Auxiliary device for repairing construction of trenchless pipeline lining

By designing auxiliary devices for non-excavation repair of pipelines, using the combination of transportation tracks and splicing components, the problem of difficulty in transporting and splicing of pipe lined pipes is solved, and efficient transportation and welding in narrow spaces is achieved, which improves the Repair efficiency and quality.

CN222026530UInactive Publication Date: 2024-11-19SHANGHAI MUNICIPAL CONSTR
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420013162.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In non-excavation repair of pipelines, the intermediate conduit leads to a narrow internal space of the pipeline, and it is difficult to transport and splice the inner lined pipe sheets, which is difficult for the existing technology to effectively solve this problem.

Method used

An auxiliary device for repair and construction of non-excavation pipeline lining is designed, including transportation tracks and splicing components. The transportation tracks are arranged along the axial direction of the pipeline. The transportation components can be moved and the inner lined pipe sheet is lifted through the lifting mechanism. The splicing components are driven by rotation. The mechanism rotates the pipe piece and rotates the disk, clamps and welds the inner lined pipe piece to form a repair lined ring piece.

Benefits of technology

It realizes safe transportation and efficient splicing in a narrow space, reduces welding difficulty, improves welding quality and efficiency, solves the problem of difficult splicing of inner lined pipe sheets, and reduces construction difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222026530U_ABST
    Figure CN222026530U_ABST
Patent Text Reader

Abstract

The utility model provides an auxiliary device for non-excavation pipeline lining repairing construction. The auxiliary device comprises a conveying rail, a conveying assembly and a splicing assembly. The transportation track is arranged in the pipeline and is parallel to the whole axial line of the pipeline, and the transportation track is arranged at the top of the middle guide pipe; the transportation assembly is movably arranged on the transportation track, and the lining duct piece is arranged on the transportation assembly and synchronously moves along with the transportation assembly; the splicing assembly is movably arranged on the conveying rail and can clamp the lining pipe pieces, so that the multiple lining pipe pieces are connected on the splicing assembly to form a repairing lining ring piece, and the repairing lining ring piece is installed at the position, to be repaired, of the pipeline. The utility model relates to the technical field of urban pipeline non-excavation repair construction, and can solve the problem that lining pipe pieces are difficult to transport and splice in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of trenchless repair construction of urban pipelines, in particular to an auxiliary device for trenchless pipeline lining repair construction. Background Art

[0002] In the construction of stainless steel lining for trenchless pipeline repair, stainless steel segments need to be transported in from the outside, and then assembled into rings one by one inside the pipeline to form the stainless steel lining of the pipeline. Finally, back-wall grouting is performed to make the segment lining and the original pipeline form a composite whole, thereby achieving the purpose of pipeline repair.

[0003] However, in actual construction, due to the presence of a middle pipe for temporary drainage in the pipeline, the internal space of the pipeline is small, and the middle pipe easily interferes with the transportation, splicing and installation of the lining segments. In addition, the size and weight of the lining segments are large, making the transportation, splicing and installation of the lining segments extremely difficult. Therefore, it is necessary to provide an auxiliary device for trenchless pipeline lining repair construction, which can solve the problem of difficulty in transporting and splicing lining segments in the prior art. Summary of the invention

[0004] The utility model aims to provide an auxiliary device for trenchless pipeline lining repair construction, which can solve the problems of difficulty in transporting and splicing lining pipe segments in the prior art.

[0005] In order to achieve the above purpose, the technical solution of the utility model is:

[0006] An auxiliary device for trenchless pipeline lining repair construction comprises: a transport track, a transport assembly and a splicing assembly; the transport track is arranged in the pipeline parallel to the entire axial direction of the pipeline, and the transport track is arranged on the top of the middle conduit; the transport assembly is movably arranged on the transport track, and the lining pipe segment is placed on the transport assembly and moves synchronously with the transport assembly; the splicing assembly is movably arranged on the transport track, and the splicing assembly can clamp the lining pipe segment, so that several lining pipe segments are connected on the splicing assembly to form a repair lining ring segment, and the repair lining ring segment is installed to the position of the pipeline to be repaired.

[0007] The transport track includes guide rails and brackets; a pair of guide rails are parallel to each other and arranged along the entire axial line of the pipeline in the pipeline, a plurality of brackets are arranged at intervals along the axial direction of the pipeline on the top of the middle duct, and a pair of guide rails are installed on the top of the middle duct through a plurality of brackets; the transport assembly and the splicing assembly are movably arranged on a pair of guide rails.

[0008] The transport assembly comprises a first rail wheel, a lifting mechanism, a segment support plate and a first frame; a plurality of first rail wheels are mounted in pairs on both sides of the first frame, and a plurality of first rail wheels are rollingly arranged on a pair of guide rails; the segment support plate can be lifted and lowered on the first frame through the lifting mechanism, and the lining segment is placed on the segment support plate;

[0009] The lifting mechanism includes a push-pull rod and a lifting rod; the push-pull rod is an X-shaped rotating and folding structure, a pair of push-pull rods are symmetrically arranged on both sides of the first frame, and the pipe segment support plate is arranged on the top of the pair of push-pull rods; a pair of lifting rods are respectively connected between the pair of push-pull rods and the first frame.

