Lateral beam feeding structure of full trestle matched with bridge girder erection machine for long-piled wharf beam slab installation

By adopting a full trench and a lateral beam feeding structure in the construction of high pile docks, the accuracy and efficiency of beam slab installation and prefabricated components installation under the influence of sea conditions are solved, and a more efficient and safer construction process is achieved.

CN222024902UActive Publication Date: 2024-11-19CCCC FOURTH HARBOR ENG CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420632576.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-11-19
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

During the construction of a high pile dock, the installation of beam slabs is affected by sea conditions such as operation water depth, wind waves, tides, etc., making the installation accuracy difficult to control. The installation of prefabricated components is limited by sea conditions and beam transport conditions, making it difficult to improve installation efficiency and reduce construction risks .

Method used

The lateral beam feeding structure of the full trench bridge and bridge staircase is adopted, and the lateral beam feeding structure is connected to the dock working platform section through the guide bridge structure section. The full trench bridge section and bridge staircase are set up to realize lateral beam feeding, reduce the impact of sea conditions, and improve installation accuracy and efficiency.

Benefits of technology

Through the full trest bridge and the lateral beam feeding structure of the bridge staircase, the impact of sea conditions on the installation of prefabricated components is reduced, the installation accuracy and efficiency are improved, and the construction risks and costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222024902U_ABST
    Figure CN222024902U_ABST
Patent Text Reader

Abstract

The utility model discloses a lateral beam feeding structure of a full trestle matched with a bridge girder erection machine for mounting long-piled wharf beams and slabs, which can reduce the influence of sea conditions such as operation water depth, stormy waves, tides and the like, improve the mounting precision and the mounting efficiency of long-piled wharf prefabricated parts and reduce the construction risk and the construction cost. The lateral beam feeding structure comprises an approach bridge structure section, a wharf working platform section, a full trestle section and the bridge erecting machine used for lateral beam feeding, the wharf working platform section is connected with the land through the approach bridge structure section, the full trestle section is arranged on one side of the approach bridge structure section, and the bridge erecting machine is arranged on the wharf working platform section. The bridge erecting machine extends from the approach bridge structure section to the wharf working platform section and extends in the length direction of the wharf working platform section, part of the bridge erecting machine is arranged on the full trestle section, and part of the bridge erecting machine is arranged on the approach bridge structure section and / or the wharf working platform section.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wharf engineering, in particular to a full-trestle bridge coordinated with a bridge erecting machine lateral beam feeding structure for installing beams and slabs of a high-pile wharf. Background Art

[0002] With the continuous in-depth development of port terminal projects and the diversified development of high-pile beam and slab design, more and more high-pile terminal beam and slab designs and constructions have emerged. The installation quality of the beam and slab of the high-pile terminal is crucial to the construction quality and normal operation of the high-pile terminal. During the construction of the high-pile terminal, the beam and slab installation is usually carried out on the water by cooperating with crane ships and barges. This installation method will be affected by the operating water depth, wind and waves, tides and other sea conditions, and the construction window period is limited. In the case of strong winds and waves (wind speed level is not less than level 6, sea condition level is not less than level 4), the installation accuracy of the beam and slab is difficult to control. In the case of low water level in the operating area (water level depth is not more than 3m), it is difficult for crane ships and barges to carry out beam and slab installation operations.

[0003] During the construction of the high-pile wharf, an approach bridge will be set up to connect the wharf working platform with the land. The installation of the wharf working platform and the approach bridge involves the construction of a large number of prefabricated components. The prefabricated components are of many types and heavy (the maximum weight is 60t). The installation of prefabricated components is not only affected by the sea conditions, but also by the conditions for transporting beams and the installation conditions of different types of prefabricated components. How to improve the installation accuracy and efficiency of these prefabricated components and reduce construction risks is an urgent problem to be solved during the construction of the high-pile wharf. Utility Model Content

[0004] At least one of the purposes of the present utility model is to provide a full trestle bridge in cooperation with a lateral beam feeding structure of a bridge erecting machine for installing beams and slabs of a high-pile wharf, in order to overcome the problems existing in the above-mentioned prior art. By using the full trestle bridge in cooperation with the lateral beam feeding structure of the bridge erecting machine, the influence of sea conditions such as operating water depth, wind and waves, and tides can be reduced, the installation accuracy and efficiency of prefabricated components of the high-pile wharf can be improved, and the construction risks and costs can be reduced.

[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model includes the following aspects.

