Production line for preparing low-carbon heat preservation agent

By designing a low-carbon insulation production line, fly ash, lime and expanded perlite are mixed to form a stable insulation, which solves the harm of fly ash to the environment and residents' health, and realizes the effective utilization and environment of fly ash Protect.

CN222001250UActive Publication Date: 2024-11-15GUANGXI SANQIUSHU ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323570627.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-11-15
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The emission of fly ash causes serious harm to the biological ecological environment and the living environment of residents, and it is necessary to find effective secondary utilization methods to reduce their harm.

Method used

A production line for preparing low-carbon insulation was designed. Through the combination of storage components, mixing components and packaging components, fly ash, lime and expanded perlite were used to form a stable low-carbon insulation to reduce fly ash. and reduce its hazards to the environment and residents' health.

Benefits of technology

By effectively mixing fly ash, lime and expanded perlite, an insulating agent can be prepared that can stabilize the temperature of the steel, reducing the harm of fly ash to the environment and residents' health, and achieving effective utilization and environmental protection of fly ash.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222001250U_ABST
    Figure CN222001250U_ABST
Patent Text Reader

Abstract

The production line for preparing the low-carbon heat preservation agent comprises a material storage assembly, a mixing assembly and a packaging assembly, the material storage assembly is suitable for storing coal ash, lime and expanded perlite, and a discharging opening is formed in the material storage assembly; the mixing assembly is arranged on one side of the material storage assembly, the mixing assembly is provided with a mixing cavity, a feeding port and a discharging port, the feeding port and the discharging port are communicated with the mixing cavity, the feeding port is arranged corresponding to the discharging port so as to receive the coal ash, the lime and the expanded perlite, and the mixing assembly is suitable for mixing the coal ash, the lime and the expanded perlite in the mixing cavity as the low-carbon heat preservation agent; the packaging assembly is arranged on the side, away from the storage assembly, of the mixing assembly and comprises a packaging piece, and the packaging piece is provided with a feeding port corresponding to the discharging port so as to receive the low-carbon heat preservation agent. According to the production line for preparing the low-carbon heat preservation agent, the storage amount of the fly ash is reduced, meanwhile, the harm of the fly ash to the environment and the body health of residents is reduced, and the production line is beneficial to protecting the environment and guaranteeing the body health of the residents.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel smelting auxiliary agents, in particular to a production line for preparing a low-carbon thermal insulation agent. Background Art

[0002] Fly ash is the fine ash collected from the flue gas after coal combustion. It is the main solid waste discharged from coal-fired power plants, and the main oxide composition of fly ash is: SiO 2 、Al 2 O 3 ,FeO,Fe 3 O 3 , CaO, TiO 2 With the development of the electric power industry, the fly ash emissions from coal-fired power plants have increased year by year, becoming one of the largest industrial waste residues in my country.

[0003] The emission of fly ash has been high. The existence of fly ash seriously harms the biological ecological environment and the living environment of residents. In order to protect the biological ecological environment and the living environment of residents, fly ash needs to be processed. Considering the cost-effectiveness, secondary utilization of fly ash is undoubtedly the best choice. According to the mineral characteristics of fly ash, it can be effectively utilized to reduce its harm to the biological ecological environment and the living environment of residents. Utility Model Content

[0004] Therefore, the technical problem to be solved by the utility model is to overcome the defect that the existence of fly ash seriously harms the biological ecological environment and the living environment of residents.

[0005] To this end, the utility model provides a production line for preparing a low-carbon heat preservation agent, comprising:

[0006] A material storage component, comprising a first material storage member, a second material storage member and a third material storage member, wherein the first material storage member and the second material storage member are suitable for storing fly ash, and the third material storage member is suitable for storing lime and expanded perlite, and the first material storage member and the second material storage member are respectively provided with a first discharge port and a second discharge port, and the third material storage member is provided with a third discharge port;

[0007] A mixing assembly is arranged on one side of the material storage assembly, the mixing assembly has a mixing chamber and a feed port and a discharge port communicated with the mixing chamber, the feed port is arranged corresponding to the first discharge port, the second discharge port and the third discharge port to receive the fly ash, the lime and the expanded perlite, and the mixing assembly is suitable for mixing the fly ash, the lime and the expanded perlite in the mixing chamber into a low-carbon heat preservation agent;

[0008] The packaging component is arranged on a side of the mixing component away from the material storage component. The packaging component includes a packaging piece, and the packaging piece has an inlet arranged corresponding to the outlet to receive the low-carbon insulation agent.

