Cooling equipment for asphalt paving construction
By fixing the nozzle to the rotary rod and using the control mechanism to control the rotary rod to rotate, the problems of large labor investment and limited coverage of existing equipment are solved, and the convenience and efficient coverage of water spray cooling on asphalt pavement are achieved.
Patent Information
- Application Number
- CN202420633653.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-28
AI Technical Summary
The existing asphalt pavement spraying and cooling equipment has a large manpower investment, low efficiency, and limited spray coverage.
A cooling equipment for asphalt paving construction is designed. By fixing the nozzle to the rotary rod and controlling the reciprocating rotation of the rotary rod with a control mechanism, the reciprocating swing of the nozzle is realized, increasing the spray coverage range, and allowing the nozzle inclination adjustment to optimize Spray range.
Reduced manpower investment, improved the convenience and efficiency of water spray cooling on asphalt pavement, and ensured a wider coverage and stable nozzle installation.
Smart Images

Figure CN222008540U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of equipment for asphalt paving construction, and in particular to a cooling device for asphalt paving construction. Background Art
[0002] Asphalt pavement is a type of pavement formed by spreading and rolling asphalt concrete. It has the advantages of being smooth, dust-free, waterproof, and durable. During construction, the paving mechanism moves along the road and spreads the hot asphalt on the road surface through the paver, and then the road surface is leveled and compacted. In addition, a sprayer is used to cool the asphalt pavement, which can effectively improve the quality of the asphalt pavement.
[0003] The sprayer includes a vehicle body, a water tank and a spray pipe. The water tank is installed on the vehicle body, and the spray pipe is connected to the water tank through a water hose. The vehicle body is also equipped with a water pump for driving the water in the water tank to be transported to the spray pipe. When in use, the vehicle body moves on the road surface, and then the spray pipe is held and sprayed toward the asphalt road surface to achieve the purpose of cooling the asphalt road surface.
[0004] During the spraying process, in order to make the road spraying cover a wider range and ensure the road spraying effect, the handle is often swung back and forth in the horizontal direction after holding the spraying tube. However, this method is relatively laborious when spraying water on the road surface for cooling, and at the same time makes the entire spraying process less efficient. Utility Model Content
[0005] In order to improve the convenience of spraying water to cool asphalt pavement, the present application provides an asphalt paving construction cooling device.
[0006] The asphalt paving construction cooling equipment provided in this application adopts the following technical solution:
[0007] A cooling device for asphalt paving construction comprises a vehicle body, a water tank and a nozzle, wherein the water tank is mounted on the vehicle body, the nozzle is connected to the water tank, a water pump is mounted on the vehicle body for driving the water in the water tank to be transported toward the nozzle, a vertically extending rotating rod is rotatably mounted on the vehicle body, the nozzle is detachably mounted on the rotating rod, and a control mechanism is mounted on the vehicle body for controlling the reciprocating rotation of the rotating rod.
[0008] By adopting the above technical solution, the nozzle is temporarily fixed to the rotating rod, and then the water pump is operated to control the spraying of the nozzle. At this time, the reciprocating rotation of the rotating rod can be controlled by the control mechanism, thereby controlling the reciprocating swing of the nozzle, which also increases the spraying coverage range. This method can reduce manpower input and improve the convenience of spraying water to cool the asphalt pavement.
[0009] Optionally, the control mechanism includes a transmission belt installed on the vehicle body and a movable block slidably connected to the vehicle body, the movable block is provided with a long movable hole, the transmission belt is fixed with a traction column, the traction column is passed through the movable hole, and the movable block is provided with a connecting piece, which connects the movable block with the rotating rod.
[0010] By adopting the above technical solution, the running transmission belt can drive the traction column to move along the circular path, so that the traction column can pull the movable block to slide back and forth in the length direction of the transmission belt, and then pull the rotating rod to rotate back and forth through the connecting part, thereby achieving the purpose of controlling the reciprocating swing of the nozzle.
[0011] Optionally, the connecting member includes a first connecting rod and a second connecting rod, the first connecting rod is connected to the rotating rod, the second connecting rod is connected to the movable block, and the first connecting rod is coaxially arranged and slidably connected to the second connecting rod.
[0012] By adopting the above technical solution, when the movable block moves, the second connecting rod and the first connecting rod will jointly pull the rotating rod to rotate back and forth, and the first connecting rod and the second connecting rod will slide against each other to achieve avoidance, which is not easy to cause obstruction to the rotation of the rotating rod.
