Pile driver for constructional engineering

By designing a pile driver for construction engineering including electromagnets and hydraulic rods, the inconvenience and low efficiency of large pile drivers when driving piles in small foundations is solved, and the effect of saving labor and improving pile driving efficiency is achieved.

CN222025041UActive Publication Date: 2024-11-19BEIJING XINGHECHEN TRADING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420646083.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-11-19
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

Existing large pile drivers are inconvenient to use when driving piles in small foundations, waste energy consumption, and manual pile driving efficiency is low, resulting in waste of labor and time.

Method used

A pile driver for construction engineering including base plate, fixing frame, hydraulic rod, electromagnet, iron plate and controller is designed. The pile driver head is lifted and lowered through the magnetic connection of the electromagnet and the control of the hydraulic rod, and the magnetic force of the electromagnet is used. The pile driving operation is completed with the gravity of the pile head.

Benefits of technology

The device is easy to operate through the controller, saves labor and improves pile driving efficiency. It is suitable for small foundation pile driving, reducing the inconvenience and energy consumption of large equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025041U_ABST
    Figure CN222025041U_ABST
Patent Text Reader

Abstract

The pile driver comprises a bottom plate, the upper surface of the bottom plate is fixedly connected with symmetrical fixing frames, the left side faces of the two fixing frames are jointly and fixedly connected with a fixing plate, the upper surface of the fixing plate is provided with a through hole, the upper surface of the fixing plate is provided with a hydraulic rod, and the hydraulic rod is fixedly connected with the left side faces of the two fixing frames. An electromagnet is fixedly connected to the output end of the hydraulic rod, an iron plate is magnetically connected to the bottom surface of the electromagnet, a piling head is fixedly connected to the bottom surface of the iron plate, symmetrical sliding rods are fixedly connected to the upper surface of the bottom plate, and sliding rings are slidably connected to the outer surfaces of the two sliding rods; and the left side surfaces of the two sliding rings are fixedly connected with fixed angle plates. According to the device, the piling head is lifted through the hydraulic rod, the electromagnet is powered off, the magnetic force of the electromagnet disappears, meanwhile, the piling head freely falls under the gravity of the piling head, the piling effect is achieved, piling on a small foundation is facilitated, labor is saved, and the piling efficiency is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction engineering, in particular to a pile driver for construction engineering. Background Art

[0002] A construction project refers to an engineering entity formed through the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines and equipment. It includes two major categories: houses and structures. Houses refer to engineering buildings for people to live, work, study, produce, operate, entertain, store goods and conduct other social activities. What is different from buildings is structures. Structures refer to engineering buildings other than houses, such as walls, roads, dams, tunnels, water towers, bridges and chimneys.

[0003] A pile driver is composed of a pile hammer, a pile frame and auxiliary equipment. The pile hammer is attached between two parallel vertical guide rods at the front of the pile frame and is lifted by a lifting hook. The pile frame is a steel structure tower with a winch at the rear to lift the pile and the pile hammer. In the process of construction, a pile driver is often needed for piling. However, most of the existing pile drivers are large-scale piling equipment. For small foundation piling that only requires a small number of piles, it is troublesome to use large-scale piling equipment, which wastes energy and is inconvenient to use. Manual piling results in a great waste of labor and time, and the efficiency of piling is low. For this reason, we propose a pile driver for construction engineering to solve the above problems. Utility Model Content

[0004] The purpose of the utility model is to provide a pile driver for construction engineering to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A pile driver for construction engineering comprises a base plate, the upper surface of the base plate is fixedly connected with a symmetrical fixing frame, the left sides of the two fixing frames are commonly fixedly connected with a fixing plate, the upper surface of the fixing plate is provided with a through hole, the upper surface of the fixing plate is installed with a hydraulic rod, the output end of the hydraulic rod is fixedly connected with an electromagnet, the bottom surface of the electromagnet is magnetically connected with an iron plate, the bottom surface of the iron plate is fixedly connected with a pile driving head, the upper surface of the base plate is fixedly connected with a symmetrical sliding rod, the outer surfaces of the two sliding rods are both slidably connected with slip rings, the left sides of the two slip rings are both fixedly connected with fixed angle plates, the bottom surfaces of the two fixed angle plates are both fixedly connected to the upper surface of the pile driving head, the upper surface of the base plate is fixedly connected with a counterweight block, and the upper surface of the counterweight block is installed with a controller.

