Height-adjustable arch bridge suspender arch end tensioning operation platform

By designing an adjustable height-adjustable arch bridge suspension rod arch end tensioning operation platform, the telescopic chord and bolt components are used to achieve rapid assembly and disassembly, solving the problems of inconvenient installation and disassembly, excessive steel use and insufficient safety of traditional platforms, and improving construction efficiency and security.

CN222024894UActive Publication Date: 2024-11-19CCCC SECOND HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420289953.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-08
Publication Date
2024-11-19
Estimated Expiration
2034-02-08

AI Technical Summary

Technical Problem

In the construction of arch bridges, traditional temporary tensioning operation platforms have problems such as poor installation and disassembly convenience, unadjustable height of the operation platform, high amount of steel used for temporary components, poor turnover and insufficient safety guarantees.

Method used

An adjustable height arch bridge suspension rod arch end tensioning working platform including lower telescopic chord, upper telescopic chord, operating table and arc-shaped connecting plate is designed to enable rapid assembly through removable telescopic chord and bolt assembly. and disassembly, suitable for boom tensioning operations at different arcs of arch ribs, and guardrails are set on the operating platen to ensure the safety of construction personnel.

Benefits of technology

It realizes flexible height adjustment of the working platform, improves turnover and reliability, reduces the amount of steel used in temporary components, ensures the safety of construction workers, is suitable for boom tensioning operations with different arch rib arcs, and improves the platform's Stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222024894U_ABST
    Figure CN222024894U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of arch bridge construction equipment, and particularly relates to a height-adjustable arch bridge suspender arch end tensioning operation platform. The device comprises a lower telescopic chord member, an upper telescopic chord member, an operation bedplate and an arc-shaped connecting plate, the two arc-shaped connecting plates are vertically arranged above and below the tensioning position of the arch rib suspender correspondingly. The inner side surfaces of the two arc-shaped connecting plates are respectively connected with two detachable lower telescopic chord members and two detachable upper telescopic chord members; and the top ends of the lower telescopic chord member and the upper telescopic chord member are connected with an operation table plate. The height of the working platform can be flexibly adjusted through the lower telescopic chord member and the upper telescopic chord member, and rapid assembly and disassembly can be achieved through the bolt assembly. The suspender tensioning device is suitable for suspender tensioning operation at different arch rib radian positions, has the advantages of being high in turnover performance, saving steel consumption of temporary components and being high in reliability, and can guarantee walking safety of constructors and safety of suspender tensioning operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of arch bridge construction equipment, and in particular relates to an arch end tensioning operation platform of an arch bridge suspender rod with adjustable height. Background Art

[0002] Arch bridges are widely used in mountainous areas and municipal bridge construction due to their advantages such as clear force transmission path, reasonable force, large bearing capacity, strong spanning capacity, beautiful shape, and good environmental coordination. Among them, the hangers of mid- and bottom-supported arch bridges are important components that transfer the load on the main beam to the arch rib to form an overall force system.

[0003] The tensioning of the hangers is a core step in the construction of arch bridges. Since tensioning the hangers at the bottom of the main beam is inconvenient and interferes with traffic under the bridge, it is often designed to be tensioned at the end of the arch rib. Since the end of the arch rib is a continuous arc, a temporary tensioning work platform needs to be built during the tensioning operation. Traditional temporary tensioning work platforms generally weld angle steel components directly at the anchor points of each hanger on the arch rib to form a triangular support truss, and construction workers complete tensioning and debugging operations on the support truss.

[0004] The traditional temporary tensioning work platform has the following main drawbacks: first, the angle steel components and the angle steel components and the arch ribs are connected by full welding, which makes installation and disassembly difficult, and the arch ribs have many welding joints and a large amount of work to remove; second, the height of the work platform cannot be flexibly adjusted, and each tensioning end occupies an work platform. The temporary components use a lot of steel and have poor turnover; third, the supporting trusses have no human-assisted cantilever, the working surface is narrow, and safety is poor. Utility Model Content

[0005] The utility model provides an arch bridge hanger arch end tensioning work platform with adjustable height, and its purpose is to provide a work platform that can flexibly adjust the height of the work platform and can realize rapid assembly and disassembly; its purpose is to provide a work platform that can be suitable for hanger tensioning operations at different arch rib curvatures, has strong turnover, saves on the amount of steel used for temporary components, and has good work surface safety and high reliability.

