Intelligent micro-grid control equipment suitable for oil and gas field well site

By designing intelligent microgrid control equipment in well sites in oil and gas fields, integrating grid-connected power meter, multi-function meter, inverter monitoring and circuit breaker protection units, intelligent management of distributed energy is realized, and the problems of information collection and control are solved. Improved energy management efficiency and grid safety.

CN222016263UActive Publication Date: 2024-11-15CHINA PETROLEUM ENG & CONSTR +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323573246.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-11-15
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The lack of intelligent photovoltaic grid-connected control cabinets in the wells of oil and gas fields, which leads to inconvenience in information collection, control and uploading, making it difficult to effectively manage and monitor distributed energy, affecting the safety and efficiency of the power grid.

Method used

An intelligent microgrid control device was designed to integrate grid-connected power meter measurement unit, multi-function meter monitoring unit, inverter monitoring unit, grid-connected circuit breaker protection measurement and control unit, intelligent gateway and switch to realize information through the Internet and the Internet of Things. Acquisition and control, adopt modular design and standardized communication protocols, and combine cable clamps to simplify the wiring process.

Benefits of technology

It realizes the measurable, considerable and controllable energy distribution in wells in oil and gas fields, improves energy management efficiency, simplifies the wiring process, enhances the flexibility and adaptability of the power grid, and ensures the reliability and safety of energy supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222016263U_ABST
    Figure CN222016263U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of oil and gas field control, and provides an intelligent micro-grid control device suitable for an oil and gas field well site, which comprises a grid-connected electric energy meter measuring unit connected with an electric energy centralized reading platform through the Internet; the intelligent gateway is respectively connected with a multifunctional meter monitoring unit, an inverter monitoring unit and a grid-connected circuit breaker protection measurement and control unit; the multifunctional meter monitoring unit, the inverter monitoring unit and the grid-connected circuit breaker protection measurement and control unit are arranged in parallel; the switch is connected with the intelligent gateway; and the control center is in communication connection with the intelligent gateway and the switch. According to the utility model, the grid-connected electric energy meter measuring unit, the multifunctional meter monitoring unit, the plurality of inverter monitoring units, the grid-connected circuit breaker protection measurement and control unit, the intelligent gateway, the switch and other units in the power grid equipment are integrated in the control cabinet to form a micro-grid structure, which is beneficial to the application and development of the micro-grid technology.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of oil and gas field control, and particularly relates to an intelligent microgrid control device suitable for oil and gas field well sites. Background Art

[0002] With the access of a large number of distributed new energy sources to the oil and gas field distribution network system, the original one-way transmission mode has been changed, while the two-way flow has changed the fault characteristics of the oil and gas field distribution network system. Microgrid is a new distributed energy organization method and structure proposed to integrate the advantages of distributed generation and weaken the impact and negative impact of distributed generation on the power grid. It integrates distributed generation units with the distribution network, directly connects distributed generation units, power networks and end users in a local area, and can easily optimize the structure and configuration, improve energy utilization efficiency, and promote the development of oil and gas field power grids towards green, environmental protection and energy saving. Therefore, the multi-microgrid system composed of solar power generation, wind power generation, micro gas turbines, fuel cells, energy storage, distribution systems, etc. may become the mainstream development trend of oil and gas field power systems.

[0003] Microgrids have a dual role. For power companies, microgrids can be regarded as a simple dispatchable load that can respond within seconds to meet the needs of the transmission system. For users, microgrids can be used as a customizable power source to meet the diverse needs of users, such as increasing local power supply reliability, reducing feeder losses, supporting local voltage and frequency through microgrid energy storage elements, or as an uninterruptible power supply to improve voltage sag correction. The design concept around the energy needs of the entire system and the power supply concept of providing users with diverse power quality are two important features of microgrids. The future distribution system will be a mixture of traditional distribution systems and a large number of microgrids distributed in the power supply area of ​​the distribution system, forming an Internet-like model.

[0004] Microgrids can be seen as a structure of the future power system, which can be used as the third-level power grid after the transmission grid and distribution grid. Compared with the current large power grid, this structure has significant economic and environmental benefits. By establishing microgrids, distributed generation can be applied to the power system and maximize its potential. Although microgrids and distributed power sources are mainly connected with the distribution grid, their impact on the entire power system will be huge and far-reaching.