[0010] The splicing assembly includes a rotation drive mechanism, a segment rotating disk, a segment clamp, a support mechanism, a second track wheel and a second frame; a plurality of second track wheels are installed in pairs on both sides of the second frame, and a plurality of second track wheels are rollingly arranged on a pair of guide rails; the segment rotating disk is arranged around the outer circumference of the middle duct, the rotation drive mechanism is installed on the second frame and is transmission-connected to the segment rotating disk, a plurality of segment clamps are respectively arranged on the segment rotating disk at intervals, and the lining segment is clamped by the segment clamp; a pair of support mechanisms are symmetrically arranged on both sides of the second frame, and each group of support mechanisms is supported between the middle duct and the segment rotating disk.

[0011] The rotation drive mechanism comprises a driving member, a driving gear and a control and power input element; the driving member is mounted on the second frame, and the driving member is externally connected to a power source and a control system through the control and power input element; the driving gear is coaxially mounted on the output shaft of the driving member, and a gear ring is formed on the inner wall of the pipe segment rotating disk, so that the driving gear is meshed and connected with the pipe segment rotating disk through the gear ring;

[0012] Each group of the supporting mechanisms comprises a side leg, a supporting pulley and a supporting connecting rod; one end of the side leg is connected to the side of the second frame, and the other end of the side leg is connected to the supporting connecting rod; one end of the supporting connecting rod abuts against the outer wall of the middle pipe, and the other end of the supporting connecting rod is rotatably mounted with a supporting pulley, and the supporting pulley rolls against the inner wall of the rotating disk of the pipe segment;

[0013] The segment rotating disk is an open annular structure, and a connecting rod is detachably installed at the opening of the segment rotating disk, so that the segment rotating disk and the connecting rod form a closed loop structure.

[0014] A method for using an auxiliary device for trenchless pipeline lining repair construction comprises the following steps:

[0015] Step 1: Lay out the transport track in the pipeline parallel to the pipeline axis and install it on the top of the middle conduit;

[0016] Step 2: Place the splicing assembly on the transport track and slide it along the transport track to the splicing position of the lining segment;

[0017] Step 3: placing the transport assembly on the transport track, placing the lining segments on the transport assembly, and transporting them to the splicing assembly along the transport track through the transport assembly;

[0018] Step 4: The splicing assembly temporarily fixes the lining segment and rotates the lining segment to the welding position;

[0019] Step 5: Weld two adjacent liner segments to splice several liner segments on the splicing assembly to form a repaired liner ring segment;

[0020] Step 6: Replace the support of the middle pipe and install the repair liner ring to the part of the pipe to be repaired;

[0021] Step 7: Release the temporary clamping of the splicing assembly on the repaired liner ring piece, and move the splicing assembly to the next welding position;

[0022] Step 8: Repeat steps 2 to 7 until the pipe is repaired.

[0023] The step 2 comprises the following sub-steps:

[0024] Step 2.1: The second frame of the splicing assembly is placed on a pair of guide rails through a plurality of second track wheels;

[0025] Step 2.2: Remove the connecting rod and fit the segment rotating disc onto the outer periphery of the middle conduit, and the segment rotating disc is meshed with the driving gear;

[0026] Step 2.3: Install the connecting rod to the opening of the segment rotating disk, so that the connecting rod and the segment rotating disk form a closed loop structure;

[0027] Step 2.4: The splicing assembly is moved as a whole to the splicing position of the lining segment along a pair of guide rails through a plurality of second track wheels;

[0028] Step 2.5: One end of a pair of supporting connecting rods of the supporting mechanism is respectively connected to the outer walls on both sides of the middle conduit, and the supporting pulleys of a pair of supporting mechanisms are respectively connected to the inner wall of the rotating disk of the pipe segment.

[0029] The step 4 comprises the following sub-steps:

[0030] Step 4.1: The lifting rod pushes the push-pull rod, so that a pair of push-pull rods lift the segment support plate to the height of the segment clamp;

[0031] Step 4.2: Temporarily fix the lining segments by using segment clamps;

[0032] Step 4.3: The control and power input components control the driving component to start, so that the driving component drives the driving gear to rotate;

[0033] Step 4.4: The driving gear engages the transmission segment rotating disk through the gear ring, so that the segment rotating disk drives the lining segment to rotate to the welding position through the segment clamp.

[0034] The step 5 comprises the following sub-steps:

[0035] Step 5.1: The transport assembly is returned, and steps 3 and 4 are repeated to transport the next lining segment to the splicing assembly;

[0036] Step 5.2: temporarily fix the next lining segment by using the segment clamp, and the next lining segment is adjacent to the lining segment;

[0037] Step 5.3: Weld and fix the next lining segment to the lining segment;

[0038] Step 5.4: Repeat steps 5.1 to 5.3 to transport and weld several liner segments in sequence to form repaired liner ring segments.

[0039] In the step 6, support columns are provided between the two sides of the bottom of the middle conduit and the inner wall of the pipe, and replacement support columns are provided between the two sides of the bottom of the middle conduit and the inner wall of the installed repair liner ring segment, and the support columns at the repair liner ring segment to be installed are removed, and the repair liner ring segment is installed to the position to be installed and connected to the installed repair liner ring segment as a whole.

