By designing a coating supply device in the polishing machine, and automatically adjusting the coating viscosity using filters and viscosity monitoring sensors, the problem of rising viscosity and impurities during use and reflow of water-based coatings is solved, and the stability of coating quality and product quality is achieved. consistency avoids equipment interruption.

CN222000598UActive Publication Date: 2024-11-15SHAOGUAN DONGYANGGUANG PACKAGE PRINTING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420317031.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-11-15
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

During the use and reflow process of existing polishing machines, the viscosity and impurity content of water-based coatings increase, resulting in unstable paper polishing effect and inability to meet the quality requirements of high-precision products, resulting in product quality inconsistency and customer complaints.

Method used

A coating supply device is designed, including a feed box, a diluent tank and a controller, which divides the raw liquid chamber and the return liquid chamber through a partition, uses a filter and a viscosity monitoring sensor to detect the viscosity of the reflow coating, and automatically adds diluent to maintain the The viscosity is within the appropriate range to ensure the quality of the coating.

Benefits of technology

Effectively remove impurities in the coating, maintain the stability of the coating viscosity, ensure the consistency of product quality, avoid interrupting the equipment operation, and meet the quality requirements of high-precision products.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222000598U_ABST
    Figure CN222000598U_ABST
Patent Text Reader

Abstract

The utility model relates to a coating supply device for a glazing machine, which comprises a supply box, a diluent tank and a controller, a partition plate is arranged in the supply box, the interior of the supply box is divided into a stock solution cavity and a liquid return cavity by the partition plate, and the liquid return cavity is communicated with the stock solution cavity; the feeding box is further provided with a material return opening communicated to the liquid return cavity, a filter and a first feeding opening communicated to the liquid return cavity, the first feeding opening is connected with the diluent tank through a first connecting pipe and a second pump body, and a first flowmeter is installed on the first connecting pipe; a viscosity monitoring sensor is mounted in the liquid return cavity; and the viscosity monitoring sensor, the first flow meter and the second pump body are electrically connected with the controller. The backflow coating enters the backflow cavity after passing through the filter, and impurities contained in the part of coating are removed; after the paint enters the backflow cavity, when the viscosity is detected to rise, the diluent is quantitatively added, and the paint enters the stock solution cavity again for use after the viscosity of the paint in the backflow cavity meets the requirement, so that the viscosity of the paint is kept in accordance with the production requirement in continuous recycling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of feeding equipment, and more specifically to a coating supply device for a glazing machine. Background Art

[0002] The offline fully automatic glazing equipment in the printing and packaging industry uses a suction pump to absorb the paint from the paint storage device to the oiled stick and the coating stick. The oiled stick and the coating stick rotate at high speed to evenly spread the paint on the coating stick, and then the coating stick oils the paper surface, and then it is dried by infrared heating to complete the glazing. Among them, the paper will only absorb a small amount of paint, and the excess paint will flow back to the paint box.

[0003] Existing glazing coatings are basically water-based coatings due to environmental protection and safety factors. During the use and reflux production process, the solid content concentration and viscosity of the coating will increase due to flow and volatilization. At the same time, the coating may also be contaminated with impurities. The glazing effect of the paper will be affected by the concentration changes and impurity content of the water-based coating. It cannot meet the precision requirements of the product, especially the quality requirements of high-precision products, and cannot guarantee the consistency of the quality of batch order products, resulting in product quality problems and causing serious customer complaints. Utility Model Content

[0004] In order to overcome the problem of increased viscosity and impurity content of the above-mentioned coating during the production process, the utility model provides a coating supply device for a glazing machine, which can remove impurities from the coating during recycling and reflow, and adjust the viscosity of the coating within a permitted range without interrupting the operation of the machine.