[0005] At present, the industry generally lacks intelligent design for photovoltaic grid-connected control cabinets. Monitoring generally adopts 4G communication stick solutions, which only collect inverter data. Multi-function meters, circuit breakers and other equipment adopt local control methods. Oil and gas field well sites are generally located in remote areas and are relatively scattered. The management and control of distributed energy generation and power grid security are top priorities for the oil and gas field industry. Therefore, how to carry out intelligent design of photovoltaic grid-connected control cabinets, realize information collection, control, and upload in one, and integrate it into the oil and gas field Internet of Things has become a key issue that needs to be solved urgently. Utility Model Content

[0006] In order to solve at least one problem in the background technology, the utility model proposes an intelligent microgrid control device suitable for oil and gas field well sites.

[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0008] An intelligent microgrid control device suitable for oil and gas field well sites, comprising:

[0009] The grid-connected electric energy meter measurement unit is connected to the electric energy collection platform via the Internet;

[0010] The intelligent gateway is respectively connected to a multi-function meter monitoring unit, an inverter monitoring unit and a grid-connected circuit breaker protection measurement and control unit;

[0011] The multi-function meter monitoring unit, the inverter monitoring unit and the grid-connected circuit breaker protection measurement and control unit are arranged in parallel;

[0012] Switch, connected to the intelligent gateway;

[0013] The control center is communicated with the intelligent gateway and the switch respectively.

[0014] Preferably, the grid-connected electric energy meter measurement unit adopts an electric energy meter, model DT(S)ZY1277(C)-M.

[0015] Preferably, the multi-function meter monitoring unit adopts a multi-function meter, model PD194Z-AC.

[0016] Preferably, several of the inverter monitoring units are arranged in parallel, and the collected working data include: AC and DC side voltage, current, AC side active power, reactive power, power factor, inverter temperature, daily power generation, monthly power generation, annual power generation, cumulative power generation, and the maximum active and reactive output range of the inverter.

[0017] Preferably, the intelligent gateway is connected to the multi-function meter monitoring unit, the inverter monitoring unit and the grid-connected circuit breaker protection measurement and control unit using RS485 cables.

[0018] Preferably, the intelligent gateway is connected to the switch via a network cable.

[0019] Preferably, the control center is connected to the switch via a network cable and connected to the intelligent gateway via wifi.

[0020] Preferably, it also includes a control cabinet and a wire clamp, wherein the grid-connected electric energy meter measuring unit, the multi-function meter monitoring unit, several inverter monitoring units, the grid-connected circuit breaker protection measurement and control unit, the intelligent gateway and the switch are all installed in the control cabinet;

[0021] The wire clamp is used to install RS485 cables and network cables.

[0022] Preferably, the wire clamp comprises a base and a jacket;

[0023] The base is fixed on the inner surface of the control cabinet, and the jacket is fixed on the base in an open ring structure for fixing RS485 cables and network cables.

[0024] Preferably, a fastening pin is slidably provided at one end of the jacket, the upper end of the fastening pin is an external hexagonal knob, and the lower end is a waist-shaped pin head;

[0025] A metal sheet is also provided on one end surface of the clamping sleeve mounting fastening pin, the fastening pin and the metal sheet are slidably matched, and a spring is provided between the metal sheet and the external hexagonal knob;

[0026] A columnar fastening groove is provided in the base, a lower friction layer is provided on the top of the inner surface of the fastening groove, and a guide hole is provided on the top of the columnar fastening groove, the guide hole extends to the surface of the base and is in clearance with the pin head;

[0027] An upper friction layer is also provided on the lower surface of the pin head.

[0028] Beneficial effects of the utility model:

[0029] 1. The utility model integrates the grid-connected electric energy meter measurement unit, the multi-function meter monitoring unit, several inverter monitoring units, the grid-connected circuit breaker protection measurement and control unit, the intelligent gateway and the switch in the control cabinet to form a microgrid structure, which is conducive to the application and development of microgrid technology;

[0030] 2. This utility model sets up modular information collection equipment, agrees on standardized communication transmission protocols, and establishes a unified energy IoT system to achieve measurable, observable, and controllable distributed energy in oil and gas field wells;

[0031] 3. The utility model uses a fastening pin in the wire clamp to replace the traditional screw, so that the cable can be directly locked manually during the wiring process, which reduces the use of screwdrivers and improves the wiring efficiency.

