Supporting device for mounting steel truss
By designing a support device for steel trusses and using threaded tie rods with opposite rotation directions to adjust the spacing of the steel trusses, the problem of low installation efficiency of steel trusses in the construction of super high-rise steel structures was solved, and efficient correction and stable connection were achieved.
Patent Information
- Application Number
- CN202323400475.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-13
AI Technical Summary
At the construction site of super high-rise steel structures, the installation of steel trusses is hampered by wind loads, making measurement and correction inconvenient and resulting in low installation efficiency.
Design a support device for steel trusses. By setting tie rods with oppositely helical thread sections at both ends of the frame, the distance between the steel truss and the main steel structure can be adjusted by rotating the tie rods, thus achieving correction.
It improves the efficiency of steel truss installation, simplifies the calibration process, and enhances the convenience of operation and the stability of installation.
Smart Images

Figure CN221989928U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a supporting device for installing a steel truss. Background Art
[0002] At present, in the existing super-high-rise steel structure construction sites, segmented lifting is usually used during the installation of steel structure trusses. In order to ensure the installation accuracy of the trusses, measurement and correction are required for each installation of a truss. As the number of floors of buildings increases, the impact of wind loads becomes greater and greater. It is inconvenient to measure and correct the steel structure trusses, and the installation efficiency of the steel structure trusses is not high. Utility Model Content
[0003] The utility model aims to provide a supporting device for installing a steel truss, which is used to facilitate the correction of the steel structure truss.
[0004] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: A supporting device for a steel truss comprises:
[0005] The frame body has symmetrical structures at both ends of the frame body. First threaded holes are respectively provided at both ends of the frame body, and the axial direction of the first threaded holes is parallel to the extension direction of the frame body;
[0006] The two pull rods each have a first threaded section and a second threaded section, the first threaded section and the second threaded section have opposite directions of rotation, and the first threaded section and the second threaded section are arranged in sequence along the length direction of the pull rod, and the first threaded section is matched and connected with the first threaded hole;
[0007] Two first connecting plates are respectively arranged at two ends of the frame body, the first connecting plate is provided with a second threaded hole, the second threaded hole is matched and connected with the second rotation direction threaded section, and the first connecting plate is connected to the frame body through a pull rod;
[0008] The first ear plate is fixedly connected to a side of the first connecting plate away from the frame body, wherein the first ear plate arranged on one of the first connecting plates is used to connect to the main steel structure, and the first ear plate arranged on the other first connecting plate is used to connect to the steel truss.
[0009] Optionally, in the above-mentioned support device for steel truss installation, the frame body includes:
[0010] beam;
[0011] The diagonal brace is obliquely arranged between two adjacent beams;
[0012] The second connecting plate is arranged at both ends of the cross beam, the supporting surface of the second connecting plate is perpendicular to the extension direction of the cross beam, the second connecting plate is provided with a first threaded hole, and the second connecting plate is connected to the first connecting plate through a pull rod.
[0013] Optionally, the above-mentioned support device for steel truss installation also includes a first clamp assembly and a second clamp assembly, the first clamp assembly and the second clamp assembly have the same structure, the first clamp assembly and the second clamp assembly both have a fixed end and a connecting end, the fixed end of the first clamp assembly is used to connect to the main steel structure, the connecting end of the first clamp assembly is used to connect to one of the first ear plates, the fixed end of the second clamp assembly is used to connect to the steel truss, and the connecting end of the second clamp assembly is used to connect to the other first ear plate.
[0014] Optionally, in the above-mentioned support device for steel truss installation, the first hoop assembly includes:
[0015] Two third connecting plates arranged in parallel are arranged in close contact with the outer surface of the main steel structure;
[0016] A second ear plate, arranged on one of the third connecting plates, the second ear plate being used for being fixedly connected to the first ear plate;
[0017] The first fastener passes through two third connecting plates arranged in parallel in sequence, and the first fastener is used to fasten the third connecting plates to the main steel structure.
[0018] Optionally, in the above-mentioned support device for steel truss installation, two first ear plates are arranged on the first connecting plate, the two first ear plates are arranged at intervals, and the gap between the two first ear plates is used to place the second ear plate. The support device also includes a second fastener, which is used to pass through the first ear plate and the second ear plate in sequence to connect and fix.
[0019] Optionally, in the above-mentioned support device for steel truss installation, the first fastener is a high-strength bolt;
[0020] And / or, the second fastener is a high-strength bolt.
