By designing large-volume anchor sealing templates, using embedded steel bars and hooks to fix the casting molds, the problems of long-term, high safety risks and high cost in the construction of high slope anchor sealing are solved, and the template assembly is simple, High efficiency and economic benefits.
Patent Information
- Application Number
- CN202420400447.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-02
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-02
AI Technical Summary
The installation of anchor head sealing formwork in the construction of medium and high slope anchor sealing is problematic in the construction of medium and high slope anchor sealing.
A large-volume anchor sealing template is designed, including anchor piers and removable fixed anchor assembly. The components include steel bar embedded parts, side back steel pipes and bottom back corrugated, which are fixed by embedded steel bars and hooks. Pouring molds avoids the construction of traditional drilling and grouting anchor rods, and use structural force to fix the formwork, simplifying the assembly and fixing process of the formwork.
It has achieved simple assembly of templates, convenient operation, low cost and high construction efficiency, reduced on-site labor intensity and work tasks, and brought good economic and social benefits.
Smart Images

Figure CN222008956U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of civil engineering slope reinforcement in water conservancy and hydropower engineering, relates to anchor sealing concrete work after the anchor cable is tensioned, and particularly relates to a large-volume anchor head anchor sealing template. Background Art
[0002] According to the existing anchor cable construction conditions of high slopes, most of the installation work of the concrete anchor template of the anchor cable anchor head is generally done by setting up double scaffolds along the slope to install and fix the template. The manufacturing process of this anchor template is complicated and old. Each pier head template is erected piece by piece in a timely manner, and multiple types of workers are required to cooperate, the fixed anchor components are welded, and cut during demoulding. The fixed anchor components have large losses, high labor intensity, high risk factor, poor quality, and reduced comprehensive turnover coefficient of the template, which makes the construction cost high.
[0003] In order to solve this problem, the utility model proposes a large-volume anchor head sealing template. Summary of the invention
[0004] In view of the shortcomings of the prior art mentioned above, the purpose of the utility model is to provide a large-volume anchor head sealing template, which is used to solve the technical problems of long time-consuming, high safety risks, high cost and low efficiency in the erection of the later anchor head sealing concrete anchor head template in the prior art of high slope sealing construction.
[0005] To achieve the above-mentioned purpose and other related purposes, the utility model provides a large-volume anchor head sealing template, including an anchor pier, on which a casting mold is detachably fixed by a fixed anchor assembly, the fixed anchor assembly including a fixed anchor member, a steel bar embedded part, a side back rib steel pipe and a bottom back rib, the side back rib steel pipe and the bottom back rib are respectively arranged on the outside and the bottom of the casting mold, the steel bar embedded part is embedded in both sides of the anchor pier and the ends are exposed, one end of the fixed anchor member is detachably connected to the exposed end of the steel bar embedded part, and the other end of the fixed anchor member is detachably connected to the side back rib steel pipe and the bottom back rib, respectively.
[0006] Preferably in any of the above schemes, the casting mold consists of a front facade template, side facade templates on both sides and a bottom plate, and the front facade template, side facade template and bottom plate are detachably connected by connecting buckles.
[0007] Preferably in any of the above schemes, the front facade formwork, the side facade formwork and the bottom plate are provided with panel reinforcements, and the panel reinforcements are ribs arranged around the front facade formwork, the side facade formwork and the bottom plate.
[0008] Preferably in any of the above schemes, the connecting buckle includes an L-shaped reinforcement and a "7"-shaped adjustable connecting piece that are connected to each other, one side of the L-shaped reinforcement is fixedly connected to the panel reinforcement, and the other side is fitted with the panel reinforcement, and the "7"-shaped adjustable connecting piece is detachably connected to the fitting side of the L-shaped reinforcement.
[0009] Preferably in any of the above schemes, the L-shaped reinforcement comprises a right-angle steel and a positioning pin welded to the outer wall of the right-angle steel, one end of the "7"-shaped adjustable connector is bent into 90°, and the other end is threaded and fixed with a matching fastener, and the threaded end of the "7"-shaped adjustable connector passes through the positioning pin and is connected and fixed by a fastener.
[0010] Preferably, in any of the above solutions, one end of the fixed anchor member is bent into a 180° hook, and the other end is threaded into a screw rod and provided with a fastener matching therewith.
[0011] Preferably in any of the above schemes, the side back rib steel pipe includes an upper back rib steel pipe and a lower back rib steel pipe, and the upper back rib steel pipe and the lower back rib steel pipe are respectively located at three equally divided positions of the front facade template.
[0012] Preferably, in any of the above schemes, the upper back rib steel pipe, the lower back rib steel pipe and the bottom back rib are all provided with prefabricated holes matching with the fixed anchor components.
[0013] Preferably, in any of the above schemes, one end of the fixed anchor member is hooked on the steel bar embedded part, and the other end passes through the prefabricated hole and is fastened by a fastener.