[0032] Other features and advantages of the utility model will be described in the following description, and partly become apparent from the description, or understood by implementing the utility model. The purpose and other advantages of the utility model can be realized and obtained by the structures indicated in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0034] Figure 1 A topological diagram of an intelligent microgrid control device applicable to an oil and gas field well site of the utility model is shown;

[0035] Figure 2 Shows Figure 1 Figure 2. Data collection of the equipment in the middle;

[0036] Figure 3 A schematic diagram of a control cabinet of an intelligent microgrid control device suitable for an oil and gas field well site according to the utility model is shown;

[0037] Figure 4 The schematic diagram of the structure of the wire clamp of the utility model is shown;

[0038] Figure 5 A partial structural schematic diagram of the fastening pin of the utility model is shown;

[0039] Figure 6 A schematic diagram of grid connection point definition is shown.

[0040] In the figure: 1. Grid-connected electric energy meter measurement unit; 2. Multi-function meter monitoring unit; 3. Inverter monitoring unit; 4. Grid-connected circuit breaker protection measurement and control unit; 5. Intelligent gateway; 6. Switch; 7. Control center; 8. RS485 cable; 9. Network cable; 10. Electric energy collection platform; 11. Control cabinet; 12. Wire clamp; 1201. Base; 1202. Jacket; 1203. Metal sheet; 1204. Fastening pin; 1205. Spring; 1206. Pin head; 1207. Guide hole; 1208. Fastening groove; 1209. Lower friction layer; 1210. Upper friction layer. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0042] An intelligent microgrid control device suitable for oil and gas field well sites, such as Figure 1 The system includes: a grid-connected electric energy meter measuring unit 1, connected to an electric energy collection platform 10 via the Internet; a multi-function meter monitoring unit 2, used to collect voltage, current and harmonics at the grid-connected point; a plurality of inverter monitoring units 3, used to collect working data of the inverter; a grid-connected circuit breaker protection measurement and control unit 4, used to. An intelligent gateway 5 is respectively connected to the multi-function meter monitoring unit 2, the inverter monitoring unit 3 and the grid-connected circuit breaker protection measurement and control unit 4; a switch 6 is connected to the intelligent gateway 5; and a control center 7 is respectively connected to the intelligent gateway 5 and the switch 6 for communication.

[0043] It should be noted that the grid-connected energy meter measurement unit 1 integrates metering, display, communication, monitoring, fee control and other functions. It can accurately measure the three-phase forward and reverse active energy, four-quadrant reactive energy and demand in real time; accurately measure the three-phase voltage, current, active power, reactive power, power factor, etc.; monitor and record events such as loss of voltage, loss of current, and phase failure; and realize remote and local meter reading, programming and other functions. The multi-function meter monitoring unit 2 is mainly used to collect the voltage, current and harmonics of the grid connection point. The location of the grid connection point is detailed in Figure 6 For distributed power sources with booster stations, the grid connection point is the high-voltage side bus or node of the distributed power booster station; for distributed power sources without booster stations, the grid connection point is the output aggregation point of the distributed power source. In addition, the inverter monitoring unit is used to collect the working data of the inverter; the grid-connected circuit breaker protection measurement and control unit 4 is used for integrated distribution protection of the grid connection point, with residual current automatic tracking function, overvoltage, undervoltage, and phase loss protection function, automatic reclosing function, electronic overload, short-circuit short delay and instantaneous protection, and loss of pressure tripping function.

[0044] It should be noted that if Figure 2 As shown, the telemetry information table b is collected and uploaded by the multi-function meter monitoring unit 2, the telemetry information table a, the remote control information table b, and the remote signaling information table a are all collected and uploaded by the inverter monitoring unit 3, the remote control information table a and the remote signaling information table b are all collected and uploaded by the grid-connected circuit breaker protection measurement and control unit 4, and the telemetry information table c and the remote signaling information table c are reserved for expansion functions, which can be realized by adding modules such as photovoltaic environment monitoring system and anti-islanding protection device at a later stage.