[0009] Optionally, in the above-mentioned production line for preparing low-carbon thermal insulation agent, the material storage component also includes at least three vibrators, two of which are respectively arranged on the first material storage member and the second material storage member, and the last vibrator is arranged on the third material storage member.

[0010] Optionally, in the above-mentioned production line for preparing low-carbon thermal insulation agent, the material storage component also includes at least three switch components, wherein two of the switch components are respectively arranged on the first material storage component and the second material storage component, and the last switch component is arranged on the third material storage component.

[0011] Optionally, in the above-mentioned production line for preparing low-carbon thermal insulation agent, the mixing component includes a first mixing structure and a second mixing structure, the first mixing structure includes a first feed port and a first discharge port, the second mixing structure includes a second feed port and a second discharge port, the first feed port is arranged corresponding to the first discharge port and the second discharge port, the second feed port is arranged corresponding to the first discharge port, and the feed port is arranged corresponding to the second discharge port.

[0012] Optionally, in the above-mentioned production line for preparing low-carbon thermal insulation agent, the first mixing structure also includes a first mixing chamber and a first rotating member and a first spiral member arranged in the first mixing chamber, and the first spiral member is arranged on the first rotating member; the first mixing structure also includes a second mixing chamber and a second rotating member and a second spiral member arranged in the second mixing chamber, and the second spiral member is arranged on the second rotating member.

[0013] Optionally, in the above-mentioned production line for preparing low-carbon thermal insulation agent, the packaging component also includes a funnel, and the funnel is arranged between the second mixing structure and the packaging component to receive the low-carbon thermal insulation agent into the packaging component.

[0014] Optionally, in the above-mentioned production line for preparing low-carbon thermal insulation agent, the packaging component also includes a bag sewing piece, the bag sewing piece is arranged between the funnel and the packaging piece, and the bag sewing piece is suitable for sewing the feed port.

[0015] Optionally, in the above-mentioned production line for preparing low-carbon thermal insulation agent, the packaging component also includes a weighing piece, which is arranged on a side of the packaging piece away from the funnel, and after the packaging piece receives the low-carbon thermal insulation agent, the weighing piece is suitable for weighing the weight of the packaging piece and the low-carbon thermal insulation agent.

[0016] Optionally, the above-mentioned production line for preparing low-carbon thermal insulation agent also includes a conveying component, which includes a first conveying structure and a second conveying structure. The first conveying structure is arranged between the storage component and the mixing component to convey the fly ash, the lime and the expanded perlite into the mixing chamber, and the second conveying structure is arranged between the mixing component and the packaging component to convey the low-carbon thermal insulation agent into the funnel.

[0017] Optionally, the above-mentioned production line for preparing low-carbon thermal insulation agent further includes a dust removal structure, which is arranged on a side of the storage component away from the mixing component, and the dust removal structure is suitable for absorbing the diffused fly ash and the lime.

[0018] The technical solution provided by the utility model has the following advantages:

[0019] 1. The production line for preparing a low-carbon thermal insulation agent provided by the utility model comprises a material storage component, a mixing component and a packaging component, the material storage component comprises a first material storage part, a second material storage part and a third material storage part, the first material storage part and the second material storage part are suitable for storing fly ash, the third material storage part is suitable for storing lime and expanded perlite, the first material storage part and the second material storage part are respectively provided with a first discharge port and a second discharge port, and the third material storage part is provided with a third discharge port; the mixing component is arranged on one side of the material storage component, the mixing component has a mixing chamber and a feed port and a discharge port connected to the mixing chamber, the feed port is arranged corresponding to the first discharge port, the second discharge port and the third discharge port to receive fly ash, lime and expanded perlite, and the mixing component is suitable for mixing the fly ash, lime and expanded perlite in the mixing chamber into a low-carbon thermal insulation agent; the packaging component is arranged on a side of the mixing component away from the material storage component, the packaging component comprises a packaging component, and the packaging component has an inlet arranged corresponding to the discharge port to receive the low-carbon thermal insulation agent.