[0006] A full trestles and a bridge erecting machine for lateral beam feeding structure for installation of beams and slabs of high-pile docks, comprising: an approach bridge structure section, a dock working platform section, a full trestles section and a bridge erecting machine for lateral beam feeding, wherein the dock working platform section is connected to the land via the approach bridge structure section, the full trestles section is arranged on one side of the approach bridge structure section, extends from the approach bridge structure section to the dock working platform section, and extends along the length direction of the dock working platform section, and the bridge erecting machine is partially arranged on the full trestles section and partially arranged on the approach bridge structure section and / or the dock working platform section.

[0007] Preferably, the full trestles section comprises a first full trestles section and a second full trestles section, the first full trestles section is arranged on one side of the approach bridge structure section, the second full trestles section is arranged on the nearshore side of the wharf working platform section, the second full trestles section extends along the length direction of the wharf working platform section, and the first full trestles section is connected to the second full trestles section; the wharf working platform section comprises a working platform, and one or more mooring piers are respectively arranged on both sides of the working platform, and the mooring piers and the mooring piers and the working platform are connected by pedestrian bridges.

[0008] Preferably, the first full-trestle bridge section includes multiple rows of piles extending from land to the working platform, a cast-in-place pile cap is arranged on the top of each row of piles, adjacent piles in each row are connected by a crossbeam, and the crossbeam is arranged on the top of the cast-in-place pile cap. Adjacent rows of piles are connected by longitudinal beams, and the longitudinal beams are arranged on the top of the crossbeams. Between adjacent rows of piles, multiple longitudinal beams are arranged along the length direction of the crossbeams, and composite plates are also arranged between adjacent longitudinal beams. Multiple rows of composite plates are arranged along the length direction of the longitudinal beams, and there is a spacing between adjacent rows of composite plates.

[0009] Preferably, the bridge-building machine includes a main beam, front legs, middle legs, tail legs, a counter-support mechanism, a jacking mechanism, a transverse track, a lifting crane, a longitudinal gantry, a hydraulic system and an electrical system, wherein the transverse tracks are respectively arranged at the bottom of the front legs and the middle legs, and the two transverse tracks are used to be arranged on the tops of two rows of piles, and each of the transverse tracks is partially arranged on the tops of the piles and partially arranged on the entire stack bridge section.

[0010] Preferably, the working platform and the mooring pier form a T-shaped structure.

[0011] Preferably, the lifting trolley is provided with a lifting structure for lifting prefabricated components, the lifting structure is connected to the lifting trolley through one or more groups of steel wire ropes, the lifting structure includes a connecting platform, a lifting pole is provided at the bottom of the connecting platform, a boss is integrally provided on the top of the lifting pole, the boss is provided in the middle of the lifting pole, the boss is connected to the connecting plate at the bottom of the connecting platform, and a plurality of lifting holes are provided in the length direction of the lifting pole, and lifting rods are respectively provided in two of the lifting holes.

[0012] Preferably, a groove is circumferentially provided at the bottom of the boss, and a snap-fit ​​plate perpendicular to the connecting plate is provided at the bottom of the connecting plate, the snap-fit ​​plate is snapped into the groove, and the boss is connected to the connecting plate via a pin.

[0013] Preferably, the cross-sectional shape of the suspension rod is L-shaped, rectangular or triangular.

[0014] Preferably, the full trestles are steel trestles, and the pedestrian bridge is a steel bridge or a prefabricated beam bridge.

[0015] Preferably, the distance between the full trestles section and the approach bridge structure section is 0.8-1.5 m, and the distance between the full trestles section and the wharf working platform section is 0.8-1.5 m.

[0016] In summary, due to the adoption of the above technical solution, the utility model has at least the following beneficial effects:

[0017] By arranging a first full trestle bridge section on one side of the approach bridge structure section and a second full trestle bridge section on the nearshore side of the dock working platform section, the first full trestle bridge section is connected with the second full trestle bridge section, so that the first and second full trestles can cooperate with the bridge erection machine to carry out lateral beam feeding, thereby improving the installation accuracy and flexibility of prefabricated components; during the installation of prefabricated components, there is no need to adopt the method of cooperation between crane ships and barges, thereby reducing the impact of sea conditions, reducing installation risks, and improving installation efficiency.

[0018] The full-trestle bridge section provides a water and land transfer platform for the installation of prefabricated components. The full-trestle bridge section not only facilitates the transportation of prefabricated components, but also allows the position of prefabricated components to be adjusted on the full-trestle bridge section to facilitate the bridge-building machine to install different types of prefabricated components such as beams, longitudinal beams, and composite plates. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the lateral beam feeding structure of a full trestle and a bridge erecting machine for installing beams and slabs of a high-pile wharf according to an exemplary embodiment of the utility model.