[0013] Optionally, a connecting block is installed on the top of the rotating rod, and the connecting block is provided with a mounting groove with an upper opening and a side opening, the nozzle is clamped in the mounting groove, and the connecting block is penetrated and threadedly connected with a locking screw for tightening the nozzle.
[0014] By adopting the above technical solution, during installation, the nozzle is installed in the installation groove, and then the locking screw is tightened to tighten the nozzle, thereby making the installation process of the nozzle relatively convenient.
[0015] Optionally, the locking screw passes through one side wall of the installation slot, the other side wall of the installation slot is fixed to a positioning pin, the positioning pin and the locking screw are coaxially arranged, and the nozzle is provided with a positioning hole that cooperates with the positioning pin.
[0016] By adopting the above technical solution, during installation, the nozzle is inserted into the installation groove, and the nozzle is sleeved on the positioning pin, and then the locking screw is tightened, thereby realizing the installation of the nozzle on the rotating rod, and the stability of the nozzle installation is better; and when tightening the locking screw, the inclination angle of the nozzle can also be adjusted, and then tightened, thereby optimizing the installation effect of the nozzle, further facilitating the adjustment of the spraying range, and improving the use effect.
[0017] Optionally, a support rod is vertically penetrated and threadedly connected to the bottom wall of the installation groove, and the support rod is supported on the lower surface of the nozzle.
[0018] By adopting the above technical solution, the support height of the nozzle can be adjusted by rotating the support rod, so that the stability of the nozzle after the inclination angle is adjusted is better, thereby improving the use effect of the nozzle.
[0019] Optionally, the side wall of the mounting groove is vertically slidably connected with an abutment rod, the upper end surface of the abutment rod is provided with a buffer layer made of elastic material, the nozzle is overlapped with the abutment rod, and the upper end of the support rod is rotatably connected to the abutment rod.
[0020] By adopting the above technical solution, the abutment rod can support the nozzle, so that the supporting effect on the nozzle is better; and when the nozzle is placed on the abutment rod, the buffer layer can reduce the impact between the nozzle and the abutment rod, reduce the possibility of damage to the nozzle, and at the same time have a noise reduction effect.
[0021] Optionally, the vehicle body is detachably provided with a protective cover, which covers the control mechanism.
[0022] By adopting the above technical solution, the protective cover can protect the control mechanism, reduce the possibility of the control mechanism causing damage to personal safety, and improve the safety of the equipment during use.
[0023] In summary, the present application includes at least one of the following beneficial technical effects:
[0024] 1. The nozzle is temporarily fixed to the rotating rod, and then the rotating rod can be controlled to rotate back and forth through the control mechanism, thereby controlling the nozzle to swing back and forth, increasing the spraying coverage, so that this method can reduce manpower input and improve the convenience of spraying water to cool the asphalt pavement;
[0025] 2. When tightening the locking screw, the inclination angle of the nozzle can also be adjusted, and then tightened, so as to optimize the installation effect of the nozzle, further facilitate the adjustment of the spraying range, and improve the use effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the structure of a cooling device for asphalt paving construction according to an embodiment of the present application;
[0027] Figure 2 This is a partial structural schematic diagram of an asphalt paving construction cooling device according to an embodiment of the present application;
[0028] Figure 3 yes Figure 2 A schematic diagram of the enlarged structure of part A;
[0029] Figure 4 yes Figure 2 A schematic diagram of the enlarged structure of part B;
[0030] Figure 5It is a schematic diagram of the partial cross-sectional structure of the connecting block of the embodiment of the present application.
[0031] Explanation of the accompanying drawings: 1. Vehicle body; 2. Water tank; 3. Nozzle; 31. Positioning hole; 4. Turntable; 5. Control mechanism; 51. Transmission belt; 511. Traction column; 52. Movable block; 521. Movable hole; 6. Connecting piece; 61. First connecting rod; 62. Second connecting rod; 7. Connecting block; 71. Mounting groove; 72. Locking screw; 73. Positioning pin; 74. Support rod; 741. Abutment rod; 742. Buffer layer; 8. Protective cover. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-5 This application is described in further detail.
[0033] The present application embodiment discloses a cooling device for asphalt paving construction. Figure 1 An asphalt paving construction cooling device includes a vehicle body 1, a water tank 2 and a nozzle 3, wherein the water tank 2 is mounted on the vehicle body 1. The nozzle 3 is provided with a water delivery hose, and both ends of the water delivery hose are respectively connected to the nozzle 3 and the water tank 2. A water delivery pump is installed on the vehicle body 1, and the water delivery pump can deliver the water in the water tank 2 toward the nozzle 3.
