Highway subgrade anti-settlement protection assembly

By designing highway roadbed anti-settlement protection components, quickly laying and fixing geotextiles with rotating shafts and fixed structures, and forming tension through socket splicing, the problem of time-consuming, labor-intensive and insufficient stability of geotextile laying in the existing technology is solved, and efficient prevention is achieved The effect of roadbed settlement.

CN222008510UActive Publication Date: 2024-11-15ANHUI RUNRUI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420352600.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-11-15
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

The existing geotextile manual laying in the roadbed construction is time-consuming and labor-intensive, making it difficult to lay flat, and there is a lack of fixing devices between multiple pieces, resulting in weakening of stability and difficult to effectively prevent roadbed settlement.

Method used

A highway roadbed anti-settlement protection component is designed, using a rotating shaft to roll up the geotextile. Through structures such as fixed blocks, support seats, bolts and fixing strips, the geotextile is quickly laid and fixed, and the components are spliced ​​by sockets and plugs. Form a tension force to enhance the stability of geotextile.

Benefits of technology

It achieves efficient and quick prevention of roadbed settlement, improves the stability and laying efficiency of geotextiles, ensures fixed connections between multiple geotextiles, and significantly improves the protective effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008510U_ABST
    Figure CN222008510U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of roadbed construction, and discloses a highway roadbed anti-settlement protection assembly which comprises a rotating shaft, geotechnical cloth is wound on the outer surface of the rotating shaft, fixing blocks are rotationally connected to the two ends of the rotating shaft correspondingly, the two fixing blocks are slidably connected with supporting seats correspondingly, and bolts rotationally penetrate through the two supporting seats correspondingly; one end of the geotechnical cloth is fixedly connected with a fixing strip, and the two ends of the fixing strip are in threaded connection with screws. By arranging the geotechnical cloth, the two supporting seats can be placed on the surface of the roadbed, the two supporting seats and the roadbed are fixed, the geotechnical cloth is unfolded through the fixing strips, the fixing strips and the surface of the roadbed are fixed, then the geotechnical cloth is laid on the surface of the roadbed, the two ends of the geotechnical cloth are fixed, and then soil is continuously added to the top of the geotechnical cloth for tamping; the protection assembly is embedded into the roadbed, and the effect of efficiently and rapidly preventing roadbed settlement is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of roadbed construction, and in particular to a highway roadbed anti-settling protection component. Background Art

[0002] In highway construction, the quality of the roadbed is directly related to whether the entire highway can be used normally. The roadbed quality problem mainly lies in the uneven settlement and deformation of the roadbed. The settlement and deformation of the roadbed are generally caused by the roadbed itself, the road vehicle conditions and the geological environment. In order to improve the quality of the roadbed, geotextiles can generally be laid during the roadbed construction process, which can strengthen the roadbed, thereby increasing the overall stability of the roadbed, protecting the roadbed and slowing down the settlement rate of the roadbed.

[0003] Existing geotextiles are generally laid by manpower. The geotextile covers a large area, is time-consuming and labor-intensive to lay manually, and is difficult to lay flat. There is a lack of fixing devices between multiple geotextiles, so that multiple geotextiles form separated small pieces, and the stability is weakened. Therefore, there is a lot of room for improvement.

[0004] The above information disclosed in the background technology is only used to increase the understanding of the background technology of the present application, and therefore, it may include information that does not constitute the prior art known to ordinary technicians in the field. Utility Model Content

[0005] In order to solve the above-mentioned problems, the present application provides a highway roadbed anti-settling protection component.

[0006] The present application provides a highway subsidence protection component that adopts the following technical solution:

[0007] A highway roadbed anti-settlement protection component comprises a rotating shaft, a geotextile is rolled up on the outer surface of the rotating shaft, both ends of the rotating shaft are rotatably connected to fixed blocks, two of the fixed blocks are slidably connected to support seats, two of the support seats are rotatably penetrated by bolts, one end of the geotextile is fixedly connected to a fixing strip, and both ends of the fixing strip are threadedly connected to screws.

[0008] Preferably, one end of one of the support bases is fixedly connected to a socket, and one end of the other support base is fixedly connected to an insert block.

[0009] Preferably, a first connecting block is fixedly connected to the front side of one end of the fixing strip, and a second connecting block is fixedly connected to the rear side of one end of the fixing strip.