[0020] Figure 2 It is an enlarged schematic diagram of the lateral feeding of beams to the working platform section of the wharf by the bridge erecting machine of the exemplary embodiment of the utility model.

[0021] Figure 3 It is a schematic diagram of a bridge erecting machine from another perspective of an exemplary embodiment of the utility model.

[0022] Figure 4 It is a schematic diagram of the hoisting structure of an exemplary embodiment of the utility model.

[0023] Figure 5 It is an enlarged schematic diagram of the connection between the boss and the connecting plate of the lifting structure of the exemplary embodiment of the utility model.

[0024] Figure 6 It is a schematic diagram of the suspension rod structure of the exemplary embodiment of the utility model from another perspective.

[0025] Markings in the figure: 1-approach bridge structure section, 2-wharf working platform section, 21-working platform, 210-pile cap, 211-crossbeam, 212-longitudinal beam, 213-composite plate, 22-mooring pier, 23-footbridge, 3-full-trestle bridge section, 31-first full-trestle bridge section, 32-second full-trestle bridge section, 33-passing platform, 4-bridge erecting machine, 41-main beam, 42-front outrigger, 43-middle outrigger, 44-tail outrigger, 45-counter-support mechanism, 46-transverse track, 47-crane, 48-longitudinal gantry, 5-beam transporter, 6-hoisting structure, 61-connecting platform, 62-hoisting shoulder pole, 63-boss, 64-connecting plate, 65-hoisting hole, 66-hoisting rod, 67-pin shaft. DETAILED DESCRIPTION

[0026] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments to make the purpose, technical solutions and advantages of the present invention more clearly understood. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0027] refer to Figure 1 The full trestles and bridge erecting machine lateral beam feeding structure for high-pile wharf beam and slab installation of the exemplary embodiment of the utility model comprises an approach bridge structure section 1, a wharf working platform section 2, a full trestles section 3 and a bridge erecting machine 4 for lateral beam feeding, wherein the wharf working platform section 2 is connected to the land through the approach bridge structure section 1, the full trestles section 3 is arranged on one side of the approach bridge structure section 1, extends from the approach bridge structure section 1 to the wharf working platform section 2, and extends along the length direction of the wharf working platform section 2, and the bridge erecting machine 4 is partially arranged on the full trestles section 3, and partially arranged on the approach bridge structure section 1 and / or the wharf working platform section 2.

[0028] In the full-bridge cooperating bridge-erecting machine lateral beam feeding structure for high-pile wharf beam and slab installation of the utility model, the full-bridge section 3 provides a water-land platform for the installation of prefabricated components, and the bridge-erecting machine 4 is partially arranged on the full-bridge section 3 and partially arranged on the approach bridge structure section 1 and / or the wharf working platform section 2, which is conducive to ensuring the stability and safety of the bridge-erecting machine 4 during the construction process; the bridge-erecting machine 4 can be horizontally moved from the full-bridge section 3 to the approach bridge structure section 1 and / or the wharf working platform section 2, and ... During the installation of the prefabricated components of section 2, the prefabricated components are transported by the beam transport vehicle to the position of the bridge erecting machine 4 of the full-trestle bridge section 3. After the bridge erecting machine 4 feeds the beams laterally, the bridge erecting machine 4 can move the beams laterally to the preset positions of the approach bridge structure section 1 and / or the wharf working platform section 2 for installation. The installation method of the full-trestle bridge section 3 in conjunction with the bridge erecting machine 4 improves the installation efficiency and installation accuracy of a large number of prefabricated components and reduces the installation risk. Moreover, the installation of prefabricated components does not require the cooperation of barges and crane ships, is less affected by sea conditions, and has low costs.

[0029] The full trestles section 3 is a steel trestles, and the full trestles section 3 is parallel to the approach bridge structure section 1, and the full trestles section 3 is also parallel to the wharf working platform section 2; the full trestles section 3 is parallel to the approach bridge structure section 1 and the wharf working platform section 2, which is conducive to the erection of the bridge erecting machine 4 and ensures the stability of the installation of the bridge erecting machine 4; the distance D between the full trestles section 3 and the approach bridge structure section 1 is 0.8~1.5m, and the distance D between the full trestles section 3 and the wharf working platform section 2 is 0.8~1.5m (reference Figure 2 ), the full trestles section 3 is respectively spaced relatively close to the approach bridge structure section 1 and the wharf working platform section 2, which is beneficial to ensure the stability of the bridge erecting machine 4 during the lateral feeding of the prefabricated components.

