Construction device for plugging two ends of shear wall
By designing an automated shear wall sealing construction device at both ends, using the moving mechanism, limiting mechanism and slurry mechanism, the problems of high labor intensity and low efficiency during the sealing of the bolt holes of the prefabricated shear wall are solved, and automated operation is realized , improves work efficiency and convenience.
Patent Information
- Application Number
- CN202420353499.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-02-26
AI Technical Summary
In the prior art, the labor intensity and efficiency of the bolt hole sealing process of prefabricated shear walls are high and low, resulting in sore arms of staff, and an automated construction equipment is needed to improve efficiency and convenience.
A shear wall sealing construction device including a base plate, a moving mechanism, a limiting mechanism, a clamping mechanism and a slurry coating mechanism is designed. It can automatically apply cement to the surface of the cement rod and insert it into the bolt hole, and then use electric power. Components such as slide rails, hydraulic cylinders, slow motors and mortar pumps are automated to adapt to the blocking of bolt holes at different heights and positions.
The process of automatically sealing bolt holes on prefabricated shear walls is realized, which reduces labor intensity, improves work efficiency and convenience, and reduces arm soreness.
Smart Images

Figure CN221989935U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a construction device for blocking both ends of a shear wall. Background Art
[0002] Shear walls are also called wind-resistant walls, earthquake-resistant walls or structural walls. They are walls in houses or structures that mainly bear horizontal loads caused by wind loads or earthquakes to prevent structural shear damage. During the production process of prefabricated shear walls, due to construction needs, multiple 10-30mm tension bolt holes will be left on the shear walls. After the prefabricated shear walls solidify, the tension bolts on the walls are pulled out, and the staff are required to seal the tension bolt holes left on the shear walls. At present, the way for workers to seal the bolt holes on the shear wall is generally to rely on construction workers to apply mortar to prefabricated cement rods, and then insert the prefabricated cement rods into the bolt holes of the shear wall. After that, the workers use concrete mortar to smooth the bolt holes at both ends of the shear wall. In the process of sealing the bolt holes on the shear wall, it is found that it relies on the workers to manually apply mortar on the cement rods and insert the cement rods into the bolt holes. Not only is the labor intensity high, but the work efficiency is also low. After working for a long time, it will cause arm pain for the workers. Therefore, a construction equipment that can automatically seal the bolt holes on the prefabricated shear wall is needed. Utility Model Content
[0003] In order to solve the above technical problems, the utility model provides a shear wall end-blocking construction device which can automatically apply cement to the surface of a cement rod when blocking the bolt holes on a prefabricated shear wall, and can automatically insert the cement rod into the bolt holes of the prefabricated shear wall. The device is easy to use, has low labor intensity, and is highly practical.
[0004] The utility model discloses a shear wall two-end blocking construction device, comprising a base plate; further comprising two groups of moving mechanisms, a limiting mechanism, a clamping mechanism and a grouting mechanism, wherein the two groups of moving mechanisms are respectively mounted on the left and right parts of the base plate, the limiting mechanism is mounted on the moving mechanism on the left, the limiting mechanism is used to limit the cement rod, the grouting mechanism and the clamping mechanism are both mounted on the moving mechanism on the right, the grouting mechanism has a grouting function, and the clamping mechanism has a clamping and fixing function; when blocking the tension bolts that are connected to the left and right sides of the prefabricated shear wall, the prefabricated shear wall is first supported and fixed on the base plate, and the prefabricated shear wall can be fixed on the base plate by supporting with a support rod or by clamping and fixing with a vise; then the limiting mechanism on the left is moved by the moving mechanism on the left until the limiting mechanism is tightly attached to the left end of the bolt hole, and then the limiting mechanism is passed. The cement rod is clamped and fixed by the clamping mechanism, and the expansion cement is automatically applied to the cement rod by the slurry coating mechanism. Then, the clamping mechanism on the right side drives the cement rod coated with the expansion cement to move into the bolt hole of the prefabricated shear wall through the moving mechanism on the right side, and the left end of the cement rod is positioned by the limiting mechanism. After the cement rod is inserted into the bolt hole of the prefabricated shear wall, the expansion cement on the surface of the cement rod fixes and bonds the cement rod to the bolt hole of the prefabricated shear wall. After that, the staff can use tools such as a trowel to apply mortar to smooth the two ends of the bolt hole. When the bolt hole on the prefabricated shear wall is blocked, cement can be automatically applied to the surface of the cement rod, and the cement rod can be automatically inserted into the bolt hole of the prefabricated shear wall. It is easy to use, has low labor intensity, and is highly practical.
