Tunnel water inrush early warning and monitoring device

By designing the placement components in the tunnel water burst warning monitoring device, and using the coordination of connecting rods, extrusion blocks and springs, the problem of unstable placement of the device on uneven ground is solved, and the stable placement of the device is achieved and the dumping damage is prevented.

CN221990443UActive Publication Date: 2024-11-12ANHUI WANTAI GEOPHYSICAL TECH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420658897.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-11-12
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

Existing tunnel water burst warning and monitoring devices are prone to overturn when placed on uneven grounds, resulting in equipment damage.

Method used

A tunnel water burst warning monitoring device including a placement assembly is designed, and the device can be placed firmly on uneven ground through the cooperation of the first and second connecting rods, extrusion blocks and springs, using support columns and springs. The limiting mechanism ensures horizontal placement and stability of the device.

Benefits of technology

It effectively avoids the device from being dumped and damaged due to unstable placement, improves the placement stability on uneven ground, and ensures the normal operation of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221990443U_ABST
    Figure CN221990443U_ABST
Patent Text Reader

Abstract

The utility model relates to a tunnel water inrush early warning and monitoring device which comprises a tunnel water inrush early warning and monitoring device body, placing assemblies are fixedly connected to the two sides of the tunnel water inrush early warning and monitoring device body correspondingly, each placing assembly comprises a mounting plate, and a first handle is fixedly connected to the position, close to the top end, of the middle of the side wall of each mounting plate; a mounting block is fixedly connected to the center of the side wall of the mounting plate, a first connecting rod is movably connected to the upper end and the lower end penetrating through the mounting block, a first extrusion block is fixedly connected to the bottom end of the first connecting rod, and a first spring sleeves the position, between the first extrusion block and the mounting block, of the outer side of the first connecting rod; a second handle is fixedly connected to the top end of the first connecting rod, sleeves are fixedly connected to the positions, close to the front end and the rear end, of the mounting plate correspondingly, and supporting columns are movably connected to the bottom ends penetrating through the sleeves, so that the placement stability of the tunnel water inrush early-warning monitoring device body is improved, and the situation that the tunnel water inrush early-warning monitoring device body topples over and is damaged due to unstable placement is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of water inrush warning monitoring, and in particular to a tunnel water inrush warning monitoring device. Background Art

[0002] The tunnel water inrush early warning monitoring device is an equipment system specially used to monitor and warn of water inrush risks in tunnels. Its main function is to collect and analyze various geological and hydrological data in the tunnel in real time to detect and prevent possible water inrush incidents in advance.

[0003] However, in actual applications, existing tunnel water inrush warning monitoring devices are usually placed on the ground in the tunnel, and the ground in the tunnel is usually uneven. Direct placement may cause the equipment to topple over and cause damage to the equipment.

[0004] Therefore, those skilled in the art provide a tunnel water inrush warning monitoring device to solve the problems raised in the above background technology. Utility Model Content

[0005] In order to solve the problems raised in the above background technology, the present application provides a tunnel water inrush early warning monitoring device.

[0006] The present application provides a tunnel water inrush warning monitoring device that adopts the following technical solution:

[0007] A tunnel water inrush early warning monitoring device comprises a tunnel water inrush early warning monitoring device body, and two sides of the tunnel water inrush early warning monitoring device body are respectively fixedly connected with placement components, and the placement component comprises a mounting plate, a first handle is fixedly connected to the side wall of the mounting plate in the middle near the top, a mounting block is fixedly connected to the side wall of the mounting plate in the middle, a first connecting rod is movably connected to the upper and lower ends of the mounting block, a first extrusion block is fixedly connected to the bottom end of the first connecting rod, a first spring is sleeved on the outside of the first connecting rod and located between the first extrusion block and the mounting block, a second handle is fixedly connected to the top of the first connecting rod, sleeves are respectively fixedly connected to the front and rear ends of the mounting plate, a support column is movably connected to the bottom end of the sleeve, a mounting pipe is connected through the side wall of the sleeve, a mounting sheet is fixedly connected to the inside of the mounting pipe, a second connecting rod is movably connected to the front and rear ends of the mounting sheet, a fixing block is fixedly connected to the front end of the second connecting rod, a second extrusion block is fixedly connected to the rear end of the second connecting rod, and a third spring is arranged on the outside of the second connecting rod and located between the second extrusion block and the mounting sheet.

[0008] Preferably, the second extrusion block is of trapezoidal design, the front and rear ends of the first extrusion block are inclined near the bottom, and the inclined surface of the first extrusion block contacts the inclined surface of the second extrusion block.

[0009] Preferably, the side wall of the support column is provided with a plane, a plurality of snap-in protrusions are arranged on the plane, the side wall of the fixing block contacts the inner wall of the mounting tube, and a plurality of snap-in protrusions are arranged on the surface of the fixing block contacting the plane on the support column.

[0010] Preferably, a second spring is provided between the support column and the sleeve, and a base is provided at the bottom end of the support column.

