Underground forklift front frame assembly tool

By designing the front frame set tooling for underground shovel trucks, the positioning shaft and lead screw are used to achieve accurate alignment of the articulated holes, the problem of position deviation of the articulated holes is solved, the assembly accuracy and installation quality are improved, and the operation process is simplified .

CN222002396UActive Publication Date: 2024-11-15SHANDONG DERUI MINING MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421110352.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-21
Publication Date
2024-11-15
Estimated Expiration
2034-05-21

AI Technical Summary

Technical Problem

The prior art lacks a set-up tooling dedicated to welding the front frame of the underground shovel truck, resulting in a deviation in the position of the articulated holes and affecting the assembly accuracy and installation effect.

Method used

A front frame set tooling including hinge plate positioning assembly, vertical plate positioning assembly and bridge seat positioning assembly is designed. The positioning shaft, lead screw and fixing sleeve are used to achieve precise positioning and support of each component to ensure the uniformity of the hinge hole. Axis aligned.

Benefits of technology

The assembly accuracy and quality of the front frame are improved, the installation problems caused by deviation of the hinge hole position are avoided, and the assembly and disassembly and welding operations are simplified, ensuring the smooth progress of welding work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222002396U_ABST
    Figure CN222002396U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of underground forklift truck production equipment, and discloses an underground forklift truck front frame assembly tool which comprises a hinge plate positioning assembly, a vertical plate positioning assembly and a bridge seat positioning assembly, the hinge plate positioning assembly comprises a positioning stand column and a positioning cushion cover, an upper hinge plate positioning shaft is inserted into an upper positioning hole of the positioning stand column, and a lower hinge plate positioning shaft is inserted into a lower positioning hole of the positioning cushion cover. A lower hinge plate positioning shaft is inserted into a lower positioning hole of the positioning cushion cover, the vertical plate positioning assembly comprises a front supporting stand column, a large arm hinge positioning shaft and a lifting hinge positioning assembly, and the bridge seat positioning assembly comprises a bridge seat bracket. The front frame assembling tool is simple in overall structure, assembling, disassembling and positioning operation of all parts of a front frame is convenient, accurate positioning and reliable supporting of all the parts of the front frame are achieved, and the assembling quality of the front frame is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of underground scraper production equipment, and in particular relates to a front frame assembly tooling for an underground scraper. Background Art

[0002] An underground shovel loader is a self-propelled equipment that integrates loading and unloading. It can complete the comprehensive operations of shoveling, loading, transporting, unloading, layered filling and partial compaction. It is suitable for underground road, water conservancy, electricity and mineral mining work. It is mainly composed of a power system, transmission system, frame, steering system, braking system, walking device, working device, etc., among which the working device includes a front frame, bucket cylinder, bucket, boom, forearm, etc.

[0003] The front frame includes an upper hinge plate, a lower hinge plate, a wall panel, a middle plate and a bridge seat that are welded together. A welding machine is used to weld and connect the various components. In addition, the welding accuracy of the front frame is very high. The hinge holes on the upper hinge plate and the lower hinge plate, the upper arm hinge holes on the wall panel and the middle plate, and the lifting hinge holes must be completely coaxial. Therefore, assembly tooling is required to position and support them.

[0004] However, there is currently no assembly tooling specifically for welding the front frame of an underground loader. Manual alignment is required before welding and fixing. As a result, there may be a certain position deviation between the hinge holes, resulting in poor assembly accuracy of the front frame and even affecting the installation of the front frame on the underground loader. Utility Model Content

[0005] The main technical problem to be solved by the utility model is to provide a front frame assembly tooling for an underground shovel loader, which facilitates the assembly, disassembly and positioning operations of the various components of the front frame, realizes the precise positioning and reliable support of the various components of the front frame, and improves the assembly quality of the front frame.

[0006] In order to solve the above technical problems, the utility model provides the following technical solutions:

[0007] A front frame assembly tool for an underground scraper, comprising a tool platform, on which a hinged plate positioning assembly, a vertical plate positioning assembly and a bridge seat positioning assembly for positioning and supporting the front frame are arranged;

[0008] The hinge plate positioning assembly includes a positioning column and a positioning cushion sleeve fixed on the tooling platform, the positioning column is provided with an upper positioning hole, an upper hinge plate positioning shaft is inserted into the upper positioning hole, a lower positioning hole is provided on the top of the positioning cushion sleeve, the lower positioning hole and the upper positioning hole are coaxially arranged, and a lower hinge plate positioning shaft is inserted into the lower positioning hole;

[0009] The vertical plate positioning assembly includes a pair of front support columns fixed on the tooling platform, a large arm hinged positioning shaft is commonly provided on the two front support columns, a lifting hinged positioning assembly is provided on the rear side of the front support columns, and the lifting hinged positioning assembly is fixed on the tooling platform;

[0010] The bridge seat positioning assembly includes a bridge seat bracket fixed on the tooling platform.