[0005] Preferably, the moving mechanism includes an electric slide rail A, a slider A, a support plate, an electric slide rail B, a slider B and a lifting mechanism, the electric slide rail A is fixedly mounted on the base plate, the slider A is slidably mounted on the base plate, the electric slide rail A is used to move the slider A forward and backward, the support plate is mounted on the slider A through the lifting mechanism, the electric slide rail B is fixedly mounted on the support plate, the slider B is slidably mounted on the electric slide rail B left and right, the electric slide rail B is used to move the slider B left and right, and the clamping mechanism and the limiting mechanism are respectively mounted on the two groups of sliders B; when the bolt holes on the prefabricated shear wall are blocked, the slider A can drive the lifting mechanism to move forward and backward through the electric slide rail A, the lifting mechanism can enable the slider B to move in the front and rear direction through the support plate and the electric slide rail B, the lifting mechanism can enable the electric slide rail B to drive the slider B to adjust the height through the support plate, since the slider B can adjust the height and the slider B can move in the front and rear direction, the two groups of sliders B can drive the limiting mechanism and the clamping mechanism to move forward and backward and adjust the height, so it can block the bolt holes at different heights and different positions in the front and rear direction on the prefabricated shear wall, which is easy to use, has low limitations and high practicality.
[0006] Preferably, the lifting mechanism includes a hydraulic cylinder, a push rod, a support and a sliding column. The hydraulic cylinder is fixedly mounted on the slider A, the lower end of the push rod is connected to the output end of the hydraulic cylinder, the support is fixedly mounted on the slider A, the lower part of the sliding column is slidably mounted on the support, and the support plate is fixedly mounted on the upper end of the sliding column and the push rod; when the bolt holes on the prefabricated shear wall are blocked, the hydraulic cylinder is opened, and the hydraulic cylinder can adjust the height of the support plate through the push rod, and the support plate can adjust the height of the slider B through the electric slide rail B; two sets of sliders B can adjust the height of the limiting mechanism and the clamping mechanism, so it can block the bolt holes at different heights on the prefabricated shear wall, it is easy to use, and has low limitations.
[0007] Preferably, the limiting mechanism includes a supporting plate, a fixing rod and a limiting plate, the supporting plate is fixedly mounted on the slider B on the left, the fixing rod is fixedly mounted on the supporting plate, and the limiting plate is fixedly mounted on the right end of the fixing rod; when the bolt hole on the prefabricated shear wall is blocked, the slider B is moved up and down and forward and backward to align the limiting plate with the left end of the bolt hole on the prefabricated shear wall, and then the slider B is driven by the electric slide rail B to move the supporting plate to the right, and the supporting plate moves the limiting plate to the right through the fixing rod until the limiting plate is tightly attached to the left end of the bolt, and when the cement rod is inserted into the bolt hole of the prefabricated shear wall, the left end of the cement rod contacts the limiting plate, which means that the cement rod is inserted to an appropriate depth, thereby improving reliability.