[0040] Compared with the prior art, the utility model has the following beneficial effects:

[0041] 1. The utility model is provided with a transport track and a transport assembly. The transport assembly can move along a pair of tracks through a first track wheel, and is used to transport lining segments above the middle conduit. The transport assembly can lift the lining segments through a lifting mechanism, lower the lining segments during transportation, and lift the lining segments to a specified height after being transported to the destination, thereby ensuring safe transportation and splicing of the lining segments in a small space, avoiding interference of the middle conduit with the transportation of the lining segments, and making transportation easier and more efficient.

[0042] 2. Since the utility model is provided with a transport track and a splicing assembly, the lining segments can be rotated to a position convenient for welding by rotating the segment rotating disk through a rotating driving mechanism, thereby facilitating the welding and splicing of the lining segments in a narrow space above the central conduit, avoiding overhead welding, reducing welding difficulty, improving welding quality and welding efficiency, and requiring less space for splicing, thereby solving the problem of difficulty in splicing the lining segments.

[0043] 3. Since the utility model is provided with a transport track and a splicing assembly, the splicing assembly can be synchronously moved along a pair of tracks through the second track wheel as the repair liner ring piece is installed, which is convenient for the installation of the repair liner ring piece at the part of the pipeline to be repaired, and is convenient for the repair construction of the pipeline, and reduces the requirements for the construction space for the installation of the repair liner ring piece, thereby reducing the construction difficulty of the pipeline liner steel plate repair. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.

[0045] Figure 1 It is a three-dimensional diagram of the auxiliary device for trenchless pipeline lining repair construction of the utility model;

[0046] Figure 2 It is a stereoscopic diagram of the transport track in the auxiliary device for trenchless pipeline lining repair construction of the utility model;

[0047] Figure 3 It is a stereoscopic diagram of the transport component (segment support plate lifting) in the auxiliary device for trenchless pipeline lining repair construction of the utility model;

[0048] Figure 4 It is a stereoscopic diagram of the transport component in the auxiliary device for trenchless pipeline lining repair construction of the utility model (the segment support plate is not lifted);

[0049] Figure 5 It is a stereoscopic diagram of a transport component in the auxiliary device for trenchless pipeline lining repair construction of the utility model (the transport component carries the lining pipe segment);

[0050] Figure 6 It is a stereoscopic diagram of the splicing components in the auxiliary device for trenchless pipeline lining repair construction of the utility model;

[0051] Figure 7 It is a front view of the pipe segment rotating disk, pipe segment clamp and connecting rod in the auxiliary device for trenchless pipe lining repair construction of the utility model;

[0052] Figure 8 It is a stereoscopic diagram of the rotating drive mechanism and the supporting mechanism in the auxiliary device for trenchless pipeline lining repair construction of the utility model;

[0053] Fig. 9 It is a front view of step 2 in the method for using the auxiliary device for trenchless pipeline lining repair construction of the utility model;

[0054] Fig.10 It is a front view of step 4 in the method for using the auxiliary device for trenchless pipe lining repair construction of the utility model;

[0055] Figure 11-13 It is a front view of step 5 in the method for using the auxiliary device for trenchless pipe lining repair construction of the utility model;

[0056] Fig.14 yes Fig.13 Stereoscopic image of

[0057] Figure 15-16 It is a front view of step 6 in the method for using the auxiliary device for trenchless pipe lining repair construction of the utility model.

[0058] In the figure: 1-transport track; 101-guide rail; 102-support; 2-transport assembly; 201-first track wheel; 202-push-pull rod; 203-lifting rod; 204-segment support plate; 205-first frame; 3-splicing assembly; 301-driving member; 302-driving gear; 303-segment rotating disk; 304-side support leg; 305-support pulley; 306-segment clamp; 307-connecting rod; 308-control and power input element; 309-second track wheel; 310-second frame; 311-gear ring; 312-support connecting rod; 4-lining segment; 400-repairing lining ring segment; 401-second lining segment; 5-middle guide tube; 501-support column; 6-pipeline. DETAILED DESCRIPTION

[0059] The following is a further detailed description of an auxiliary device for trenchless pipe lining repair construction proposed by the utility model in combination with the accompanying drawings and specific embodiments. The advantages and features of the utility model will become clearer according to the following description and claims. It should be noted that the accompanying drawings are in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the utility model.

[0060] Please see attached Figure 1 , Attachment Fig.13 To Attachment Fig.15 An auxiliary device for trenchless pipeline lining repair construction includes a transport track 1, a transport component 2 and a splicing component 3; the transport track 1 is arranged in the pipeline 6 parallel to the axial direction of the pipeline 6, and the transport track 1 is arranged on the top of the middle guide tube 5; the transport component 2 is movably arranged on the transport track 1, and the lining segment 4 is placed on the transport component 2 and moves synchronously with the transport component 2; the splicing component 3 is movably arranged on the transport track 1, and the splicing component 3 can clamp the lining segment 4, so that several lining segments 4 are connected on the splicing component 3 to form a repair lining ring segment 400, and the repair lining ring segment 400 is installed to the position of the pipeline 6 to be repaired.