[0011] The following is a further optimization of the above technical solution by the utility model:

[0012] The lifting hinge positioning assembly comprises two fixed sleeves arranged at intervals, each fixed sleeve is fixed on the tooling platform, and a lifting hinge positioning shaft is inserted in the central hole of each fixed sleeve.

[0013] Further optimization: A first positioning screw is provided at both upper and lower ends of each of the front supporting columns, and each first positioning screw is installed on the corresponding front supporting column in a threaded connection manner.

[0014] Further optimization: A rear supporting column is respectively arranged on both sides of the bridge seat bracket, and a plurality of second positioning screws are arranged on each rear supporting column, and each second positioning screw is installed on the upper end of the corresponding rear supporting column in a threaded connection manner.

[0015] Further optimization: a shaft support seat is fixed to the upper end of each front supporting column, a placement groove is provided on the top of each shaft support seat, and both ends of the upper arm hinged positioning shaft are respectively placed in the corresponding placement grooves.

[0016] Further optimization: a positioning sleeve is arranged in the upper positioning hole, and the upper hinge plate positioning shaft passes through the center hole of the positioning sleeve.

[0017] The utility model adopts the above technical scheme, has ingenious conception and reasonable structure, and is specially used for the assembly and welding of the front frame. The hinge holes on the upper hinge plate and the lower hinge plate, the big arm hinge holes on the wall plate and the middle plate, and the lifting hinge holes can be completely aligned, thereby ensuring the assembly accuracy between the various components of the front frame, improving the assembly quality of the front frame, and avoiding the situation where the lifting cylinder, the big arm and other components cannot be installed due to the position deviation between the various hinge holes.

[0018] The positioning shaft plug-in positioning method is adopted, and the assembly, disassembly and positioning operations of the various components of the front frame on the assembly tooling are very convenient, realizing the precise positioning between the bridge seat, wall panel, middle plate, upper hinge plate and lower hinge plate, and the assembly tooling will not cause any obstacles to the welding work of the front frame.

[0019] Moreover, through the cooperation of the positioning screw and the fixing sleeve, the support of the wall panel and the middle panel and the determination of the distance between the wall panel and the middle panel are realized, thereby ensuring the accuracy and verticality of the assembly position of the wall panel and the middle panel.

[0020] The utility model is further described below in conjunction with the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the overall structure in the embodiment of the utility model;

[0022] Figure 2 This is a schematic diagram of the installation of the front frame in the embodiment of the utility model;

[0023] Figure 3 for Figure 2 A schematic diagram of the main view;

[0024] Figure 4 for Figure 3 Schematic top view of .

[0025] In the figure: 1- tooling platform; 2- hinged plate positioning assembly; 21- positioning column; 22- positioning cushion sleeve; 23- upper positioning hole; 24- upper hinged plate positioning shaft; 25- lower positioning hole; 26- lower hinged plate positioning shaft; 27- positioning shaft sleeve; 3- vertical plate positioning assembly; 31- front support column; 32- upper arm hinged positioning shaft; 33- lifting hinged positioning assembly; 331- fixing sleeve; 332- lifting hinged positioning shaft; 34- first positioning screw; 35- supporting shaft seat; 36- placing groove; 4- bridge seat positioning assembly; 41- bridge seat bracket; 42- rear support column; 43- second positioning screw; 5- front frame; 51- upper hinged plate; 52- lower hinged plate; 53- wall panel; 54- middle plate; 55- bridge seat; 56- inner plate. DETAILED DESCRIPTION

[0026] like Figure 1-Figure 4 Commonly shown: a front frame assembly tooling for an underground shovel loader, including a tooling platform 1, on which a hinged plate positioning component 2, a vertical plate positioning component 3 and a bridge seat positioning component 4 for positioning and supporting a front frame 5 are arranged.

[0027] In this embodiment, the front frame 5 includes two vertically arranged wall panels 53, and two vertically arranged middle panels 54 are arranged between the two wall panels 53. Each wall panel 53 and the middle panel 54, and the two middle panels 54 are arranged at intervals. The front ends of the wall panels 53 and the middle panels 54 are provided with upper hinged plates 51 and lower hinged plates 52 arranged up and down, and the rear ends of the wall panels 53 and the middle panels 54 are jointly provided with a bridge seat 55.

[0028] In this embodiment, the hinge plate positioning assembly 2 is used to support the upper hinge plate 51 and the lower hinge plate 52 , and to coaxially position the hinge holes on the upper hinge plate 51 and the lower hinge plate 52 .