[0008] Preferably, the clamping mechanism includes a support plate B, a slow motor, a drive shaft and a three-jaw chuck, the support plate B is fixedly mounted on the slider B on the right, the slow motor is fixedly mounted on the support plate B, the drive shaft is rotatably mounted on the support plate B, the right end of the drive shaft is connected to the output end of the slow motor, and the three-jaw chuck is fixedly mounted on the left end of the drive shaft; when the bolt hole on the prefabricated shear wall is blocked, the right end of the cement rod is first clamped and fixed by the three-jaw chuck, and then the three-jaw chuck drives the drive shaft and the three-jaw chuck to move by moving the slider B in the up-and-down direction and in the front-and-back direction, so that the cement rod is The rod is aligned with the bolt hole on the prefabricated shear wall, and then the slider B on the right side is slowly moved to the left through the electric slide rail B, and at the same time, the driving shaft drives the three-jaw chuck to rotate slowly through the slow motor, and the three-jaw chuck drives the cement rod to rotate slowly, and at the same time, the expansion cement is evenly applied to the surface of the cement rod through the slurry coating mechanism, and the slider B moves the cement rod to the left through the support plate B, the driving shaft and the three-jaw chuck until the cement rod is inserted into the bolt hole of the prefabricated shear wall, so that the prefabricated shear wall is tightly bonded to the bolt hole of the prefabricated shear wall through the expansion cement; it is convenient to seal the bolt holes on the prefabricated shear wall and improves convenience.
[0009] Preferably, the slurry coating mechanism includes a support frame, a mortar pump and a cement rod, the support frame is fixedly mounted on the left part of the right support plate, the mortar pump is fixedly mounted on the upper end of the support frame, the input end of the mortar pump is provided with an input hose, the output end of the mortar pump is connected to a slurry discharge pipe, the output end of the mortar discharge pipe is directed downward, and a valve is provided on the slurry discharge pipe; the input hose is connected to an external cement storage tank, when the rotating cement rod moves to the left, the mortar pump is turned on, and the valve on the slurry discharge pipe is opened, the external expansive cement drips onto the cement rod via the input hose, the mortar pump and the slurry discharge pipe in turn, and since the cement rod rotates while moving to the left, the expansive cement ash is evenly smeared on the surface of the cement rod, so that the cement rod is fixedly bonded to the prefabricated shear wall through the expansive cement; the expansive cement can be automatically applied to the cement rod, which is convenient to use and highly practical.
[0010] Preferably, a lighting lamp is provided on the bottom plate; through the above arrangement, the top of the bottom plate is brighter, which facilitates the observation of the sealing status of the bolt holes and improves convenience.
[0011] Compared with the prior art, the utility model has the following beneficial effects: when the bolt holes on the prefabricated shear wall are sealed, cement can be automatically applied to the surface of the cement rod, and the cement rod can be automatically inserted into the bolt holes of the prefabricated shear wall. It is easy to use, has low labor intensity and high practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a first axonometric structural schematic diagram of the utility model;
[0013] Figure 2 It is a second axonometric structural schematic diagram of the utility model;
[0014] Figure 3 It is a structural schematic diagram of the electric slide rail A, the slider B and the hydraulic cylinder;
[0015] Figure 4 It is a schematic diagram of the structure of slider B, drive shaft and slow motor;
[0016] Figure 5 It is a schematic diagram of the structure of a mortar pump, a support frame, a three-jaw chuck, etc.
[0017] Markings in the attached drawings: 1. Base plate; 2. Electric slide rail A; 3. Slider A; 4. Support plate; 5. Electric slide rail B; 6. Slider B; 7. Hydraulic cylinder; 8. Push rod; 9. Pillar; 10. Sliding column; 11. Support plate; 12. Fixed rod; 13. Limit plate; 14. Support plate B; 15. Slow motor; 16. Drive shaft; 17. Three-jaw chuck; 18. Support frame; 19. Mortar pump; 20. Slurry discharge pipe; 21. Cement rod; 22. Prefabricated shear wall. DETAILED DESCRIPTION
[0018] In order to facilitate the understanding of the utility model, the utility model will be described more comprehensively below with reference to the relevant drawings. The utility model can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the utility model more thorough and comprehensive.
