By designing multi-hook brackets in the construction of high-pier cover beams of bridges, using support blocks, rebars and safety nets, the problems of I-steel deformation and high-altitude object strikes are solved, and the structural stability of cover beams is improved during pouring and construction safety.

CN222008671UInactive Publication Date: 2024-11-15CHINA RAILWAY 24TH BUREAU GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420606793.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the construction of existing cover beams, the I-shaped steel support formwork is easily deformed or displaced due to eccentric force, which reduces the structural stability of the bracket, and the risk of high-altitude objects hitting the construction site is prone to occur.

Method used

Design a multi-hook bracket for high piers for bridge construction. By setting up support blocks, rebars, safety nets, rubber pads and other structures, the stability of the connecting plates and I-steel is improved, the pressure is dispersed, and the structural stability of the bracket is enhanced. and intercept splashed concrete slag through safety nets and drawstrings.

Benefits of technology

It effectively reduces the possibility of local stress damage, improves the structural stability of the cover beam during pouring, reduces the risk of high-altitude objects, and improves construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008671U_ABST
    Figure CN222008671U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of building construction, and particularly relates to a multi-hoop support for bridge high pier capping beam construction, which comprises a plurality of pier columns. The middle part of the pier column is fixedly connected with a hoop body; the top of the hoop body is fixedly connected with two jacks; the output end of the jack is fixedly connected with first I-shaped steel; a plurality of second I-shaped steels are fixedly connected to the tops of the adjacent first I-shaped steels; a plurality of first channel steels are fixedly connected to the top of the first I-shaped steel; a plurality of second channel steels are fixedly connected between the adjacent first channel steels; a plurality of deformed steel bars are arranged between the adjacent first I-shaped steel in a penetrating manner; a plurality of supporting blocks are fixedly connected to the middle part of the deformed steel bar; by arranging the deformed steel bars, the two pieces of first I-shaped steel are pulled into an integral structure, the supporting effect and the structural stability of the first I-shaped steel during capping beam construction are improved, the pressure applied to the support during capping beam pouring is effectively dispersed, and the possibility that the support is damaged due to local stress concentration is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building construction, in particular to a multi-hoop bracket for the construction of a high pier cap beam of a bridge. Background Art

[0002] Bridge construction is a complex engineering process involving multiple stages and expertise. From the initial design and planning, to foundation construction, steel frame construction, formwork production and installation, to concrete pouring and maintenance, each step requires careful planning and execution.

[0003] The cap beam is an important part of the bridge structure. It is located above the piers, supporting the load of the bridge deck and transferring it to the piers. The cap beam is generally made of reinforced concrete structure with sufficient strength and rigidity.

[0004] During the construction of existing cap beams, hoop support is usually used for I-beams, and the I-beams support the cap beam formwork. During use and observation, it was found that the back ribs of the formwork would exert eccentric force on the I-beams, which would cause the I-beams to deform or move, thereby reducing the structural stability of the support.

[0005] Therefore, in order to solve the above problems, a multi-hoop bracket for the construction of high pier cap beams of bridges is proposed. Utility Model Content

[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0007] The technical solution adopted by the utility model to solve its technical problems is: a multi-hoop bracket for the construction of a high pier cap beam of a bridge described in the utility model comprises a plurality of piers; a hoop body is fixedly connected to the middle of the pier; two jacks are fixedly connected to the top of the hoop body; a first I-beam is fixedly connected to the output end of the jack; a plurality of second I-beams are fixedly connected to the tops of adjacent first I-beams; a connecting plate is fixedly connected between adjacent first I-beams; a plurality of first channel steels are fixedly connected to the top of the first I-beam; a plurality of second channel steels are fixedly connected between adjacent first channel steels; Side form; the top of the second I-beam is fixedly connected with a bottom form; a plurality of threaded steel bars are arranged through adjacent first I-beams; a plurality of support blocks are fixedly connected to the middle of the threaded steel bars; by arranging the support blocks, the support blocks will provide additional support for the connecting plate, thereby improving the stability of the connecting plate during the casting of the cap beam and reducing the deformation of the surface of the connecting plate. At the same time, by arranging the threaded steel bars, the two first I-beams are tied into an integral structure, thereby improving the supporting effect and structural stability of the first I-beam during the construction of the cap beam, effectively dispersing the pressure applied to the bracket during the casting of the cap beam, and reducing the possibility of damage to the bracket due to local stress concentration.