[0034] Reference Figure 1 and Figure 2 The vehicle body 1 is rotatably mounted with a vertically extending rotating rod 4, and a connecting block 7 is provided on the top of the rotating rod 4, so that the nozzle 3 can be detachably mounted on the connecting block 7 on the top of the rotating rod 4. The vehicle body 1 is mounted with a control mechanism 5, which can drive the rotating rod 4 to reciprocate. At the same time, the vehicle body 1 is detachably mounted with a protective cover 8 by screws, and the protective cover 8 covers the control mechanism 5.
[0035] During the spraying process, the nozzle 3 can be temporarily fixed to the connecting block 7, and then the nozzle 3 can be installed on the rotating rod 4. When the water pump is subsequently operated to control the spraying of the nozzle 3, the rotating rod 4 can be controlled to rotate back and forth through the control mechanism 5, thereby controlling the nozzle 3 to swing back and forth, which also increases the spraying coverage. In addition, this method can reduce manpower input and improve the convenience of spraying water to cool the asphalt pavement. In addition, the protective cover 8 can protect the control mechanism 5, reduce the possibility of the control mechanism 5 causing damage to personal safety, and improve the safety of the equipment during use.
[0036] Reference Figure 2 and Figure 3The control mechanism 5 includes a transmission belt 51 and a movable block 52. The transmission belt 51 is installed on the vehicle body 1. The transmission belt 51 includes multiple guide wheels, a belt body and a motor. The guide wheels are rotatably connected to the vehicle body. The belt body is simultaneously sleeved on multiple guide wheels. The motor controls the rotation of one of the guide wheels. At this time, the vehicle body 1 is installed with a guide frame, and the movable block 52 is slidably connected in the guide frame. The movable block 52 is provided with a long strip of movable hole 521. The belt body in the transmission belt 51 is fixed with a traction column 511, and the traction column 511 is inserted into the movable hole 521.
[0037] Reference Figure 2 and Figure 3 The movable block 52 is provided with a connecting member 6, which includes a first connecting rod 61 and a second connecting rod 62. The first connecting rod 61 is connected to the rotating rod 4, and the second connecting rod 62 is connected to the movable block 52. The first connecting rod 61 is coaxially penetrated and slidably connected to the second connecting rod 62.
[0038] When in use, the running transmission belt 51 can drive the traction column 511 to move along the annular path, so that the traction column 511 can pull the movable block 52 to slide back and forth in the length direction of the transmission belt 51, and in this process, the traction column 511 will slide in the movable hole 521. Subsequently, the movable block 52 will pull the rotating rod 4 to rotate back and forth through the second connecting rod 62 and the first connecting rod 61, and the first connecting rod 61 and the second connecting rod 62 will slide against each other to avoid each other and not easily hinder the rotation of the rotating rod 4. Thus, the purpose of controlling the reciprocating swing of the nozzle 3 is achieved.
[0039] In other embodiments, the connecting member 6 may also be configured as a gear and a rack that mesh with each other, the gear being coaxially fixed to the rotating rod 4 , and the rack being fixed to the movable block 52 .
[0040] Reference Figure 4 and Figure 5 The connection block 7 is provided with an installation slot 71 with an upper opening and a side opening. In the two opposite side walls of the installation slot 71, a positioning pin 73 is fixed to one side wall, and a locking screw 72 is passed through and threadedly connected to the other side wall. The positioning pin 73 and the locking screw 72 are coaxially arranged. The nozzle 3 is provided with a positioning hole 31. The nozzle 3 is installed in the installation slot 71. The positioning pin 73 is plugged into the positioning hole 31, and the locking screw 72 is pressed against the nozzle 3.
[0041] During installation, the nozzle 3 is inserted into the installation groove 71, and the nozzle 3 is sleeved on the positioning pin 73, and then the locking screw 72 is tightened. Thus, the nozzle 3 is installed on the rotating rod 4, and the stability of the installation of the nozzle 3 is better. In addition, when tightening the locking screw 72, the inclination angle of the nozzle 3 can be adjusted, and then tightened, so as to optimize the installation effect of the nozzle 3, further facilitate the adjustment of the spraying range, and improve the use effect.