[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is: a paint supply device for a glazing machine, comprising a feed box, a diluent tank and a controller, a first connecting pipe and a second pump body, the feed box is provided with a discharge port and a feed port, the discharge port is provided with a first pump body, the first pump body is used to extract the liquid in the feed box; a partition is provided in the feed box, the partition divides the interior of the feed box into a raw liquid chamber and a return liquid chamber, the return liquid chamber is connected to the raw liquid chamber; the discharge port and the feed port are both connected to the raw liquid chamber; the top of the feed box is also provided with a return port connected to the return liquid chamber, a filter installed on the return port and a first feeding port connected to the return liquid chamber, the feed box is connected to the first connecting pipe and the second pump body and connected to the diluent tank through the first feeding port, and the first connecting pipe is provided with a first flow meter; a viscosity monitoring sensor is installed in the return liquid chamber; the viscosity monitoring sensor, the first flow meter, and the second pump body are all electrically connected to the controller.

[0006] In the above technical solution, the staff adds a certain amount of paint stock liquid and diluent to the stock liquid chamber of the feed box according to the ratio to obtain a paint with a viscosity that meets the production standard. The paint in the stock liquid chamber is pumped out to the glazing machine through the first pump body. The reflux pipe of the glazing machine is connected to the filter, and the filtered paint flows into the reflux chamber. The viscosity monitoring sensor in the reflux chamber detects the viscosity of the paint in the reflux chamber. Among them, the controller sets the viscosity threshold and the amount of addition corresponding to the viscosity difference. When the viscosity detected by the viscosity monitoring sensor does not meet the viscosity threshold, the second pump body is started, and the diluent in the diluent tank is pumped into the reflux chamber through the second pump body. When the flow meter detects that the flow reaches the amount of addition corresponding to the viscosity difference, the second pump body is closed. At this time, the viscosity of the paint in the reflux chamber meets the production standard. After the paint in the reflux chamber reaches a certain amount, it flows into the stock liquid chamber and is pumped back to the glazing machine for use.

[0007] Preferably, a connecting port is provided at the top of the end of the partition away from the return material port, and the connecting port is used to connect the return liquid chamber and the original liquid chamber. After the paint in the return liquid chamber is basically filled up, it flows into the original liquid chamber from the connecting port. At the same time, the connecting port is far away from the return material port, and the refluxed paint will not directly enter the original liquid chamber through the connecting port, so that the viscosity of the paint in the return chamber will be stabilized before entering the original liquid chamber, so that the viscosity of the paint entering the original liquid chamber meets the production standard and will not have an adverse effect on the paint in the original liquid chamber.

[0008] Preferably, the viscosity monitoring sensor is located near the return port. The viscosity monitoring sensor is a rotor viscosity measurement sensor. After the refluxed paint flows into the reflux chamber from the return port, it can contact the viscosity monitoring sensor, thereby detecting the viscosity of the refluxed paint in the first place, so as to immediately determine whether it is necessary to add diluent.

[0009] Preferably, the first feed port is located on a side close to the return port. The viscosity monitoring sensor is also located close to the return port. After the diluent is added, the diluent and the reflowing paint will be near the viscosity detection sensor. The viscosity monitoring sensor immediately detects the viscosity of the paint after the diluent is added, reducing the detection delay. When the subsequent reflowing paint enters the reflow chamber, the reflowing paint will wash away the mixed paint, and the paint newly entering the reflow chamber will undergo the above process again.

[0010] Preferably, a transfer tank is further included, and the bottom of the transfer tank is sealed and connected to the feed end of the filter. Since the filter will produce a certain amount of flow resistance, in order to avoid blockage caused by the flow rate of the filter being less than the reflux rate, a transfer tank is added, and the paint that cannot pass through the filter in time is stored and retained in the transfer tank to avoid blockage caused by the paint being unable to reflux. The reflux pipe of the glazing machine is connected to the top of the transfer tank.

[0011] Preferably, the bottom diameter of the transfer tank is consistent with the diameter of the feed end of the filter, so that all the paint in the transfer tank can flow into the filter without liquid accumulation at the bottom. The diameter of the transfer tank gradually increases from the bottom to the top, increasing the volume of the transfer tank to accommodate more paint.