[0019] Example 1
[0020] like Figures 1 to 5 The utility model comprises a shear wall two-end blocking construction device comprising a base plate 1, two groups of moving mechanisms, a limiting mechanism, a clamping mechanism and a grouting mechanism. The two groups of moving mechanisms are respectively installed on the left and right parts of the base plate 1, the limiting mechanism is installed on the moving mechanism on the left, the limiting mechanism is used to limit the cement rod, the grouting mechanism and the clamping mechanism are both installed on the moving mechanism on the right, the grouting mechanism has a grouting function, and the clamping mechanism has a clamping and fixing function; when the tension bolts communicating on the left and right sides of the prefabricated shear wall 22 are blocked, the prefabricated shear wall 22 is first supported and fixed on the base plate 1, and the method of fixing the prefabricated shear wall 22 on the base plate 1 can be supported by a support rod or clamped and fixed by a vise; then the limiting mechanism on the left is moved by the moving mechanism on the left until the limiting mechanism is tightly attached to the left end of the bolt hole, and then the cement rod 21 is fixed by the clamping mechanism The cement rod 21 is clamped and fixed, and the expansion cement is automatically applied to the cement rod 21 through the slurry coating mechanism, and then the clamping mechanism on the right side drives the cement rod 21 coated with the expansion cement to move into the bolt hole of the prefabricated shear wall 22 through the moving mechanism on the right side, and the left end of the cement rod 21 is positioned by the limiting mechanism. After the cement rod 21 is inserted into the bolt hole of the prefabricated shear wall 22, the expansion cement on the surface of the cement rod 21 fixes and bonds the cement rod 21 to the bolt hole of the prefabricated shear wall 22, and then the staff uses tools such as a trowel to apply mortar to smooth the two ends of the bolt hole; when the bolt hole on the prefabricated shear wall 22 is blocked, cement can be automatically applied to the surface of the cement rod 21, and the cement rod 21 can be automatically inserted into the bolt hole of the prefabricated shear wall 22, which is easy to use, has low labor intensity, and is highly practical.
[0021] like Figure 1 and Figure 2The moving mechanism includes an electric slide rail A2, a slider A3, a support plate 4, an electric slide rail B5, a slider B6 and a lifting mechanism. The electric slide rail A2 is fixedly mounted on the bottom plate 1, and the slider A3 is slidably mounted on the bottom plate 1. The electric slide rail A2 is used to move the slider A3 forward and backward. The support plate 4 is mounted on the slider A3 through a lifting mechanism. The electric slide rail B5 is fixedly mounted on the support plate 4. The slider B6 is slidably mounted on the electric slide rail B5. The electric slide rail B5 is used to move the slider B6 left and right. The clamping mechanism and the limit mechanism are respectively mounted on the two groups of sliders B6; when the bolt holes on the prefabricated shear wall 22 are blocked, The slider A3 can drive the lifting mechanism to move forward and backward through the electric slide rail A2, and the lifting mechanism can move the slider B6 in the front and rear direction through the support plate 4 and the electric slide rail B5. The lifting mechanism can use the support plate 4 to allow the electric slide rail B5 to drive the slider B6 to adjust the height. Since the slider B6 can adjust the height and move in the front and rear direction, the two groups of sliders B6 can drive the limiting mechanism and the clamping mechanism to move forward and backward and adjust the height, so it can seal the bolt holes at different heights and different positions in the front and rear direction on the prefabricated shear wall 22. It is easy to use, has low limitations, and is highly practical.
[0022] like Figure 3 The lifting mechanism includes a hydraulic cylinder 7, a push rod 8, a support 9 and a sliding column 10. The hydraulic cylinder 7 is fixedly mounted on the slider A3. The lower end of the push rod 8 is connected to the output end of the hydraulic cylinder 7. The support 9 is fixedly mounted on the slider A3. The lower part of the sliding column 10 is slidably mounted on the support 9 up and down. The support plate 4 is fixedly mounted on the upper end of the sliding column 10 and the push rod 8. When the bolt holes on the prefabricated shear wall 22 are blocked, the hydraulic cylinder 7 is opened, and the hydraulic cylinder 7 can adjust the height of the support plate 4 through the push rod 8, and the support plate 4 can adjust the height of the slider B6 through the electric slide rail B5. The two sets of sliders B6 can adjust the height of the limiting mechanism and the clamping mechanism, so it can block the bolt holes at different heights on the prefabricated shear wall 22, which is easy to use and has low limitations.