[0020] The production line for preparing low-carbon thermal insulation agent of this structure is provided with a mixing component arranged on one side of a material storage component and a packaging component arranged on the side of the mixing component away from the material storage component. The material storage component includes a first material storage part, a second material storage part and a third material storage part, wherein the first material storage part can store fly ash, the second material storage part can also store fly ash, and the third material storage part can store lime and expanded perlite. Meanwhile, a first discharge port is provided on the first material storage part, a second discharge port is provided on the second material storage part, and a third discharge port is provided on the third material storage part. The mixing component has a mixing chamber and a feed port and a discharge port connected with the mixing chamber, wherein the feed port is provided corresponding to the first discharge port, the second discharge port and the third discharge port, so that the materials stored in the first material storage part and the second material storage part can be discharged. The fly ash, lime and expanded perlite in the third storage member can be discharged through the first discharge port, the second discharge port and the third discharge port respectively, and discharged into the mixing chamber through the feed port, and mixed into a low-carbon insulation agent in the mixing chamber. The packaging component includes a packaging member, and the packaging member has an inlet, and the inlet is arranged corresponding to the outlet, so as to receive the low-carbon insulation agent discharged from the outlet, and then realize the collection of the low-carbon insulation agent for subsequent use. In summary, the fly ash, lime and expanded perlite are effectively mixed through the above-mentioned production line to make it a insulation agent that can stabilize the temperature of the molten steel. While reducing the storage amount of fly ash, it also reduces the harm of fly ash to the environment and the health of residents, which is beneficial to protecting the environment and ensuring the health of residents. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 This is a schematic structural diagram of a production line for preparing a low-carbon heat-insulating agent provided in an embodiment of the utility model;

[0023] Description of reference numerals:

[0024] 1- material storage component; 11- first material storage component; 12- second material storage component; 13- third material storage component;

[0025] 2-mixing assembly; 21-first mixing structure; 211-first rotating member; 212-first spiral member; 22-second mixing structure; 221-second rotating member; 222-second spiral member;

[0026] 3-packing assembly; 31-packing piece; 32-funnel; 33-bag sewing piece; 34-weighing piece;

[0027] 41-first transmission structure; 42-second transmission structure;

[0028] 5-Dust removal structure. DETAILED DESCRIPTION

[0029] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0033] Example 1

[0034] This embodiment provides a production line for preparing a low-carbon heat preservation agent, such as Figure 1As shown, the material storage component 1 includes a material storage component 1, a mixing component 2 and a packaging component 3. The material storage component 1 includes a first material storage component 11, a second material storage component 12 and a third material storage component 13. The first material storage component 11 and the second material storage component 12 are suitable for storing fly ash, and the third material storage component 13 is suitable for storing lime and expanded perlite. The first material storage component 11 and the second material storage component 12 are respectively provided with a first discharge port and a second discharge port, and the third material storage component 13 is provided with a third discharge port; the mixing component 2 is arranged on one side of the material storage component 1, and the mixing component 2 is arranged on the other side of the material storage component 1. The mixing component 2 has a mixing chamber and a feed port and a discharge port connected to the mixing chamber. The feed port is arranged corresponding to the first discharge port, the second discharge port and the third discharge port to receive fly ash, lime and expanded perlite. The mixing component 2 is suitable for mixing the fly ash, lime and expanded perlite in the mixing chamber into a low-carbon thermal insulation agent; the packaging component 3 is arranged on the side of the mixing component 2 away from the storage component 1, and the packaging component 3 includes a packaging component 31, and the packaging component 31 has an inlet arranged corresponding to the discharge port to receive the low-carbon thermal insulation agent.

