Plastering device for building construction

By introducing inclined guide plates and unblocking holes into the plastering device for building construction to remove gas from the cement slurry, and by adopting a disassembly mechanism to simplify the installation of the scraper, the problems of voids and gaps caused by gas in the cement slurry are solved, thereby improving construction efficiency and equipment maintenance convenience.

CN222009504UActive Publication Date: 2024-11-15SHANDONG TONGJU BUILDING ENERGY SAVING TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202422485086.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2024-11-15
Estimated Expiration
2034-10-15

AI Technical Summary

Technical Problem

Traditional plastering equipment for building construction cannot effectively remove air from cement slurry, leading to problems such as hollow areas or gaps. Furthermore, the disassembly and installation of scrapers are cumbersome, affecting construction quality and equipment lifespan.

Method used

A plastering device for building construction was designed, which uses inclined guide plates and unblocking holes to remove cement slurry gas, and simplifies the installation and disassembly process of the scraper through a disassembly mechanism, including a combination structure of connecting column, movable slot, fixing block, spring and top block.

Benefits of technology

It effectively removes air from cement slurry, avoids voids and gaps, simplifies the disassembly and installation of scrapers, and improves construction efficiency and equipment lifespan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222009504U_ABST
    Figure CN222009504U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a building construction plastering device which comprises a movable platform, two electric telescopic rods are symmetrically arranged on the movable platform, a driving mechanism is arranged on the movable platform, a material storage box is installed between the two electric telescopic rods, a guide plate is installed in the material storage box, and the guide plate is connected with the movable platform. A dredging hole is formed in the guide plate, and a connecting rod is fixedly connected between the two electric telescopic rods. According to the utility model, after mixed cement paste is put into the storage box, the cement paste flows on the guide plate, one part of the cement paste on the bottom layer flows to the bottom of the storage box through the dredging hole, and the other part falls into the bottom through the front end of the guide plate. The front end of the guide plate is rounded, so that cement paste can flow conveniently, and smoothness is improved. And through screening on the two sides of the guide plate and the dredging hole, gas in the cement paste is effectively removed, hollowing or notches are avoided during plastering operation of the scraper, follow-up repairing work is reduced, the working efficiency is improved, and the labor force of workers is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a building construction plastering device. Background Art

[0002] In the field of construction, wall plastering is an important task. Traditional construction plastering devices are usually simple in structure, generally consisting of a simple material storage container and a scraper. The material storage container directly pours cement slurry onto the scraper or uses a simple diversion method to make the cement slurry flow to the scraper for plastering.

[0003] However, the existing technical solutions have the following problems: First, traditional devices cannot effectively remove the gas in cement slurry, and the problem of hollowing or gaps caused by the inability to effectively remove the gas in cement slurry is particularly prominent. Since the gas in the cement slurry will form gaps during the plastering process, the wall surface will be uneven. Subsequent repairs will not only increase the construction cost, but may also affect the quality of the entire construction project due to incomplete repairs. Secondly, the scraper is usually installed on the device in a fixed connection. When the scraper is damaged or needs to be cleaned, the disassembly and installation process is very cumbersome, and even requires the use of professional tools, which consumes a lot of time and effort, is not conducive to the timely maintenance of the equipment, and thus reduces the service life of the equipment. To this end, we propose a plastering device for construction. Utility Model Content

[0004] Technical issues solved

[0005] In view of the deficiencies in the prior art, the utility model provides a plastering device for building construction, which solves the above-mentioned problems. Technical Solution

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction plastering device, comprising a mobile platform, two electric telescopic rods are symmetrically arranged on the mobile platform, a driving mechanism is arranged on the mobile platform, a storage box is installed between the two electric telescopic rods, a guide plate is installed inside the storage box, a dredging hole is opened on the guide plate, a connecting rod is fixedly connected between the two electric telescopic rods, a scraper is arranged on the front side of the connecting rod, the scraper corresponds to the guide plate up and down, and a disassembly mechanism is arranged on the scraper.

[0007] Preferably, the guide plate is tiltedly arranged inside the storage box, and the inclination angle of the guide plate is the same as the inclination angle inside the storage box, the front end of the guide plate is chamfered, and the front end of the guide plate is located inside the storage box.