[0007] In a further embodiment, the magnetic force between the electromagnet and the iron plate is greater than the weight of the pile driving head, and warning lights are installed on the upper surfaces of the two fixing frames.

[0008] In a further embodiment, the right sides of the two fixing frames are fixedly connected with fixing columns, and the right ends of the two fixing columns are fixedly connected with handles.

[0009] In a further embodiment, a protection box is fixedly connected to the upper surface of the base plate, and a battery is installed inside the protection box.

[0010] In a further embodiment, the bottom surface of the bottom plate is fixedly connected with symmetrical first supporting legs, and rollers are installed at the bottom ends of the two first supporting legs.

[0011] In a further embodiment, a second supporting leg is fixedly connected to the bottom surface of the base plate, and a steering auxiliary wheel is installed at the bottom end of the second supporting leg.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The device is convenient for workers to control the device through a controller. The electromagnet can be energized to generate magnetic force, the electromagnet can be lowered by a hydraulic rod to connect the electromagnet to the iron plate magnetically, the hydraulic rod can be used to raise the pile driving head, and the electromagnet can be powered off to make its magnetic force disappear. At the same time, the pile driving head falls freely under its own gravity to achieve the effect of piling, which is convenient for piling on small foundations, saves labor, and further improves the efficiency of piling. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a three-dimensional structural schematic diagram of the front view of a pile driver used in construction projects.

[0015] Figure 2 It is a cross-sectional view of the front view of the bottom plate of a pile driver used in construction engineering.

[0016] Figure 3 It is a three-dimensional structural schematic diagram of a top view of a pile driver used in construction projects.

[0017] Figure 4 It is a three-dimensional structural schematic diagram of a pile driver used in construction projects from a bottom view.

[0018] In the figure: 1. bottom plate; 2. fixing frame; 3. fixing plate; 4. through hole; 5. hydraulic rod; 6. electromagnet; 7. iron plate; 8. pile driving head; 9. sliding rod; 10. slip ring; 11. fixed angle plate; 12. counterweight; 13. controller; 14. fixing column; 15. handle; 16. warning light; 17. protection box; 18. battery; 19. first supporting leg; 20. roller; 21. second supporting leg; 22. steering auxiliary wheel. DETAILED DESCRIPTION

[0019] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0020] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-4 In the utility model, a pile driver for construction engineering comprises a base plate 1, a symmetrical fixing frame 2 is fixedly connected to the upper surface of the base plate 1, a fixing plate 3 is fixedly connected to the left sides of the two fixing frames 2, a through hole 4 is opened on the upper surface of the fixing plate 3, a hydraulic rod 5 is installed on the upper surface of the fixing plate 3, an electromagnet 6 is fixedly connected to the output end of the hydraulic rod 5, an iron plate 7 is magnetically connected to the bottom surface of the electromagnet 6, a pile driving head 8 is fixedly connected to the bottom surface of the iron plate 7, a symmetrical sliding rod 9 is fixedly connected to the upper surface of the base plate 1, a slip ring 10 is slidably connected to the outer surfaces of the two sliding rods 9, a fixed angle plate 11 is fixedly connected to the left sides of the two slip rings 10, the bottom surfaces of the two fixed angle plates 11 are fixedly connected to the upper surface of the pile driving head 8, a counterweight 12 is fixedly connected to the upper surface of the base plate 1, and a controller 13 is installed on the upper surface of the counterweight 12.