[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0007] A height-adjustable arch bridge boom arch end tensioning work platform comprises a lower telescopic chord, an upper telescopic chord, an operating table and an arc-shaped connecting plate; two arc-shaped connecting plates are provided; the two arc-shaped connecting plates are vertically and parallelly arranged, and the inner sides of the two arc-shaped connecting plates are respectively connected with two detachable lower telescopic chords and two upper telescopic chords; the top ends of the lower telescopic chord and the upper telescopic chord are connected with the operating table.

[0008] The operating table includes a longitudinal horizontal connecting rod, a transverse horizontal connecting rod, a pedestrian cantilever and a cantilever connecting piece; the longitudinal horizontal connecting rod and the transverse horizontal connecting rod are respectively provided with two, and the two longitudinal horizontal connecting rods and the two transverse horizontal connecting rods are detachably connected to form a rectangular frame; there are multiple cantilever connecting pieces; the multiple cantilever connecting pieces are connected to the inner side of the rectangular frame and are perpendicular to the connected longitudinal horizontal connecting rods or transverse horizontal connecting rods; the upper surfaces of the cantilever connecting piece, the two longitudinal horizontal connecting rods and the two transverse horizontal connecting rods are flush; the pedestrian cantilever is connected to the upper surface of the cantilever connecting piece.

[0009] The longitudinal horizontal connecting rod and the transverse horizontal connecting rod are both made of rectangular steel pipes; the cantilever connecting piece is made of channel steel, and the pedestrian cantilever plate is made of aluminum alloy decking.

[0010] Both ends of the longitudinal horizontal connecting rod and the transverse horizontal connecting rod are respectively provided with connecting holes.

[0011] The operating table is surrounded by guardrails, and an entry and exit door is arranged on the guardrails.

[0012] The arc-shaped connecting plate is a rectangular plate, and one of its long sides is provided with an arc-shaped groove that matches the arc shape of the upper surface of the arch rib on the arch bridge.

[0013] The lower telescopic chord and the upper telescopic chord are both made of rectangular steel pipes; the two lower telescopic chords and the two upper telescopic chords are symmetrically connected to the two sides of each vertically placed arc-shaped connecting plate; the lower telescopic chord and the upper telescopic chord can be freely adjusted in length.

[0014] The lower telescopic chord and the upper telescopic chord are respectively composed of multiple tubes with different outer diameters; the tube with a smaller outer diameter is sleeved in the tube with a larger outer diameter; the upper and lower ends of each tube are horizontally provided with connecting holes; the upper and lower tubes are connected and fixed by bolts.

[0015] The length of each tube section is 50 cm. Beneficial Effects

[0016] (1) The utility model is composed of a lower telescopic chord, an upper telescopic chord, an operating table and an arc-shaped connecting plate. The utility model can not only flexibly adjust the height of the working platform through the lower telescopic chord and the upper telescopic chord, but also realize rapid assembly and disassembly through the bolt assembly; the utility model is suitable for the tensioning operation of the suspender at different arch rib curvatures.

[0017] (2) The utility model has strong turnover, saves steel for temporary components and has high reliability.

[0018] (3) The utility model provides guardrails around the operating table to ensure the safety of construction workers while walking and working.

[0019] (4) The arc-shaped connecting plate of the utility model adopts a rectangular plate structure with an arc-shaped groove on one long side that matches the arc shape of the upper surface of the arch rib on the arch bridge, so that it can be closely attached to the surface of the arch rib, making it more stable.

[0020] (5) The lower telescopic chord and the upper telescopic chord of the utility model are designed as telescopic rods, and the lengths of the lower telescopic chord and the upper telescopic chord can be freely adjusted to facilitate the tensioning operation and can adapt to the arc position of different arch rib hanger tensioning locations.

[0021] (6) The utility model is provided with a pedestrian overhanging plate, on which construction operations such as jack installation, suspension rod tensioning and nut anchor assembly installation can be carried out. At the same time, small construction tools can be placed on the pedestrian overhanging plate, so that the working surface is wider.

[0022] The above description is only an overview of the technical solution of the utility model. In order to more clearly understand the technical means of the utility model and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the utility model in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 It is an application schematic diagram of the utility model.

[0025] Figure 2 It is a schematic diagram of the elevation layout of the utility model.

[0026] Figure 3 for Figure 2 Middle AA section view;

[0027] Figure 4 for Figure 2 Middle BB section view.

