Circulating system between pier pile foundation construction holes in water
By using steel casing and mud overflow pipe system in water pier pile foundation construction, the initial and secondary settlement of mud is achieved, and the problems of poor sedimentation effect of conventional sedimentation tanks and mud overflowing into the water are solved, and the mud is realized efficient recycling and environmental protection of water.
Patent Information
- Application Number
- CN202420386568.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-02-28
AI Technical Summary
During the construction of pier pile foundations in water, conventional sedimentation tanks cannot effectively settle mud, causing mud to overflow into the water body, causing pollution.
The steel casing and mud overflow pipe system are used to realize the recycling of mud through the primary settlement and secondary settlement zones, and the steel casing is used as a multi-functional sedimentation tank and conveying pipe for the extraction and settlement of mud.
It effectively prevents mud from overflowing into the water body, improves the precipitation effect of mud, realizes efficient recycling of mud, and ensures environmental protection of water body.
Smart Images

Figure CN221990318U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of underwater pile foundation construction, and in particular relates to an inter-hole circulation system for underwater pier pile foundation construction. Background Art
[0002] Due to geographical location and terrain conditions, many highway, railway, and construction projects generally involve the construction of underwater bridge piers. In the construction of underwater pier pile foundations, impact drilling is required to assist with mud wall protection, but for the circulation of mud, mud pools and sedimentation tanks are usually used for mud circulation. Since the conventional sedimentation is only carried out once in the sedimentation tank, the sedimentation effect is not good; when the pile foundation is poured with mud, there is also the problem of mud overflowing into the water and causing water pollution. Utility Model Content
[0003] The utility model aims to provide an inter-hole circulation system for the construction of underwater pier pile foundations, which ingeniously uses steel casings to complete secondary sedimentation, connects the steel casings to prevent mud from overflowing, and solves the problems of only one sedimentation in the sedimentation tank, resulting in poor sedimentation effect, and the overflow of mud poured from the pile foundation into the water, causing water pollution.
[0004] To this end, the technical solution adopted by the utility model is: a circulation system between construction holes of underwater pier pile foundation, including a steel platform and a transport steel trestle connecting the steel platform with the land, and also including a mud pool built on land, a plurality of steel casings corresponding to the upper and lower parts of the pile foundation, and a mud overflow pipe horizontally connected to the upper part of the steel casing. The polluted mud in the steel casing corresponding to the construction pile foundation can overflow into the connected adjacent steel casing through the mud overflow pipe for primary sedimentation. A mud circulation conveying pipe is provided between the mud pool and the steel casing. A partition is provided in the middle of the mud pool to form a clean mud area on the left and a mud secondary sedimentation area on the right. The mud circulation conveying pipe includes a clean The mud conveying pipe and the primary sedimentation mud conveying pipe, the suction end of the clean mud conveying pipe extends into the clean mud area, and the slurry discharge end extends into the steel casing corresponding to the construction pile foundation, so as to convey the clean mud to the construction hole pile, the suction end of the primary sedimentation mud conveying pipe extends into the steel casing connected to the steel casing corresponding to the construction pile foundation, and the slurry discharge end extends into the mud secondary sedimentation area, so as to convey the mud after the primary sedimentation to the mud secondary sedimentation area for secondary sedimentation, and the upper horizontal interval of the interlayer is provided with a one-way hole leading from the mud secondary sedimentation area to the clean mud area, so that the mud after the secondary sedimentation is sent back to the clean mud area, forming a recycling utilization of the mud.
[0005] As a preferred embodiment of the above scheme, the steel casings are divided into three rows and arranged alternately from left to right. The steel casings located in the left and right rows are each provided with only one mud overflow pipe connected to the steel casing located in the middle row. The adjacent steel casings located in the middle row are connected front to back, and it is ensured that the steel casings located in the middle row are connected to at most three steel casings located in the left and right rows.
[0006] Compared with the matrix arrangement of conventional steel casings, when a staggered arrangement is adopted, the left and right columns can be constructed first, and the middle column can be constructed last, so as to ensure that the suction end of the initial sedimentation mud conveying pipe is moved the least number of times. The idea is ingenious, and it is not necessary for all adjacent steel casings to be connected in pairs. The connection of all steel casings can be completed with a minimum number of mud overflow pipes, which greatly reduces the construction cost. Only a single mud overflow pipe is required to be set up in the left and right columns of steel casings, so that the other steel casings can be used as the initial mud sedimentation tank.
[0007] It is further preferred that the plurality of mud overflow pipes do not cross each other, so as to avoid collisions with each other at the same height and to avoid the pipe body being too long to affect the stability of the structure.