[0035] The production line for preparing low-carbon thermal insulation agent of the above structure is provided with a mixing component 2 arranged on one side of a material storage component 1 and a packaging component 3 arranged on the side of the mixing component 2 away from the material storage component 1. The material storage component 1 includes a first material storage part 11, a second material storage part 12 and a third material storage part 13. The first material storage part 11, the second material storage part 12 and the third material storage part 13 are respectively the first material bin, the second material bin and the third material bin in this embodiment, wherein the first material storage part 11 can store fly ash, the second material storage part 12 can also store fly ash, and the third material storage part 13 can store lime and expanded perlite. At the same time, a first discharge port is provided on the first material storage part 11, a second discharge port is provided on the second material storage part 12, and a third discharge port is provided on the third material storage part 13. The mixing component 2 has a mixing chamber and a feed port and a discharge port connected to the mixing chamber, wherein the feed port corresponds to the first discharge port, the second discharge port and the third discharge port. The material port is set so that the fly ash, lime and expanded perlite stored in the first storage member 11, the second storage member 12 and the third storage member 13 can be discharged through the first discharge port, the second discharge port and the third discharge port respectively, and discharged into the mixing chamber through the feed port, and mixed into a low-carbon insulation agent in the mixing chamber. The packaging component 3 includes a packaging member 31. The packaging member 31 is a packaging machine in this embodiment. The packaging member 31 has an inlet, and the inlet is set corresponding to the outlet, so as to receive the low-carbon insulation agent discharged from the outlet, and then realize the collection of the low-carbon insulation agent for subsequent use. In summary, the fly ash, lime and expanded perlite are effectively mixed through the above-mentioned production line to make it a insulation agent that can stabilize the temperature of the molten steel. While reducing the storage amount of fly ash, it also reduces the harm of fly ash to the environment and the health of residents, which is beneficial to protecting the environment and ensuring the health of residents.

[0036] Specifically, when preparing the thermal insulation for molten steel, density and thermal conductivity are the two most important factors. The most effective way to reduce thermal conductivity and density is to add lightweight porous materials containing gas phases such as expanded perlite to fly ash. Although the melting point of expanded perlite is relatively low, adding it to fly ash causes the melting point of the thermal insulation to be too high. Adding a small amount of lime can control the melting point of the thermal insulation within a reasonable range and improve the thermal insulation effect. After adding the thermal insulation, the low melting point phases among the various mineral phases first melt into liquid phases under high temperature conditions. As the temperature continues to rise, the liquid phase continuously absorbs surrounding substances and expands, and finally all melts into liquid phases. During this process, the appearance of the thermal insulation agent softens, spheroidizes, and flows.

[0037] In addition, the mineral material ratio of the low carbon insulation agent is: fly ash 60%-80%, expanded perlite 10%-20%, lime 5%-10%, among which, the raw material composition ratio of the low carbon insulation agent is: SiO2 50%-60%, CaO 8%-13%, Al2O3 22%-25%, a small amount of Fe2O3 and alkali metal oxides. When the ingredients required for the low carbon insulation agent are mixed, some organic adhesives, such as CMC and starch, can be added to improve the strength of the low carbon insulation agent.

[0038] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, the material storage assembly 1 further includes at least three vibrating members, wherein two vibrating members are respectively arranged on the first material storage member 11 and the second material storage member 12 , and the last vibrating member is arranged on the third material storage member 13 .

[0039] The production line for preparing low-carbon thermal insulation agent of the above structure also includes three vibrating parts by setting the storage component 1. The vibrating parts are vibration motors in this embodiment, wherein two vibrating parts are respectively arranged on the first storage part 11 and the second storage part 12, and the last vibrating part is arranged on the third storage part 13. Therefore, when the fly ash, lime and expanded perlite in the first storage part 11, the second storage part 12 and the third storage part 13 are discharged into the mixing chamber through the first discharge port, the second discharge port and the third discharge port respectively, the three vibrating parts can respectively drive the first storage part 11, the second storage part 12 and the third storage part 13 to vibrate, so that the fly ash, lime and expanded perlite can be smoothly discharged into the mixing chamber, avoiding blockage.

[0040] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, the material storage assembly 1 further includes at least three switch members, wherein two switch members are respectively arranged on the first material storage member 11 and the second material storage member 12 , and the last switch member is arranged on the third material storage member 13 .