[0008] Preferably, a plurality of first connecting rods are fixedly connected to the middle portion of the first I-beam; a plurality of second connecting rods are fixedly connected between adjacent first connecting rods; a safety net is fixedly connected between adjacent first connecting rods; by providing the safety net, concrete debris splashed during pouring will fall onto the surface of the safety net, thereby enabling the bracket to intercept falling objects during cap beam construction and reducing the possibility of being hit by high-altitude objects at the construction site.

[0009] Preferably, a horizontal plate is fixedly connected to the bottom of the adjacent first connecting rod; a vertical column is fixedly connected to the top of the horizontal plate; the vertical column passes through the safety net; through the cooperation of the horizontal plate and the vertical column, when the concrete debris falls to the surface of the safety net, it will produce friction with the vertical column and then stop sliding, thereby enhancing the interception effect of the safety net on the concrete debris.

[0010] Preferably, a pull rope is fixedly connected between adjacent columns; the pull rope is located at the top of the safety net; by providing the pull rope, when debris falls to the surface of the safety net, it will come into contact with the pull rope and be intercepted by the pull rope, further enhancing the safety net's intercepting effect on the debris, and at the same time, the pull rope also connects the columns into a more stable structure, improving the limiting effect of the columns on the debris.

[0011] Preferably, a third channel steel is fixedly connected to the top of the pier; the third channel steel is located between the connecting plate and the pier; by providing the third channel steel, the third channel steel will disperse the pressure on the connecting plate to the pier and provide additional support for the connecting plate, thereby reducing the possibility of deformation of the connecting plate during the construction of the cap beam and improving the structural stability of the connecting plate.

[0012] Preferably, a plurality of fixing columns are fixedly connected to the top of the first I-beam; the fixing columns are cylindrical structures; by setting the fixing columns, construction personnel can quickly locate the installation position of the second I-beam according to the positions of the fixing columns, thereby improving the accuracy of the installation position of the second I-beam. At the same time, the fixing columns will also have a certain limiting effect on the second I-beam, thereby enhancing the stability of the bracket.

[0013] Preferably, a rubber pad is fixedly connected to the inner wall of the clamp body; the rubber pad is located in the middle of the pier and the clamp body; by providing the rubber pad, the rubber pad will increase the friction between the pier and the clamp body, reduce the sliding of the clamp body during the construction of the cap beam, enhance the supporting effect of the clamp body on the bracket, and at the same time reduce the direct contact between the clamp body and the pier, thereby ensuring the smoothness of the pier surface.

[0014] The utility model is beneficial in that:

[0015] 1. The utility model discloses a multi-hoop bracket for the construction of a high pier cap beam of a bridge. By arranging support blocks, the support blocks provide additional support for the connecting plates, thereby improving the stability of the connecting plates during casting of the cap beam and reducing deformation of the connecting plates on the surfaces. At the same time, by arranging threaded steel bars, the two first I-beams are tied together into an integral structure, thereby improving the supporting effect and structural stability of the first I-beams during cap beam construction, effectively dispersing the pressure applied to the bracket during casting of the cap beam and reducing the possibility of damage to the bracket due to local stress concentration.

[0016] 2. The utility model discloses a multi-hoop bracket for the construction of a high pier cap beam of a bridge. By setting a safety net, concrete debris splashed during pouring will fall onto the surface of the safety net, thereby enabling the bracket to intercept falling objects during the cap beam construction and reducing the possibility of high-altitude objects hitting the construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a schematic diagram of the main body of the utility model;

[0019] Figure 2 This is a schematic diagram of the structure of the clamp body in the utility model;

[0020] Figure 3 This is a schematic diagram of the structure of the support block in the utility model;

[0021] Figure 4 It is a structural schematic diagram of the center column of the utility model.