[0021] Compared with the prior art, when the above technical solution is adopted, the operator connects the first ear plates provided on the first connecting plates at both ends of the frame to the main steel structure and the steel truss respectively. After the connection and fixation are completed, the verticality of the steel truss is measured. After the measurement is completed, only one of the pull rods needs to be rotated forward or reversely so that the two first connecting plates move closer to or away from each other toward the frame. In this process, the first connecting plate drives the first ear plate to move together, and the first ear plate pulls the steel truss and adjusts the distance between the steel truss and the main steel structure to complete the correction of the steel truss. Compared with the traditional method in which each section of the truss needs to be measured and corrected, the present application only needs to rotate the pull rod after the installation is completed to realize the correction of the steel truss, which is convenient for operation and improves the installation efficiency of the steel truss. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0023] Figure 1 This is a structural schematic diagram of a support device for steel truss installation in an embodiment of the utility model;
[0024] Figure 2 for Figure 1 Side view of
[0025] Figure 3 This is a structural schematic diagram of a first clamp assembly of a support device for steel truss installation in an embodiment of the utility model;
[0026] Figure 4 for Figure 3 Side view of.
[0027] Reference numerals:
[0028] 1-frame; 101-crossbeam; 102-diagonal brace; 103-second connecting plate; 2-pull rod; 3-first connecting plate;
[0029] 4-first ear plate; 5-first clamp assembly; 501-third connecting plate; 502-second ear plate; 503-first fastener. DETAILED DESCRIPTION
[0030] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0031] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0032] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined. The meaning of "several" is one or more, unless otherwise clearly and specifically defined.
[0033] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0034] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0035] like Figure 1-Figure 4 As shown, the embodiment of the utility model provides a support device for a steel truss, hereinafter referred to as the support device, which includes: a frame body 1, two tie rods 2, two first connecting plates 3 and a first ear plate 4.
[0036] Among them, the structures at both ends of the frame body 1 are symmetrical, and a first threaded hole is respectively provided at both ends of the frame body 1, and the axial direction of the first threaded hole is parallel to the extension direction of the frame body 1; the two pull rods 2 both have a first rotational direction thread segment and a second rotational direction thread segment, the rotation directions of the first rotational direction thread segment and the second rotational direction thread segment are opposite, and the first rotational direction thread segment and the second rotational direction thread segment are arranged in sequence along the length direction of the pull rod 2, and the first rotational direction thread segment is matched and connected with the first threaded hole; the two first connecting plates 3 are respectively arranged at the two ends of the frame body 1, and the first connecting plate 3 is provided with a second threaded hole, and the second threaded hole is matched and connected with the second rotational direction thread segment, and the first connecting plate 3 is connected to the frame body 1 through the pull rod 2; the first ear plate 4 is fixedly connected to the side of the first connecting plate 3 away from the frame body 1, and the first ear plate 4 set on one of the first connecting plates 3 is used to connect with the main steel structure, and the first ear plate 4 set on the other first connecting plate 3 is used to connect with the steel truss.
[0037] When implementing it, Figure 1As shown, the operator connects the first ear plates 4 provided on the first connecting plates 3 at both ends of the frame 1 to the main steel structure and the steel truss respectively. After the connection and fixation are completed, the verticality of the steel truss is measured. After the measurement is completed, only one of the pull rods 2 needs to be rotated forward or reversely so that the two first connecting plates 3 move closer to or away from each other toward the frame 1. During this process, the first connecting plate 3 drives the first ear plate 4 to move together. The first ear plate 4 pulls the steel truss and adjusts the distance between the steel truss and the main steel structure to complete the correction of the steel truss. Compared with the traditional method that each section of the truss needs to be measured and corrected after installation, the present application only needs to rotate the pull rod 2 after installation to achieve the correction of the steel truss, which is convenient for operation and improves the installation efficiency of the support device.