[0041] The production line for preparing low-carbon thermal insulation agent of the above structure also includes three switch components through the arrangement of the storage component 1. The switch components are valves in this embodiment, wherein two switch components are respectively arranged on the first storage component 11 and the second storage component 12, and the last switch component is arranged on the third storage component 13. Therefore, when the fly ash, lime and expanded perlite in the first storage component 11, the second storage component 12 and the third storage component 13 are discharged into the mixing chamber through the first discharge port, the second discharge port and the third discharge port respectively, the three switch components can respectively control the opening or closing of the first discharge port, the second discharge port and the third discharge port, thereby accurately controlling the discharge amount of fly ash, lime and expanded perlite.

[0042] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, the mixing component 2 includes a first mixing structure 21 and a second mixing structure 22. The first mixing structure 21 includes a first feed port and a first discharge port, and the second mixing structure 22 includes a second feed port and a second discharge port. The first feed port is arranged corresponding to the first discharge port and the second discharge port, the second feed port is arranged corresponding to the first discharge port, and the feed port is arranged corresponding to the second discharge port.

[0043] The production line for preparing a low-carbon thermal insulation agent of the above structure is provided with a mixing component 2 including a first mixing structure 21 and a second mixing structure 22, wherein the first mixing structure 21 has a first feed port and a first discharge port, and the first feed port is provided corresponding to the first discharge port and the second discharge port, so that the first mixing structure 21 receives fly ash, lime and expanded perlite discharged from the first discharge port, the second discharge port and the third discharge port, and mixes part of the fly ash, lime and expanded perlite into a low-carbon thermal insulation agent, and the second mixing structure 22 has a second feed port and a second discharge port, and the second feed port is provided corresponding to the first discharge port, so that the second mixing structure 22 receives fly ash, lime, expanded perlite and part of the low-carbon thermal insulation agent discharged from the first discharge port, and further mixes the fly ash, lime and expanded perlite, so that the fly ash, lime and expanded perlite are completely mixed into a low-carbon thermal insulation agent, and the low-carbon thermal insulation agent is discharged through the second discharge port.

[0044] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, the first mixing structure 21 also includes a first mixing chamber and a first rotating member 211 and a first spiral member 212 arranged in the first mixing chamber, and the first spiral member 212 is arranged on the first rotating member 211. The first mixing structure 21 also includes a second mixing chamber and a second rotating member 221 and a second spiral member 222 arranged in the second mixing chamber, and the second spiral member 222 is arranged on the second rotating member 221.

[0045] The production line for preparing a low-carbon thermal insulation agent of the above structure is provided with a first mixing chamber by setting a first mixing structure 21 and a second mixing chamber by setting a second mixing structure 22, wherein a first rotating member 211 and a first spiral member 212 are provided in the first mixing chamber, the first rotating member 211 is a first rotating shaft in the present embodiment, the first spiral member 212 is a first spiral blade in the present embodiment, and the first spiral member 212 is provided on the first rotating member 211, and can rotate in the first mixing chamber following the first rotating member 211, so as to mix the fly ash, lime and expanded perlite and convey them to the first discharge port, and a second rotating member 221 and a second spiral member 222 are provided in the second mixing chamber, the second rotating member 221 is a second rotating shaft in the present embodiment, the second spiral member 222 is a second spiral blade in the present embodiment, and the second spiral member 222 is provided on the second rotating member 221, and can rotate in the second mixing chamber following the second rotating member 221, so as to further mix the fly ash, lime and expanded perlite and convey them to the second discharge port.

[0046] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, the packaging assembly 3 further includes a funnel 32 , which is disposed between the second mixing structure 22 and the packaging component 31 to receive the low-carbon heat-insulating agent into the packaging component 31 .

[0047] The production line for preparing low-carbon thermal insulation agent of the above structure also includes a funnel 32 by setting the packaging component 3. The funnel 32 is specifically arranged between the second mixing structure 22 and the packaging component 31. Therefore, when the low-carbon thermal insulation agent in the second mixing chamber is discharged from the second discharge port, the low-carbon thermal insulation agent can first enter the funnel 32, and then be discharged to the feed port on the packaging component 31 through the funnel 32, thereby avoiding the low-carbon thermal insulation agent from being directly discharged from the second discharge port to the feed port, which is easy to spill during the discharge process, and is conducive to avoiding waste.

