AI Technical Summary
In the hot-dip galvanizing process of steel profiles, the amount of water and water temperature of water quenching are difficult to accurately control, resulting in unstable cooling state of steel profiles, prone to bending deformation and poor surface gloss. At the same time, the waste of large amounts of softening water causes waste of water resources.
A steel galvanized water quenching control system was designed, including a water quenching tank, liquid level meter, thermometer, water inlet and return water pipes, spray system and circulation pump. The water volume and water temperature are automatically adjusted through the PLC control system to achieve water Recycling.
The accurate control of the amount of erosion and soaking water and water temperature is achieved, water resources are saved, and the quality of the water quenching process after steel plating is improved through two water cooling and cooling.
Smart Images

Figure CN222024456U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a galvanized steel water quenching control system, belonging to the technical field of galvanized steel water quenching treatment equipment in the metallurgical industry. Background Art
[0002] In the production process of hot-dip galvanizing of steel, water quenching is a common way to cool the plated steel. The plated steel is immersed in the water quenching tank through a conveyor chain, and the steel is flushed or soaked with a large amount of pure softened water to complete the heat exchange, so that the steel at about 370° is quickly cooled to 40-50°. This single water quenching method of flushing or soaking has the following defects:
[0003] (1) The process parameters such as the amount of water and water temperature for flushing and soaking are manually operated, and the operators mostly operate based on their previous experience. The process parameters such as the amount of water and water temperature for flushing and soaking are difficult to control, and the cooling state of the steel is not easy to track and detect, which can easily cause quality problems such as bending and deformation of the steel during the water quenching process and poor surface gloss;
[0004] (2) Large amounts of softened water from flushing or soaking are often treated as industrial wastewater, resulting in a waste of water resources. Utility Model Content
[0005] The utility model aims to provide a galvanized steel water quenching control system, which can realize accurate control of flushing and soaking water volume and water temperature, and recycle water, thus saving water resources and solving the problems existing in the background technology.
[0006] The technical solution of the utility model is:
[0007] A galvanized steel water quenching control system comprises a water quenching tank and a water quenching tank moving chain inlet and a water quenching tank moving chain outlet arranged on both sides of the water quenching tank. The composition also comprises a water quenching tank water inlet pipe, a water quenching tank return pipe, a water quenching tank spray pipe, a spray box return pipe and a spray water tank. The water quenching tank is provided with a water quenching tank level gauge and a water quenching tank thermometer. A water quenching tank water inlet regulating valve is installed on the water quenching tank water inlet pipe, and a water quenching tank return valve and a water quenching tank return pump are installed on the water quenching tank return pipe; one end of the water quenching tank spray pipe is arranged in the water quenching tank, and the other end of the water quenching tank spray pipe is provided with a spray head, the water spraying direction of the spray head is toward the steel in front of the water quenching tank moving chain inlet, a water collecting tank and a spray water tank are arranged below the spray head, one end of the spray box return pipe is connected to the spray water tank, and the other end of the spray box return pipe is arranged in the water quenching tank.
[0008] A spray pump is installed on the water quenching tank spray pipe, and a spray water tank return valve and a spray water tank return pump are installed on the spray box return pipe.
[0009] The spray water tank is provided with a spray tank liquid level gauge.
[0010] The spray water tank is located below the water collecting tank.
[0011] The beneficial effects of the utility model are: accurate control of flushing and soaking water volume and water temperature can be achieved, and water can be recycled to save water resources; in addition, the steel section is cooled by water twice, which improves the water quenching process quality of the steel section after plating. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the utility model;
[0013] Figure 2 This is the control system block diagram of the utility model;
[0014] In the figure: water quenching tank 1, water quenching tank moving chain inlet 2, water quenching tank moving chain outlet 3, water quenching tank water inlet regulating valve 4, water quenching tank level gauge 5, water quenching tank thermometer 6, water quenching tank return valve 7, water quenching tank return pump 8, spray pump 9, non-contact infrared temperature sensor 10, spray head 11, water collecting tank 12, spray box level gauge 13, spray water tank 14, spray water tank return valve 15, spray water tank return pump 16, host computer 17, water quenching control PLC 18, water quenching tank heater 19, steel surface infrared thermometer 20. DETAILED DESCRIPTION
[0015] The present invention will be further described below by way of examples with reference to the accompanying drawings.
[0016] See attached Figure 1 , 2 , a galvanized steel water quenching control system, comprising a water quenching tank 1 and a water quenching tank moving chain inlet 2 and a water quenching tank moving chain outlet 3 arranged on both sides of the water quenching tank 1, the composition also includes a water quenching tank water inlet pipe, a water quenching tank return pipe, a water quenching tank spray pipe, a spray box return pipe and a spray water tank 14, the water quenching tank 1 is provided with a water quenching tank level meter 5 and a water quenching tank thermometer 6, a water quenching tank water inlet regulating valve 4 is installed on the water quenching tank water inlet pipe, and a water quenching tank return valve 7 and a water quenching tank return pump 8 are installed on the water quenching tank return pipe; one end of the water quenching tank spray pipe is arranged in the water quenching tank 1, and the other end of the water quenching tank spray pipe is provided with a spray head 11, the water spraying direction of the spray head 11 is toward the steel in front of the water quenching tank moving chain inlet 2, a water collecting tank 12 and a spray water tank 14 are arranged below the spray head 11, one end of the spray box return pipe is connected to the spray water tank 14, and the other end of the spray box return pipe is arranged in the water quenching tank 1.
