Aproll anti-sedimentation structure

By setting up support walls and reverse ridges below the cantilever structure to prevent backfill soil erosion, the problem of soil settlement under the cantilever structure is solved, and the stability and integrity of the water-spreading structure is achieved.

CN222009164UActive Publication Date: 2024-11-15CHINA CONSTR FIFTH ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420127059.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-18
Publication Date
2024-11-15
Estimated Expiration
2034-01-18

AI Technical Summary

Technical Problem

The backfill soil under the cantilever structure will slowly lose, resulting in the problem of settlement and cracking of the water-spreading structure. The existing technology such as setting up a support wall cannot completely avoid this problem.

Method used

Design a water-scattered anti-segregation structure, including basement roof panels, exterior walls, cantilever panels, structural beams and supporting walls. The supporting wall extends along the structural beams and is equipped with reverse ridges to connect to the basement roof panels. The internal structural columns are installed to support the soil. , prevent backfill soil erosion.

Benefits of technology

It effectively avoids the loss of backfill soil below the cantilever plate, prevents the settlement and cracking of the water-spreading structure, and improves the stability of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222009164U_ABST
    Figure CN222009164U_ABST
Patent Text Reader

Abstract

The utility model relates to an apron anti-sedimentation structure. The aproll anti-sedimentation structure comprises a basement top plate, a basement outer wall is connected to the basement top plate, a first-layer cantilever plate is connected to the basement outer wall, a structural beam is arranged at the end, opposite to the basement outer wall, of the first-layer cantilever plate, and the structural beam is connected with aproll; the structure is characterized in that a supporting wall body is built at the lower end of the structural beam so as to prevent backfill soil below the apron from losing to the position below the first-layer cantilever plate, the supporting wall body extends in the vertical direction, and the lower end of the supporting wall body is connected with a basement top plate. According to the apron anti-sedimentation structure, the supporting wall body is arranged between the apron and the first-layer cantilever plate, the problem that backfill soil below the apron is lost towards the position below the first-layer cantilever plate is avoided, and sedimentation and cracking of the apron are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, and in particular relates to a water dispersion anti-settling structure. Background Art

[0002] The first floor of some residential buildings is a cantilevered structure at the air conditioning panels and balcony panels, so it is difficult to compact the backfill soil at the bottom of the air conditioning panels and balcony panels. There is a water dispersion structure outside the cantilevered structure, and the backfill soil under the water dispersion structure is also backfilled. The backfill soil under the water dispersion structure will slowly flow under the cantilevered structure, causing the water dispersion structure around the main building to sink and crack.

[0003] The invention patent with application announcement number CN114215114A discloses a cantilever slab perimeter water dispersion construction structure and construction method. The cantilever slab perimeter water dispersion construction structure sets a supporting wall at the lower end of the water dispersion structure to enclose the water dispersion and the bottom of the first-floor cantilever slab into a closed space, so as to reduce the risk of water dispersion settling. However, the cantilever slab perimeter water dispersion construction structure still cannot avoid the problem of backfill soil under the water dispersion structure flowing to the bottom of the cantilever structure. Utility Model Content

[0004] The utility model aims to provide a water dispersion anti-settling structure to solve the technical problem that the backfill soil below the water dispersion structure will flow to the bottom of the cantilever structure.

[0005] In order to achieve the above objectives, the technical solution adopted by the utility model is:

[0006] A water dispersion anti-settling structure comprises a basement top plate, the basement top plate is connected to a basement outer wall, a first-floor cantilever plate is connected to the basement outer wall, a structural beam is provided at one end of the first-floor cantilever plate opposite to the basement outer wall, and the structural beam is connected to the water dispersion; a supporting wall is built at the lower end of the structural beam to prevent backfill soil under the water dispersion from being lost to under the first-floor cantilever plate, the supporting wall extends in an up-down direction, and the lower end of the supporting wall is connected to the basement top plate.

[0007] Furthermore, the supporting wall extends along the length direction of the structural beam, and a plurality of structural columns are arranged in the supporting wall, and the plurality of structural columns are evenly distributed along the length direction of the supporting wall.

[0008] Furthermore, a counter-slope is provided at the lower end of the supporting wall, and the lower end of the counter-slope is connected to the basement ceiling.

[0009] Furthermore, the first-floor cantilevered panel is an air-conditioning panel or a balcony panel.

[0010] Beneficial effects of the utility model:

[0011] The utility model discloses a water sprinkling anti-settling structure in which a supporting wall is arranged between the water sprinkling and the first-floor cantilever plate, thereby preventing the backfill soil under the water sprinkling from flowing under the first-floor cantilever plate and preventing the water sprinkling from settling and cracking. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the anti-settling structure of the water dispersion in Example 1 (the cantilevered plate of the first floor is a balcony plate);

[0013] Figure 2 This is a structural schematic diagram of the water dispersion and anti-settling structure in Example 1 (the first-floor cantilever plate is an air-conditioning plate).

[0014] In the figure: 1. Basement roof; 2. Basement exterior wall; 3. First floor cantilever slab; 4. Structural beam; 5. Supporting wall; 6. Concrete counter-edge; 7. Drainage; 8. Backfill soil. DETAILED DESCRIPTION

[0015] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0016] The implementation of the water dispersion anti-settling structure in the utility model is as follows Figure 1-2 shown.

[0017] Example 1

[0018] The anti-settling structure of the present embodiment includes a basement roof 1, a basement outer wall 2 is connected to the basement roof 1, a first-floor cantilever slab 3 is connected to the basement outer wall 2, a structural beam 4 is provided at one end of the first-floor cantilever slab 3 opposite to the basement outer wall 2, and the structural beam 4 is connected to the water 7. A supporting wall 5 is built at the lower end of the structural beam 4 to prevent the backfill soil 8 under the water 7 from flowing to the lower part of the first-floor cantilever slab 3. The supporting wall 5 extends in the up-down direction, and a concrete anti-ridge 6 is cast at the lower end of the supporting wall 5, and the lower end of the concrete anti-ridge 6 is connected to the basement roof 1. The supporting wall 5 is arranged along the length direction of the structural beam 4, and a plurality of structural columns (not shown in the figure) are arranged in the supporting wall 5, and the plurality of structural columns are evenly distributed along the length direction of the supporting wall 5. The interval between every two adjacent structural columns is 3m. The first-floor cantilever slab 3 is an air conditioning slab or a balcony slab.

[0019] Finally, it should be noted that in the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention.

[0020] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

Claims

1. A water dispersion anti-settling structure, comprising a basement top plate, the basement top plate is connected to a basement outer wall, the basement outer wall is connected to a first-floor cantilever plate, a structural beam is provided at one end of the first-floor cantilever plate opposite to the basement outer wall, and the structural beam is connected to the water dispersion; Features: A supporting wall is built at the lower end of the structural beam to prevent the backfill soil under the scattered water from being lost to the bottom of the first-floor cantilever slab. The supporting wall extends in the up-down direction, and the lower end of the supporting wall is connected to the basement top slab.

2. The water dispersion and anti-settling structure according to claim 1, Features: The supporting wall extends along the length direction of the structural beam, and a plurality of structural columns are arranged in the supporting wall, and the plurality of structural columns are evenly distributed along the length direction of the supporting wall.

3. The water dispersion and anti-settling structure according to claim 1, Features: The lower end of the supporting wall is provided with an anti-slope, and the lower end of the anti-slope is connected to the basement top plate.

4. The water dispersion and anti-settling structure according to claim 1, Features: The first-floor cantilevered slab is an air-conditioning slab or a balcony slab.