[0029] In this embodiment, the vertical plate positioning assembly 3 is used to support and position the wall panel 53 and the middle panel 54 , and to coaxially position the upper arm hinge holes and the lifting hinge holes on the wall panel 53 and the middle panel 54 .

[0030] In this embodiment, the bridge seat positioning assembly 4 is used to support the bridge seat 55 and press the wall panel 53 against the side wall of the bridge seat 55, thereby achieving accurate positioning and reliable support for the various components of the front frame 5, thereby improving the finished product quality of the front frame 5 without the need for rework.

[0031] like Figure 1 and Figure 2 As shown together, the hinge plate positioning assembly 2 includes a positioning column 21 and a positioning cushion sleeve 22 fixed on the tooling platform 1. The positioning column 21 is provided with an upper positioning hole 23, and an upper hinge plate positioning shaft 24 is inserted into the upper positioning hole 23.

[0032] In this embodiment, the upper hinge plate positioning shaft 24 is used to position the hinge hole of the upper hinge plate 51; a lower positioning hole 25 is provided on the top of the positioning cushion sleeve 22, and the lower positioning hole 25 is coaxially arranged with the upper positioning hole 23, and a lower hinge plate positioning shaft 26 is inserted into the lower positioning hole 25.

[0033] In this embodiment, the lower hinge plate positioning shaft 26 is used to position the hinge hole of the lower hinge plate 52 .

[0034] In this embodiment, the upper positioning hole 23 and the lower positioning hole 25 on the assembly tooling are coaxially arranged, so after positioning, the hinge hole of the upper hinge plate 51 and the hinge hole of the lower hinge plate 52 are coaxially arranged, ensuring the coaxiality of the two hinge holes, thereby ensuring the assembly accuracy of the upper hinge plate 51 and the lower hinge plate 52.

[0035] like Figure 1 and Figure 2 As shown together, the vertical plate positioning assembly 3 includes a pair of front support columns 31 fixed on the tooling platform 1, and a large arm hinged positioning shaft 32 is commonly provided on the two front support columns 31.

[0036] In this embodiment, the upper arm hinge positioning shaft 32 is used to coaxially position the upper arm hinge holes on the wall panel 53 and the middle panel 54 .

[0037] A lifting hinged positioning assembly is arranged on the rear side of the front supporting column, and the lifting hinged positioning assembly is fixed on the tooling platform.

[0038] In this embodiment, the lifting hinge positioning assembly is used to coaxially position the lifting hinge holes on the adjacent wall panels 53 and the middle panel 54 .

[0039] The bridge seat positioning assembly 4 includes a bridge seat bracket 41 fixed on the tooling platform 1 , and the bottom of the rear end of the bridge seat 55 is pressed on the bridge seat bracket 41 .

[0040] The lifting hinge positioning assembly 33 includes two fixed sleeves 331 arranged at intervals. Each fixed sleeve 331 is fixed on the tooling platform 1 . A lifting hinge positioning shaft 332 is inserted into the center hole of each fixed sleeve 331 .

[0041] In this embodiment, since there is a certain distance between the wall panel 53 and the middle panel 54 , the fixing sleeve 331 is used to ensure the consistency of the distance between the wall panel 53 and the middle panel 54 .

[0042] A first positioning screw 34 is disposed at both upper and lower ends of each front supporting column 31 , and each first positioning screw 34 is installed on the corresponding front supporting column 31 in a threaded connection manner.

[0043] A rear support column 42 is respectively provided on both sides of the bridge seat bracket 41, and a plurality of second positioning screws 43 are provided on each rear support column 42. Each second positioning screw 43 is installed on the upper end of the corresponding rear support column 42 in a threaded connection manner.

[0044] In this embodiment, the first positioning screw 34 and the second positioning screw 43 are provided to support and fix the wall panel 53 .

[0045] Since there are no other supporting or fixing structures on the outside of the two wall panels 53, in order to prevent the wall panels 53 from tilting outward, the first positioning screw 34 is required to support and fix the front end, and the second positioning screw 43 is used to support and fix the rear end of the wall panel 53, thereby ensuring the verticality and stability of the wall panel 53.

[0046] A shaft support seat 35 is fixed to the upper end of each front support column 31 , and a placement groove 36 is provided on the top of each shaft support seat 35 . Both ends of the upper arm hinged positioning shaft 32 are respectively placed in the corresponding placement grooves 36 .

[0047] A positioning sleeve 27 is disposed in the upper positioning hole 23 , and the upper hinge plate positioning shaft 24 passes through the center hole of the positioning sleeve 27 .

[0048] When in use, the lower hinge plate 52, the bridge seat 55, the upper hinge plate 51, the two wall plates 53 and the two middle plates 54 of the front frame 5 are placed in sequence.