[0022] In the figure: 1. pier column; 102. clamp body; 103. jack; 104. first I-beam; 105. second I-beam; 106. first channel steel; 107. second channel steel; 108. connecting plate; 109. side form; 110. threaded steel; 111. support block; 112. bottom form; 2. first connecting rod; 22. second connecting rod; 23. safety net; 3. cross plate; 32. column; 4. pull rope; 5. third channel steel; 6. fixing column; 7. rubber pad. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Specific examples are given below.

[0025] See also Figures 1 to 3As shown, a multi-hoop support for the construction of a high pier cap beam of a bridge described in an embodiment of the utility model comprises a plurality of piers 1; a hoop body 102 is fixedly connected to the middle of the pier 1; two jacks 103 are fixedly connected to the top of the hoop body 102; a first I-beam 104 is fixedly connected to the output end of the jack 103; a plurality of second I-beams 105 are fixedly connected to the tops of adjacent first I-beams 104; a connecting plate 108 is fixedly connected between adjacent first I-beams 104; a plurality of first channel steels 106 are fixedly connected to the tops of the first I-beams 104; a plurality of second channel steels 106 are fixedly connected between adjacent first channel steels 106. 07; a side form 109 is fixedly connected between adjacent first channel steels 106; a bottom form 112 is fixedly connected to the top of the second I-beam 105; a plurality of threaded steel bars 110 are provided through adjacent first I-beams 104; a plurality of support blocks 111 are fixedly connected to the middle of the threaded steel bars 110; before pouring, the length of the output end of the jack 103 on the top of the clamp body 102 can be adjusted to control the height of the bottom form 112 and thus control the elevation of the cap beam. The first channel steel 106 and the second channel steel 107 are connected to the side form 109 by tension screws. After completion, the cap beam can be poured. During pouring, the concrete will press against the bottom form 112 and the side form 109 The bottom mold 112 will directly transfer the pressure to the second I-beam 105 after being subjected to the pressure, and the second I-beam 105 will transfer the pressure to the first I-beam 104. After the side mold 109 transfers the pressure to the first channel steel 106, the first channel steel 106 will disperse the pressure to the second channel steel 107 and the first I-beam 104. Because most of the pressure applied by the first channel steel 106 to the first I-beam 104 is eccentric force, the first I-beam 104 will have a tendency to lateral deformation or displacement. At this time, the threaded steel 110 will tie the two first I-beams 104 together to connect the first I-beams 104 more tightly, forming A more stable structure, and the support block 111 will provide additional support for the connecting plate 108, thereby increasing the stability of the connecting plate 108; by setting the support block 111, the support block 111 will provide additional support for the connecting plate 108, thereby improving the stability of the connecting plate 108 during the casting of the cap beam and reducing the deformation of the surface of the connecting plate 108; at the same time, by setting the threaded steel bar 110, the two first I-beams 104 are tied together into an integral structure, thereby improving the supporting effect and structural stability of the first I-beam 104 during the construction of the cap beam, effectively dispersing the pressure applied to the bracket during the casting of the cap beam, and reducing the possibility of the bracket being damaged due to local stress concentration.

[0026] See also Figure 3 and Figure 4As shown, a plurality of first connecting rods 2 are fixedly connected to the middle part of the first I-beam 104; a plurality of second connecting rods 22 are fixedly connected between adjacent first connecting rods 2; a safety net 23 is fixedly connected between adjacent first connecting rods 2; when the cap beam is cast, concrete debris will splash to the outside, and the debris will fall to the surface of the safety net 23 when splashing and be intercepted by the safety net 23; by setting up the safety net 23, the concrete debris splashed during casting will fall to the surface of the safety net 23, thereby realizing the interception of falling objects during the cap beam construction by the bracket, reducing the possibility of high-altitude objects hitting the construction site.

