabricated foundation for a temporary board house with a strip foundation combined with a raft foundation. Background Art
[0002] The traditional prefabricated house is an economical prefabricated house with color steel plate as the frame, sandwich panel as the enclosure material, standard module series for space combination, and bolted components. It realizes the universal standardization of temporary buildings - it can be assembled and disassembled conveniently and quickly. At the same time, the prefabricated house is suitable for a wide range of terrains and can be located on hillsides, hills and grasslands.
[0003] The main building materials for existing permanent housing are reinforced concrete structures or steel structures. Reinforced concrete structures are heavy, difficult to construct, and have a long concrete pouring construction period, making them unsuitable as temporary housing structures. They also have problems such as low reusability and large waste of resources.
[0004] In order to solve the above problems, the present application provides a prefabricated foundation for a temporary board house combining a strip foundation with a raft foundation. Utility Model Content
[0005] The present application provides a temporary prefabricated foundation for a strip foundation combined with a raft foundation, which adopts the following technical solution:
[0006] A prefabricated foundation for a temporary board house combining a strip foundation and a raft foundation, comprising a raft foundation base, wherein two transverse strip foundations are arranged on the top of the raft foundation base, and longitudinal strip foundations are arranged on both sides of the position between the two transverse strip foundations, and the two transverse strip foundations and the longitudinal strip foundation are distributed in a rectangular shape on the periphery of the top of the raft foundation base, and assembly holes are opened on both sides of the bottom end of each of the transverse strip foundations and the longitudinal strip foundation, and a prefabricated rod is inserted into the inner wall of each assembly hole, and each prefabricated rod is fixedly connected to the top of the raft foundation base, and a first clamping groove is vertically penetrated at one side end of each of the transverse strip foundations close to the longitudinal strip foundation, and a second clamping groove is vertically penetrated at one side end of each of the longitudinal strip foundations close to the transverse strip foundation, and a connecting column is clamped at the connection between the first clamping groove and the second clamping groove on each side, and a plurality of first steel bars are fixedly arranged in a triangular shape on both sides of the connecting column.
[0007] Through the above technical solution, the first reinforcement member realizes the docking and assembly function between the prefabricated foundation of the panel house and the panel house body.
[0008] Furthermore, the first card slot and the second card slot on each side are both in a "T"-shaped slot structure, and the first card slot and the second card slot on each side are both symmetrically distributed, and each connecting column is in an "I"-shaped column structure.
[0009] Through the above technical solution, by utilizing the design of the first clamping groove, the second clamping groove, and the connecting column structure, the connection limiting effect of the horizontal strip base and the vertical strip base close to each other can be achieved.
[0010] Furthermore, a plurality of second reinforcement members are fixedly provided at the middle position of each of the transverse strip bases and the longitudinal strip bases, and the vertical height of each of the second reinforcement members is consistent with that of the first reinforcement members.
[0011] Through the above technical solution, the second reinforcement member plays a role in the butt assembly reinforcement between the prefabricated foundation of the panel house and the panel house body.
[0012] Furthermore, a metal connecting piece is provided at the connection between the top of the raft foundation base and the outer side wall of the bottom end of each transverse strip base and longitudinal strip base, and bolts are threadedly connected to both side ends of each metal connecting piece.
[0013] Furthermore, the metal connecting sheet is an "L"-shaped sheet structure, and the bolt members on both sides are distributed in an axisymmetric manner on both side ends of the metal connecting sheet.
[0014] Through the above technical solution, the metal connecting plates and bolts achieve the assembly connection limiting effect between the raft foundation base and each transverse strip foundation and longitudinal strip foundation.
[0015] Furthermore, auxiliary structures are provided at the four corners of the top of the raft foundation base and on both sides of the top of each transverse strip foundation and longitudinal strip foundation, and the auxiliary structure includes a reserved groove, a metal hanging ring is provided on the lower side of the inside of the reserved groove, and a plurality of fixing ribs are fixedly connected to the outer wall of the bottom end of the metal hanging ring, and the fixing ribs are fixedly provided on the inner wall of the bottom end of the reserved groove, and a sealing chuck is clamped on the inner wall of the top end of the reserved groove.
[0016] Through the above technical solution, the auxiliary structure facilitates the construction of the raft foundation base, the transverse strip foundation and the longitudinal strip foundation by an external crane.
[0017] Furthermore, the blocking chuck is located above the metal hanging ring, and the blocking chuck is a circular disc structure, and a hand-holding groove is provided at the top of the blocking chuck.
[0018] Through the above technical solution, the hand-held groove is used to lift and place the sealing chuck.
[0019] In summary, this application includes the following beneficial technical effects:
[0020] Through the raft foundation base, the upper structure can be supported, and at the same time, in conjunction with the transverse strip foundation, longitudinal strip foundation, assembly holes, prefabricated rods, first slots, second slots, connecting columns, first steel bars and second steel bars, the overall temporary board house prefabricated foundation combines the strip foundation with the raft foundation, so that the traditional concrete cast-in-place method is changed into factory prefabrication, which reduces the amount of excavation and backfilling of the core soil of the house, and effectively improves the reusability, while effectively saving costs, shortening construction period and achieving green environmental protection benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the overall structure of this application;
[0022] Figure 2 A partial semi-exploded diagram of this application;
[0023] Figure 3 For this application Figure 1 A magnified view of the structure at center;
[0024] Figure 4 This is a semi-exploded diagram of the auxiliary structure of this application.