[0014] As described above, the large-volume anchor head sealing template of the utility model has the following beneficial effects:
[0015] 1. In the utility model, the template of the large-volume anchor head is easy to assemble, and there is no need to use an external diagonal support lining to set up the template. The combined force of the structure is utilized to optimize the fixing method of the template. The template can be fixed as a whole in advance and can be assembled at any time on site. The operation is convenient, the cost is low, and the construction efficiency is high.
[0016] 2. In the utility model, pre-buried anchor steel bars are used in the anchor piers, and combined with hooks and knots, the anchor rod construction of slope drilling and grouting in traditional operations is avoided, which greatly reduces the actual work tasks and labor intensity on site, and brings good economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 Shown is a front elevation schematic diagram of the present utility model.
[0018] Figure 2 Display as Figure 1Section view of the AA plane.
[0019] Figure 3 Display as Figure 2 Cross-sectional view of the middle BB plane.
[0020] Figure 4 A diagram showing the connector parts.
[0021] Figure 5 Shown is a schematic diagram of a fixed anchor member.
[0022] Component number description
[0023] 1-casting mold; 2-panel reinforcement; 3-connecting buckle; 4-fixed anchor assembly; 5-front elevation formwork; 6-side elevation formwork; 7-L-shaped reinforcement; 8-locating pin; 9-"7"-shaped adjustable connector; 10-fastener; 11-upper back corrugated steel pipe; 12-lower back corrugated steel pipe; 13-fixed anchor component; 14-embedded steel bar; 15-bottom back corrugated. DETAILED DESCRIPTION
[0024] The following is a description of the implementation of the present invention by means of specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0025] See also Figures 1 to 5 It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings in this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the utility model, so they have no substantial technical significance. Any modification of the structure, change in the proportion relationship, or adjustment of the size should still fall within the scope of the technical content disclosed by the utility model without affecting the effects and purposes that can be achieved by the utility model. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the utility model. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the utility model without substantially changing the technical content.
[0026] See also Figure 1-5The utility model provides a large-volume anchor head sealing template, including an anchor pier, on which a casting mold 1 is detachably fixed by a fixed anchor assembly 4, the fixed anchor assembly 4 includes a fixed anchor member 13, a steel bar embedded part 14, a side back rib steel pipe and a bottom back rib 15, the side back rib steel pipe and the bottom back rib 15 are respectively arranged on the outside and the bottom of the casting mold 1, the steel bar embedded part 14 is embedded on both sides of the anchor pier and the end is exposed, one end of the fixed anchor member 13 is detachably connected to the exposed end of the steel bar embedded part 14, and the other end of the fixed anchor member 13 is detachably connected to the side back rib steel pipe and the bottom back rib 15 respectively.
[0027] When this embodiment is used, in order to solve the problem that the conventional construction method of sealing large-volume anchor heads generally adopts the method of erecting tall scaffolding, which is time-consuming, has great safety risks, consumes a lot of materials, and has low efficiency, this embodiment proposes an integrated template, which does not require drilling anchor holes and can be quickly constructed without the cooperation of a crane, has high construction efficiency, and can effectively save costs. Specifically, a casting mold 1 is set at the position where the anchor needs to be sealed on the concrete anchor pier, and the casting mold 1 is detachably fixed to the anchor pier by fixing the anchor assembly 4. The fixed anchor assembly 4 includes a steel bar embedded part 14, which is embedded in the concrete anchor pier, with 3 embedded on one side and a total of 6 embedded in one anchor pier. At the same time, two side back rib steel pipes are set on the outside of the casting mold 1, and a bottom back rib 15 is set at the bottom of the casting mold 1. One end of the fixed anchor member 13 is hooked on the exposed end of the embedded steel bar 14, and the other end is detachably connected to the side back rib steel pipe and the bottom back rib 15. During the whole process, the fixed anchor member 13 is connected to the side back rib steel pipe, and the side back rib steel pipe transmits the pulling force to the panel, thereby fixing the casting mold 1. At the same time, the fixed anchor member 13 does not directly contact the casting mold 1, and has no connection with the casting mold 1, which can be easily installed and disassembled.
[0028] In this embodiment, the steel bar embedded part 14 is made of threaded steel with a diameter of 16 mm, a single thread is 30 cm, and 15 cm is exposed. The material of the steel bar embedded part 14 is not limited to the threaded steel with a diameter of 16 mm, and can be adjusted according to the size of the anchor head and the change of the stress condition. Of course, the length and exposed length of the steel bar embedded part 14 are not limited to this, and can be adjusted accordingly.
[0029] As a further description of the above embodiment, the casting mold 1 is composed of a front facade template 5, side facade templates 6 on both sides and a bottom plate. The front facade template 5, the side facade template 6 and the bottom plate are detachably connected by connecting buckles 3.