[0027] See also Figure 3 and Figure 4 As shown, a cross plate 3 is fixedly connected to the bottom of the adjacent first connecting rod 2; a column 32 is fixedly connected to the top of the cross plate 3; the column 32 is arranged through the safety net 23; during the construction of the cap beam, concrete debris will splash, and the concrete debris will slide after falling on the surface of the safety net 23 and then come into contact with the column 32. When the debris comes into contact and friction with the column 32, the speed will be reduced until it stops sliding; through the cooperation of the cross plate 3 and the column 32, the concrete debris will stop sliding after friction with the column 32 when falling on the surface of the safety net 23, thereby enhancing the interception effect of the safety net 23 on the concrete debris.

[0028] See also Figure 4 As shown, a pull rope 4 is fixedly connected between adjacent columns 32; the pull rope 4 is located at the top of the safety net 23; when debris falls to the surface of the safety net 23, the debris will come into contact with the pull rope 4 and the speed of the debris will be reduced when rubbing against the pull rope 4; by setting the pull rope 4, when the debris falls to the surface of the safety net 23, it will come into contact with the pull rope 4 and be intercepted by the pull rope 4, further enhancing the intercepting effect of the safety net 23 on the debris, and at the same time, the pull rope 4 also connects the columns 32 into a more stable structure, thereby improving the limiting effect of the columns 32 on the debris.

[0029] See also Figure 2 As shown, a third channel steel 5 is fixedly connected to the top of the pier 1; the third channel steel 5 is located between the connecting plate 108 and the pier 1; when the cap beam is constructed, the third channel steel 5 will provide additional support for the connecting plate 108, and also disperse the pressure on the connecting plate 108 to the pier 1, thereby increasing the structural stability of the connecting plate 108; by providing the third channel steel 5, the third channel steel 5 will disperse the pressure on the connecting plate 108 to the pier 1 and provide additional support for the connecting plate 108, thereby reducing the possibility of deformation of the connecting plate 108 during the cap beam construction and improving the structural stability of the connecting plate 108.

[0030] See also Figure 2As shown, a plurality of fixing columns 6 are fixedly connected to the top of the first I-beam 104; the fixing columns 6 are cylindrical structures; when installing the bracket, after the construction personnel have set the fixing columns 6 according to the required spacing, the second I-beam 105 can be directly installed according to the positions of the fixing columns 6, thereby improving the accuracy of the position of the second I-beam 105; by setting the fixing columns 6, the construction personnel can quickly locate the installation position of the second I-beam 105 according to the positions of the fixing columns 6, thereby improving the accuracy of the installation position of the second I-beam 105, and at the same time, the fixing columns 6 will also have a certain limiting effect on the second I-beam 105, thereby enhancing the stability of the bracket.

[0031] See also Figure 2 As shown, the inner wall of the clamp body 102 is fixedly connected with a rubber pad 7; the rubber pad 7 is located between the pier 1 and the clamp body 102; after the clamp body 102 is installed on the surface of the pier 1, the rubber pad 7 will increase the friction coefficient between the clamp body 102 and the pier 1, and increase the friction between the clamp body 102 and the pier 1; by providing the rubber pad 7, the rubber pad 7 will increase the friction between the pier 1 and the clamp body 102, reduce the sliding of the clamp body 102 during the construction of the cap beam, enhance the supporting effect of the clamp body 102 on the bracket, and at the same time reduce the direct contact between the clamp body 102 and the pier 1, thereby ensuring the smoothness of the surface of the pier 1.