[0008] Preferably, the disassembly mechanism includes a connecting column, an movable slot and a fixed block, two connecting columns are symmetrically fixedly installed on the rear side of the scraper, two connecting slots are opened on the front side wall of the connecting rod corresponding to the positions of the two connecting columns, the internal shape and size of the connecting slots are adapted to the shape and size of the connecting columns, and the side walls of the two connecting columns away from each other are both provided with movable slots, the movable slots are U-shaped slots in cross-section, and the internal movable slots are connected with a fixed block.

[0009] Preferably, the disassembly mechanism also includes a spring and a top block, and the side walls of the two fixed blocks that are close to each other are fixedly connected with a spring, and the end of the spring away from the corresponding fixed block is fixedly connected to the side wall adjacent to the inside of the corresponding connecting column, and the two connecting columns are movably sleeved with a top block, and the top block is located at the front end of the corresponding fixed block, and the side walls of the two connecting grooves that are away from each other are provided with a fixed groove, and the fixed groove corresponds to the position of the movable slot on the corresponding connecting column, and the internal shape and size of the fixed groove are adapted to the shape and size of the fixed block port.

[0010] Preferably, the fixing block is a U-shaped block, and the fixing blocks extend through the corresponding connecting grooves to the outside of the connecting column, and the two ends of the fixing blocks on the outside of the connecting column are symmetrically provided with inclined surfaces on one side of the wall.

[0011] Preferably, both sides of the mobile platform are provided with rollers for driving the device to move. Beneficial Effects

[0012] Compared with the prior art, the utility model provides a plastering device for building construction, which has the following beneficial effects:

[0013] 1. By setting the inclined guide plate inside the storage box and the dredging holes on the guide plate, the gas in the cement slurry is efficiently removed to avoid hollowing and gaps. After the mixed cement slurry is placed in the storage box, the cement slurry flows on the guide plate. Part of the bottom cement slurry flows to the bottom of the storage box through the dredging holes, and the other part falls to the bottom through the front end of the guide plate. The rounded corners at the front end of the guide plate facilitate the flow of cement slurry and improve its fluidity. Through the screening on both sides of the guide plate and the dredging hole, the gas inside the cement slurry is effectively removed, and hollowing or gaps are avoided during the scraper plastering operation, which reduces the subsequent repair work, improves work efficiency, and reduces the labor of workers.

[0014] 2. By setting up a disassembly mechanism, including a connecting column, a movable slot, a fixed block, a spring and a top block, the scraper can be easily disassembled and installed, and the maintenance can be facilitated. When the scraper is damaged or needs to be cleaned after use, push the top block on the connecting column backward, and the top block squeezes the fixed block. Under the guidance of the inclined surface of the fixed block, the fixed block retracts into the inside of the connecting column. After separating from the fixed slot, the connecting column can be taken out to complete the scraper disassembly. During installation, align the connecting column on the scraper with the connecting slot on the connecting rod and insert it. The fixed block enters the fixed slot under the action of the spring elastic force to complete the scraper installation. The operation is simple and convenient, and the scraper can be disassembled and installed in a timely and effective manner, which facilitates maintenance and increases the service life of the equipment.

[0015] 3. The U-shaped design of the fixing block can enhance the connection stability. The fixing block is U-shaped, and after passing through the connection groove, it is connected with the fixing groove, which increases the contact area and stability of the connection and prevents the scraper from loosening or deflecting during operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional diagram of the utility model;

[0017] Figure 2 This is a half-section view of the material storage box of the utility model;

[0018] Figure 3 This is a cross-sectional view of the connecting rod of the utility model;

[0019] Figure 4 For this utility model Figure 3 Enlarged view of point A in the middle.