[0038] like Figure 1 As shown, specifically, in this embodiment, the frame 1 includes: a crossbeam 101, a diagonal brace 102 and a second connecting plate 103, the diagonal brace 102 is obliquely arranged between two adjacent crossbeams 101; the second connecting plate 103 is arranged at both ends of the crossbeam 101, the supporting surface of the second connecting plate 103 is perpendicular to the extension direction of the crossbeam 101, the second connecting plate 103 is provided with a first threaded hole, and the second connecting plate 103 is connected to the first connecting plate 3 through a pull rod 2. Among them, the cross beam 101 adopts 40 angle steel with a thickness of 3mm, the diagonal brace 102 adopts 20 angle steel with a thickness of 3mm, and the second connecting plate 103 adopts a steel plate with a length and width of 300mm. One, two, three, six, etc. steel plates with a length and width of 400mm can be arranged between the second connecting plates 103 arranged at both ends of the cross beam 101. When multiple steel plates are arranged on the cross beam 101, the spacing between two adjacent steel plates is 500mm-600mm, that is, the spacing between two adjacent steel plates is 100mm-200mm. The distance can be 500mm, 520mm, 535mm, 576mm, 600mm, etc. The spacing between the steel plates is adjusted according to the actual length of use, and the steel plates are fixed to the crossbeam 101 with M20 high-strength bolts. There is no specific limitation on the number and arrangement spacing of the steel plates. As long as the number and spacing of the steel plates meet the support requirements, the frame 1 is composed of the crossbeam 101, the diagonal brace 102 and the second connecting plate 103, which ensures the reliability and stability of the frame 1 structure.
[0039] Specifically, in this embodiment, the support device further includes a first hoop assembly 5 and a second hoop assembly, the first hoop assembly 5 and the second hoop assembly have the same structure, and both the first hoop assembly 5 and the second hoop assembly have a fixed end and a connecting end, the fixed end of the first hoop assembly 5 is used to connect with the main steel structure, the connecting end of the first hoop assembly 5 is used to connect with one of the first ear plates 4, the fixed end of the second hoop assembly is used to connect with the steel truss, and the connecting end of the second hoop assembly is used to connect with another first ear plate 4. After the construction personnel connect and fix the fixed end of the first hoop assembly 5 with the main steel structure, and then connect and fix the fixed end of the second hoop assembly with the steel truss, the frame 1 is placed between the main steel structure and the steel truss, the first ear plate 4 set at one end of the frame 1 is connected and fixed to the connecting end of the first hoop assembly 5, and the first ear plate 4 set at the other end of the frame 1 is connected and fixed to the connecting end of the second hoop assembly, thereby ensuring the reliability and stability of the connection structure between the support device, the main steel structure and the steel truss. Among them, welding, bolt connection or other fixed connection methods can be used between the connecting ends of the first ear plate 4 and the first clamp assembly 5, and between the connecting ends of the first ear plate 4 and the second clamp assembly. The fixed connection method between the connecting ends of the first ear plate 4 and the first clamp assembly 5, and between the connecting ends of the first ear plate 4 and the second clamp assembly are not specifically limited here, as long as the stability of the connection structure is met between the connecting ends of the first ear plate 4 and the first clamp assembly 5, and between the connecting ends of the first ear plate 4 and the second clamp assembly.
[0040] like Figure 3 and Figure 4As shown, specifically, in this embodiment, the first clamp assembly 5 includes: a third connecting plate 501, a second ear plate 502 and a first fastener 503, two parallel third connecting plates 501 are arranged in close contact with the outer surface of the main steel structure; the second ear plate 502 is arranged on one of the third connecting plates 501, and the second ear plate 502 is used to be fixedly connected with the first ear plate 4; the first fastener 503 sequentially passes through the two parallel third connecting plates 501, and the first fastener 503 is used to fasten the third connecting plate 501 to the main steel structure. The construction personnel firstly set the two third connecting plates 501 in parallel and in close contact with the outer surface of the main steel structure, and then pass the first fastener 503 sequentially through the two third connecting plates 501 and fasten them, completing the installation and fixation of the first clamp assembly 5, and finally connect and fix the first ear plate 4 of the frame 1 with the second ear plate 502. Among them, the third connecting plate 501 adopts a steel plate with a length and width of 600 mm. One, two, three, five, eight or more first fasteners 503 can be arranged between the two third connecting plates 501, and multiple first fasteners 503 are arranged at intervals. There is no specific limitation on the number and arrangement position of the first fasteners 503, as long as the first fasteners 503 can connect and fasten the two third connecting plates 501 to the outer surface of the main steel structure.