[0061] The transport track 1 is used to guide and limit the movement of the transport assembly 2 and the splicing assembly 3, so as to ensure the stable transportation of the lining segment 4 between the middle conduit 5 and the pipeline 6. The transport assembly 2 is used to carry the lining segment 4, and the lining segment 4 is hoisted into the well and placed on the transport assembly 2, and the lining segment 4 is transported to the splicing assembly 3 through the transport assembly 2. The splicing assembly 3 is placed near the position of the pipeline 6 to be repaired, and is used to weld and splice several lining segments 4 to form a repair lining ring segment 400, so as to facilitate the installation of the spliced ​​repair lining ring segment 400 to the position of the pipeline 6 to be repaired.

[0062] By setting up the transport component 2, the problem of inconvenience in transporting the lining segments 4 due to the narrow space between the central conduit 5 and the pipeline 6 is solved; by using the splicing component 3, the lining segments 4 are temporarily fixed and rotated, which facilitates the welding and splicing operations of adjacent lining segments 4, thus solving the problem of difficulty in splicing the lining segments 4 in a narrow space.

[0063] Please see attached Figure 2 The transport track 1 includes a guide rail 101 and a bracket 102; a pair of guide rails 101 are parallel to each other and arranged along the entire axial direction of the pipeline 6 in the pipeline 6, and a plurality of brackets 102 are arranged at intervals along the axial direction of the pipeline 6 on the top of the middle duct 5, and a pair of guide rails 101 are installed on the top of the middle duct 5 through a plurality of brackets 102; the transport component 2 and the splicing component 3 are movably arranged on the pair of guide rails 101.

[0064] Preferably, the bracket 102 can adopt a U-shaped structure, and the bottom of the bracket 102 is an arc structure that matches the outer diameter of the middle duct 5, so that the bracket 102 fits on the top surface of the middle duct 5 through the arc structure, with a large contact area and high installation stability, so as to ensure the installation and use stability of the transport component 2 and the splicing component 3 on the transport track 1.

[0065] Preferably, the guide rail 101 can adopt a T-shaped or other structural form according to actual use requirements. The top two ends of the bracket 102 are respectively used to support a pair of guide rails 101. The number of brackets 102 can be adaptively adjusted according to the load-bearing requirements to ensure load-bearing safety.

[0066] Please see attached Figure 3 To Attachment Figure 5 The transport component 2 includes a first rail wheel 201, a lifting mechanism, a segment support plate 204 and a first frame 205; a plurality of first rail wheels 201 are installed in pairs on both sides of the first frame 205, and a plurality of first rail wheels 201 are rollingly set on a pair of guide rails 101; the segment support plate 204 can be lifted and lowered on the first frame 205 through a lifting mechanism, and the lining segment 4 is placed on the segment support plate 204.

[0067] Preferably, four first rail wheels 201 are disposed on both sides of the first frame 205 , and the four first rail wheels 201 cooperate with a pair of guide rails 101 to achieve movement of the first frame 205 along the pair of guide rails 101 .

[0068] Preferably, the segment support plate 204 has an arc surface structure matching the lining segment 4, so that the lining segment 4 is placed on the segment support plate 204 in a close fit, and the lining segment 4 can be stably placed on the segment support plate 204 by surface contact and move synchronously with the transport assembly 2. The lifting mechanism is used to control the height of the segment support plate 204, thereby controlling the height of the lining segment 4, setting the lining segment 4 at a certain height above the middle conduit 5, and will not be interfered by components such as the middle conduit 5 during transportation, and lifting the lining segment 4 after transportation to the destination, so that the splicing assembly 3 can temporarily clamp and fix the lining segment 4.

[0069] Please see attached Figure 3 The lifting mechanism includes a push-pull rod 202 and a lifting rod 203; the push-pull rod 202 is an X-shaped rotating and folding structure, a pair of push-pull rods 202 are symmetrically arranged on both sides of the first frame 205, and the pipe segment support plate 204 is arranged on the top of the pair of push-pull rods 202; a pair of lifting rods 203 are respectively connected between the pair of push-pull rods 202 and the first frame 205.

[0070] Preferably, the jacking rod 203 can be a hydraulic jacking rod, such as a jack, etc., and a hydraulic jacking rod of appropriate specifications can be selected according to the weight of the lining segment 4. A pair of jacking rods 203 are started synchronously to ensure the smooth lifting of the segment support plate 204, thereby ensuring that the lining segment 4 is stably lifted to the splicing assembly 3.

[0071] Please see attached Figure 6 To Attachment Fig. 9 The splicing assembly 3 includes a rotation drive mechanism, a pipe segment rotating disk 303, a pipe segment clamp 306, a support mechanism, a second track wheel 309 and a second frame 310; a plurality of second track wheels 309 are installed in pairs on both sides of the second frame 310, and a plurality of second track wheels 309 are rollingly arranged on a pair of guide rails 101; the pipe segment rotating disk 303 is arranged around the outer periphery of the middle conduit 5, the rotation drive mechanism is installed on the second frame 310 and is transmission-connected with the pipe segment rotating disk 303, a plurality of pipe segment clamps 306 are respectively arranged on the pipe segment rotating disk 303 at intervals, and the lining pipe segment 4 is clamped by the pipe segment clamp 306; a pair of support mechanisms are symmetrically arranged on both sides of the second frame 310, and each group of support mechanisms is supported between the middle conduit 5 and the pipe segment rotating disk 303.

