Excavation device for flood drainage project construction
By designing an excavation device with tracks, gear plates and rolling wheels, the problem of difficult excavation depth and angle adjustment in traditional water conservancy projects is solved, and construction efficiency is improved and labor demand is reduced.
Patent Information
- Application Number
- CN202420293907.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-18
AI Technical Summary
During the excavation of trenches in traditional water conservancy projects, the excavation depth and angle are not easy to adjust, resulting in the soil rolling into the trench, which requires a lot of manual transfer and is inefficient.
An excavation device including tracks, gear plates, motor chassis, lifting components, pushing components and rolling wheels is designed. The excavation height and angle are adjusted through threaded lifting rods, outer limiting plates and motors, and the rolling wheels are used to improve work. efficiency.
It realizes flexible adjustment of excavation depth and angle, reduces labor and improves construction efficiency.
Smart Images

Figure CN222025141U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering excavation, in particular to an excavation device for drainage engineering construction. Background Art
[0002] Drainage projects refer to construction projects for the development of water resources and prevention of floods. Trench excavation is an important project in water conservancy construction.
[0003] In the traditional trench excavation process of water conservancy projects, the excavation depth and angle are not easy to adjust. The soil is directly shoveled during excavation, and the shoveled soil will roll into the ditch, requiring manual work to push the soil to both sides. This method is not only inefficient, but also requires a lot of labor. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the shortcomings of the prior art, the utility model provides an excavation device for drainage project construction, which solves the problem that in the traditional water conservancy project trench excavation process proposed in the above background technology, the excavation depth and angle are difficult to adjust, the soil is directly shoveled during excavation, and the shoveled soil will roll into the ditch, requiring manual work to push the soil to both sides.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the utility model is implemented through the following technical solutions: an excavation device for drainage engineering construction, comprising two tracks, a plurality of gear plates are provided inside the tracks, a cross bar is provided on the upper surface of the two tracks, motor boxes are provided on both sides of the cross bar, a lifting assembly is fixedly connected to the upper surface of the cross bar, a pushing assembly is provided on the lower surface of the lifting assembly, fixed plates are fixedly connected on both sides of the bottom of the cross bar, motors are provided inside the two motor boxes, the conveying ends of the two motors are rotatably connected to gears adapted to the gear plates, the other ends of the two gears are rotatably connected to bearings on the fixed plate, and a rolling wheel is provided at the bottom of the fixed plate.
[0008] Optionally, installation grooves are provided on both sides of the track, and the surfaces of the installation grooves of one of the tracks and the other track are clamped with matching blocks, and the surfaces of the blocks are threaded with knob studs, and one side of the inner walls of the two installation grooves is provided with threaded holes matching the knob studs.
[0009] Optionally, the lifting assembly includes two threaded lifting rods, a rotating rod is rotatably connected to the same side of the two threaded lifting rods, a balance rod is fixedly connected to one side of the rotating rod, a mounting plate is fixedly connected to the bottom of the balance rod, a cavity is opened on the surface of the mounting plate, and fixing studs are threaded through both sides of the mounting plate.
[0010] Optionally, the pushing assembly includes an outer limiting plate, drive shafts are provided on both sides of the outer limiting plate, one end of the two drive shafts is rotatably connected to a connecting rod, the surfaces of the two drive shafts are fixedly connected to fixing rods, one end of the two fixing rods is provided with a U-buzzer plate, the bottom of the U-buzzer plate is fixedly connected to a supporting rod, and the other end of the two supporting rods is rotatably connected to one side of the mounting plate.
[0011] Optionally, one side of the outer limiting plate is engraved with an internal thread that is compatible with the fixing stud, and the lower surface of the U bulldozer plate is configured as an inclined surface.
[0012] Optionally, rotating rods are provided on both sides of the rolling wheel, and both sides of the rotating rods are rotatably connected to the fixed plate. The rolling wheel is a solid structure.