[0008] Further preferably, the one-way hole is equipped with a one-way valve, and the suction ends of the clean mud delivery pipe and the primary sedimentation mud delivery pipe are both installed with mud pumps, so as to realize the suction function, and the design is reasonable.
[0009] It is further preferred that the horizontal height of the mud overflow pipe is 0.5m to 0.6m lower than the main beam of the steel platform and 8m to 11m higher than the pile foundation, so that the remaining mud storage height of the steel casing is 8m to 11m. Therefore, during the pouring of the last pile foundation of a single pier, the remaining pile foundation steel casings can still be used as sedimentation tanks. The top of the steel casing is flush with the top surface of the steel platform, and the horizontal height of the mud overflow pipe is 0.5m to 0.6m lower than the main beam of the steel platform to prevent mud from escaping from the steel casing during the concrete pouring process and polluting the water body.
[0010] It is further preferred that the steel platform is equipped with a solid slag storage box corresponding to the steel casing, so that the slag from the steel casing can be regularly salvaged and stored. During the impact drilling construction process, fine slag with a particle size less than 1.5 cm can be pumped out by a mud pump, but slag with a particle size greater than 1.5 cm cannot pass through the mud pump filter and will settle to the steel casing. Therefore, in order to avoid a continuous decrease in the slag storage capacity of the steel casing, regular salvage is required, and the design is reasonable.
[0011] Beneficial effects of the utility model:
[0012] (1) Compared with the overflow of mud poured from the pile foundation into the water, which causes water pollution, the wooden solution cleverly connects the upper part of the steel casing, thereby preventing the mud from overflowing. At the same time, the corresponding steel casings of other pile foundations except the construction pile foundation can be used as primary sedimentation tanks, killing two birds with one stone and ensuring water environmental protection.
[0013] (2) Excess mud can be promptly pumped out to the secondary mud settling area through the primary mud delivery pipe to reduce the risk of overflow. The one-way hole on the upper part of the interlayer can return the mud after secondary settling to the clean mud area, thus forming a recycling system for the mud. The mud can perfectly meet the use standards after the primary settling in the steel casing and the secondary settling in the secondary mud settling area. The mud can be efficiently circulated, effectively avoiding the occurrence of poor sedimentation effect.
[0014] In summary, it has the advantages of connecting the steel casing to achieve two goals at one stroke, ensuring water environmental protection, efficient mud circulation, and good mud sedimentation effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a top view of the utility model.
[0016] Figure 2 for Figure 1 Front cross-sectional view (the steel casing in the far right column is not shown). DETAILED DESCRIPTION
[0017] The present invention will be further described below by way of embodiments and in conjunction with the accompanying drawings:
[0018] Combination Figure 1 — Figure 2 As shown, an inter-hole circulation system for underwater pier pile foundation construction is composed of a steel platform 1, a transport steel trestle 3 connecting the steel platform 1 with the land, a mud pool 4 built on the land, a plurality of steel casings 5 corresponding to the upper and lower parts of the pile foundation 2, and a mud overflow pipe 6 horizontally connected to the upper part of the steel casing 5.
[0019] The polluted mud in the steel casing 5 corresponding to the construction pile foundation can overflow into the connected adjacent steel casing 5 through the mud overflow pipe 6 for initial settlement.
[0020] The steel casings 5 are divided into three rows and arranged alternately from left to right. The steel casings 5 located in the left and right rows are each provided with only one mud overflow pipe 6 connected to the steel casings 5 located in the middle row. The adjacent steel casings 5 located in the middle row are connected front to back, and it is ensured that the steel casings 5 located in the middle row are connected to at most three steel casings 5 located in the left and right rows.
[0021] The plurality of mud overflow pipes 6 do not cross each other.
[0022] The top of the steel casing 5 is flush with the top surface of the steel platform 1 .
[0023] The steel platform 1 is equipped with a solid slag storage box corresponding to the steel casing 5 , so that the slag from the steel casing 5 is salvaged and stored regularly.
[0024] A mud circulation conveying pipe 7 is provided between the mud pool 4 and the steel casing 5 .
[0025] The mud pool 4 is provided with a partition 41 in the middle to form a clean mud area 42 on the left and a mud secondary sedimentation area 43 on the right.
[0026] The mud circulation conveying pipe 7 is composed of a clean mud conveying pipe 71 and a primary sedimentation mud conveying pipe 72 .
[0027] The suction end of the clean mud conveying pipe 71 extends into the clean mud area 42, and the slurry outlet end extends into the steel casing 5 corresponding to the construction pile foundation, so as to convey the clean mud into the construction hole pile.