[0048] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, the packaging assembly 3 further includes a bag sewing member 33, which is disposed between the funnel 32 and the packaging member 31, and is suitable for sewing the feed port.

[0049] The production line for preparing low-carbon thermal insulation agent of the above structure also includes a bag sewing part 33 by setting the packaging component 3. The bag sewing part 33 is a chain conveying bag sewing device in this embodiment. The bag sewing part 33 is specifically arranged between the funnel 32 and the packaging part 31. When the funnel 32 discharges the low-carbon thermal insulation agent into the packaging part 31 and when the packaging part 31 is filled with solubilizing particles, the bag sewing part 33 sews up the feed port of the packaging part 31, thereby closing the space in the packaging part 31, so that the solubilizing particles cannot be spilled from the feed port, thereby facilitating the transportation of the packaging part 31.

[0050] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, the packaging assembly 3 also includes a weighing piece 34, which is arranged on a side of the packaging piece 31 away from the funnel 32. After the packaging piece 31 receives the low-carbon insulation agent, the weighing piece 34 is suitable for weighing the weight of the packaging piece 31 and the low-carbon insulation agent.

[0051] The production line for preparing low-carbon thermal insulation agent of the above structure also includes a weighing piece 34 by setting the packaging component 3. The weighing piece 34 is a weighing machine in this embodiment. The weighing piece 34 is specifically arranged on the side of the packaging piece 31 away from the funnel 32, that is, the packaging piece 31 is arranged on the weighing piece 34. When the packaging piece 31 is full of low-carbon thermal insulation agent, the weighing piece 34 can weigh the weight of the packaging piece 31 and the low-carbon thermal insulation agent falling into the packaging piece 31, so that the weight of the low-carbon thermal insulation agent contained in each packaging piece 31 remains consistent, even if the containing specifications of each packaging piece 31 remain consistent.

[0052] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, it also includes a conveying component, which includes a first conveying structure 41 and a second conveying structure 42. The first conveying structure 41 is arranged between the storage component 1 and the mixing component 2 to convey fly ash, lime and expanded perlite into the mixing chamber, and the second conveying structure 42 is arranged between the mixing component 2 and the packaging component 3 to convey the low-carbon insulation agent into the funnel 32.

[0053] The production line for preparing low-carbon thermal insulation agent of the above structure is provided with a conveying component between the material storage component 1 and the packaging component 3. The conveying component specifically includes a first conveying structure 41 and a second conveying structure 42. The first conveying structure 41 and the second conveying structure 42 are both conveyor belt structures in this embodiment, wherein the first conveying structure 41 is provided between the material storage component 1 and the mixing component 2, so that when fly ash, lime and expanded perlite are discharged from the first discharge port, the second discharge port and the third discharge port, the first conveying structure 41 can receive the fly ash, lime and expanded perlite, and convey them to the first feed port of the first mixing structure 21, so that they can be mixed in the first mixing structure 21, and the second conveying structure 42 is provided between the mixing component 2 and the packaging component 3, so that when the low-carbon thermal insulation agent is discharged from the second discharge port of the second mixing structure 22, the second conveying structure 42 can receive the low-carbon thermal insulation agent and convey it to the funnel 32, so that it is transmitted toward the feed port on the packaging component 31.

[0054] The production line for preparing the low-carbon heat preservation agent provided in this embodiment is as follows: Figure 1 As shown, a dust removal structure 5 is also included. The dust removal structure 5 is arranged on a side of the material storage assembly 1 away from the mixing assembly 2. The dust removal structure 5 is suitable for absorbing diffused fly ash and lime.