[0012] Preferably, the feed box is provided with an observation window, which is perpendicular to the partition and at least partially located in the return liquid chamber, and the rest of the window is located in the original liquid chamber. The conditions of the original liquid chamber and the return liquid chamber can be checked through the observation window. If the paint in the original liquid chamber is insufficient, a certain amount of paint stock solution and diluent can be added in time. If there is a problem inside the return liquid chamber, it can also be seen in time through the observation window.

[0013] Preferably, it also includes a raw liquid tank, the feed box is provided with a second feeding port connected to the return liquid chamber, the second feeding port is connected to the raw liquid tank through a second connecting pipe and a third pump body, the second connecting pipe is provided with a second flow meter, and the second flow meter and the third pump body are both electrically connected to the controller. In the event of a special situation where the viscosity of the paint is insufficient, the controller is set with a viscosity threshold and an addition amount corresponding to the viscosity difference. When the viscosity detected by the viscosity monitoring sensor does not match the viscosity threshold, and the detected viscosity is lower than the viscosity threshold, the third pump body is started, and the raw paint in the raw liquid tank is pumped into the return liquid chamber through the third pump body. When the flow meter detects that the flow rate reaches the addition amount corresponding to the viscosity difference, the third pump body is closed.

[0014] Preferably, the raw liquid tank is connected to the feed port via a first metering pump and a first feed pipe, and the diluent tank is connected to the feed port via a second metering pump and a second feed pipe; the first metering pump and the second metering pump are both electrically connected to the controller. The first metering pump and the second metering pump can respectively quantitatively deliver the paint raw liquid and the diluent to the raw liquid cavity without manual addition, and since both are quantitative additions, after setting the respective addition amounts, the viscosity of the paint in the raw liquid cavity can meet the production requirements.

[0015] Preferably, a level meter is installed in the original liquid chamber, and the level meter is electrically connected to the controller. When the level meter detects that the paint in the original liquid chamber is insufficient, the controller will control the first metering pump and the second metering pump to start, so as to realize automatic feeding of the original liquid chamber.

[0016] Compared with the prior art, the utility model has the following beneficial effects: the refluxed paint enters the reflux chamber only after passing through the filter, so as to remove impurities contained in this part of the paint; after entering the reflux chamber, when the viscosity rises, the first pump body and the flow meter are started to quantitatively increase the diluent, so that the paint viscosity in the reflux chamber reaches the requirement and then re-enters the original liquid chamber for use, so that the paint can always maintain a viscosity that meets the production requirements during continuous recycling, thereby ensuring the quality of the product without interrupting the machine operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a structural schematic diagram of Embodiment 1 of a coating material supply device for a glazing machine of the utility model;

[0018] Figure 2 It is a structural schematic diagram of the box body of the utility model;

[0019] Figure 3 It is a structural schematic diagram of a second embodiment of a coating material supply device for a glazing machine of the utility model;

[0020] Figure 4 It is a structural schematic diagram of another embodiment of the embodiment 3 of the paint supply device for a glazing machine of the utility model. DETAILED DESCRIPTION

[0021] The drawings are only for illustrative purposes and cannot be construed as limiting the present invention. To better illustrate the present embodiment, some parts of the drawings may be omitted, enlarged, or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions may be omitted in the drawings. The positional relationships described in the drawings are only for illustrative purposes and cannot be construed as limiting the present invention.