[0023] like Figure 2 The limiting mechanism includes a supporting plate 11, a fixing rod 12 and a limiting plate 13. The supporting plate 11 is fixedly mounted on the slider B6 on the left side, the fixing rod 12 is fixedly mounted on the supporting plate 11, and the limiting plate 13 is fixedly mounted on the right end of the fixing rod 12. When the bolt hole on the prefabricated shear wall 22 is blocked, the limiting plate 13 is aligned with the left end of the bolt hole on the prefabricated shear wall 22 by moving the slider B6 up and down and forward and backward. Then, the slider B6 drives the supporting plate 11 to move rightward through the electric slide rail B5. The supporting plate 11 moves the limiting plate 13 to the rightward through the fixing rod 12 until the limiting plate 13 is tightly attached to the left end of the bolt. When the cement rod 21 is inserted into the bolt hole of the prefabricated shear wall 22, the contact between the left end of the cement rod 21 and the limiting plate 13 indicates that the cement rod 21 has been inserted to a suitable depth, thereby improving reliability.
[0024] like Figure 4 The clamping mechanism includes a support plate B14, a slow motor 15, a drive shaft 16 and a three-jaw chuck 17. The support plate B14 is fixedly mounted on the slider B6 on the right side, the slow motor 15 is fixedly mounted on the support plate B14, the drive shaft 16 is rotatably mounted on the support plate B14, the right end of the drive shaft 16 is connected to the output end of the slow motor 15, and the three-jaw chuck 17 is fixedly mounted on the left end of the drive shaft 16; when the bolt hole on the prefabricated shear wall 22 is blocked, the right end of the cement rod 21 is first clamped and fixed by the three-jaw chuck 17, and then the three-jaw chuck 17 drives the drive shaft 16 and the three-jaw chuck 17 to move through the movement of the slider B6 in the up-down direction and the front-back direction, so that the cement rod 21 is used to support the bolt holes on the prefabricated shear wall 22, and then the slider B6 on the right side is slowly moved to the left through the electric slide rail B5, and at the same time, the driving shaft 16 drives the three-jaw chuck 17 to rotate slowly through the slow motor 15, and the three-jaw chuck 17 drives the cement rod 21 to rotate slowly, and at the same time, the expansion cement is evenly applied to the surface of the cement rod 21 through the slurry coating mechanism, and the slider B6 moves the cement rod 21 to the left through the support plate B14, the driving shaft 16 and the three-jaw chuck 17 until the cement rod 21 is inserted into the bolt hole of the prefabricated shear wall 22, so that the prefabricated shear wall 22 is tightly bonded to the bolt hole of the prefabricated shear wall 22 through the expansion cement; it is convenient to seal the bolt holes on the prefabricated shear wall 22 and improve convenience.
[0025] like Figure 5 The slurry coating mechanism includes a support frame 18, a mortar pump 19 and a cement rod 21. The support frame 18 is fixedly installed on the left part of the right support plate 4, and the mortar pump 19 is fixedly installed on the upper end of the support frame 18. The input end of the mortar pump 19 is provided with an input hose, and the output end of the mortar pump 19 is connected with a slurry discharge pipe 20. The direction of the output end of the slurry discharge pipe 20 is downward, and a valve is provided on the slurry discharge pipe 20; the input hose is connected to an external cement storage tank, and when the rotating cement rod 21 moves to the left, the mortar pump 19 is opened, and the valve on the slurry discharge pipe 20 is opened, and the external expansion cement drips onto the cement rod 21 through the input hose, the mortar pump 19 and the slurry discharge pipe 20 in turn, and because the cement rod 21 rotates while moving to the left, the expansion cement ash is evenly smeared on the surface of the cement rod 21, so that the cement rod 21 is fixedly bonded to the prefabricated shear wall 22 through the expansion cement; the expansion cement can be automatically applied to the cement rod 21, which is convenient to use and highly practical. The bottom plate 1 is provided with an illumination lamp.
[0026] Example 2
[0027] On the basis of Example 1, the lifting mechanism can also adopt a lifting platform, so that the lifting platform is installed on the slider A3, and the support plate 4 is installed on the lifting platform. The height of the support plate 4 can also be adjusted through the lifting platform.