[0010] Preferably, one end of the two fixed blocks is fixedly connected with a sliding block, one side of the two support seats is provided with a sliding groove, and the two sliding blocks are movably connected to the two sliding grooves respectively.

[0011] Preferably, two ends of the fixing strip are respectively fixedly connected to two fixing blocks by screws.

[0012] In summary, this application includes the following beneficial technical effects:

[0013] 1. By setting the geotextile, two support bases can be placed on the roadbed surface, the two support bases are fixed to the roadbed, the geotextile is unfolded through the fixing strip, the fixing strip is fixed to the roadbed surface through screws, and then the geotextile is laid on the roadbed surface and the two ends of the geotextile are fixed, and then soil is added on the top of the geotextile for compaction, and the protective component is buried in the roadbed; compared with the existing technology, it has the effect of efficiently and quickly preventing roadbed settlement;

[0014] 2. By setting the socket and the plug-in block, the plug-in block on one side of one protective component can be inserted into the socket on one side of the other protective component to splice the two protective components. At this time, the connecting block 1 of one protective component fits with the connecting block 2 of the other protective component. The connecting block 1 and the connecting block 2 can be fixedly connected to the roadbed by screws, and then one end of the geotextile of the two protective components can be fixedly connected to the roadbed at the same time, so that tension is formed between multiple geotextiles; compared with the existing technology, it has the effect of more stable connection of protective components. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall winding structure of the embodiment of the application;

[0016] Figure 2 is a schematic structural diagram of a rotating shaft according to an embodiment of the application;

[0017] Figure 3 It is a schematic diagram of the overall expanded structure of an embodiment of the application.

[0018] Explanation of the accompanying reference numerals: 1. rotating shaft; 2. geotextile; 3. supporting seat; 4. slide groove; 5. sliding block; 6. fixing block; 7. fixing bar; 8. screw; 9. bolt; 10. connecting block 1; 11. connecting block 2; 12. socket; 13. plug block. DETAILED DESCRIPTION

[0019] The following is combined with Figure 1-3 This application is described in further detail.

[0020] The present application embodiment discloses a highway subsidence protection component, referring to Figure 1-Figure 3, including a rotating shaft 1, the outer surface of the rotating shaft 1 is rolled up with a geotextile 2, the geotextile 2 can generate tension when a load acts, enhance the tensile strength of the soil and disperse the load, thereby increasing the load capacity of the roadbed and preventing the roadbed from settling, both ends of the rotating shaft 1 are rotatably connected with fixed blocks 6, one end of the geotextile 2 can be pulled to drive the rotating shaft 1 to rotate, and then the geotextile 2 can be unfolded, the two fixed blocks 6 are slidably connected with a support seat 3, the two fixed blocks 6 can drive the rotating shaft 1 and the geotextile 2 to move up and down along the fixed blocks 6, so that the rotating shaft 1 can gradually descend with the unfolding of the geotextile 2, and finally approach the surface of the roadbed, so that the geotextile 2 is laid flat on the surface of the roadbed, which is convenient for adding soil and tamping in the later stage In fact, the two support seats 3 are both rotatably penetrated by bolts 9, one end of the geotextile 2 is fixedly connected with a fixing bar 7, and both ends of the fixing bar 7 are threadedly connected with screws 8. The two support seats 3 are placed on the roadbed surface, and the two bolts 9 can be turned downward to insert the two bolts 9 into the roadbed, thereby fixing the two support seats 3 to the roadbed, and then the two screws 8 are turned out, and the geotextile 2 is unfolded through the fixing bar 7, and the fixing bar 7 is fixed to the roadbed surface through the screws 8, and then the geotextile 2 is laid on the roadbed surface and the two ends of the geotextile 2 are fixed, and then soil is added on the top of the geotextile 2 for compaction, and the protective component is buried in the roadbed, which plays a role in preventing the roadbed from settling.

[0021] Reference Figure 1 One end of one of the support seats 3 is fixedly connected to a socket 12, and one end of the other support seat 3 is fixedly connected to an insert block 13. The insert block 13 on one side of one of the protective components can be inserted into the socket 12 on one side of the other protective component to splice the two protective components, so that tension is formed between the multiple geotextiles 2, which is more stable and has a better anti-settlement effect.