[0041] like Figure 1 and Figure 2 As shown, specifically, in this embodiment, two first ear plates 4 are arranged on the first connecting plate 3, and the two first ear plates 4 are arranged at intervals. The gap between the two first ear plates 4 is used to place the second ear plate 502. The supporting device also includes a second fastener, and the second fastener is used to sequentially pass through the first ear plate 4 and the second ear plate 502 to connect and fix. Two first ear plates 4 are arranged at intervals on the first connecting plate 3, and the second ear plate 502 is placed in the gap between the two first ear plates 4. The second fastener sequentially passes through the first ear plate 4 and the second ear plate 502, wherein both the first ear plate 4 and the second ear plate 502 have mounting holes, and the mounting holes are A22 circular holes. After the second fastener sequentially passes through the mounting holes on the first ear plate 4 and the mounting holes on the second ear plate 502, the first ear plate 4 and the second ear plate 502 are connected and fixed, thereby ensuring the reliability and stability of the connection structure between the supporting device, the main steel structure and the steel truss, and facilitating turnover.
[0042] Specifically, in this embodiment, the first fastener 503 is a high-strength bolt; and / or, the second fastener is a high-strength bolt. That is, only the first fastener 503 uses a high-strength bolt or only the second fastener uses a high-strength bolt, or both the first fastener 503 and the second fastener use a high-strength bolt. High-strength bolts can withstand large loads and have good corrosion resistance, which increases the service life of the first fastener 503 and the second fastener, and ensures the stability and reliability of the connection structure of the support device.
[0043] In the description of the above embodiments, specific features, structures, materials or characteristics may be combined in a suitable manner in any one or more embodiments or examples.
[0044] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A support device for steel truss installation, It is characterized in that include: A frame body, wherein the two ends of the frame body have symmetrical structures, and the two ends of the frame body are respectively provided with first threaded holes, and the axial direction of the first threaded holes is parallel to the extension direction of the frame body; Two pull rods, each having a first threaded section and a second threaded section, the first threaded section and the second threaded section have opposite directions of rotation, and the first threaded section and the second threaded section are arranged in sequence along the length direction of the pull rod, and the first threaded section is matched and connected with the first threaded hole; Two first connecting plates are respectively arranged at two ends of the frame body, the first connecting plate is provided with a second threaded hole, the second threaded hole is matched and connected with the second rotation direction threaded section, and the first connecting plate is connected to the frame body through the pull rod; The first ear plate is fixedly connected to a side of the first connecting plate away from the frame body, wherein the first ear plate arranged on one of the first connecting plates is used to connect to the main steel structure, and the first ear plate arranged on the other first connecting plate is used to connect to the steel truss.
2. The support device for steel truss installation according to claim 1, It is characterized in that The frame comprises: beam; The diagonal brace is obliquely arranged between two adjacent beams; The second connecting plate is arranged at both ends of the cross beam, the supporting surface of the second connecting plate is perpendicular to the extension direction of the cross beam, the second connecting plate is provided with the first threaded hole, and the second connecting plate is connected to the first connecting plate through the pull rod.
3. The support device for steel truss installation according to claim 1, It is characterized in that It also includes a first hoop assembly and a second hoop assembly, the first hoop assembly and the second hoop assembly have the same structure, the first hoop assembly and the second hoop assembly both have a fixed end and a connecting end, the fixed end of the first hoop assembly is used to connect to the main steel structure, the connecting end of the first hoop assembly is used to connect to one of the first ear plates, the fixed end of the second hoop assembly is used to connect to the steel truss, and the connecting end of the second hoop assembly is used to connect to the other first ear plate.
4. The support device for steel truss installation according to claim 3, It is characterized in that The first clamp assembly comprises: Two third connecting plates arranged in parallel are arranged in close contact with the outer surface of the main steel structure; a second ear plate, arranged on one of the third connecting plates, the second ear plate being used for being fixedly connected to the first ear plate; The first fastener passes through the two third connecting plates arranged in parallel in sequence, and the first fastener is used to fasten the third connecting plate to the main steel structure.
5. The support device for steel truss installation according to claim 4, It is characterized in that Two first ear plates are arranged on the first connecting plate, and the two first ear plates are arranged at intervals. The gap between the two first ear plates is used to place the second ear plate. The supporting device also includes a second fastener, and the second fastener is used to pass through the first ear plate and the second ear plate in sequence to connect and fix.
6. The support device for steel truss installation according to claim 5, It is characterized in that The first fastener is a high-strength bolt; And / or, the second fastener is a high-strength bolt.