[0011] Preferably, a protective cover is fixedly connected between the bottom end of the first handle and the mounting plate, and the second handle and the first extrusion block are movably connected to the protective cover.

[0012] In summary, this application includes the following beneficial technical effects:

[0013] 1. Pull the second handle, the second handle drives the first extrusion block to rise through the first connecting rod, the fixed block is reset through the cooperation of the second connecting rod, the second extrusion block and the third spring, and is away from the support column. The support column moves downward and resets under the drive of the second spring. After the body of the tunnel water inrush warning monitoring device is placed horizontally, release the second handle, the first spring cooperates with the mounting block, the first connecting rod and the first extrusion block to squeeze the second extrusion block, and the second extrusion block cooperates with the second connecting rod to drive the fixed block to contact the support column to limit the support column. The body of the tunnel water inrush warning monitoring device can be placed on uneven ground, so that the placement stability of the body of the tunnel water inrush warning monitoring device is improved, and the body of the tunnel water inrush warning monitoring device is prevented from tipping over and being damaged due to unstable placement. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of this application;

[0015] Figure 2 It is a schematic diagram of the structure of the placement component of the present application;

[0016] Figure 3 yes Figure 2 The enlarged view of point A in the middle;

[0017] Figure 4 It is a cross-sectional view of the casing and the mounting pipe of the present application.

[0018] Explanation of the accompanying drawings: 1. Tunnel water inrush warning monitoring device body; 2. Placement component; 201. Mounting plate; 202. First handle; 203. Protective cover; 204. Mounting block; 205. First connecting rod; 206. Second handle; 207. First extrusion block; 208. First spring; 209. Sleeve; 210. Support column; 211. Second spring; 212. Mounting tube; 213. Mounting plate; 214. Second connecting rod; 215. Second extrusion block; 216. Third spring; 217. Fixing block. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] Example 1

[0021] like Figure 1-4 As shown, the present application discloses a tunnel water inrush warning monitoring device, including a tunnel water inrush warning monitoring device body 1, and placement components 2 are respectively installed on both sides of the tunnel water inrush warning monitoring device body 1, and the placement component 2 includes a mounting plate 201, and a first handle 202 is installed in the middle of the side wall of the mounting plate 201 near the top, and a mounting block 204 is installed in the middle of the side wall of the mounting plate 201, and a first connecting rod 205 is installed through the upper and lower ends of the mounting block 204, and a first extrusion block 207 is installed at the bottom end of the first connecting rod 205, and a first spring 208 is sleeved on the outer side of the first connecting rod 205 and between the first extrusion block 207 and the mounting block 204. A second handle 206 is installed at the top of a connecting rod 205, sleeves 209 are installed at the front and rear ends of the mounting plate 201, a support column 210 is installed at the bottom of the sleeve 209, a mounting tube 212 is connected through the side wall of the sleeve 209, a mounting plate 213 is installed on the inner side of the mounting tube 212, a second connecting rod 214 is installed in the middle of the front and rear ends of the mounting plate 213, a fixing block 217 is installed at the front end of the second connecting rod 214, a second extrusion block 215 is installed at the rear end of the second connecting rod 214, and a third spring 216 is provided on the outer side of the second connecting rod 214 and between the second extrusion block 215 and the mounting plate 213;

[0022] Lifting the second handle 206 drives the first connecting rod 205 and the first extrusion block 207 to rise, and the second extrusion block 215 and the fixed block 217 are driven away from the support column 210 by the third spring 216 and the second connecting rod 214, so that the support column 210 contacts the ground, so that the main body 1 of the tunnel water inrush early warning monitoring device is placed horizontally, and the second handle 206 is released. Driven by the first spring 208, the first extrusion block 207 descends and squeezes the second extrusion block 215. The second extrusion block 215 drives the fixed block 217 to contact the support column 210 through the second connecting rod 214, and the support column 210 is limited, so that the placement of the main body 1 of the tunnel water inrush early warning monitoring device can adapt to uneven ground.

[0023] like Figure 2-3As shown, the second extrusion block 215 is of trapezoidal design, and the front and rear ends of the first extrusion block 207 are inclined near the bottom. The inclined surface of the first extrusion block 207 contacts the inclined surface of the second extrusion block 215. The first extrusion block 207 descends to contact the second extrusion block 215, which can drive the second extrusion block 215 to move.

[0024] like Figure 1-3 As shown, a plane is provided on the side wall of the support column 210, and a plurality of snap-in protrusions are arranged on the plane. The side wall of the fixed block 217 contacts the inner wall of the mounting tube 212, and a plurality of snap-in protrusions are arranged on the surface where the fixed block 217 contacts the plane on the support column 210. The contact surfaces of the fixed block 217 and the support column 210 are both provided with snap-in protrusions, which can enhance the limiting effect on the support column 210.

[0025] like Figure 1-2 As shown, a protective cover 203 is installed between the bottom end of the first handle 202 and the mounting plate 201, and the second handle 206 and the first extrusion block 207 are movably connected to the protective cover 203. By setting the protective cover 203, the movable part of the placement component 2 can be covered and protected, and the second handle 206 and the first extrusion block 207 can be limited.