[0022] Reference Figure 1 The front side of one end of the fixing strip 7 is fixedly connected with a connecting block 10, and the rear side of one end of the fixing strip 7 is fixedly connected with a connecting block 2 11. When two protective components are spliced, the connecting block 10 of one protective component fits with the connecting block 2 11 of the other protective component. The connecting block 10 and the connecting block 2 11 can be fixedly connected to the roadbed by screws 8, and then one end of the geotextiles 2 of the two protective components are fixedly connected to the roadbed at the same time, so that tension is formed between the two geotextiles 2.

[0023] Reference Figure 1 and Figure 2One end of the two fixed blocks 6 is fixedly connected with a slider 5, and one side of the two support seats 3 is provided with a slide groove 4. The two sliders 5 are movably connected with the two slide grooves 4 respectively. When the geotextile 2 is rolled up on the outer surface of the rotating shaft 1, the two support seats 3 are placed on the roadbed surface for fixation. The bottom of the geotextile 2 contacts the roadbed surface, pushing the two fixed blocks 6 upward, thereby driving the two sliders 5 to move up in the two slide grooves 4. As the geotextile 2 unfolds, the two sliders 5 gradually slide down until the geotextile 2 is fully unfolded, and the bottom of the rotating shaft 1 contacts the roadbed surface, so that the geotextile 2 is laid flat on the roadbed surface.

[0024] Reference Figure 1 and Figure 2 The two ends of the fixing strip 7 are respectively fixedly connected to the two fixing blocks 6 by screws 8. When the geotextile 2 is rolled up, the two ends of the fixing strip 7 can be fixedly connected to the two fixing blocks 6 by screws 8. When the geotextile 2 needs to be unfolded, the two screws 8 can be rotated out, the fixing strip 7 can be placed on the roadbed surface, and then the two screws 8 are inserted into the roadbed from top to bottom through the two ends of the fixing strip 7 to fix the fixing strip 7.

[0025] The implementation principle of a highway roadbed anti-settlement protection component of the embodiment of the present application is as follows: by setting the geotextile 2, two support seats 3 can be placed on the roadbed surface, and two bolts 9 can be turned downward to insert the two bolts 9 into the roadbed, thereby fixing the two support seats 3 to the roadbed, and then the two screws 8 are turned out, and the geotextile 2 is unfolded through the fixing strip 7, and the fixing strip 7 is fixed to the roadbed surface through the screws 8, and then the geotextile 2 is laid on the roadbed surface and the two ends of the geotextile 2 are fixed, and then soil is added on the top of the geotextile 2 for compaction, and the protection component is buried in the roadbed, which has the effect of efficiently and quickly preventing the roadbed from settling;

[0026] By setting the socket 12 and the plug block 13, the plug block 13 on one side of one protective component can be inserted into the socket 12 on one side of the other protective component to splice the two protective components. At this time, the connecting block 10 of one protective component fits with the connecting block 2 11 of the other protective component. The connecting block 10 and the connecting block 2 11 can be fixedly connected to the roadbed by screws 8, and then one end of the geotextile 2 of the two protective components is fixedly connected to the roadbed at the same time, so that tension is formed between the multiple geotextiles 2, which has the effect of making the connection of the protective components more stable.

[0027] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0028] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;

[0029] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

[0030] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A highway subsidence protection assembly, comprising a rotating shaft (1), It is characterized in that The outer surface of the rotating shaft (1) is rolled up with a geotextile (2), both ends of the rotating shaft (1) are rotatably connected to fixed blocks (6), both of the two fixed blocks (6) are slidably connected to support seats (3), both of the two support seats (3) are rotatably penetrated by bolts (9), one end of the geotextile (2) is fixedly connected to a fixing strip (7), and both ends of the fixing strip (7) are threadedly connected to screws (8).

2. A highway subsidence protection component according to claim 1, It is characterized in that One end of one of the support bases (3) is fixedly connected to a socket (12), and one end of the other support base (3) is fixedly connected to an insert block (13).

3. A highway subsidence protection component according to claim 1, It is characterized in that A first connecting block (10) is fixedly connected to the front side of one end of the fixing strip (7), and a second connecting block (11) is fixedly connected to the rear side of one end of the fixing strip (7).

4. A highway subsidence protection assembly according to claim 1, It is characterized in that One end of the two fixed blocks (6) is fixedly connected to a slider (5), one side of the two support seats (3) is provided with a slide groove (4), and the two sliders (5) are movably connected to the two slide grooves (4) respectively.

5. A highway subsidence protection component according to claim 1, It is characterized in that The two ends of the fixing strip (7) are respectively fixedly connected to the two fixing blocks (6) by means of screws (8).