[0030] When this embodiment is used, two front elevation templates 5, two side elevation templates 6 and a bottom plate are connected by connecting buckles 3 to form a casting mold 1 for casting anchor head concrete. The template is cut from wooden boards. In order to ensure the stability of the casting mold 1, 5cm*5cm ribs are used around the panel wooden template on each side to form a panel reinforcement structure.
[0031] In this embodiment, the size of the template can be adjusted according to the actual size of the concrete, and the template material can also be adjusted using a steel template.
[0032] In this embodiment, two connecting buckles 3 are used on the front facade template 5, the side facade template 6 and the bottom template, and they are all set at equal thirds. The connecting buckle 3 includes an L-shaped reinforcement 7 and a "7"-shaped adjustable connector 9 that are connected to each other. The L-shaped reinforcement 7 includes a right-angle steel and a positioning pin 8 welded to the outer wall of the right-angle steel. One end of the "7"-shaped adjustable connector 9 is bent into 90°, and the other end is threaded and fixed with a matching fastener 10. One side of the right-angle steel is fixedly connected to the panel reinforcement 2, and the other side (i.e., the side with the positioning pin 8) is fitted with the panel reinforcement 2. The threaded end of the "7"-shaped adjustable connector 9 passes through the positioning pin 8 and is connected and fixed by the fastener 10.
[0033] In this embodiment, the DN15 hollow steel tube of the fastener 10 can also be adjusted accordingly with the size of the fixed anchor member 13 .
[0034] In this embodiment, the length of the right angle steel is 5cm*5cm, the length of the positioning pin 8 is 6cm, the bending length of the "7"-shaped adjustable connector 9 is 5cm, and the threading length of the other end is 10cm.
[0035] In this embodiment, the length of the right-angle steel and the positioning pin 8, the bending length and the threading length of the "7"-shaped adjustable connector 9 can be adjusted according to the width of the panel reinforcement structure, which can be flexibly handled to meet the requirements.
[0036] As a further description of the above embodiment, the side back rib steel pipe includes an upper back rib steel pipe 11 and a lower back rib steel pipe 12, and the upper back rib steel pipe 11 and the lower back rib steel pipe 12 are respectively located at three equally divided positions of the front facade template 5.
[0037] When this embodiment is used, the upper back-corrugated steel pipe 11 and the lower back-corrugated steel pipe 12 are respectively located at three equal positions of the front facade template 5 to ensure the uniformity of the force on the casting mold 1, thereby ensuring the stability of the fixing of the casting mold 1.
[0038] In this embodiment, the upper back rib steel pipe 11 , the lower back rib steel pipe 12 and the bottom back rib 15 are all provided with prefabricated holes matching with the fixing anchor member 13 .
[0039] In this embodiment, the upper connecting buckle 3 on the front facade template 5 is placed at the center of the upper back corrugated steel pipe 11 and the top, and the lower connecting buckle 3 is placed at the center line of the lower back corrugated steel pipe 12 and the bottom plate.
[0040] As a further description of the above embodiment, one end of the fixed anchor member 13 is bent into a 180° hook, and the other end is threaded into a screw and provided with a fastener 10 matching it.
[0041] When this embodiment is used, one end of the fixed anchor member 13 is bent into a 180° hook and hooked on the embedded steel bar 14; the other end is threaded into a screw rod, which passes through the prefabricated holes on the upper back rib steel pipe 11, the lower back rib steel pipe 12 and the bottom back rib 15, and is then tightened with a fastener 10 to connect and fix them, so that an oblique upward force is generated, so that the casting mold 1 is stabilized on the anchor pier.
[0042] In this embodiment, the fixed anchor member 13 is made of round steel with a diameter of 12 mm, and the tail end is threaded into a screw with a length of 15 cm. Of course, the material, overall length and tail thread length of the fixed anchor member 13 can be adjusted according to the size of the anchor head and the anchor pier.
[0043] In this embodiment, the length specifications of the fixed anchor components 13 connecting the upper back corrugated steel pipe 11 and the lower back corrugated steel pipe 12 are the same, and the length of the fixed anchor components 13 connecting the bottom back corrugated steel pipe 15 is shorter than the length of the fixed anchor components 13 connecting the upper back corrugated steel pipe 11 and the lower back corrugated steel pipe 12.