[0030] refer to Figure 2 , Figure 3 The bridge erecting machine 4 is a double-beam bridge erecting machine, including a main beam 41, a front support leg 42, a middle support leg 43, a tail support leg 44, a back-up mechanism 45, a jacking mechanism, a transverse track 46, a lifting crane 47, a longitudinal gantry 48, a hydraulic system and an electrical system, wherein the transverse tracks 46 are respectively arranged at the bottom of the front support leg 42 and the middle support leg 43, and the two transverse tracks 46 are used to be arranged on the top of two rows of piles, and each transverse track 46 is partially arranged on the top of the pile and partially arranged on the full stack bridge section, so that the main beam 41 can be moved from the full stack bridge section 3 to the top of the pile to install prefabricated components.

[0031] refer to Figure 1The full-bridge section 3 includes a first full-bridge section 31 and a second full-bridge section 32. The first full-bridge section 31 is arranged on one side of the approach bridge structure section 1, and the second full-bridge section 32 is arranged on the nearshore side of the dock working platform section 2. The second full-bridge section 32 extends along the length direction of the dock working platform section 2, and the first full-bridge section 31 is connected to the second full-bridge section 32. A meeting platform 33 is arranged at the connection position between the first full-bridge section 31 and the second full-bridge section 32 to facilitate meeting on the full-bridge; during application, a meeting platform 33 can also be arranged on the first full-bridge section 31 and / or the second full-bridge section 32 to facilitate meeting on the first full-bridge section 31 or the second full-bridge section 32 to avoid interference from beam transport vehicles or other material transportation devices. In the application process, the width of the full trestle section 3 is preferably 8-10m, and the width of the meeting platform 33 is preferably 12-15m; the elevation of the full trestle section 3 is not greater than the elevation of the pile column of the approach bridge structure section 1, and the elevation of the full trestle section 3 is not greater than the elevation of the pile column of the dock working platform section 2. When other approach bridge structure sections are to be set on the nearshore side of the dock working platform section 21 to connect the dock working platform with the land (or connect the dock working platform with other structures), the full trestle section can also be set on one side of the other approach bridge structure sections to improve the flexibility of the installation of the high-pile dock beam slab. The dock working platform section 2 includes a working platform 21, and one or more mooring piers 22 are respectively set on both sides of the working platform 21. The mooring piers 22 and the mooring piers 22 and the working platform 21 are connected by a pedestrian bridge 23. The pedestrian bridge 23 can be a steel bridge or a prefabricated beam slab bridge.

[0032] The approach bridge structure section 1 includes multiple rows of piles extending from land to the dock working platform section, with a distance between adjacent rows of piles of 16 to 25 m. A cast-in-place pile cap 210 is provided on the top of each row of piles, and adjacent piles in each row are connected by a crossbeam 211, which is a cast-in-place crossbeam or a prefabricated crossbeam. The crossbeam 211 is arranged on the top of the cast-in-place pile cap 210. Adjacent rows of piles are connected by longitudinal beams 212, which are arranged on the top of the crossbeams 211. Between adjacent rows of piles, multiple longitudinal beams 212 are arranged along the length direction of the crossbeams 211, and composite plates 213 are also arranged between adjacent longitudinal beams 212. Multiple rows of composite plates 213 are arranged along the length direction of the longitudinal beams 212, and there is a certain spacing (such as 1 to 5 m) between adjacent rows of composite plates 213.

[0033] The overall shape of the working platform 21 is a rectangular structure, including multiple rows of piles extending from the shore side to the sea side. The distance between adjacent rows of piles is determined according to the construction requirements. A cast-in-place pile cap 210 is arranged on the top of each row of piles. The adjacent piles in each row are connected by a crossbeam 211, which is a prefabricated crossbeam 211 and is arranged on the top of the pile cap 210. The adjacent rows of piles are connected by a longitudinal beam 212, which is arranged on the top of the crossbeam 211. Multiple longitudinal beams 212 are arranged along the length direction of the cross beam 211, and a spacing of 0.5 to 1.5 m is arranged between adjacent longitudinal beams 212. Composite plates 213 are also arranged between adjacent longitudinal beams 212, and multiple rows of composite plates 213 are arranged along the length direction of the longitudinal beams 212, and a certain spacing (0.2 to 1.5 m) is arranged between adjacent composite plates; when mooring piers 22 are respectively arranged on both sides of the working platform 21, a T-shaped structure is formed between the working platform 21 and the mooring piers 22 (refer to Figure 1 The mooring pier can be set on the nearshore side of the working platform or on the sea side of the working platform).