[0020] In the figure: 1. mobile platform; 2. roller; 3. driving mechanism; 4. electric telescopic rod; 5. storage box; 6. connecting rod; 7. scraper; 8. guide plate; 9. dredging hole; 10. connecting column; 11. connecting groove; 12. movable slot; 13. fixed block; 14. spring; 15. fixed groove; 16. top block. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-4A plastering device for construction includes a mobile platform 1, two electric telescopic rods 4 are symmetrically arranged on the mobile platform 1, a driving mechanism 3 is arranged on the mobile platform 1, a material storage box 5 is installed between the two electric telescopic rods 4, a guide plate 8 is installed inside the material storage box 5, a dredging hole 9 is opened on the guide plate 8, a connecting rod 6 is fixedly connected between the two electric telescopic rods 4, a scraper 7 is arranged on the front side of the connecting rod 6, the scraper 7 corresponds to the guide plate 8 up and down, and a disassembly mechanism is arranged on the scraper 7.

[0023] When in use, the mixed cement slurry can be stored in the storage box 5, and then the storage box 5 is driven to move up and down by the driving mechanism 3 in cooperation with the two electric telescopic rods 4, and at the same time, the scraper 7 below the storage box 5 is cooperated to complete the plastering operation on the wall.

[0024] The guide plate 8 is tiltedly arranged inside the material storage box 5 , and the tilt angle of the guide plate 8 is the same as the tilt angle inside the material storage box 5 . The front end of the guide plate 8 is rounded, and the front end of the guide plate 8 is located inside the material storage box 5 .

[0025] The disassembly mechanism includes a connecting column 10, an active slot 12 and a fixed block 13. Two connecting columns 10 are symmetrically fixedly installed on the rear side of the scraper 7. Two connecting slots 11 are provided on the front wall of the connecting rod 6 at positions corresponding to the two connecting columns 10. The internal shape and size of the connecting slot 11 are adapted to the shape and size of the connecting column 10. The wall surface on one side of the two connecting columns 10 away from each other is provided with an active slot 12. The active slot 12 is a U-shaped slot, and the internal active slot 12 is movably connected with a fixed block 13.

[0026] The disassembly mechanism also includes a spring 14 and a top block 16. The side walls of the two fixed blocks 13 that are close to each other are fixedly connected with the spring 14. The end of the spring 14 that is away from the corresponding fixed block 13 is fixedly connected to the side wall adjacent to the inside of the corresponding connecting column 10. The two connecting columns 10 are movably sleeved with a top block 16, and the top block 16 is located at the front end of the corresponding fixed block 13. The side walls of the two connecting grooves 11 that are away from each other are each provided with a fixing groove 15. The fixing groove 15 corresponds to the position of the movable slot 12 on the corresponding connecting column 10, and the internal shape and size of the fixing groove 15 are adapted to the shape and size of the port of the fixed block 13.

[0027] The fixing block 13 is a U-shaped block, and the fixing block 13 passes through the corresponding connection groove 11 and extends to the outside of the connection column 10. The two ends of the fixing block 13 on the outside of the connection column 10 are symmetrically provided with inclined surfaces on one side of the wall. The inclined surfaces of the fixing block 13 are provided as follows: Figure 4 shown.

[0028] When the fixing block 13 is squeezed during use, the spring 14 deforms and the fixing block 13 can enter the interior of the connecting column 10. When the connecting column 10 enters the interior of the connecting groove 11, when the positions of the adjacent openings of the fixing groove 15 and the movable slot 12 correspond to each other, the fixing block 13 will enter the interior of the fixing groove 15 under the action of the elastic force of the spring 14. Figure 4 As shown, the position of the scraper 7 is fixed.

[0029] Rollers 2 are provided on both sides of the mobile platform 1 . A total of four rollers 2 with electric telescopic rods are provided on the left and right sides of the mobile platform 1 . The number of rollers 2 is not limited. The device can be moved by the rollers 2 .

[0030] Working principle:

[0031] When in use, the mixed cement slurry can be put into the storage box 5. At this time, the cement slurry will flow on the guide plate 8, and a part of the cement slurry at the bottom layer will first flow to the bottom of the storage box 5 through the dredging hole 9, and the other part will fall into the bottom of the storage box 5 through the front end of the guide plate 8. The rounded corners at the front end of the guide plate 8 can facilitate the flow of cement slurry and improve the smoothness of the cement slurry when passing through the guide plate 8. In this way, after screening on both sides of the guide plate 8 and the dredging hole 9, the gas inside the cement slurry can be effectively removed, which greatly avoids the occurrence of hollows or gaps when the scraper 7 is performing plastering operations, resulting in the need for subsequent repairs, greatly improving work efficiency and reducing the labor of workers.