[0017] In this example, refer to the attached Figure 1The spray head 11 is installed at the engine roller table at the zinc pot outlet to spray and cool the steel sections entering the water quenching tank moving chain inlet 2. A spray pump 9 is installed on the water quenching tank spray pipe. A spray water tank return valve 15 and a spray water tank return pump 16 are installed on the spray box return pipe. The spray water tank 14 is provided with a spray box liquid level meter 13. The spray water tank 14 is located below the water collecting tank 12.
[0018] 1. The spray control method is as follows:
[0019] Step A1, the water quenching PLC system receives the steel tapping signal sent by the galvanizing machine for the first time;
[0020] Step A2, spray pump 9 starts;
[0021] Step A3, detecting the surface temperature of the steel section by an infrared thermometer;
[0022] Step A4: The water quenching PLC controller compares the collected temperature value with the set value and automatically adjusts the output frequency according to the preset value of the spray frequency conversion. If the deviation exceeds 10°, the frequency is adjusted by 3%.
[0023] Step A5: The water quenching PLC system receives a stop signal from the galvanizing machine.
[0024] Step A6: The spray pump 9 stops automatically.
[0025] 2. The spray water tank level control method is as follows:
[0026] Step B1, the cooling water sprayed from the spray head cools the steel section and then enters the spray water tank 14 through the water collecting tank 12;
[0027] Step B2, the spray water tank 14 reaches a preset water level;
[0028] Step B3, the spray water tank return water pump 16 is started, and the water quenching PLC controller performs PI adjustment on the spray water return pump variable frequency output according to the spray water tank liquid level.
[0029] 3. Water quenching tank level control method:
[0030] Step C1, the electric regulating valve of the water inlet pipe of the water quenching tank is opened, and pure softened water from the water production station is injected into the water quenching tank;
[0031] Step C2: When the liquid level in the water quenching tank reaches the target liquid level, the electric valve is closed;
[0032] Step C3, spraying and heating of the water quenching tank cause liquid level fluctuation;
[0033] Step C4-1, when the liquid level in the water quenching tank is higher than the upper limit of the liquid level, the water quenching tank return water pump is started and operates at a preset frequency, and the return water is transported back to the water treatment station;
[0034] Step C4-2, when the liquid level of the water quenching tank is lower than the lower limit of the liquid level, the electric regulating valve of the water quenching tank water inlet pipe is opened, and the opening of the regulating valve is self-adjusted according to the liquid level;
[0035] Step C5: When the liquid level in the water quenching tank reaches the target liquid level, the electric valve is closed.
[0036] 4. Water quenching tank temperature control method:
[0037] Step D1-1: When the temperature of the water quenching tank is lower than the lower limit temperature value, the heater operates; when the temperature reaches the target value, the heater stops operating.
[0038] Step D1-2: When the temperature of the water quenching tank is higher than the upper limit temperature, the water quenching tank return pump starts and runs at a preset frequency. At this time, step C4-2 will be executed. When the temperature reaches the target value through water circulation, the water quenching tank return pump stops running.
[0039] The galvanized steel water quenching system completes the first cooling of the steel through the spray head installed at the engine roller of the zinc pot outlet. The steel is then transferred to the water quenching tank by the transfer chain and completed the second cooling in the water quenching tank. This system fully recycles water and saves water resources. The steel is cooled by water twice, which improves the quality of the water quenching process after the steel is plated.
Claims
1. A galvanized steel water quenching control system, comprising a water quenching tank (1) and a water quenching tank moving chain inlet (2) and a water quenching tank moving chain outlet (3) arranged on both sides of the water quenching tank (1), characterized in that: The composition also includes a water quenching tank inlet pipe, a water quenching tank return pipe, a water quenching tank spray pipe, a spray box return pipe and a spray water tank (14). The water quenching tank (1) is provided with a water quenching tank level meter (5) and a water quenching tank thermometer (6). The water quenching tank inlet pipe is installed with a water quenching tank water inlet regulating valve (4), and the water quenching tank return pipe is installed with a water quenching tank return valve (7) and a water quenching tank return pump (8). One end of the water quenching tank spray pipe is arranged in the water quenching tank (1), and the other end of the water quenching tank spray pipe is provided with a spray head (11). The spray head (11) sprays water in a direction toward the steel section in front of the water quenching tank moving chain inlet (2). A water collecting tank (12) and a spray water tank (14) are provided below the spray head (11). One end of the spray box return pipe is connected to the spray water tank (14), and the other end of the spray box return pipe is arranged in the water quenching tank (1).
2. A galvanized steel water quenching control system according to claim 1, characterized in that: A spray pump (9) is installed on the water quenching tank spray pipe, and a spray water tank return valve (15) and a spray water tank return pump (16) are installed on the spray tank return pipe.
3. A galvanized steel water quenching control system according to claim 1 or 2, characterized in that: The spray water tank (14) is provided with a spray tank liquid level meter (13).
4. A galvanized steel water quenching control system according to claim 1, characterized in that: The spray water tank (14) is located below the water collecting tank (12).