[0044] In summary, the working principle of the large-volume anchor head sealing template is as follows:
[0045] First, the front elevation formwork 5, the side elevation formwork 6 and the bottom plate are connected by the connecting buckle 3 to form an integrated casting mold 1. Because the design adopts the positioning pin 8 and the fastener 10, the casting mold 1 has the advantage of being extremely easy to disassemble and assemble. At the same time, by fixing the anchor member 13 and the anchor pull of the upper back rib steel pipe 11, the lower back rib steel pipe 12 and the bottom back rib 15, the upper back rib steel pipe 11 and the lower back rib steel pipe 12 generate an oblique upward pulling force. The force generated here is mainly the horizontal positive pressure on the anchor pier, which acts on the casting mold 1 to make it stable. At the same time, the bottom back rib 15 is arranged at the bottom of the casting mold 1 and directly attached to the anchor pier. Through the force analysis, the main force is upward, which avoids the lower part from being emptied when pouring concrete. Through the steel bar embedded parts 14 and the fixed anchor member 13, the acting force is borne by the large anchor pier. Since the embedded steel bar 14 is connected to the anchor pier steel cage during embedding, and the anchor pier steel cage is also welded to the embedded slope anchor bars during overall suspension, and the large anchor pier has been tensioned, there is no need to worry about damage to the anchor pier through force calculation.
[0046] In summary, in the utility model, the template of the large anchor head is easy to assemble, and there is no need to borrow the external diagonal support lining to set up the template. The combined force of the structure is used to optimize the fixing method of the template, so that the template can be fixed into a whole in advance, and it can be assembled at any time on site; the anchor steel bars are embedded in the anchor pier, and the anchor rod construction of the slope drilling and grouting in the traditional operation is avoided, which greatly reduces the actual work tasks and labor intensity on site. It brings good economic and social benefits. Therefore, the utility model effectively overcomes the various shortcomings of the prior art and has a high industrial utilization value.
[0047] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed in the present invention shall still be covered by the claims of the present invention.
Claims
1. A large-volume anchor head sealing template, including an anchor pier, characterized in that: A casting mould (1) is detachably fixed to the anchor pier via a fixed anchor assembly (4); the fixed anchor assembly (4) comprises a fixed anchor component (13), a steel bar embedded component (14), a side back rib steel pipe and a bottom back rib (15); the side back rib steel pipe and the bottom back rib (15) are respectively arranged on the outside and bottom of the casting mould (1); the steel bar embedded component (14) is embedded on both sides of the anchor pier with the ends exposed; one end of the fixed anchor component (13) is detachably connected to the exposed end of the steel bar embedded component (14); and the other end of the fixed anchor component (13) is detachably connected to the side back rib steel pipe and the bottom back rib (15).
2. The large-volume anchor head sealing template according to claim 1 is characterized in that: The casting mold (1) is composed of a front elevation template (5), side elevation templates (6) on both sides, and a bottom plate. The front elevation template (5), the side elevation template (6) and the bottom plate are detachably connected via connecting buckles (3).
3. The large-volume anchor head sealing template according to claim 2 is characterized in that: The front facade template (5), the side facade template (6) and the bottom plate are all provided with panel reinforcement members (2), and the panel reinforcement members (2) are ribs arranged around the front facade template (5), the side facade template (6) and the bottom plate.
4. The large-volume anchor head sealing template according to claim 3 is characterized in that: The connecting buckle (3) comprises an L-shaped reinforcement member (7) and a "7"-shaped adjustable connecting member (9) which are connected to each other. One side of the L-shaped reinforcement member (7) is fixedly connected to the panel reinforcement member (2), and the other side is fitted to the panel reinforcement member (2). The "7"-shaped adjustable connecting member (9) is detachably connected to the fitted side of the L-shaped reinforcement member (7).
5. The large-volume anchor head sealing template according to claim 4 is characterized in that: The L-shaped reinforcement member (7) comprises a right-angle steel and a positioning pin (8) welded to the outer wall of the right-angle steel; one end of the "7"-shaped adjustable connecting member (9) is bent into 90 degrees, and the other end is threaded and fixed with a matching fastener (10); the threaded end of the "7"-shaped adjustable connecting member (9) passes through the positioning pin (8) and is connected and fixed by the fastener (10).
6. The large-volume anchor head sealing template according to claim 2 is characterized in that: One end of the fixed anchor member (13) is bent into a 180° hook, and the other end is threaded into a screw rod and provided with a fastener (10) matching the screw rod.
7. The large-volume anchor head sealing template according to claim 6 is characterized in that: The side back-corrugated steel pipe comprises an upper back-corrugated steel pipe (11) and a lower back-corrugated steel pipe (12), and the upper back-corrugated steel pipe (11) and the lower back-corrugated steel pipe (12) are respectively located at three equally divided positions of the front facade template (5).
8. The large-volume anchor head sealing template according to claim 7 is characterized in that: The upper back corrugated steel pipe (11), the lower back corrugated steel pipe (12) and the bottom back corrugated steel pipe (15) are all provided with prefabricated holes matching the fixed anchor member (13).
9. The large-volume anchor head sealing template according to claim 8 is characterized in that: One end of the fixed anchor member (13) is hooked on the steel bar embedded part (14), and the other end passes through the prefabricated hole and is fastened and connected by a fastener (10).