[0028] The electric slide rail A2, electric slide rail B5, hydraulic cylinder 7, sliding column 10, slow motor 15, three-jaw chuck 17 and mortar pump 19 of the shear wall end blocking construction device of the utility model are all purchased on the market. Technical personnel in the industry only need to install and operate them according to the accompanying instruction manual, without the need for technical personnel in this field to make creative labor.
[0029] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A shear wall end blocking construction device, comprising a bottom plate (1); characterized in that: The invention also comprises two groups of moving mechanisms, a limiting mechanism, a clamping mechanism and a slurry coating mechanism. The two groups of moving mechanisms are respectively mounted on the left and right parts of the bottom plate (1). The limiting mechanism is mounted on the moving mechanism on the left side and is used to limit the cement rod. The slurry coating mechanism and the clamping mechanism are both mounted on the moving mechanism on the right side. The slurry coating mechanism has a slurry coating function and the clamping mechanism has a clamping and fixing function.
2. A shear wall end blocking construction device as claimed in claim 1, characterized in that: The moving mechanism comprises an electric slide rail A (2), a slider A (3), a support plate (4), an electric slide rail B (5), a slider B (6) and a lifting mechanism, wherein the electric slide rail A (2) is fixedly mounted on a base plate (1), the slider A (3) is slidably mounted on the base plate (1), the electric slide rail A (2) is used to move the slider A (3) forward and backward, the support plate (4) is mounted on the slider A (3) through the lifting mechanism, the electric slide rail B (5) is fixedly mounted on the support plate (4), the slider B (6) is slidably mounted on the electric slide rail B (5), the electric slide rail B (5) is used to move the slider B (6) left and right, and the clamping mechanism and the limiting mechanism are respectively mounted on the two groups of sliders B (6).
3. A shear wall end blocking construction device as claimed in claim 2, characterized in that: The lifting mechanism comprises a hydraulic cylinder (7), a push rod (8), a support column (9) and a sliding column (10); the hydraulic cylinder (7) is fixedly mounted on a sliding block A (3); the lower end of the push rod (8) is connected to the output end of the hydraulic cylinder (7); the support column (9) is fixedly mounted on the sliding block A (3); the lower part of the sliding column (10) is slidably mounted on the support column (9) up and down; and the support plate (4) is fixedly mounted on the upper ends of the sliding column (10) and the push rod (8).
4. A shear wall end blocking construction device as claimed in claim 2, characterized in that: The limiting mechanism comprises a support plate (11), a fixing rod (12) and a limiting plate (13); the support plate (11) is fixedly mounted on the left sliding block B (6); the fixing rod (12) is fixedly mounted on the support plate (11); and the limiting plate (13) is fixedly mounted on the right end of the fixing rod (12).
5. A shear wall end blocking construction device as claimed in claim 2, characterized in that: The clamping mechanism comprises a support plate B (14), a slow motor (15), a driving shaft (16) and a three-jaw chuck (17); the support plate B (14) is fixedly mounted on the right side slider B (6); the slow motor (15) is fixedly mounted on the support plate B (14); the driving shaft (16) is rotatably mounted on the support plate B (14); the right end of the driving shaft (16) is connected to the output end of the slow motor (15); and the three-jaw chuck (17) is fixedly mounted on the left end of the driving shaft (16).
6. A shear wall end blocking construction device as claimed in claim 2, characterized in that: The slurry coating mechanism comprises a support frame (18), a mortar pump (19) and a cement rod (21); the support frame (18) is fixedly mounted on the left part of the right support plate (4); the mortar pump (19) is fixedly mounted on the upper end of the support frame (18); an input hose is arranged at the input end of the mortar pump (19); the output end of the mortar pump (19) is connected to a slurry discharge pipe (20); the output end of the slurry discharge pipe (20) faces downward; and a valve is arranged on the slurry discharge pipe (20).
7. A shear wall end blocking construction device as claimed in claim 1, characterized in that: The bottom plate (1) is provided with an illumination lamp.