[0028] The suction end of the primary sedimentation mud conveying pipe 72 extends into the steel casing 5 connected to the steel casing 5 corresponding to the construction pile foundation, and the slurry outlet end extends into the mud secondary sedimentation area 43, so as to convey the mud after the primary sedimentation to the mud secondary sedimentation area 43 for secondary sedimentation.
[0029] Mud pumps 73 are installed at the suction ends of the cleaning mud delivery pipe 71 and the primary sedimentation mud delivery pipe 72 .
[0030] One-way holes leading from the mud secondary sedimentation area 43 to the clean mud area 42 are arranged horizontally at intervals on the upper part of the partition 41, so that the mud after secondary sedimentation is sent back to the clean mud area 42, forming a recycling utilization of the mud.
[0031] The one-way hole is equipped with a one-way valve.
[0032] The horizontal height of the mud overflow pipe 6 is 0.5m to 0.6m lower than the main beam of the steel platform 1 and 8m to 11m higher than the pile foundation 2 .
[0033] First, the pile foundations corresponding to the steel casings 5 on the left and right rows are constructed in sequence, so that the mud pump at the suction end of the initial sedimentation mud delivery pipe 72 is placed in the steel casing 5 in the middle row. After the construction of the pile foundations 2 corresponding to the steel casings 5 on the left and right rows is closed, the pile foundations 2 corresponding to the steel casings 5 in the middle row are constructed from front to back.
[0034] Finally, it is necessary to arrange special personnel to clean up the sediment in the mud pool 4 and transport it to the designated waste dump for disposal in time. It is strictly forbidden to dispose of waste mud and sediment in water areas.
Claims
1. An inter-hole circulation system for underwater pile foundation construction, comprising a steel platform (1) and a transport steel trestle (3) connecting the steel platform (1) with land, characterized in that: The invention also comprises a mud pool (4) constructed on land, a plurality of steel casings (5) corresponding to the upper and lower parts of the pile foundation (2), and a mud overflow pipe (6) horizontally connected to the upper part of the steel casing (5). The polluted mud in the steel casing (5) corresponding to the pile foundation can overflow into the connected adjacent steel casing (5) through the mud overflow pipe (6) for primary sedimentation. A mud circulation conveying pipe (7) is arranged between the mud pool (4) and the steel casing (5). A partition (41) is arranged in the middle of the mud pool (4) to form a clean mud area (42) on the left and a mud secondary sedimentation area (43) on the right. The mud circulation conveying pipe (7) comprises a clean mud conveying pipe (71) and a primary sedimentation mud conveying pipe (72). The suction end of the slurry conveying pipe (71) extends into the clean mud area (42), and the slurry outlet end extends into the steel casing (5) corresponding to the construction pile foundation, thereby conveying the clean mud to the construction hole pile. The suction end of the primary sedimentation mud conveying pipe (72) extends into the steel casing (5) connected to the steel casing (5) corresponding to the construction pile foundation, and the slurry outlet end extends into the mud secondary sedimentation area (43), thereby conveying the mud after the primary sedimentation to the mud secondary sedimentation area (43) for secondary sedimentation. The upper horizontal interval of the partition (41) is provided with a one-way hole leading from the mud secondary sedimentation area (43) to the clean mud area (42), so that the mud after the secondary sedimentation is sent back to the clean mud area (42), forming a recycling utilization of the mud.
2. The inter-hole circulation system for underwater pile foundation construction according to claim 1, characterized in that: The steel casings (5) are divided into three rows and arranged alternately from left to right. The steel casings (5) located in the left and right rows are each provided with only one mud overflow pipe (6) connected to the steel casing (5) located in the middle row. The adjacent steel casings (5) located in the middle row are connected front to back, and it is ensured that the steel casing (5) located in the middle row is connected to at most three steel casings (5) located in the left and right rows.
3. The inter-hole circulation system for underwater pile foundation construction according to claim 2, characterized in that: The plurality of mud overflow pipes (6) do not cross each other.
4. The inter-hole circulation system for underwater pile foundation construction according to claim 1, characterized in that: The one-way hole is equipped with a one-way valve, and the suction ends of the cleaning mud delivery pipe (71) and the primary sedimentation mud delivery pipe (72) are both equipped with mud pumps (73).
5. The inter-hole circulation system for underwater pile foundation construction according to claim 1, characterized in that: The horizontal height of the mud overflow pipe (6) is 0.5m to 0.6m lower than the main beam of the steel platform (1) and 8m to 11m higher than the pile foundation (2), and the top of the steel casing (5) is flush with the top surface of the steel platform (1).
6. The inter-hole circulation system for underwater pile foundation construction according to claim 1, characterized in that: The steel platform (1) is equipped with a solid slag storage box corresponding to the steel casing (5), so that the slag from the steel casing (5) is regularly salvaged and stored.