[0013] (III) Beneficial effects
[0014] The utility model has at least the following beneficial effects:
[0015] Through the setting of the threaded lifting rod, the outer limit plate, the motor and the rolling wheel, the threaded lifting rod is adjusted during use so that the U bulldozer plate acts on the construction land, the height can be adjusted, the position of the outer limit plate is controlled, the excavation angle for the construction land is adjusted, the motor is started, and the output end of the motor drives the gear to rotate so that the device moves forward on the track and drives the rolling wheel to improve work efficiency and reduce a lot of labor. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the implementation or the prior art description. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0018] Figure 2 It is a three-dimensional structural schematic diagram of the lifting assembly of the utility model;
[0019] Figure 3 It is a three-dimensional structural schematic diagram of the propulsion assembly of the utility model;
[0020] Figure 4 It is a three-dimensional structural schematic diagram of the rolling wheel of the utility model;
[0021] Figure 5 It is a schematic diagram of the planar structure of the utility model.
[0022] In the figure: 1. track; 2. gear plate; 3. cross bar; 4. motor box; 5. lifting assembly; 501. threaded lifting rod; 502. balance rod; 503. mounting plate; 504. fixing stud; 6. pushing assembly; 601. outer limit plate; 602. driving shaft; 603. fixing rod; 604. U bulldozer plate; 605. supporting rod; 7. fixing plate; 8. motor; 9. gear; 10. bearing; 11. rolling wheel; 12. block; 13. knob stud; 14. rotating rod. DETAILED DESCRIPTION
[0023] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment in size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.
[0024] See also Figures 1 to 5 The utility model provides a technical solution: an excavation device for drainage engineering construction, comprising two tracks 1, a plurality of gear plates 2 are arranged inside the tracks 1, a cross bar 3 is arranged on the upper surface of the two tracks 1, motor boxes 4 are arranged on both sides of the cross bar 3, a lifting assembly 5 is fixedly connected to the upper surface of the cross bar 3, a pushing assembly 6 is arranged on the lower surface of the lifting assembly 5, a fixing plate 7 is fixedly connected to both sides of the bottom of the cross bar 3, motors 8 are arranged inside the two motor boxes 4, the conveying ends of the two motors 8 are rotatably connected to gears 9 adapted to the gear plates 2, the other ends of the two gears 9 are rotatably connected to bearings 10 on the fixing plate 7, and a rolling wheel 11 is arranged at the bottom of the fixing plate 7. Through the arrangement of the threaded lifting rod 501, the outer limit plate 601, the motor 8 and the rolling wheel 11, the threaded lifting rod 501 is adjusted during use so that the U bulldozer plate 604 acts on the construction land, the height can be adjusted, the position of the outer limit plate 601 is controlled, the excavation angle for the construction land is adjusted, the motor 8 is started, and the output end of the motor 8 drives the gear to rotate so that the device moves forward on the track 1 and drives the rolling wheel 11 to roll the construction land below, thereby improving the work efficiency and reducing a large amount of labor;
[0025] Both sides of the track 1 are provided with mounting grooves, and the surfaces of the mounting grooves of one track 1 and the other track 1 are both connected with matching clamping blocks 12, and the surfaces of the clamping blocks 12 are threadedly penetrated with knob studs 13, and one side of the inner walls of the two mounting grooves is provided with threaded holes matching the knob studs 13, and the matching use of the clamping blocks 12 and the knob studs 13 can extend the length of the track 1;
[0026] The lifting assembly 5 includes two threaded lifting rods 501, wherein a rotating rod is rotatably connected to the same side of one of the two threaded lifting rods 501 and the other threaded lifting rod 501, a balancing rod 502 is fixedly connected to one side of the rotating rod, a mounting plate 503 is fixedly connected to the bottom of the balancing rod 502, a cavity is opened on the surface of the mounting plate 503, and fixing studs 504 are threadedly penetrated on both sides of the mounting plate 503, and the height of the lifting assembly 5 can be adjusted through the two threaded lifting rods 501;
[0027] The pushing assembly 6 includes an outer limiting plate 601, and driving shafts 602 are arranged on both sides of the outer limiting plate 601. One end of the two driving shafts 602 is rotatably connected to a connecting rod. The surfaces of the two driving shafts 602 are fixedly connected to fixing rods 603. One end of the two fixing rods 603 is provided with a U bulldozer 604. The bottom of the U bulldozer 604 is fixedly connected to a supporting rod 605. The other ends of the two supporting rods 605 are rotatably connected to one side of the mounting plate 503. Adjusting the fixed position of the outer limiting plate 601 can adjust the depth of the land construction by the U bulldozer 604.