[0045] In addition, the grid-connected electric energy meter measurement unit 1 adopts an electric energy meter, model DT(S)ZY1277(C)-M. The multi-function meter monitoring unit 2 adopts a multi-function meter, model PD194Z-ACJ. Several inverter monitoring units 3 are set in parallel, and the inverter monitoring unit uses a SmartLogger device for data collection. The collected working data includes: AC and DC side voltage and current, AC side active power, reactive power, power factor, inverter temperature, daily power generation, monthly power generation, annual power generation, cumulative power generation, inverter maximum active and reactive output range, etc. The intelligent gateway 5 is connected to the multi-function meter monitoring unit 2, the inverter monitoring unit 3 and the grid-connected circuit breaker protection measurement and control unit 4 using an RS485 cable 8. In addition, the intelligent gateway 5 is connected to the switch 6 via a network cable 9 (or optical fiber). The control center 7 is connected to the switch 6 via a network cable 9 (or optical fiber) and is connected to the intelligent gateway 5 via wifi.

[0046] Furthermore, if Figure 3 As shown, the intelligent microgrid control device also includes a control cabinet 11 and a wire clamp 12. The grid-connected electric energy meter measurement unit 1, the multi-function meter monitoring unit 2, several inverter monitoring units 3, the grid-connected circuit breaker protection and control unit 4, the intelligent gateway 5 and the switch 6 are all installed in the control cabinet 11. The wire clamp 12 is used to install the RS485 cable 8 and the network cable 9. Specifically, as shown in FIG. Figure 4 As shown, the wire clamp 12 includes a base 1201 and a jacket 1202; the base 1201 is fixed to the inner surface of the control cabinet 11, and the jacket 1202 is fixed to the base 1201, which is an open ring structure and is used to fix the RS485 cable 8 and the network cable 9. Figure 5 As shown, a fastening pin 1204 is slidably provided at one end of the jacket 1202, the upper end of the fastening pin 1204 is an outer hexagonal knob, and the lower end is a waist-shaped pin head 1206; a metal sheet 1203 is also provided on the surface of one end of the jacket 1202 where the fastening pin 1204 is installed, the fastening pin 1204 and the metal sheet 1203 are slidably matched, and a spring 1205 is provided between the metal sheet 1203 and the outer hexagonal knob; a fastening groove 1208 is provided in the base 1201, a lower friction layer 1209 is provided on the top of the inner surface of the fastening groove 1208, and a guide hole 1207 is provided on the top of the columnar fastening groove 1208, the guide hole 1207 extends to the surface of the base 1201, and is in clearance with the pin head 1206, and its shape is the same as the pin head 1206, which is waist-shaped. An upper friction layer 1210 is also provided on the lower surface of the pin head 1206.

[0047] It should be noted that the wire clamp 12 of the utility model replaces the traditional screw with a fastening pin 1204. When working, first slide the pin head 1206 into the fastening groove 1208 along the guide hole 1207, and then turn the external hexagonal knob to make the lower friction layer 1209 and the upper friction layer 1210 contact. At the same time, the spring 1205 is in a compressed state, and its rebound force makes the lower friction layer 1209 and the upper friction layer 1210 tightly against each other, thereby increasing the friction force. This structure can be manually locked without the use of a screwdriver or other equipment, thereby simplifying the wiring steps.

[0048] The utility model adopts integrated design to realize efficient management and control of energy. In addition, the control cabinet 11 can also add new structures from the following aspects.

[0049] The control cabinet 11 can adopt an intelligent control design, and with the help of the "cloud computing, edge collaboration" solution, it can perform real-time monitoring, data analysis and optimization control of the photovoltaic power generation system, thereby improving energy utilization efficiency.

[0050] The control cabinet 11 can also be made of special materials such as high temperature resistance and corrosion resistance, and can operate stably in harsh environments, thereby ensuring the reliability of energy supply to the oil and gas field well site.

[0051] The control cabinet 11 can also improve the safety protection mechanism, such as adding a voltage protector, etc., to prevent power grid anomalies, lightning and other unexpected situations from causing damage to the equipment, ensuring the safety of people and equipment.

[0052] The control cabinet 11 can also support a variety of grid-connection modes to meet the energy requirements of different oil and gas field well sites, thereby improving the flexibility and adaptability of the equipment.