[0022] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "long", "short" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, they are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0023] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0024] The technical solution of the present invention is further described in detail below through specific embodiments and in conjunction with the accompanying drawings:

[0025] Example 1

[0026] like Figure 1-2 The present invention shows an embodiment 1 of a coating supply device for a glazing machine, comprising a feed box 1, a diluent tank 3 and a controller. The feed box 1 is provided with a discharge port and a feed port 101. A first pump body 2 is installed at the discharge port. The first pump body 2 is used to extract the liquid in the feed box 1. A partition 102 is provided in the feed box 1. The partition 102 divides the interior of the feed box 1 into a raw liquid chamber 103 and a return liquid chamber 104. The return liquid chamber 104 is connected to the raw liquid chamber 103. The discharge port and the feed port 101 are both connected to the feed box 103. To the original liquid chamber 103; the feed box 1 is provided with a return port 105 connected to the return liquid chamber 104, a filter 4 installed on the return port 105 and a first feeding port 106 connected to the return liquid chamber 104, the first feeding port 106 is connected to the diluent tank 3 through the first connecting pipe 5 and the second pump body 6, and the first connecting pipe 5 is installed with the first flow meter 7; a viscosity monitoring sensor 8 is installed in the return liquid chamber 104; the viscosity monitoring sensor 8, the first flow meter 7, and the second pump body 6 are all electrically connected to the controller.

[0027] Specifically, a connecting port 1021 is provided at the top of one end of the partition 102 away from the return port 105, and the connecting port 1021 is used to connect the return liquid chamber 104 and the original liquid chamber 103. After the return liquid chamber 104 is basically filled with the coating in the return liquid chamber 104, it flows into the original liquid chamber 103 from the connecting port 1021. At the same time, the connecting port 1021 is far away from the return port 105, and the refluxed coating will not directly enter the original liquid chamber 103 through the connecting port 1021, so that the viscosity of the coating in the return chamber will be stabilized before entering the original liquid chamber 103, so that the viscosity of the coating entering the original liquid chamber 103 meets the production standard, and will not have an adverse effect on the coating in the original liquid chamber 103.

[0028] Furthermore, the viscosity monitoring sensor 8 is located near the return port 105, and the first feed port 106 is located on a side near the return port 105. In this embodiment, the viscosity monitoring sensor 8 is installed at the bottom of the reflux chamber, and the return port 105 and the first feed port 106 are also arranged near the bottom of the reflux chamber. The viscosity monitoring sensor 8 is a rotor viscosity measurement sensor. After the refluxed paint flows into the reflux chamber from the return port 105, it can contact the viscosity monitoring sensor 8, so that the viscosity of the refluxed paint can be detected at the first time, so that it can be immediately determined whether the diluent needs to be added. After the diluent is added, the diluent and the refluxed paint will be near the viscosity detection sensor, and the viscosity monitoring sensor 8 will immediately detect the viscosity of the paint after the diluent is added, reducing the detection delay. When the subsequent refluxed paint enters the reflux chamber, the refluxed paint will wash away the mixed paint, and the new paint entering the reflux chamber will undergo the above process again.

[0029] In order to avoid blockage caused by the flow rate of the filter 4 being lower than the reflux rate, a transfer tank 9 is also included, the bottom of which is connected to the feed end of the filter 4, wherein the reflux pipe of the glazing machine is connected to the top of the transfer tank 9. The paint that cannot pass through the filter 4 in time is stored and retained in the transfer tank 9 to avoid blockage caused by the inability of the paint to reflux. In this embodiment, the bottom diameter of the transfer tank 9 is consistent with the diameter of the feed end of the filter 4, the paint in the transfer tank 9 can all flow into the filter 4, and no liquid will accumulate at the bottom. The diameter of the transfer tank 9 from the bottom to the top gradually increases, increasing the volume of the transfer tank 9, thereby accommodating more paint.

[0030] In addition, the feed box 1 is provided with an observation window 107, which is perpendicular to the partition 102 and at least partially located in the return liquid chamber 104, and the rest is located in the original liquid chamber 103. The conditions of the original liquid chamber 103 and the return liquid chamber 104 can be checked through the observation window 107. If the paint in the original liquid chamber 103 is insufficient, a certain amount of paint stock solution and diluent can be added in time. If there is a problem inside the return liquid chamber 104, it can also be seen through the observation window 107 in time.