[0028] In the figure: 1. arch rib; 2. arch foot; 3. main beam; 4. hanger; 5. main beam cable guide; 6. arch rib cable guide; 7. arch rib anchor leveling block; 8. tensioning work platform assembly; 9. nut anchor assembly; 8-1. lower telescopic chord; 8-2. upper telescopic chord; 8-3. longitudinal horizontal connecting rod; 8-4. transverse horizontal connecting rod; 8-5. arc connecting plate; 8-6. bolt assembly; 8-7. pedestrian cantilever board; 8-8. cantilever connector. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Embodiment 1

[0030] according to Figure 1-Figure 4 The shown embodiment shows an adjustable height arch bridge hanger arch end tensioning work platform, comprising a lower telescopic chord 8-1, an upper telescopic chord 8-2, an operating table and an arc-shaped connecting plate 8-5; two arc-shaped connecting plates 8-5 are provided; the two arc-shaped connecting plates 8-5 are vertically and parallelly arranged above and below the arch rib hanger tensioning position, and the inner sides of the two arc-shaped connecting plates 8-5 are respectively connected with two detachable lower telescopic chords 8-1 and two upper telescopic chords 8-2; the top ends of the lower telescopic chord 8-1 and the upper telescopic chord 8-2 are connected with an operating table.

[0031] The utility model is applied to the tensioning construction of arch bridge hangers at the arch ends in actual use. The specific use is as follows:

[0032] Cast the main beam 3 concrete and pre-embed the main beam cable guide 5, install the arch rib 1 segment and cast the arch foot 2 with concrete, install the hanger 4 through the main beam cable guide 5 below and anchor it at the bottom of the main beam 3, pass through the arch rib cable guide 6 above and anchor it on the arch rib anchor leveling block 7 through the nut anchor assembly 9, and complete the preparation work before the hanger tensioning operation. At the appropriate positions on the arch rib 1 above and below the arch rib anchor leveling block 7, vertically weld the arc connecting plate 8-5 respectively, so that the arc connecting plate 8-5 is tightly attached to the surface of the arch rib 1. Install the lower telescopic chord 8-1 on the inner side of the arc connecting plate 8-5 below the arch rib anchor leveling block 7, and install the upper telescopic chord 8-2 on the inner side of the arc connecting plate 8-5 above the arch rib anchor leveling block 7; the connection between the lower telescopic chord 8-1 and the upper telescopic chord 8-2 and the upper and lower arc connecting plates 8-5 is carried out by the bolt assembly 8-6 of the prior art. Adjust the length of the lower telescopic chord 8-1 and the upper telescopic chord 8-2 to place them at a suitable height and keep the tops of the two at the same horizontal plane; connect the operating table to the lower telescopic chord 8-1 and the upper telescopic chord 8-2 through the bolt assembly 8-6, and after the installation of the tensioning work platform assembly 8 is completed, the boom tensioning construction work can be carried out. When the boom tensioning construction work is completed, if the tensioning platform assembly 8 needs to be disassembled, it can be carried out in the reverse order of the above-mentioned installation method.

[0033] The tensioning operation platform assembly 8 can be circulated and utilized. According to the requirement of synchronously tensioning the suspenders 4 of the upstream and downstream arch ribs 1, arc-shaped connecting plates 8-5 are welded at the tensioning ends of each arch rib. Only two sets of tensioning operation platform assemblies 8 are needed to complete the tensioning operation of the suspenders 4 of the entire bridge.

[0034] The utility model can not only flexibly adjust the height of the working platform through the lower telescopic chord and the upper telescopic chord, but also realize rapid assembly and disassembly through the bolt assembly; the utility model is suitable for the tensioning operation of the suspender at different arch rib curvatures. The utility model has strong turnover, saves steel for temporary components, and has high reliability. Embodiment 2

[0035] according to Figure 1-Figure 4 The shown arch bridge boom arch end tensioning work platform with adjustable height is different from the embodiment 1 in that: the operating platform includes a longitudinal horizontal connecting rod 8-3, a transverse horizontal connecting rod 8-4, a pedestrian cantilever board 8-7 and a cantilever connector 8-8; the longitudinal horizontal connecting rod 8-3 and the transverse horizontal connecting rod 8-4 are respectively provided with two, and the two longitudinal horizontal connecting rods 8-3 and the two transverse horizontal connecting rods 8-4 are detachably connected to form a rectangular frame; the cantilever connector 8-8 is provided with multiple; multiple cantilever connectors 8-8 are connected to the inner side of the rectangular frame and are perpendicular to the connected longitudinal horizontal connecting rod 8-3 or transverse horizontal connecting rod 8-4; the upper surfaces of the cantilever connector 8-8, the two longitudinal horizontal connecting rods 8-3 and the two transverse horizontal connecting rods 8-4 are flush; the pedestrian cantilever board 8-7 is connected to the upper surface of the cantilever connector 8-8.