[0072] Preferably, the segment clamps 306 can be arranged on the segment rotating disk 303 at intervals of 90° to clamp four liner segments 4 so that the four liner segments 4 can be spliced ​​to form a repaired liner ring segment 400. The rotation drive mechanism is used to drive the segment rotating disk 303 to rotate, so that the liner segments 4 are rotated to a position convenient for welding, which minimizes the impact of the narrow space on the splicing operation of the liner segments 4, and can avoid overhead welding operations, which is conducive to ensuring welding quality and welding efficiency.

[0073] Preferably, the outer diameter of the pipe segment rotating disk 303 is slightly smaller than the inner diameter of the repair lining ring segment 400, so that after the lining pipe segments 4 clamped by four pipe segment clamps 306 are spliced ​​into the repair lining ring segment 400, the diameter of the repair lining ring segment 400 meets the repair requirements of the pipeline 6.

[0074] Preferably, four second track wheels 309 are arranged on both sides of the second frame 310, and the four second track wheels 309 cooperate with a pair of guide rails 101 to realize the movement of the second frame 310 along the pair of guide rails 101, and the second frame 310 moves synchronously with the installation process of the repair liner ring piece 400.

[0075] The segment clamp 306 is used to temporarily clamp and fix the lining segment 4, so that the lining segment 4 is fixed on the segment rotating disk 303 and rotates synchronously with it. The support mechanism is used to support the segment rotating disk 303, transfer the weight of the segment rotating disk 303 and the weight of the lining segment 4 clamped thereon to the middle conduit 5, and ensure the splicing stability of the lining segment 4.

[0076] Please see attached Figure 6 To Attachment Fig. 9 The rotation driving mechanism includes a driving member 301, a driving gear 302 and a control and power input element 308; the driving member 301 is installed on the second frame 310, and the driving member 301 is externally connected to the power supply and control system through the control and power input element 308; the driving gear 302 is coaxially installed on the output shaft of the driving member 301, and a gear ring 311 is formed on the inner wall of the pipe segment rotating disk 303, so that the driving gear 302 is meshed and connected with the pipe segment rotating disk 303 through the gear ring 311.

[0077] Preferably, the driving member 301 can adopt a motor with forward and reverse functions, and the motor power can be selected according to the weight adaptability of the lining segment 4 to ensure that the segment rotating disk 303 and the lining segment 4 / repair lining ring segment 400 can be driven to rotate stably during splicing and installation operations.

[0078] The output shaft of the motor can be connected to the driving gear 302 through a coupling, and the motor controls the driving gear 302 to rotate forward or reverse, thereby driving the pipe segment rotating disk 303 and the lining pipe segment 4 to rotate to a position suitable for welding through the engagement of the driving gear 302 and the gear ring 311, or driving the pipe segment rotating disk 303 and the repaired lining ring segment 400 to rotate to a position suitable for installation.

[0079] Please see attached Figure 6 To Attachment Fig. 9Each group of the supporting mechanisms includes a side leg 304, a supporting pulley 305 and a supporting connecting rod 312; one end of the side leg 304 is connected to the side of the second frame 310, and the other end of the side leg 304 is connected to the supporting connecting rod 312; one end of the supporting connecting rod 312 abuts against the outer wall of the middle conduit 5, and the other end of the supporting connecting rod 312 is rotatably mounted on the axis of the supporting pulley 305 through a rotating bearing, and the supporting pulley 305 rolls against the inner wall of the pipe segment rotating disk 303.

[0080] Preferably, the side support legs 304 can adopt an arc structure to avoid collision with the middle duct 5. At the same time, a detachable or rotatable connection can be adopted between the side support legs 304 and the second frame 310. When the second frame 310 moves, the supporting mechanism is not installed or the supporting mechanism is rotated upward to prevent wear between the supporting connecting rod 312 and the middle duct 5. When splicing the lining segments 4 and installing and repairing the lining ring segments 400, the supporting mechanism is installed or rotated downward to abut against the middle duct 5, so as to provide reliable support on both sides for the segment rotating disk 303, the lining segments 4 and the repaired lining ring segments 400, thereby ensuring the stability and safety of the construction process.

[0081] Through the setting of the supporting connecting rod 312, the weight of the pipe segment rotating disk 303 and the lining pipe segment 4 is transferred to the middle duct 5. A pair of supporting mechanisms and the driving gear 302 form three supporting points. The three supporting points distributed in an isosceles triangle can ensure the setting stability of the pipe segment rotating disk 303, the lining pipe segment 4 and the repair lining ring segment 400 to the greatest extent and avoid instability.

[0082] By setting the supporting pulley 305, the supporting pulley 305 is in rolling contact with the inner wall of the pipe segment rotating disk 303, and the friction force is small, which can reduce the friction resistance while ensuring stable support.

[0083] Please see attached Figure 6 To Attachment Fig. 9 The segment rotating disk 303 is an open annular structure, and a connecting rod 307 can be detachably installed at the opening of the segment rotating disk 303, so that the segment rotating disk 303 and the connecting rod 307 form a closed loop structure.