[0031] The working principle or working process of this embodiment is as follows: the staff adds a certain amount of paint stock solution and diluent to the stock liquid chamber 103 of the feed box 1 according to the ratio to obtain a paint with a viscosity that meets the production standard. The paint in the stock liquid chamber 103 is pumped out to the glazing machine through the first pump body 2. The reflux pipe of the glazing machine is connected to the filter 4, and the filtered paint flows into the reflux chamber. The viscosity monitoring sensor 8 in the reflux chamber detects the viscosity of the paint in the reflux chamber. Among them, the controller sets the viscosity threshold and the amount of addition corresponding to the viscosity difference. When the viscosity detected by the viscosity monitoring sensor 8 does not match the viscosity threshold, the second pump body 6 is started, and the diluent in the diluent tank 3 is extracted into the return liquid chamber 104 through the second pump body 6. When the flow meter detects that the flow reaches the amount of addition corresponding to the viscosity difference, the second pump body 6 is closed. At this time, the viscosity of the paint in the reflux chamber meets the production standard. After reaching a certain amount, the paint in the reflux chamber flows into the stock liquid chamber 103 and is pumped back to the glazing machine for use.

[0032] The beneficial effects of this embodiment are as follows: the refluxed paint enters the reflux chamber only after passing through the filter 4, so as to remove impurities contained in this part of the paint; after entering the reflux chamber, when the viscosity rises, the first pump body 2 and the flow meter are started to quantitatively increase the diluent, so that the paint viscosity in the reflux chamber reaches the requirement and then re-enters the original liquid chamber 103 for use, so that the paint can always maintain a viscosity that meets the production requirements during continuous recycling, thereby ensuring the quality of the product without interrupting the machine operation.

[0033] Example 2

[0034] Embodiment 2 of a coating material supply device for a glazing machine is different from embodiment 1 in that: Figure 3 As shown, it also includes a raw liquid tank 10, such as Figure 2 As shown, the feed box 1 is provided with a second feed port 108 connected to the return liquid chamber 104. The second feed port 108 is connected to the stock liquid tank 10 through the second connecting pipe 11 and the third pump body 12. The second connecting pipe 11 is provided with a second flow meter 13. The second flow meter 13 and the third pump body 12 are both electrically connected to the controller. In the case of insufficient viscosity of the coating under special circumstances, the controller is set with a viscosity threshold and an addition amount corresponding to the viscosity difference. When the viscosity detected by the viscosity monitoring sensor 8 does not match the viscosity threshold, and the detected viscosity is lower than the viscosity threshold, the third pump body 12 is started, and the coating stock liquid in the stock liquid tank 10 is pumped into the return liquid chamber 104 through the third pump body 12. When the flow meter detects that the flow rate reaches the addition amount corresponding to the viscosity difference, the third pump body 12 is closed.

[0035] The remaining technical features and working principles of this embodiment are consistent with those of Embodiment 1.

[0036] Example 3

[0037] Embodiment 3 of a coating material supply device for a glazing machine is different from embodiment 2 in that: Figure 4 As shown, the raw liquid tank 10 is connected to the feed port 101 through the first metering pump 14 and the first feeding pipe 15, and the diluent tank 3 is connected to the feed port 101 through the second metering pump 16 and the second feeding pipe 17; the first metering pump 14 and the second metering pump 16 are both electrically connected to the controller. The first metering pump 14 and the second metering pump 16 can respectively quantitatively transport the paint raw liquid and the diluent to the raw liquid chamber 103 without manual addition, and since both are quantitatively added, after setting the respective addition amounts, the viscosity of the paint in the raw liquid chamber 103 can meet the production requirements.

[0038] Preferably, a level meter is installed in the original liquid chamber 103, and the level meter is electrically connected to the controller. When the level meter detects that the paint in the original liquid chamber 103 is insufficient, the controller will control the first metering pump 14 and the second metering pump 16 to start, so as to realize automatic feeding of the original liquid chamber 103.

[0039] The rest of the working principles and effects of this embodiment are consistent with those of Embodiment 2.