[0055] The production line for preparing low-carbon thermal insulation agent of the above structure is provided with a dust removal structure 5 on the side of the storage component 1 away from the mixing component 2. The dust removal structure 5 in this embodiment is a bag dust collector. When fly ash, lime and expanded perlite are discharged from the first discharge port, the second discharge port and the third discharge port to the first conveying structure 41 respectively, a certain amount of dust will be generated in the process of falling. Due to the nature of the fly ash itself, the dust is polluting. Therefore, the dust removal structure 5 can absorb the dust, thereby preventing the dust from polluting the environment. Of course, when the low-carbon thermal insulation agent is discharged from the first mixing structure 21 to the second mixing structure 22, a certain amount of dust will also be generated, and the dust removal structure 5 can also absorb the dust.

[0056] The production line for preparing low-carbon heat preservation agent provided by the utility model has the following working process:

[0057] First, the first storage member 11, the second storage member 12 and the third storage member 13 discharge fly ash, lime and expanded perlite to the first conveying structure 41 through the first discharge port, the second discharge port and the third discharge port respectively; then, the first conveying structure 41 conveys the fly ash, lime and expanded perlite to the first mixing structure 21 through the first feeding port, and the first mixing structure 21 converts part of the fly ash, lime and expanded perlite into a low-carbon heat-insulating agent; after that, the first mixing structure 21 converts the fly ash, lime, expanded perlite and part of the low-carbon heat-insulating agent into a low-carbon heat-insulating agent; The material inlet and the second material inlet are discharged into the second mixing structure 22, and the second mixing structure 22 mixes the remaining fly ash, lime and expanded perlite into a low-carbon heat-insulating agent; then, the second mixing structure 22 discharges the low-carbon heat-insulating agent into the funnel 32 through the second material outlet, and the low-carbon heat-insulating agent discharged into the funnel 32 is discharged into the package 31 through the material inlet opened on the package 31; finally, the bag sewing part 33 sews up the material inlet of the package 31, and weighs the package 31 and the low-carbon heat-insulating agent stored in the package 31 through the weighing part 34. At this point, the workflow of the production line for preparing the low-carbon heat-insulating agent is completed.

[0058] The production line for preparing low-carbon thermal insulation agent provided by the utility model comprises a mixing component 2 arranged on one side of a material storage component 1 and a packaging component 3 arranged on the side of the mixing component 2 away from the material storage component 1. The material storage component 1 comprises a first material storage part 11, a second material storage part 12 and a third material storage part 13, wherein the first material storage part 11 can store fly ash, the second material storage part 12 can also store fly ash, and the third material storage part 13 can store lime and expanded perlite. Meanwhile, a first discharge port is provided on the first material storage part 11, a second discharge port is provided on the second material storage part 12, and a third discharge port is provided on the third material storage part 13. The mixing component 2 has a mixing chamber and a feeding port and a discharging port connected with the mixing chamber, wherein the feeding port is arranged corresponding to the first discharge port, the second discharge port and the third discharge port, so that the materials stored in the first material storage part 11 can be discharged to the mixing chamber. The fly ash, lime and expanded perlite in the storage part 11, the second storage part 12 and the third storage part 13 can be discharged through the first discharge port, the second discharge port and the third discharge port respectively, and discharged into the mixing chamber through the feed port, and mixed into a low-carbon insulation agent in the mixing chamber. The packing component 3 includes a packing part 31, and the packing part 31 has an inlet, and the inlet is arranged corresponding to the outlet, so as to receive the low-carbon insulation agent discharged from the outlet, and then realize the collection of the low-carbon insulation agent for subsequent use. In summary, the fly ash, lime and expanded perlite are effectively mixed through the above-mentioned production line to make it a insulation agent that can stabilize the temperature of the molten steel. While reducing the storage amount of fly ash, it also reduces the harm of fly ash to the environment and the health of residents, which is beneficial to protecting the environment and ensuring the health of residents.

[0059] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention of the utility model.