[0053] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. An intelligent microgrid control device suitable for oil and gas field well sites, characterized in that: include: A grid-connected electric energy meter measuring unit (1) is connected to an electric energy collection platform (10) via the Internet; The intelligent gateway (5) is respectively connected to the multi-function meter monitoring unit (2), the inverter monitoring unit (3) and the grid-connected circuit breaker protection measurement and control unit (4); The multifunctional meter monitoring unit (2), the inverter monitoring unit (3) and the grid-connected circuit breaker protection measurement and control unit (4) are arranged in parallel; A switch (6) connected to the intelligent gateway (5); The control center (7) is communicatively connected with the intelligent gateway (5) and the switch (6) respectively.

2. The intelligent microgrid control device suitable for oil and gas field well site according to claim 1, characterized in that: The grid-connected electric energy meter measurement unit (1) adopts an electric energy meter, the model of which is DT(S)ZY1277(C)-M.

3. The intelligent microgrid control device suitable for oil and gas field well site according to claim 1 is characterized in that: The multi-function meter monitoring unit (2) adopts a multi-function meter, model PD194Z-AC.

4. The intelligent microgrid control device suitable for oil and gas field well site according to claim 1, characterized in that: A plurality of the inverter monitoring units (3) are arranged in parallel, and the collected working data include: AC and DC side voltage and current, AC side active power, reactive power, power factor, inverter temperature, daily power generation, monthly power generation, annual power generation, cumulative power generation, and the maximum active and reactive output range of the inverter.

5. The intelligent microgrid control device suitable for oil and gas field well site according to claim 1, characterized in that: The intelligent gateway (5) is connected to the multi-function meter monitoring unit (2), the inverter monitoring unit (3) and the grid-connected circuit breaker protection measurement and control unit (4) using an RS485 cable (8).

6. The intelligent microgrid control device suitable for oil and gas field well site according to claim 5, characterized in that: The intelligent gateway (5) is connected to the switch (6) via a network cable (9).

7. The intelligent microgrid control device suitable for oil and gas field well site according to claim 6, characterized in that: The control center (7) is connected to the switch (6) via a network cable (9) and is connected to the intelligent gateway (5) via wifi.

8. The intelligent microgrid control device suitable for oil and gas field well site according to claim 7, characterized in that: It also includes a control cabinet (11) and a wire clamp (12), wherein the grid-connected electric energy meter measurement unit (1), the multi-function meter monitoring unit (2), a plurality of inverter monitoring units (3), a grid-connected circuit breaker protection measurement and control unit (4), an intelligent gateway (5) and a switch (6) are all installed in the control cabinet (11); The wire clamp (12) is used to install the RS485 cable (8) and the network cable (9).

9. The intelligent microgrid control device suitable for oil and gas field well site according to claim 8, characterized in that: The wire clamp (12) comprises a base (1201) and a jacket (1202); The base (1201) is fixed on the inner surface of the control cabinet (11), and the jacket (1202) is fixed on the base (1201) and is in an open ring structure, and is used to fix the RS485 cable (8) and the network cable (9).

10. The intelligent microgrid control device suitable for oil and gas field well site according to claim 9, characterized in that: A fastening pin (1204) is slidably provided at one end of the jacket (1202), wherein the upper end of the fastening pin (1204) is an external hexagonal knob and the lower end is a waist-shaped pin head (1206); A metal sheet (1203) is also provided on one end surface of the jacket (1202) for mounting the fastening pin (1204), the fastening pin (1204) and the metal sheet (1203) are slidably matched, and a spring (1205) is provided between the metal sheet (1203) and the external hexagonal knob; A columnar fastening groove (1208) is provided in the base (1201), a lower friction layer (1209) is provided at the top of the inner surface of the fastening groove (1208), and a guide hole (1207) is provided at the top of the columnar fastening groove (1208), the guide hole (1207) extends to the surface of the base (1201) and is clearance-matched with the pin head (1206); An upper friction layer (1210) is also provided on the lower surface of the pin head (1206).

Citation Information

Cited By

  • An energy management optimization method for coordinated control of molten salt heat storage and battery in an oilfield microgrid

    CN122740247A