[0084] The opening width of the pipe segment rotating disk 303 is not less than the outer diameter of the middle duct 5, so that it is convenient to install the pipe segment rotating disk 303 on the outer periphery of the middle duct 5. After the installation is completed, the opening of the pipe segment rotating disk 303 is closed by the connecting rod 307 to form a closed-loop structure, thereby improving the integrity and bearing capacity of the closed-loop structure.

[0085] Preferably, the segment rotating disk 303 is slightly larger than a 3 / 4 circle, ensuring that the four segment clamps 306 are arranged at equal intervals of 90° on the segment rotating disk 303, and the connecting rod 307 is slightly smaller than a 1 / 4 circle.

[0086] Please see attached Figure 1 To Attachment Fig.16 A method for using an auxiliary device for trenchless pipe lining repair construction comprises the following steps:

[0087] Step 1: a transport track 1 is laid out in the pipeline parallel to the axial direction of the pipeline, and the transport track 1 is installed on the top of the middle conduit 5.

[0088] Specifically, a plurality of brackets 102 are fixedly installed on the top of the middle conduit 5 along the axial direction of the middle conduit 5 , and then a pair of guide rails 101 are installed on the plurality of brackets 102 , and the pair of guide rails 101 are arranged parallel to each other.

[0089] The bracket 102 can be installed on the middle conduit 5 by welding, screwing, etc., as long as stable installation and safe bearing are ensured.

[0090] Please see attached Fig. 9 , Step 2: Place the splicing assembly 3 on the transport track 1 and slide it along the transport track 1 to the splicing position of the lining segment 4.

[0091] The splicing position of the lining pipe segment 4 is located beside the installation position of the repair lining ring segment 400, so that after the splicing of the repair lining ring segment 400 is completed, it can be directly installed at the position in the pipeline 6 that needs to be repaired.

[0092] The step 2 comprises the following sub-steps:

[0093] Step 2.1: The second frame 310 of the splicing assembly 3 is placed on a pair of guide rails 101 via a plurality of second track wheels 309 .

[0094] Step 2.2: Remove the connecting rod 307 , and fit the pipe segment rotating disk 303 onto the outer periphery of the middle conduit 5 , and the pipe segment rotating disk 303 is meshed with the driving gear 302 .

[0095] At this time, the weight of the segment rotating disk 303 is borne by the driving gear 302 and transmitted to the top of the middle conduit 5 .

[0096] Step 2.3: Install the connecting rod 307 to the opening of the pipe segment rotating disk 303, so that the connecting rod 307 and the pipe segment rotating disk 303 form a closed loop structure.

[0097] When rotating the pipe segment rotating disk 303, the pipe segment rotating disk 303 is prevented from falling off the driving gear 302. Since the connecting rod 307 occupies a smaller size of the closed-loop structure, the welding positions of the four lining pipe segments 4 can be rotated to the top of the middle conduit 5, thereby facilitating the welding and splicing operations of the lining pipe segments 4.

[0098] Step 2.4: The splicing assembly 3 is integrally moved along a pair of guide rails 101 to the splicing position of the lining segment 4 via a plurality of second track wheels 309 .

[0099] Step 2.5: One end of the supporting connecting rods 312 of a pair of supporting mechanisms are respectively abutted against the outer walls of both sides of the middle conduit 5, and the supporting pulleys 305 of a pair of supporting mechanisms are respectively abutted against the inner wall of the pipe segment rotating disk 303.

[0100] By setting a pair of supporting mechanisms on both sides of the second vehicle body 310, the supporting connecting rod 312 is supported on the middle duct 5, and the supporting pulley 305 abuts against the inner wall of the pipe segment rotating disk 303 to prevent the pipe segment rotating disk 303 from shaking left and right, thereby ensuring the splicing stability of the subsequent lining pipe segment 4.

[0101] Step 3: Set the transport component 2 on the transport track 1, place the lining pipe segment 4 on the transport component 2, and transport it along the transport track 1 to the splicing component 3 through the transport component 2.

[0102] Specifically, the first frame 205 is placed on a pair of guide rails 101 through a plurality of first track wheels 201, and then a lining segment 4 is placed on the segment support plate 204, and the transport assembly 2 and the lining segment 4 are moved as a whole along the transport track 1 to the splicing assembly 3 through the first track wheels 201.

[0103] When the transport component 2 transports the lining segment 4, the push-pull rod 202 is folded, thereby lowering the height and center of gravity of the lining segment 4, which can not only ensure the transportation stability of the lining segment 4, but also avoid collision between the lining segment 4 and equipment and components inside the pipeline 6, thereby improving the transportation safety of the lining segment 4 and reducing the transportation space requirement between the pipeline 6 and the central conduit 5.

[0104] Please see attached Fig.10 , Step 4: The splicing assembly 3 temporarily fixes the lining segment 4, and rotates the lining segment 4 to the welding position.

[0105] Preferably, the welding position can be located at the top of the middle duct 5, and the spliced ​​ends of the lining segments 4 are rotated to the top of the middle duct 5, so that construction personnel can set up a welding operation platform on the top of the middle duct 5 for welding adjacent lining segments 4, avoiding overhead welding operations, which is beneficial to ensuring welding quality and welding efficiency.