[0034] refer to Figure 3 , Figure 4 A lifting structure 6 for lifting prefabricated components is provided on the lifting trolley 47 of the bridge erecting machine 4. The lifting structure 6 is connected to the lifting trolley 47 by one or more groups of steel wire ropes. The lifting structure 6 includes a connecting platform 61. A lifting pole 62 is provided at the bottom of the connecting platform 61. A boss 63 is integrally provided on the top of the lifting pole 62. The boss 63 is provided in the middle of the lifting pole 62. The boss 63 is connected to the connecting plate 64 at the bottom of the connecting platform 61 by a pin shaft 67. A plurality of lifting holes 65 are provided in the length direction of the lifting pole 62. The distance between adjacent lifting holes 65 is determined according to the lifting requirements. Two lifting holes 65 are respectively provided with hanging rods 66. The two hanging rods 66 can be arranged as an integrated structure or as a structure independent of each other. When the two hanging rods 66 are structures independent of each other, during the lifting process, the distance between the two hanging rods 66 can be adjusted according to the size of the prefabricated component to be lifted to improve the stability and safety of the lifting. The bottom of the boss 63 is also circumferentially provided with a groove (refer to Figure 5 ), a snap-fit ​​plate perpendicular to the connecting plate 64 is provided at the bottom of the connecting plate 64, the snap-fit ​​plate is snapped into the groove, and the boss 63 can rotate in the connecting plate 64. During the rotation, under the action of the groove and the snap-fit ​​plate, the safety of the boss 63 during the rotation can be maintained; after the boss 63 of the lifting pole 62 is rotated, the lifting structure 6 can not only lift the longitudinal beam 212, but also the cross beam 211 or the composite plate 213 without changing the position of the bridge erecting machine 4, thereby improving the flexibility of the bridge erecting machine 4 to enable the bridge erecting machine 4 to work normally at different parts of the high-pile wharf.

[0035] refer to Figure 4The cross-section of each suspension rod 66 is an L-shaped structure. The top of the suspension rod 66 is connected to the lifting pole 62 through a pin shaft. A rectangular structure is formed between the two suspension rods 66 and the lifting pole 62. The L-shaped suspension rod 66 can be used to lift the longitudinal beam. Figure 6 The cross-sectional shape of the suspension rod 66 can also be a rectangular or triangular structure. The middle part of the suspension rod 66 is hollow, so that the beam or the composite plate can pass through the suspension rod 66, thereby lifting the beam or the composite plate without rotating the boss 63, thereby improving the flexibility of the prefabricated component lifting; the top of the suspension rod 66 is also provided with connecting ears, which are respectively located on both sides of the boss 63, so that the suspension rod 66 is connected to the lifting pole 62 through a pin shaft.

[0036] The above is only a detailed description of the specific implementation of the utility model, rather than a limitation of the utility model. Various substitutions, modifications and improvements made by technicians in the relevant technical field without departing from the principle and scope of the utility model should be included in the protection scope of the utility model.

Claims

1. A full trestle bridge used for the installation of beams and slabs at high-pile docks and a lateral beam feeding structure of a bridge erecting machine. It is characterized in that include: An approach bridge structure section (1), a wharf working platform section (2), a full trestle bridge section (3), and a bridge erection machine (4) for lateral beam feeding, wherein the wharf working platform section (2) is connected to land via the approach bridge structure section (1); the full trestle bridge section (3) is arranged on one side of the approach bridge structure section (1), extends from the approach bridge structure section (1) to the wharf working platform section (2), and extends along the length direction of the wharf working platform section (2); the bridge erection machine (4) is partially arranged on the full trestle bridge section (3) and partially arranged on the approach bridge structure section (1) and / or the wharf working platform section (2).

2. The full trestle bridge used for the installation of beams and slabs of high-pile docks according to claim 1 is combined with the lateral beam feeding structure of the bridge erecting machine. It is characterized in that The full trestles section (3) comprises a first full trestles section (31) and a second full trestles section (32); the first full trestles section (31) is arranged on one side of the approach bridge structure section (1); the second full trestles section (32) is arranged on the nearshore side of the dock working platform section (2); the second full trestles section (32) extends along the length direction of the dock working platform section (2); the first full trestles section (31) is connected to the second full trestles section (32); the dock working platform section (2) comprises a working platform (21); one or more mooring piers (22) are respectively arranged on both sides of the working platform (21); the mooring piers (22) and the mooring piers (22) and the working platform (21) are connected via pedestrian bridges (23).