[0023] The magnetic force between the electromagnet 6 and the iron plate 7 is greater than the weight of the pile driving head 8. Warning lights 16 are installed on the upper surfaces of the two fixing frames 2. The right sides of the two fixing frames 2 are fixedly connected with fixing columns 14. The right ends of the two fixing columns 14 are fixedly connected with handles 15. The upper surface of the base plate 1 is fixedly connected with a protection box 17. A battery 18 is installed inside the protection box 17. The warning light 16 can be used to warn the surrounding personnel when the device is working. The cooperation of the fixing column 14 and the handle 15 makes it convenient for the staff to push the device, saving the staff's time. The battery 18 can be used to power the device to avoid sudden power failure when the device is running.

[0024] A symmetrical first supporting leg 19 is fixedly connected to the bottom surface of the base plate 1, and rollers 20 are installed at the bottom ends of the two first supporting legs 19. A second supporting leg 21 is fixedly connected to the bottom surface of the base plate 1, and a steering auxiliary wheel 22 is installed at the bottom end of the second supporting leg 21. The cooperation between the first supporting leg 19 and the roller 20 can facilitate the staff to move the device, and the cooperation between the second supporting leg 21 and the steering auxiliary wheel 22 can facilitate the staff to steer the device, thereby improving the piling efficiency.

[0025] The working principle of the utility model is:

[0026] When in use, the device is first connected to a corresponding power source, and then the storage battery 18 is fully charged. Then, the device is stably placed in a suitable position through the cooperation of the roller 20 and the steering auxiliary wheel 22. Then, the device is controlled by the controller 13, and then the electromagnet 6 is energized to generate a magnetic force. Then, the hydraulic rod 5 is used to lower the electromagnet 6 so that the electromagnet 6 is magnetically connected to the iron plate 7. Then, the pile driving head 8 is raised by the hydraulic rod 5. When the pile driving head 8 reaches a certain height, the electromagnet 6 is powered off to eliminate its magnetic force. At the same time, the pile driving head 8 falls freely under its own gravity to achieve the effect of piling.

[0027] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0028] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A pile driver for construction engineering, characterized in that: The invention comprises a bottom plate (1), the upper surface of the bottom plate (1) is fixedly connected to a symmetrical fixing frame (2), the left sides of the two fixing frames (2) are commonly fixedly connected to a fixing plate (3), the upper surface of the fixing plate (3) is provided with a through hole (4), the upper surface of the fixing plate (3) is installed with a hydraulic rod (5), the output end of the hydraulic rod (5) is fixedly connected to an electromagnet (6), the bottom surface of the electromagnet (6) is magnetically connected to an iron plate (7), and the bottom surface of the iron plate (7) is fixedly connected to A pile driving head (8), the upper surface of the base plate (1) is fixedly connected to symmetrical sliding rods (9), the outer surfaces of the two sliding rods (9) are slidably connected to sliding rings (10), the left sides of the two sliding rings (10) are fixedly connected to fixed angle plates (11), the bottom surfaces of the two fixed angle plates (11) are fixedly connected to the upper surface of the pile driving head (8), the upper surface of the base plate (1) is fixedly connected to a counterweight block (12), and the upper surface of the counterweight block (12) is installed with a controller (13).

2. A pile driver for construction engineering according to claim 1, characterized in that: The magnetic force between the electromagnet (6) and the iron plate (7) is greater than the weight of the pile driving head (8), and warning lights (16) are installed on the upper surfaces of the two fixing frames (2).

3. A pile driver for construction engineering according to claim 1, characterized in that: The right sides of the two fixing frames (2) are fixedly connected with fixing columns (14), and the right ends of the two fixing columns (14) are fixedly connected with handles (15).

4. A pile driver for construction engineering according to claim 1, characterized in that: A protection box (17) is fixedly connected to the upper surface of the base plate (1), and a storage battery (18) is installed inside the protection box (17).

5. A pile driver for construction engineering according to claim 1, characterized in that: The bottom surface of the bottom plate (1) is fixedly connected to symmetrical first supporting legs (19), and rollers (20) are installed at the bottom ends of the two first supporting legs (19).