[0106] The step 4 comprises the following sub-steps:

[0107] Step 4.1: The lifting rod 203 pushes the push-pull rod 202 , so that the pair of push-pull rods 202 lift the segment support plate 204 to the height of the segment clamp 306 .

[0108] In order to avoid collision, the transportation height of the lining segment 4 is relatively low. After being transported to the destination, it is necessary to provide power through the lifting rod 203 to unfold the push-pull rod 202 of the X-shaped structure. The push-pull rod 202 can adopt the scissors support of the existing technology to lift the lining segment 4 through the segment support plate 204 to the height of the segment clamp 306 to ensure that the segment clamp 306 can reliably clamp the lining segment 4.

[0109] Step 4.2: Temporarily fix the lining segment 4 by using the segment clamp 306 .

[0110] The segment clamp 306 can adopt a conventional clamping structure of the segment, and stably clamp the liner segment 4 through the segment clamp 306. Preferably, one liner segment 4 can be clamped and fixed by one segment clamp 306. If the liner segment 4 is larger in size or heavier in weight, the number of segment clamps 306 can be increased.

[0111] Step 4.3: The control and power input element 308 controls the driving member 301 to start, so that the driving member 301 drives the driving gear 302 to rotate.

[0112] The power supply provides working power to the driving member 301 through the control and power input element 308. The control system controls the rotation direction and rotation speed of the motor through the control and power input element 308, so that the driving gear 302 drives the pipe segment rotating disk 303 in a specified direction and speed.

[0113] Step 4.4: The driving gear 302 engages the transmission segment rotating disk 303 through the gear ring 311, so that the segment rotating disk 303 drives the lining segment 4 to rotate to the welding position through the segment clamp 306.

[0114] The driving gear 302 is meshed with the gear ring 311 , and the transmission stability is high, and it is not easy to slip or loosen, thereby ensuring the stable rotation of the lining segment 4 and preventing the lining segment 4 from shaking due to the shift of the center of gravity.

[0115] Please see attached Fig.11 To Attachment Fig.14 Step 5: Weld two adjacent liner segments 4 so that several liner segments 4 are spliced ​​on the splicing assembly 3 to form a repaired liner ring segment 400.

[0116] The liner segments 4 are spliced ​​together by conventional welding to form the repaired liner ring segments 400, which will not be described in detail here.

[0117] The step 5 comprises the following sub-steps:

[0118] Step 5.1: Transport component 2 returns, and steps 3 and 4 are repeated to transport the next lining segment 401 to the splicing component 3.

[0119] The method of transporting the lining segments 401 through the transport assembly 2 is the same as step 3, and will not be repeated here. The transport assembly 2 transports the lining segments 4 back and forth, and forms a flow-type collaborative operation device with the splicing assembly 3, which reduces the difficulty of transporting and assembling the lining segments 4 and improves the construction efficiency.

[0120] Step 5.2: Temporarily fix the next lining segment 401 by the segment clamp 306, and the next lining segment 401 is adjacent to the lining segment 4 to facilitate welding and splicing.

[0121] Step 5.3: Weld the next lining segment 401 to the lining segment 4, as shown in the attached Fig.11 shown.

[0122] Step 5.4: Repeat steps 5.1 to 5.3, transport and weld several liner segments 4 in sequence, and form a repaired liner ring segment 400, as shown in the attached figure. Fig.12 To Attachment Fig.14 shown.

[0123] Please see attached Fig.15 Step 6: Replace the support of the middle conduit 5 and install the repair liner ring piece 400 to the part of the pipeline 6 to be repaired.

[0124] Specifically, support columns 501 are provided between the bottom sides of the middle conduit 5 and the inner wall of the pipe 6. Fig.16 As shown, replacement support columns (not shown in the figure) are set between the two sides of the bottom of the middle conduit 5 and the inner wall of the installed repair liner ring segment 400, and the support columns 501 at the repair liner ring segment 400 to be installed are removed, and the repair liner ring segment 400 is installed to the position to be installed and connected to the installed repair liner ring segment 400 into a whole.

[0125] Since the weight of the entire auxiliary device and the repair liner ring 400 needs to be borne by the middle conduit 5, supporting columns 501 are arranged between the bottom sides of the middle conduit 5 and the inner wall of the pipe 6 to improve the stability of the middle conduit 5 and ensure the safety of the construction.

[0126] However, since the setting of the support column 501 will interfere with the movement and installation of the repair liner ring segment 400, it is necessary to replace the support first, and install the repair liner ring segment 400 on the basis of ensuring safety. When replacing the support, first remove the support column 501 that interferes with the installation of the repair liner ring segment 400, and set the replacement support column between the installed repair liner ring segment 400 and the middle conduit 5. The replacement support column here will not interfere with the subsequent installation of the repair liner ring segment 400, thereby ensuring the construction safety of the repair liner ring segment 400 to be installed.

[0127] Step 7: Release the temporary clamping of the splicing assembly 3 on the repair liner ring piece 400, and move the splicing assembly 3 to the next welding position.

[0128] Step 8: Repeat steps 2 to 7 until the repair of pipe 6 is completed.