3. The full trestle bridge used for the installation of beams and slabs of high-pile docks according to claim 2 is combined with the lateral beam feeding structure of the bridge erecting machine. It is characterized in that The first full-trestle bridge section (31) comprises a plurality of rows of pile columns extending from land to the working platform (21), a cast-in-place pile cap (210) being arranged on the top of each row of pile columns, adjacent pile columns in each row being connected via a crossbeam (211), the crossbeam (211) being arranged on the top of the cast-in-place pile cap (210), adjacent rows of pile columns being connected via a longitudinal beam (212), the longitudinal beam (212) being arranged on the top of the crossbeam (211), a plurality of longitudinal beams (212) being arranged along the length direction of the crossbeam (211) between adjacent rows of pile columns, a plurality of laminated plates (213) being arranged between adjacent longitudinal beams (212), a plurality of rows of laminated plates (213) being arranged along the length direction of the longitudinal beam (212), and a spacing being provided between adjacent rows of laminated plates (213).

4. The full trestle bridge used for the installation of beams and slabs of high-pile docks according to claim 1 and the lateral beam feeding structure of the bridge erecting machine, It is characterized in that The bridge erection machine (4) comprises a main beam (41), a front leg (42), a middle leg (43), a rear leg (44), a back-up mechanism (45), a lifting mechanism, a transverse track (46), a crane (47), a longitudinal gantry vehicle (48), a hydraulic system and an electrical system, wherein the transverse track (46) is respectively arranged at the bottom of the front leg (42) and the middle leg (43), two transverse tracks (46) are used to be arranged on the top of two rows of piles, and each transverse track (46) is partially arranged on the top of the pile and partially arranged on the entire stack bridge section (3).

5. The full trestle bridge used for the installation of beams and slabs of high-pile docks according to claim 2 is combined with the lateral beam feeding structure of the bridge erecting machine. It is characterized in that The working platform (21) and the mooring pier (22) form a T-shaped structure.

6. The full trestle bridge used for the installation of beams and slabs of high-pile docks according to claim 4 and the lateral beam feeding structure of the bridge erecting machine, It is characterized in that The crane (47) is provided with a lifting structure (6) for lifting prefabricated components. The lifting structure (6) is connected to the crane (47) via one or more sets of steel wire ropes. The lifting structure (6) comprises a connecting platform (61). A lifting pole (62) is provided at the bottom of the connecting platform (61). A boss (63) is integrally provided at the top of the lifting pole (62). The boss (63) is provided in the middle of the lifting pole (62). The boss (63) is connected to a connecting plate (64) at the bottom of the connecting platform (61). A plurality of lifting holes (65) are provided in the length direction of the lifting pole (62), and lifting rods (66) are respectively provided in two of the lifting holes (65).

7. The full trestle bridge used for the installation of beams and slabs of high-pile docks according to claim 6 and the lateral beam feeding structure of the bridge erecting machine, It is characterized in that A groove is circumferentially provided at the bottom of the boss (63), and a clamping plate perpendicular to the connecting plate (64) is provided at the bottom of the connecting plate (64). The clamping plate is clamped into the groove, and the boss (63) and the connecting plate (64) are connected via a pin shaft (67).

8. The full trestle bridge used for installing beams and slabs of high-pile docks according to claim 6 and the lateral beam feeding structure of the bridge erecting machine, It is characterized in that The cross-sectional shape of the suspension rod (66) is an L-shaped, rectangular or triangular structure.

9. The full trestle bridge used for the installation of beams and slabs of high-pile docks according to claim 2 and the lateral beam feeding structure of the bridge erecting machine, It is characterized in that The full trestles (3) are steel trestles, and the pedestrian bridge (23) are steel bridges or prefabricated beam-slab bridges.

10. A full trestle bridge and a lateral beam feeding structure of a bridge erecting machine for installing beams and slabs of high-pile docks according to any one of claims 1 to 9, It is characterized in that The distance between the full trestles section (3) and the approach bridge structure section (1) is 0.8-1.5 m, and the distance between the full trestles section (3) and the dock working platform section (2) is 0.8-1.5 m.

Citation Information

Cited By

  • Cantilever lifting device for wharf beam plate installation and application method thereof

    CN119263083A