Claims

1. A production line for preparing a low-carbon heat preservation agent, characterized in that: include: A material storage component (1) comprises a first material storage member (11), a second material storage member (12) and a third material storage member (13), wherein the first material storage member (11) and the second material storage member (12) are suitable for storing fly ash, and the third material storage member (13) is suitable for storing lime and expanded perlite, and the first material storage member (11) and the second material storage member (12) are respectively provided with a first discharge port and a second discharge port, and the third material storage member (13) is provided with a third discharge port; A mixing component (2) is arranged on one side of the material storage component (1), the mixing component (2) having a mixing chamber and a feed port and a discharge port connected to the mixing chamber, the feed port being arranged corresponding to the first discharge port, the second discharge port and the third discharge port to receive the fly ash, the lime and the expanded perlite, the mixing component (2) being suitable for mixing the fly ash, the lime and the expanded perlite in the mixing chamber into a low-carbon heat preservation agent; A packaging component (3) is arranged on a side of the mixing component (2) away from the material storage component (1), and the packaging component (3) comprises a packaging piece (31), and the packaging piece (31) has an inlet arranged corresponding to the outlet to receive the low-carbon thermal insulation agent.

2. The production line for preparing low-carbon thermal insulation agent according to claim 1, characterized in that: The material storage component (1) further comprises at least three vibrating members, wherein two of the vibrating members are respectively arranged on the first material storage member (11) and the second material storage member (12), and the last vibrating member is arranged on the third material storage member (13).

3. The production line for preparing low-carbon thermal insulation agent according to claim 2, characterized in that: The material storage component (1) further comprises at least three switch components, wherein two of the switch components are respectively arranged on the first material storage component (11) and the second material storage component (12), and the last switch component is arranged on the third material storage component (13).

4. The production line for preparing a low-carbon heat preservation agent according to any one of claims 1 to 3, characterized in that: The mixing assembly (2) comprises a first mixing structure (21) and a second mixing structure (22), wherein the first mixing structure (21) comprises a first feed port and a first discharge port, and the second mixing structure (22) comprises a second feed port and a second discharge port, wherein the first feed port is arranged corresponding to the first discharge port and the second discharge port, the second feed port is arranged corresponding to the first discharge port, and the feed port is arranged corresponding to the second discharge port.

5. The production line for preparing low-carbon heat preservation agent according to claim 4, characterized in that: The first mixing structure (21) further comprises a first mixing chamber and a first rotating member (211) and a first spiral member (212) arranged in the first mixing chamber, wherein the first spiral member (212) is arranged on the first rotating member (211). The first mixing structure (21) further comprises a second mixing chamber and a second rotating member (221) and a second spiral member (222) arranged in the second mixing chamber, wherein the second spiral member (222) is arranged on the second rotating member (221).

6. The production line for preparing low-carbon heat preservation agent according to claim 5, characterized in that: The packaging component (3) further comprises a funnel (32), wherein the funnel (32) is arranged between the second mixing structure (22) and the packaging member (31) to receive the low-carbon heat-insulating agent into the packaging member (31).

7. The production line for preparing low-carbon thermal insulation agent according to claim 6, characterized in that: The packaging assembly (3) further comprises a bag sewing member (33), wherein the bag sewing member (33) is arranged between the funnel (32) and the packaging member (31), and the bag sewing member (33) is suitable for sewing the feed opening.

8. The production line for preparing low-carbon thermal insulation agent according to claim 7, characterized in that: The packaging component (3) further comprises a weighing piece (34), wherein the weighing piece (34) is arranged on a side of the packaging piece (31) away from the funnel (32), and after the packaging piece (31) receives the low-carbon heat-insulating agent, the weighing piece (34) is suitable for weighing the weight of the packaging piece (31) and the low-carbon heat-insulating agent.

9. The production line for preparing low-carbon heat preservation agent according to claim 8, characterized in that: The invention also comprises a conveying assembly, wherein the conveying assembly comprises a first conveying structure (41) and a second conveying structure (42), wherein the first conveying structure (41) is arranged between the material storage assembly (1) and the mixing assembly (2) to convey the fly ash, the lime and the expanded perlite into the mixing chamber, and the second conveying structure (42) is arranged between the mixing assembly (2) and the packaging assembly (3) to convey the low-carbon thermal insulation agent into the funnel (32).

10. The production line for preparing a low-carbon heat preservation agent according to any one of claims 1 to 3, characterized in that: It also comprises a dust removal structure (5), which is arranged on a side of the material storage component (1) away from the mixing component (2), and is suitable for absorbing the diffused fly ash and lime.