[0049] First, align the hinge hole of the lower hinge plate 52 with the lower positioning hole 25, and insert the lower hinge plate positioning shaft 26 into the hinge hole of the lower hinge plate 52 and the lower positioning hole 25 to complete the positioning of the lower hinge plate.

[0050] The bridge seat 55 is then placed on the rear side of the lower hinge plate 52, with the front end aligned with the rear end of the lower hinge plate 52, and the rear end placed on the bridge seat bracket 41 for support.

[0051] Then, the upper hinge plate 51 is placed so that the hinge hole of the upper hinge plate 51 is aligned with the upper positioning hole 23 , and the upper hinge plate positioning shaft 24 is inserted into the hinge hole of the upper hinge plate 51 and the upper positioning hole 23 to complete the positioning of the upper hinge plate 51 .

[0052] Then, the two wall panels 53 and the two middle panels 54 are placed at corresponding positions respectively, and the upper arm hinge positioning shaft 32 is inserted into the upper arm hinge holes on the wall panels 53 and the middle panels 54 .

[0053] Then, the lifting hinge positioning shaft is inserted into the lifting hinge hole of the wall panel 53 , the center hole of the fixing sleeve 331 and the lifting hinge hole of the middle plate 54 .

[0054] Finally, all the first positioning screws 34 and the second positioning screws 43 are tightened so as to be pressed against the outer wall of the wall panel 53 and the side wall of the bridge seat 55 .

[0055] After completing the assembly work, use a welding machine to weld each connection position.

[0056] The utility model is designed according to the structure of the front frame 5 and the welding process, and is specially used for positioning, supporting and welding the front frame 5, so that the positioning accuracy and supporting stability between the components of the front frame 5 can be ensured, and at the same time, the welding work will not be hindered; and the utility model adopts a simple shaft rod plug-in positioning method to position it, and the positioning and assembly and disassembly operations are very convenient.

[0057] For ordinary technicians in this field, according to the teachings of the present invention, without departing from the principles and spirit of the present invention, changes, modifications, substitutions and variations made to the implementation methods are still within the protection scope of the present invention.

Claims

1. A front frame assembly tool for an underground scraper, comprising a tool platform (1), characterized in that: The tooling platform (1) is provided with a hinged plate positioning assembly (2), a vertical plate positioning assembly (3) and a bridge seat positioning assembly (4) for positioning and supporting the front vehicle frame (5); The hinge plate positioning assembly (2) comprises a positioning column (21) and a positioning sleeve (22) fixed on the tooling platform (1); the positioning column (21) is provided with an upper positioning hole (23), an upper hinge plate positioning shaft (24) is inserted into the upper positioning hole (23); a lower positioning hole (25) is provided at the top of the positioning sleeve (22); the lower positioning hole (25) and the upper positioning hole (23) are coaxially arranged vertically; a lower hinge plate positioning shaft (26) is inserted into the lower positioning hole (25); The vertical plate positioning assembly (3) comprises a pair of front support columns (31) fixed on the tooling platform (1), a large arm hinged positioning shaft (32) is placed on the two front support columns (31), and a lifting hinged positioning assembly (33) is arranged on the rear side of the front support columns (31), and the lifting hinged positioning assembly (33) is fixed on the tooling platform (1); The bridge seat positioning assembly (4) comprises a bridge seat bracket (41) fixed on the tooling platform (1).

2. The front frame assembly tool for an underground scraper according to claim 1, characterized in that: The lifting hinge positioning assembly (33) comprises two fixed sleeves (331) arranged at intervals, each fixed sleeve (331) is fixed on the tooling platform (1), and a lifting hinge positioning shaft (332) is inserted into the center hole of each fixed sleeve (331).

3. The front frame assembly tool for an underground scraper according to claim 2, characterized in that: A first positioning screw (34) is provided at both upper and lower ends of each front supporting column (31), and each first positioning screw (34) is installed on the corresponding front supporting column (31) in a threaded connection manner.

4. The front frame assembly tool for an underground scraper according to claim 3, characterized in that: A rear support column (42) is respectively provided on both sides of the bridge seat bracket (41), and each rear support column (42) is provided with a plurality of second positioning screws (43), and each second positioning screw (43) is installed on the upper end of the corresponding rear support column (42) in a threaded connection manner.

5. The front frame assembly tool for underground scraper according to claim 4, characterized in that: A shaft support seat (35) is fixed to the upper end of each front support column (31), and a placement groove (36) is provided on the top of each shaft support seat (35). Both ends of the upper arm hinge positioning shaft (32) are respectively placed in the corresponding placement grooves (36).

6. The front frame assembly tool for underground scraper according to claim 5, characterized in that: A positioning sleeve (27) is arranged in the upper positioning hole (23), and the upper hinge plate positioning shaft (24) passes through the center hole of the positioning sleeve (27).