[0025] Description of the numbers in the figure:
[0026] 1. Raft foundation base; 2. Horizontal strip foundation; 3. Longitudinal strip foundation; 4. Assembly hole; 5. Prefabricated rod; 6. First slot; 7. Second slot; 8. Connecting column; 9. First reinforcement member; 10. Second reinforcement member; 11. Metal connecting plate; 12. Bolt member; 13. Reserved groove; 14. Metal lifting ring; 15. Fixing rib; 16. Sealing chuck. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application; obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application without making creative work are within the scope of protection of the present application.
[0028] In the description of the present application, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present application. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0029] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "set / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0030] Example:
[0031] The present application embodiment discloses a temporary prefabricated foundation for a board house with a strip foundation combined with a raft foundation. Figure 1 Figure 2 and Figure 3 , including a raft foundation base 1, two transverse strip foundations 2 are arranged on the top of the raft foundation base 1, longitudinal strip foundations 3 are arranged on both sides of the position between the two transverse strip foundations 2, and the two transverse strip foundations 2 and the longitudinal strip foundations 3 are distributed in a rectangular shape on the periphery of the top of the raft foundation base 1, and assembly holes 4 are opened on both sides of the bottom of each transverse strip foundation 2 and the longitudinal strip foundation 3, and a prefabricated rod 5 is inserted into the inner wall of each assembly hole 4, and each prefabricated rod 5 is fixedly connected to the top of the raft foundation base 1, and a first clamping groove 6 is vertically penetrated at one side end of each transverse strip foundation 2 close to the longitudinal strip foundation 3, and a second clamping groove 7 is vertically penetrated at one side end of each longitudinal strip foundation 3 close to the transverse strip foundation 2, and a connecting column 8 is clamped at the connection inside the first clamping groove 6 and the second clamping groove 7 on each side, and a plurality of first steel bars 9 are fixedly arranged in a triangular shape on both sides of the connecting column 8;
[0032] The first card slot 6 and the second card slot 7 on each side are both in a "T"-shaped slot structure, and the first card slot 6 and the second card slot 7 on each side are symmetrically distributed, and each connecting column 8 is in an "I"-shaped column structure, and a plurality of second steel bars 10 are fixedly arranged in the middle position of each transverse strip base 2 and longitudinal strip base 3, and the vertical height of each second steel bar 10 is consistent with that of the first steel bar 9.
[0033] See also Figure 1 and Figure 4 A metal connecting sheet 11 is provided at the connection between the top of the raft foundation base 1 and the outer side wall of the bottom end of each transverse strip foundation 2 and the longitudinal strip foundation 3. Bolts 12 are threaded through both sides of each metal connecting sheet 11. The metal connecting sheet 11 is an "L"-shaped sheet structure, and the bolts 12 on both sides are axially symmetrically distributed on both sides of the metal connecting sheet 11.
[0034] Auxiliary structures are arranged at the four corners of the top of the raft foundation base 1 and on both sides of the top of each transverse strip foundation 2 and longitudinal strip foundation 3. The auxiliary structures include a reserved groove 13. A metal ring 14 is arranged on the lower side of the reserved groove 13. A plurality of fixing ribs 15 are fixedly connected to the outer wall at the bottom end of the metal ring 14. The fixing ribs 15 are fixedly arranged on the inner wall at the bottom end of the reserved groove 13. A blocking chuck 16 is clamped on the inner wall at the top end of the reserved groove 13. The blocking chuck 16 is located above the metal ring 14, and the blocking chuck 16 is a circular disc-shaped structure, and a hand-holding groove is provided on the top end of the blocking chuck 16. The blocking chuck 16 is clamped on the inner wall at the top end of the reserved groove 13, so that the metal ring 14 can be exposed when needed, and the metal ring 14 can be hidden when not needed, thereby improving the overall aesthetics and preventing obstacles to the assembly work of the subsequent board house structure.