[0032] When the scraper 7 is damaged during use or needs to be cleaned after use, the top blocks 16 on the two connecting columns 10 can be pushed backwards until the top blocks 16 contact the side wall adjacent to the connecting rod 6. At this time, the fixing block 13 is squeezed by the top block 16 and retracted into the inside of the connecting column 10 under the guidance of the inclined surface on the fixing block 13. When the fixing block 13 is separated from the inside of the fixing groove 15, the connecting column 10 can be taken out of the connecting groove 11 to complete the disassembly of the scraper 7. When installing the scraper 7, it is only necessary to align the connecting column 10 on the scraper 7 with the position of the connecting groove 11 on the connecting rod 6 and insert it until the fixing block 13 enters the inside of the fixing groove 15 under the action of the elastic force of the spring 14 to complete the installation of the scraper 7. The operation is simple, convenient and practical. The scraper 7 can be disassembled and installed in a timely and effective manner, which is convenient for maintenance of the scraper 7 and greatly improves the service life of the equipment.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A plastering device for construction, comprising a mobile platform (1), two electric telescopic rods (4) being symmetrically arranged on the mobile platform (1), and a driving mechanism (3) being arranged on the mobile platform (1), characterized in that: A material storage box (5) is installed between the two electric telescopic rods (4), a guide plate (8) is installed inside the material storage box (5), and a dredging hole (9) is opened on the guide plate (8). A connecting rod (6) is fixedly connected between the two electric telescopic rods (4), and a scraper (7) is arranged on the front side of the connecting rod (6). The scraper (7) corresponds to the guide plate (8) in upper and lower positions, and a disassembly mechanism is arranged on the scraper (7).

2. A plastering device for building construction according to claim 1, characterized in that: The guide plate (8) is arranged obliquely inside the material storage box (5), and the inclination angle of the guide plate (8) is the same as the inclination angle inside the material storage box (5); the front end of the guide plate (8) is arranged with a rounded corner, and the front end of the guide plate (8) is located inside the material storage box (5).

3. A plastering device for building construction according to claim 1, characterized in that: The disassembly mechanism comprises a connecting column (10), an active clamping groove (12) and a fixed block (13); two connecting columns (10) are symmetrically fixedly mounted on the rear side of the scraper (7); two connecting grooves (11) are provided on the front side wall surface of the connecting rod (6) at positions corresponding to the two connecting columns (10); the internal shape and size of the connecting grooves (11) are adapted to the shape and size of the connecting columns (10); the side walls of the two connecting columns (10) which are away from each other are both provided with an active clamping groove (12); the active clamping groove (12) is a groove with a U-shaped cross section; the internal part of the active clamping groove (12) is movably clamped with a fixed block (13).

4. A construction plastering device according to claim 3, characterized in that: The disassembly mechanism further comprises a spring (14) and a top block (16); the side walls of the two fixed blocks (13) close to each other are fixedly connected to the spring (14); one end of the spring (14) away from the corresponding fixed block (13) is fixedly connected to the side wall of the corresponding connecting column (10) adjacent to each other; the top block (16) is movably sleeved on the two connecting columns (10); the top block (16) is located at the front end of the corresponding fixed block (13); the side walls of the two connecting grooves (11) away from each other are provided with a fixed groove (15); the fixed groove (15) corresponds to the position of the movable slot (12) on the corresponding connecting column (10); and the internal shape and size of the fixed groove (15) are adapted to the shape and size of the port of the fixed block (13).

5. A plastering device for building construction according to claim 3, characterized in that: The fixing block (13) is a U-shaped block, and the fixing blocks (13) all penetrate the interior of the corresponding connecting groove (11) and extend to the outside of the connecting column (10), and the two ends of the fixing blocks (13) located outside the connecting column (10) and away from each other are symmetrically provided with inclined surfaces on one side wall.

6. A plastering device for building construction according to claim 1, characterized in that: Rollers (2) are provided on both sides of the mobile platform (1).

Citation Information

Cited By

  • Plastering device for house building construction

    CN224351576U