[0040] Obviously, the above embodiments of the utility model are only examples for clearly explaining the utility model, and are not intended to limit the implementation methods of the utility model. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the utility model should be included in the protection scope of the claims of the utility model.

Claims

1. A coating supply device for a glazing machine, comprising a supply box (1), wherein the supply box (1) is provided with a discharge port and a feed port (101), wherein a first pump body (2) is installed at the discharge port, and the first pump body (2) is used to pump out liquid in the supply box (1), characterized in that: The invention also comprises a diluent tank (3), a controller, a first connecting pipe (5), and a second pump body (6); the feed box (1) is connected to the diluent tank (3) via the first connecting pipe (5) and the second pump body (6); a partition (102) is arranged inside the feed box (1); the partition (102) divides the interior of the feed box (1) into a raw liquid chamber (103) and a return liquid chamber (104); the return liquid chamber (104) is connected to the raw liquid chamber (103); the discharge port and the feed port (101) are both connected to the raw liquid chamber (103); the feed box (1) is provided with a connecting port (102) connected to the return liquid chamber (104); The invention relates to a liquid return chamber (104) having a return port (105), a filter (4) installed on the return port (105) and a first feed port (106) connected to the liquid return chamber (104); the feed box (1) is connected to a first connecting pipe (5) and a second pump body (6) through the first feed port (106) and is connected to the diluent tank (3); a first flow meter (7) is installed on the first connecting pipe (5), and a viscosity monitoring sensor (8) is installed in the liquid return chamber (104); the viscosity monitoring sensor (8), the first flow meter (7) and the second pump body (6) are all electrically connected to the controller.

2. A coating material supply device for a glazing machine according to claim 1, characterized in that: A communication port (1021) is provided at the top of one end of the partition (102) away from the return material port (105), and the communication port (1021) is used to connect the return liquid chamber (104) and the original liquid chamber (103).

3. A coating material supply device for a glazing machine according to claim 2, characterized in that: The viscosity monitoring sensor (8) is located near the return port (105).

4. A coating material supply device for a glazing machine according to claim 3, characterized in that: The first feeding port (106) is located on a side close to the return port (105).

5. The coating material supply device for a glazing machine according to claim 1, characterized in that: It also comprises a transfer tank (9), the bottom of which is sealedly connected to the feed end of the filter (4).

6. A coating material supply device for a glazing machine according to claim 5, characterized in that: The bottom diameter of the transfer tank (9) is consistent with the diameter of the feed end of the filter (4), and the diameter of the transfer tank (9) gradually increases from the bottom to the top.

7. A coating material supply device for a glazing machine according to claim 1, characterized in that: The feed box (1) is provided with an observation window (107), wherein the observation window (107) is perpendicular to the partition plate (102) and is at least partially located in the return liquid chamber (104), and the rest of the observation window is located in the original liquid chamber (103).

8. A coating material supply device for a glazing machine according to any one of claims 1 to 7, characterized in that: The invention also comprises a raw liquid tank (10), wherein the feed box (1) is provided with a second feed port (108) connected to the return liquid chamber (104), the second feed port (108) is connected to the raw liquid tank (10) via a second connecting pipe (11) and a third pump body (12), a second flow meter (13) is provided on the second connecting pipe (11), and the second flow meter (13) and the third pump body (12) are both electrically connected to the controller.

9. A coating material supply device for a glazing machine according to claim 8, characterized in that: The raw liquid tank (10) is connected to the feed port (101) via a first metering pump (14) and a first feed pipe (15), and the diluent tank (3) is connected to the feed port (101) via a second metering pump (16) and a second feed pipe (17); the first metering pump (14) and the second metering pump (16) are both electrically connected to the controller.

10. The coating material supply device for a glazing machine according to claim 8, characterized in that: A liquid level meter is installed in the original liquid chamber (103), and the liquid level meter is electrically connected to the controller.

Citation Information

Cited By

  • Dip-coating equipment for pump body impeller

    CN120551003A