[0026] like Figure 1 , 4 As shown, a second spring 211 is provided between the support column 210 and the sleeve 209, and a base is provided at the bottom end of the support column 210. By providing the second spring 211 between the support column 210 and the sleeve 209, the support column 210 can be easily driven to reset. The support column 210 increases the contact area with the ground through the base, so that the main body 1 of the tunnel water inrush early warning monitoring device is placed more stably.

[0027] The standard parts used in the utility model can all be purchased from the market, and special-shaped parts can be customized according to the instructions and the drawings. The specific connection methods of each part adopt the conventional means such as mature bolts, rivets, welding, etc. in the existing technology. The machinery, parts and equipment all adopt the conventional models in the existing technology, and the circuit connection adopts the conventional connection method in the existing technology, which will not be described in detail here.

[0028] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0029] The implementation principle of a tunnel water inrush warning monitoring device in the embodiment of the present application is:

[0030] When in use, place the main body 1 of the tunnel water inrush warning monitoring device at the point to be monitored, hold the second handle 206 to drive the second handle 206 to lift, the second handle 206 drives the first connecting rod 205 and the first extrusion block 207 to rise away from the second extrusion block 215, the first spring 208 between the first extrusion block 207 and the mounting block 204 is compressed, the second connecting rod 214 between the second extrusion block 215 and the mounting plate 213 pushes the second extrusion block 215, the second connecting rod 214 and the fixed block 217 to move, the fixed block 217 is away from the support column 210, the support column 210 and the casing The second spring 211 between 209 pushes the support column 210 to descend, and the tunnel water inrush early warning monitoring device body 1 is placed horizontally and steadily, and the second handle 206 is released. The first spring 208 drives the first extrusion block 207 to descend and contact and extrude the second extrusion block 215. The second extrusion block 215 drives the second connecting rod 214 and the fixed block 217 to move and contact the support column 210, and the support column 210 is limited. When moving the tunnel water inrush early warning monitoring device body 1, it can be moved by holding the first handle 202. The tunnel water inrush early warning monitoring device body 1 collects and analyzes various data in the tunnel.

[0031] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A tunnel water inrush warning monitoring device, comprising a tunnel water inrush warning monitoring device body (1), wherein two sides of the tunnel water inrush warning monitoring device body (1) are respectively fixedly connected with placement components (2), characterized in that: The placement assembly (2) comprises a mounting plate (201), a first handle (202) being fixedly connected to the top of a side wall of the mounting plate (201) in the middle, a mounting block (204) being fixedly connected to the side wall of the mounting plate (201) in the middle, a first connecting rod (205) being movably connected to the upper and lower ends of the mounting block (204), a first extrusion block (207) being fixedly connected to the bottom end of the first connecting rod (205), a first spring (208) being sleeved on the outside of the first connecting rod (205) and located between the first extrusion block (207) and the mounting block (204), a second handle (206) being fixedly connected to the top of the first connecting rod (205), and a first connecting rod (206) being fixedly connected to the front and rear ends of the mounting plate (201). The ends are fixedly connected with sleeves (209), the bottom end of the sleeve (209) is movably connected with a support column (210), the side wall of the sleeve (209) is connected with a mounting tube (212), the inner side of the mounting tube (212) is fixedly connected with a mounting plate (213), the front and rear ends of the mounting plate (213) are movably connected with a second connecting rod (214), the front end of the second connecting rod (214) is fixedly connected with a fixing block (217), the rear end of the second connecting rod (214) is fixedly connected with a second extrusion block (215), and a third spring (216) is provided on the outer side of the second connecting rod (214) and between the second extrusion block (215) and the mounting plate (213).

2. A tunnel water inrush warning monitoring device according to claim 1, characterized in that: The second extrusion block (215) is of trapezoidal design, and the front and rear ends of the first extrusion block (207) are both inclined near the bottom, and the inclined surface of the first extrusion block (207) contacts the inclined surface of the second extrusion block (215).

3. A tunnel water inrush warning monitoring device according to claim 1, characterized in that: The side wall of the support column (210) is provided with a plane, on which a plurality of clamping protrusions are arranged; the side wall of the fixing block (217) contacts the inner wall of the mounting tube (212); and the surface of the fixing block (217) in contact with the plane on the support column (210) is provided with a plurality of clamping protrusions.

4. A tunnel water inrush early warning monitoring device according to claim 1, characterized in that: A second spring (211) is arranged between the support column (210) and the sleeve (209), and a base is arranged at the bottom end of the support column (210).

5. A tunnel water inrush warning monitoring device according to claim 1, characterized in that: A protective cover (203) is fixedly connected between the bottom end of the first handle (202) and the mounting plate (201), and the second handle (206) and the first extrusion block (207) are movably connected to the protective cover (203).

Citation Information

Cited By

  • Micro-seismic floor water inrush early warning equipment

    CN223871111U