[0129] When the repair liner ring segments 400 are installed sequentially, adjacent repair liner ring segments 400 may be connected by staggered seams to improve the structural strength of the entire repair liner.

[0130] The above description is only a description of the preferred embodiment of the utility model, and is not any limitation on the scope of the utility model. Any changes and modifications made by ordinary technicians in the field of the utility model based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. An auxiliary device for trenchless pipeline lining repair construction, characterized in that: include: A transport track (1), a transport component (2) and a splicing component (3); the transport track (1) is arranged in the pipeline (6) parallel to the axial direction of the pipeline (6) and is arranged on the top of the middle conduit (5); the transport component (2) is movably arranged on the transport track (1), and the lining pipe segment (4) is placed on the transport component (2) and moves synchronously with the transport component (2); the splicing component (3) is movably arranged on the transport track (1), and the splicing component (3) can clamp the lining pipe segment (4), so that a plurality of lining pipe segments (4) are connected on the splicing component (3) to form a repair lining ring segment (400), and the repair lining ring segment (400) is installed at the position to be repaired of the pipeline (6).

2. The auxiliary device for trenchless pipe lining repair construction according to claim 1, characterized in that: The transport track (1) comprises a guide rail (101) and a bracket (102); a pair of guide rails (101) are parallel to each other and arranged along the entire axial direction of the pipeline (6) in the pipeline (6); a plurality of brackets (102) are arranged at intervals on the top of the middle conduit (5) along the axial direction of the pipeline (6); a pair of guide rails (101) are installed on the top of the middle conduit (5) via the plurality of brackets (102); and the transport component (2) and the splicing component (3) are movably arranged on the pair of guide rails (101).

3. The auxiliary device for trenchless pipe lining repair construction according to claim 2, characterized in that: The transport assembly (2) comprises a first rail wheel (201), a lifting mechanism, a segment support plate (204) and a first frame (205); a plurality of first rail wheels (201) are installed in pairs on both sides of the first frame (205), and a plurality of first rail wheels (201) are rollingly arranged on a pair of guide rails (101); the segment support plate (204) is liftably arranged on the first frame (205) through the lifting mechanism, and the lining segment (4) is placed on the segment support plate (204); The lifting mechanism comprises a push-pull rod (202) and a lifting rod (203); the push-pull rod (202) is an X-shaped rotating folding structure, a pair of push-pull rods (202) are symmetrically arranged on both sides of a first frame (205), and a pipe segment support plate (204) is arranged on the top of the pair of push-pull rods (202); and a pair of lifting rods (203) are respectively connected between the pair of push-pull rods (202) and the first frame (205).

4. The auxiliary device for trenchless pipe lining repair construction according to claim 2, characterized in that: The splicing assembly (3) comprises a rotation drive mechanism, a pipe segment rotating disk (303), a pipe segment clamp (306), a support mechanism, a second track wheel (309) and a second frame (310); a plurality of second track wheels (309) are installed in pairs on both sides of the second frame (310), and a plurality of second track wheels (309) are rollingly arranged on a pair of guide rails (101); the pipe segment rotating disk (303) is arranged around the outer periphery of the middle conduit (5), the rotation drive mechanism is installed on the second frame (310) and is transmission-connected to the pipe segment rotating disk (303), a plurality of pipe segment clamps (306) are respectively arranged at intervals on the pipe segment rotating disk (303), and the lining pipe segment (4) is clamped by the pipe segment clamps (306); a pair of support mechanisms are symmetrically arranged on both sides of the second frame (310), and each group of support mechanisms is supported between the middle conduit (5) and the pipe segment rotating disk (303).

5. The auxiliary device for trenchless pipe lining repair construction according to claim 4, characterized in that: The rotation drive mechanism comprises a driving member (301), a driving gear (302) and a control and power input element (308); the driving member (301) is mounted on the second frame (310), and the driving member (301) is externally connected to a power source and a control system through the control and power input element (308); the driving gear (302) is coaxially mounted on the output shaft of the driving member (301), and a toothed ring (311) is formed on the inner wall of the pipe segment rotating disk (303), so that the driving gear (302) is meshed and transmission-connected with the pipe segment rotating disk (303) through the toothed ring (311); Each group of the supporting mechanisms comprises a side leg (304), a supporting pulley (305) and a supporting connecting rod (312); one end of the side leg (304) is connected to the side of the second frame (310), and the other end of the side leg (304) is connected to the supporting connecting rod (312); one end of the supporting connecting rod (312) is in contact with the outer wall of the middle conduit (5), and the other end of the supporting connecting rod (312) is rotatably mounted with the supporting pulley (305), and the supporting pulley (305) is in rolling contact with the inner wall of the pipe segment rotating disk (303); The segment rotating disk (303) is an open annular structure, and a connecting rod (307) is detachably mounted at the opening of the segment rotating disk (303), so that the segment rotating disk (303) and the connecting rod (307) form a closed loop structure.

Citation Information

Cited By

  • Auxiliary device for repairing construction of trenchless pipeline lining and using method of auxiliary device

    CN117927771A

  • A device for assisting with trenchless pipe-in-pipe lining rehabilitation construction and method of use thereof

    CN117927771B