[0036] Furthermore, the longitudinal horizontal connecting rod 8-3 and the transverse horizontal connecting rod 8-4 are both made of rectangular steel pipes; the cantilever connector 8-8 is made of channel steel, and the pedestrian cantilever plate 8-7 is made of aluminum alloy decking.

[0037] Furthermore, both ends of the longitudinal horizontal connecting rod 8-3 and the transverse horizontal connecting rod 8-4 are respectively provided with connecting holes.

[0038] Furthermore, guardrails are arranged around the operating table, and entrance doors are arranged on the guardrails.

[0039] In actual use, after the height of the lower telescopic chord 8-1 and the upper telescopic chord 8-2 are installed and adjusted, the longitudinal horizontal connecting rod 8-3 and the transverse horizontal connecting rod 8-4 are connected to the top of the lower telescopic chord 8-1 and the upper telescopic chord 8-2 through the bolt assembly 8-6; then, the cantilever connector 8-8 is installed on the longitudinal horizontal connecting rod 8-3 and the transverse horizontal connecting rod 8-4, and finally the pedestrian cantilever board 8-7 is firmly installed above the cantilever connector 8-8. After the installation of the tensioning work platform assembly 8 is completed, the suspension rod tensioning construction work can be carried out.

[0040] The utility model is designed with a pedestrian overhanging plate, on which construction operations such as jack installation, suspension rod tensioning and nut anchor assembly installation can be carried out, and small construction tools can be placed on the pedestrian overhanging plate, so that the working surface is wider.

[0041] The utility model arranges guardrails and inlet and outlet doors around the operating table to ensure the safety of construction workers walking and working.

[0042] The technical solution that the longitudinal horizontal connecting rod 8-3 and the transverse horizontal connecting rod 8-4 are made of rectangular steel pipes, the cantilever connecting piece 8-8 is made of channel steel, and the pedestrian cantilever plate 8-7 is made of aluminum alloy decking makes the implementation of the utility model simple, the material acquisition is convenient, and the cost is low. Embodiment 3

[0043] according to Figure 2 and Figure 3 The shown arch end tensioning work platform with adjustable height of an arch bridge boom is different from the first embodiment in that the arc connecting plate 8-5 is a rectangular plate, and an arc groove matching the arc shape of the upper surface of the arch rib on the arch bridge is opened on one of its long sides.

[0044] In actual use, the arc-shaped connecting plate 8-5 adopts the above technical solution, so that it can be closely attached to the surface of the arch rib, making the stability of the overall platform better. Embodiment 4

[0045] according to Figure 2 and Figure 3 The shown arch end tensioning work platform for an arch bridge hanger with adjustable height is different from the first embodiment in that: the lower telescopic chord 8-1 and the upper telescopic chord 8-2 are both made of rectangular steel pipes; the two lower telescopic chords 8-1 and the two upper telescopic chords 8-2 are symmetrically connected to the two side edges of each vertically placed arc-shaped connecting plate 8-5; the lower telescopic chord 8-1 and the upper telescopic chord 8-2 can freely adjust the length.

[0046] Furthermore, the lower telescopic chord 8-1 and the upper telescopic chord 8-2 are respectively composed of multiple tubes with different outer diameters; the tube with a smaller outer diameter is sleeved inside the tube with a larger outer diameter; each tube section has connecting holes horizontally opened at both ends; the upper and lower tube sections are fixed by bolts.

[0047] In actual use, the lower telescopic chord 8-1 and the upper telescopic chord 8-2 are both made of rectangular steel pipes, which are easy to obtain and have low cost.

[0048] The lower telescopic chord 8-1 and the upper telescopic chord 8-2 adopt an adjustable telescopic structure, and the length of the lower telescopic chord and the upper telescopic chord can be freely adjusted to facilitate the leveling of the operating table, thereby facilitating the tensioning operation and adapting to the arc position of different arch rib hanger tensioning locations. Embodiment 5

[0049] according to Figure 2 and Figure 3 The height-adjustable arch bridge hanger arch end tensioning work platform shown is different from the fourth embodiment in that the length of each tube section is 50 cm.

[0050] In actual use, the length of each pipe section adopts a technical solution of 50cm, which is conducive to flexible adjustment of the height of the working platform and facilitates the turnover and storage of materials.