[0028] One side of the outer plate 601 is engraved with an internal thread that matches the fixing stud 504. The lower surface of the U bulldozer plate 604 is set to be an inclined surface, and the setting of the inclined surface can facilitate the construction of the land;
[0029] Rotating rods 14 are arranged on both sides of the rolling wheel 11. Both sides of the rotating rods 14 are rotatably connected to the fixed plate 7. The rolling wheel 11 is a solid structure. The solid structure improves the overall quality of the rolling wheel 11 and facilitates land construction.
[0030] The electrical components appearing in this article are all connected to an external main controller and 220V AC power, and the main controller can be a conventional known device that controls a computer, etc. The specific implementation method of the present disclosure omits the detailed description of known functions and known components. To ensure the compatibility of the equipment, the operating methods used are consistent with the parameters of marketed equipment.
[0031] Specifically, when the excavation device for drainage engineering construction is working / in use: the device is placed at the construction position, the block 12 is rotated and fixed in the installation groove by the knob stud 12, the two threaded lifting rods 501 are adjusted, and the mounting plate 503 is fixed at the construction height by the threaded lifting rods 501, so that the U bulldozer plate 604 is in contact with the construction land, the outer limit plate 601 is placed in a suitable position, the stud 504 is fixed, the depth of action of the U bulldozer plate 604 on the construction land is adjusted, the motor 8 is started, and the conveying ends of the two motors 8 drive their gears 9 to move on the internal gear plate 2 of the track 1, so that the device moves forward as a whole, and the rolling wheel 11 acts on the construction land as the device moves forward.
[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An excavation device for drainage engineering construction, comprising two tracks (1), Features: A plurality of gear plates (2) are provided inside the track (1), a cross bar (3) is provided on the upper surface of the two tracks (1), a motor box (4) is provided on both sides of the cross bar (3), a lifting assembly (5) is fixedly connected to the upper surface of the cross bar (3), a pushing assembly (6) is provided on the lower surface of the lifting assembly (5), a fixing plate (7) is fixedly connected to both sides of the bottom of the cross bar (3), a motor (8) is provided inside the two motor boxes (4), the conveying ends of the two motors (8) are rotatably connected to gears (9) adapted to the gear plates (2), the other ends of the two gears (9) are rotatably connected to bearings (10) on the fixing plate (7), and a rolling wheel (11) is provided at the bottom of the fixing plate (7); Both sides of the track (1) are provided with mounting grooves, and the surfaces of the mounting grooves of one track (1) and the other track (1) are both clamped with matching clamping blocks (12), and the surfaces of the clamping blocks (12) are threadedly provided with knob studs (13), and one side of the inner walls of the two mounting grooves is provided with threaded holes matching the knob studs (13); The lifting assembly (5) comprises two threaded lifting rods (501), the same side of the two threaded lifting rods (501) is rotatably connected to a rotating rod, one side of the rotating rod is fixedly connected to a balancing rod (502), the bottom of the balancing rod (502) is fixedly connected to a mounting plate (503), a cavity is provided on the surface of the mounting plate (503), and both sides of the mounting plate (503) are threadedly penetrated with fixing studs (504); The pushing assembly (6) comprises an outer limiting plate (601), drive shafts (602) are arranged on both sides of the outer limiting plate (601), one end of the two drive shafts (602) is rotatably connected to a connecting rod, the surfaces of the two drive shafts (602) are fixedly connected to fixing rods (603), one end of the two fixing rods (603) is arranged with a U-buzzer plate (604), the bottom of the U-buzzer plate (604) is fixedly connected to a supporting rod (605), and the other ends of the two supporting rods (605) are rotatably connected to one side of the mounting plate (503).
2. An excavation device for drainage engineering construction according to claim 1, Features: One side of the outer limiting plate (601) is engraved with an internal thread matched with the fixing stud (504), and the lower surface of the U bulldozer plate (604) is arranged to be an inclined surface.
3. An excavation device for drainage engineering construction according to claim 1, Features: Rotating rods (14) are provided on both sides of the rolling wheel (11), and both sides of the rotating rod (14) are rotatably connected to the fixed plate (7). The rolling wheel (11) is a solid structure.