[0032] Working principle: Before pouring, the length of the output end of the jack 103 on the top of the clamp body 102 can be adjusted to control the height of the bottom form 112 and thus the elevation of the cap beam. The first channel steel 106 and the second channel steel 107 are connected to the side form 109 through the tension screw. After completion, the cap beam can be poured. During pouring, the concrete will exert pressure on the bottom form 112 and the side form 109. After the bottom form 112 is under pressure, it will directly transfer the pressure to the second I-beam 105, and the second I-beam 105 will transfer the pressure to the first I-beam 104, while the side form 109 will transfer the pressure to the first I-beam 104. After being handed over to the first channel steel 106, the first channel steel 106 will distribute the pressure to the second channel steel 107 and the first I-beam 104. Because most of the pressure applied by the first channel steel 106 to the first I-beam 104 is eccentric force, it will cause the first I-beam 104 to have a tendency to lateral deformation or displacement. At this time, the threaded steel 110 will tie the two first I-beams 104 together, connecting the first I-beams 104 more closely to form a more stable structure, and the support block 111 will provide additional support for the connecting plate 108 to increase the stability of the connecting plate 108. Stability; when the cap beam is cast, concrete debris will splash to the outside, and the debris will fall to the surface of the safety net 23 and be intercepted by the safety net 23; when the cap beam is constructed, concrete debris will splash, and the concrete debris will slide after falling to the surface of the safety net 23 and then come into contact with the column 32. When the debris comes into contact and rubs with the column 32, the speed will be reduced until it stops sliding; when the debris falls to the surface of the safety net 23, the debris will come into contact with the pull rope 4 and reduce the speed of the debris when rubbing against the pull rope 4; during the construction of the cap beam, the third channel steel 5 will provide additional support for the connecting plate 108, and at the same time disperse the pressure on the connecting plate 108 to the pier 1, thereby increasing the structural stability of the connecting plate 108; when installing the bracket, after the construction personnel have set the fixing column 6 according to the required spacing, the second I-beam 105 can be directly installed according to the position of the fixing column 6, thereby improving the accuracy of the position of the second I-beam 105; after the clamp body 102 is installed on the surface of the pier 1, the rubber pad 7 will increase the friction coefficient between the clamp body 102 and the pier 1, thereby increasing the friction force between the clamp body 102 and the pier 1.

[0033] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A multi-hoop support for the construction of a high pier cap beam of a bridge, comprising a plurality of pier columns (1), characterized in that: A hoop body (102) is fixedly connected to the middle of the pier column (1); two jacks (103) are fixedly connected to the top of the hoop body (102); a first I-beam (104) is fixedly connected to the output end of the jack (103); a plurality of second I-beams (105) are fixedly connected to the tops of adjacent first I-beams (104); a connecting plate (108) is fixedly connected between adjacent first I-beams (104); A plurality of first channel steels (106) are connected; a plurality of second channel steels (107) are fixedly connected between adjacent first channel steels (106); a side mold (109) is fixedly connected between adjacent first channel steels (106); a bottom mold (112) is fixedly connected to the top of the second I-beam (105); a plurality of threaded steels (110) are provided through between adjacent first I-beams (104); and a plurality of support blocks (111) are fixedly connected to the middle of the threaded steels (110).

2. A multi-hoop bracket for construction of high pier cap beams of bridges according to claim 1, characterized in that: A plurality of first connecting rods (2) are fixedly connected to the middle of the first I-beam (104); a plurality of second connecting rods (22) are fixedly connected between adjacent first connecting rods (2); and a safety net (23) is fixedly connected between adjacent first connecting rods (2).

3. A multi-hoop bracket for construction of high pier cap beams of bridges according to claim 2, characterized in that: A transverse plate (3) is fixedly connected to the bottom of the adjacent first connecting rod (2); and a vertical column (32) is fixedly connected to the top of the transverse plate (3).

4. A multi-hoop bracket for construction of high pier cap beams of bridges according to claim 3, characterized in that: A pull rope (4) is fixedly connected between adjacent upright posts (32); the pull rope (4) is located at the top of the safety net (23).

5. A multi-hoop bracket for construction of high pier cap beams of bridges according to claim 4, characterized in that: A third channel steel (5) is fixedly connected to the top of the pier column (1); the third channel steel (5) is located between the connecting plate (108) and the pier column (1).

6. A multi-hoop bracket for construction of high pier cap beams of bridges according to claim 5, characterized in that: A plurality of fixing columns (6) are fixedly connected to the top of the first I-beam (104); the fixing columns (6) are cylindrical structures.