[0035] The implementation principle of this embodiment is: during construction, according to the size requirements of the temporary board house, the raft foundation base 1 and each transverse strip foundation 2 and longitudinal strip foundation 3 are prefabricated as a whole, and then the whole is assembled at the designated foundation pit position;
[0036] First, the raft foundation base 1 is stably placed at the bottom of the foundation pit, and the two transverse strip foundations 2 and the longitudinal strip foundation 3 are assembled in a rectangular shape on the top of the raft foundation base 1, and during assembly, the assembly holes 4 at the bottom ends of each transverse strip foundation 2 and the longitudinal strip foundation 3 are respectively plugged into the prefabricated rods 5 on the top of the raft foundation base 1. After that, each connecting column 8 provided with a first steel bar 9 is respectively close to each transverse strip foundation 2 and the longitudinal strip foundation 3 and close to one side end, so that each connecting column 8 is clamped in the common internal position of the first clamping groove 6 and the second clamping groove 7 on each side. At this time, the two transverse strip foundations 2 and the longitudinal strip foundation 3 are in an assembly pre-positioned state at the top of the raft foundation base 1. Under the joint action of each metal connecting sheet 11 and its side end bolt member 12, they are fixedly assembled at the connection between the raft foundation base 1 and the outer side wall of the bottom end of each transverse strip foundation 2 and the longitudinal strip foundation 3, thereby completing the assembly operation of the prefabricated foundation of the temporary board house;
[0037] Among them, when assembling the raft foundation base 1 and each horizontal strip foundation 2 and longitudinal strip foundation 3, due to their large mass, they need to be hoisted, transferred and assisted in installation by a suitable crane (this operation cannot be completed independently by humans). At this time, each auxiliary structure set at the top of the three can be used to cooperate with the crane to complete it. In this process, the sealing chuck 16 is first extracted and moved away from the top of the reserved groove 13, so that the metal ring 14 inside the reserved groove 13 is exposed, and then the external traction rope is tied to the metal ring 14 to realize the hoisting of the raft foundation base 1 and each horizontal strip foundation 2 and longitudinal strip foundation 3. After the hoisting and assembly are completed, each sealing chuck 16 needs to be clamped and reset inside the top of the reserved groove 13.
[0038] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A temporary prefabricated foundation for a board house with a strip foundation combined with a raft foundation, comprising a raft foundation base (1), characterized in that: The top of the raft foundation base (1) is provided with two transverse strip foundations (2), and longitudinal strip foundations (3) are provided on both sides of a position between the two transverse strip foundations (2), and the two transverse strip foundations (2) and the longitudinal strip foundations (3) are distributed in a rectangular shape on the periphery of the top of the raft foundation base (1), and both sides of the bottom of each of the transverse strip foundations (2) and the longitudinal strip foundations (3) are provided with assembly holes (4), and the inner wall of each assembly hole (4) is plugged with a prefabricated rod (5), and each prefabricated rod (5) is fixedly connected to the top of the raft foundation base (1), and each of the transverse strip foundations (2) is provided with a first clamping groove (6) vertically penetrating at one side end close to the longitudinal strip foundation (3), and each of the longitudinal strip foundations (3) is provided with a second clamping groove (7) vertically penetrating at one side end close to the transverse strip foundation (2), and a connecting column (8) is clamped at the connection between the first clamping groove (6) and the second clamping groove (7) on each side, and a plurality of first steel bars (9) are fixedly provided in a triangular shape on both sides of the connecting column (8).
2. The temporary prefabricated foundation of a strip foundation combined with a raft foundation according to claim 1 is characterized by: The first card slot (6) and the second card slot (7) on each side are both in a "T"-shaped slot structure, and the first card slot (6) and the second card slot (7) on each side are both symmetrically distributed, and each connecting column (8) is in an "I"-shaped column structure.
3. The temporary prefabricated foundation of a strip foundation combined with a raft foundation according to claim 1 is characterized by: A plurality of second reinforcement members (10) are fixedly arranged at the middle position of each of the transverse strip bases (2) and the longitudinal strip bases (3), and the vertical height of each of the second reinforcement members (10) is consistent with that of the first reinforcement member (9).
4. The temporary prefabricated foundation of a strip foundation combined with a raft foundation according to claim 1 is characterized by: A metal connecting piece (11) is provided at the connection between the top of the raft foundation base (1) and the outer side wall of the bottom end of each transverse strip foundation (2) and the longitudinal strip foundation (3), and bolts (12) are threadedly connected to both side ends of each metal connecting piece (11).
5. The temporary prefabricated foundation of a strip foundation combined with a raft foundation according to claim 4 is characterized by: The metal connecting sheet (11) is an "L"-shaped sheet structure, and the bolt members (12) on both sides are distributed in an axisymmetric manner at both side ends of the metal connecting sheet (11).
6. The temporary prefabricated foundation of a strip foundation combined with a raft foundation according to claim 1 is characterized by: Auxiliary structures are arranged at the four corners of the top of the raft foundation base (1) and on both sides of the top of each transverse strip foundation (2) and longitudinal strip foundation (3), and the auxiliary structure comprises a reserved groove (13). A metal hanging ring (14) is arranged on the lower side of the inside of the reserved groove (13). A plurality of fixing ribs (15) are fixedly connected to the outer wall of the bottom end of the metal hanging ring (14). The fixing ribs (15) are fixedly arranged on the inner wall of the bottom end of the reserved groove (13). A sealing chuck (16) is clamped on the inner wall of the top end of the reserved groove (13).
7. The temporary prefabricated foundation of a strip foundation combined with a raft foundation according to claim 6 is characterized by: The blocking chuck (16) is located above the metal hanging ring (14), and the blocking chuck (16) is in a circular disc-shaped structure, and a hand-holding groove is provided at the top of the blocking chuck (16).