[0042] Reference Figure 4 and Figure 5 The side wall of the installation groove 71 is vertically slidably connected with an abutting rod 741, and the two ends of the abutting rod 741 are respectively clamped and slidably connected to the two side walls of the installation groove 71. A buffer layer 742 is provided on the upper end surface of the abutting rod 741, and the buffer layer 742 is made of elastic material, such as rubber or silicone. A vertically extending support rod 74 is penetrated and threadedly connected to the bottom wall of the installation groove 71, and the top of the support rod 74 is rotatably connected to the abutting rod 741. The nozzle 3 is mounted on the upper end surface of the abutting rod 741.
[0043] When the nozzle 3 is installed in the installation groove 71, after the nozzle 3 is sleeved on the positioning pin 73, the support rod 74 is rotated to adjust the height of the abutment rod 741, and finally the locking screw 72 is tightened. This facilitates the adjustment of the support height of the nozzle 3, making it more convenient to adjust the inclination of the nozzle 3 and more stable when used. The buffer layer 742 can reduce the impact between the nozzle 3 and the abutment rod 741, reduce the possibility of damage to the nozzle 3, and also has a noise reduction effect.
[0044] The implementation principle of the asphalt paving construction cooling device of the embodiment of the present application is as follows: when in use, the nozzle 3 is temporarily fixed to the rotating rod 4. Then, the rotating rod 4 is controlled to rotate back and forth by the control mechanism 5, thereby controlling the nozzle 3 to swing back and forth, so that during the water spraying process, the spraying coverage is also increased, and this method can reduce manpower input and improve the convenience of water spraying cooling on the asphalt pavement.
[0045] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An asphalt paving construction cooling device, comprising a vehicle body (1), a water tank (2) and a nozzle (3), wherein the water tank (2) is mounted on the vehicle body (1), the nozzle (3) is connected to the water tank (2), and a water pump is mounted on the vehicle body (1) for driving water in the water tank (2) to be transported toward the nozzle (3), characterized in that: The vehicle body (1) is rotatably mounted with a vertically extending rotating rod (4), the nozzle (3) is detachably mounted on the rotating rod (4), and the vehicle body (1) is mounted with a control mechanism (5) for controlling the reciprocating rotation of the rotating rod (4).
2. The asphalt paving construction cooling equipment according to claim 1, characterized in that: The control mechanism (5) comprises a transmission belt (51) mounted on the vehicle body (1) and a movable block (52) slidably connected to the vehicle body (1); the movable block (52) is provided with a long movable hole (521); a traction column (511) is fixed to the transmission belt (51); the traction column (511) is passed through the movable hole (521); the movable block (52) is provided with a connecting piece (6); the connecting piece (6) connects the movable block (52) to the rotating rod (4).
3. The asphalt paving construction cooling equipment according to claim 2, characterized in that: The connecting member (6) comprises a first connecting rod (61) and a second connecting rod (62), wherein the first connecting rod (61) is connected to the rotating rod (4), and the second connecting rod (62) is connected to the movable block (52), and the first connecting rod (61) is coaxially arranged and slidably connected to the second connecting rod (62).
4. The asphalt paving construction cooling equipment according to claim 1, characterized in that: A connecting block (7) is installed on the top of the rotating rod (4), and the connecting block (7) is provided with a mounting groove (71) with an upper opening and a side opening. The nozzle (3) is clamped in the mounting groove (71), and a locking screw (72) is passed through and threadedly connected to the connecting block (7) to tighten the nozzle (3).
5. The asphalt paving construction cooling equipment according to claim 4, characterized in that: The locking screw (72) passes through one side wall of the installation slot (71), and the other side wall of the installation slot (71) is fixed to a positioning pin (73). The positioning pin (73) and the locking screw (72) are coaxially arranged, and the nozzle (3) is provided with a positioning hole (31) that cooperates with the positioning pin (73).
6. The asphalt paving construction cooling equipment according to claim 5, characterized in that: A support rod (74) is vertically penetrated through the bottom wall of the installation groove (71) and is threadedly connected thereto, and the support rod (74) is supported on the lower surface of the nozzle (3).
7. The asphalt paving construction cooling equipment according to claim 6, characterized in that: The side wall of the mounting groove (71) is connected to an abutting rod (741) in a vertical sliding manner. The upper end surface of the abutting rod (741) is provided with a buffer layer (742) made of elastic material. The nozzle (3) is overlapped with the abutting rod (741). The upper end of the support rod (74) is rotatably connected to the abutting rod (741).
8. The asphalt paving construction cooling equipment according to claim 1, characterized in that: The vehicle body (1) is detachably mounted with a protective cover (8), which covers the control mechanism (5).