[0051] In the absence of conflicts, technicians in this field can combine the relevant technical features in the above examples according to actual conditions to achieve corresponding technical effects. The specific combinations are not described here one by one.

[0052] It should be noted that all directional indications (such as up, down, left, right, front, back...) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the various components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0053] In addition, the descriptions of "first", "second", etc. in the present invention are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.

[0054] The above is only a preferred embodiment of the utility model. The utility model will not be limited to these embodiments shown in this article, but should conform to the widest range consistent with the principles and novel features disclosed in this article. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the utility model still fall within the scope of the technical solution of the utility model.

Claims

1. A height-adjustable arch bridge suspender arch end tensioning work platform, characterized in that: The invention comprises a lower telescopic chord rod (8-1), an upper telescopic chord rod (8-2), an operating table and an arc-shaped connecting plate (8-5); two arc-shaped connecting plates (8-5) are provided; the two arc-shaped connecting plates (8-5) are arranged vertically and in parallel, and the inner sides of the two arc-shaped connecting plates (8-5) are respectively connected to two detachable lower telescopic chord rods (8-1) and two upper telescopic chord rods (8-2); the top ends of the lower telescopic chord rod (8-1) and the upper telescopic chord rod (8-2) are connected to the operating table.

2. The height-adjustable arch bridge suspender arch end tensioning work platform according to claim 1, characterized in that: The operating table comprises a longitudinal horizontal connecting rod (8-3), a transverse horizontal connecting rod (8-4), a pedestrian cantilever plate (8-7) and a cantilever connecting member (8-8); two longitudinal horizontal connecting rods (8-3) and two transverse horizontal connecting rods (8-4) are respectively provided, and the two longitudinal horizontal connecting rods (8-3) and the two transverse horizontal connecting rods (8-4) are detachably connected to form a rectangular frame; a plurality of cantilever connecting members (8-8) are provided; the plurality of cantilever connecting members (8-8) are connected to the inner side of the rectangular frame and are perpendicular to the connected longitudinal horizontal connecting rod (8-3) or transverse horizontal connecting rod (8-4); the upper surfaces of the cantilever connecting member (8-8), the two longitudinal horizontal connecting rods (8-3) and the two transverse horizontal connecting rods (8-4) are flush; the pedestrian cantilever plate (8-7) is connected to the upper surface of the cantilever connecting member (8-8).

3. The height-adjustable arch bridge suspender arch end tensioning work platform as claimed in claim 2, characterized in that: The longitudinal horizontal connecting rod (8-3) and the transverse horizontal connecting rod (8-4) are both made of rectangular steel pipes; the cantilever connecting piece (8-8) is made of channel steel, and the pedestrian cantilever plate (8-7) is made of aluminum alloy decking.

4. The height-adjustable arch bridge suspender arch end tensioning work platform according to claim 2 or 3, characterized in that: Both ends of the longitudinal horizontal connecting rod (8-3) and the transverse horizontal connecting rod (8-4) are respectively provided with connecting holes.

5. The height-adjustable arch bridge suspender arch end tensioning work platform according to claim 1 or 2, characterized in that: The operating table is surrounded by guardrails, and an entry and exit door is arranged on the guardrails.

6. The height-adjustable arch bridge suspender arch end tensioning work platform according to claim 1, characterized in that: The arc-shaped connecting plate (8-5) is a rectangular plate, and one of its long sides is provided with an arc-shaped groove that matches the arc shape of the upper surface of the arch rib on the arch bridge.

7. The height-adjustable arch bridge suspender arch end tensioning work platform according to claim 1, characterized in that: The lower telescopic chord (8-1) and the upper telescopic chord (8-2) are both made of rectangular steel pipes; the two lower telescopic chords (8-1) and the two upper telescopic chords (8-2) are symmetrically connected to the inner side of each vertically placed arc-shaped connecting plate (8-5); the lower telescopic chord (8-1) and the upper telescopic chord (8-2) are freely adjustable in length.

8. The height-adjustable arch bridge suspender arch end tensioning work platform according to claim 7, characterized in that: The lower telescopic chord (8-1) and the upper telescopic chord (8-2) are respectively composed of multiple tubes with different outer diameters; the tube with a smaller outer diameter is sleeved inside the tube with a larger outer diameter; the upper and lower ends of each tube are horizontally provided with connecting holes; and the upper and lower tubes are connected and fixed by bolts.

9. The height-adjustable arch bridge suspender arch end tensioning work platform according to claim 8, characterized in that: The length of each tube section is 50 cm.