Unmanned aerial vehicle guided lofting system for overhead line pole
Through the drone guided stake system, the centimeter-level positioning accuracy is achieved using laser emitters and balanced components, solving the problem of time-consuming and low efficiency of traditional construction staked operations, and improving the efficiency and intelligent application level of overhead line tower poles.
Patent Information
- Application Number
- CN202420529739.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-19
AI Technical Summary
The construction of traditional overhead lines is time-consuming, low-efficiency, high-cost, and labor-intensive. The data is prone to errors and it is difficult to adapt to digital transformation, especially in complex environments that the risk and difficulty of layout increase.
Design an overhead line tower pole drone guided stakeout system, including ground control stations and stakeout drone, equipped with laser transmitters and balance components, realize centimeter-level positioning accuracy through wireless communication and RTK equipment, simplify stakeout point positioning, and reduce Work difficulty.
It greatly reduces the layout time of staking points, improves working efficiency, reduces manual errors, improves the level of intelligent application, and simplifies the positioning method of staking points.
Smart Images

Figure CN222040749U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of overhead line construction layout, and relates to an overhead line tower pole unmanned aerial vehicle guided layout system. Background Art
[0002] As a medium for carrying and transmitting electric power resources, the power grid is the core infrastructure to ensure my country's economic development and people's livelihood. With the rapid development of the economy and society, my country is actively promoting the construction of a national smart grid, which puts higher requirements on power grid projects. In the process of implementing overhead lines in power grid projects, stakeout is the basic work of overhead line tower construction. Therefore, it is particularly important to improve the stakeout operation mode of overhead lines in power grid projects and enhance the level of intelligent application.
[0003] Traditional construction and layout operations in overhead lines are characterized by high precision and large workload. They mainly rely on manual use of tape measures, theodolites, total stations and other equipment to carry out related operations. This operation method has the disadvantages of long time consumption, low efficiency, high cost, high labor intensity, much manual intervention, and easy data errors. In addition, the progress of work is also easily affected by operating conditions and environment. Since most transmission line projects need to pass through high mountains, dense forests, deserts and other areas, they have the characteristics of long distances, narrow rivers, and complex construction environments. The risk and difficulty of laying out the layout points increase rapidly, and the relevant data results are relatively primitive, which is difficult to adapt to the requirements of digital transformation. Therefore, based on new technologies, research on the application of drones in the construction and layout of power grid projects is an inevitable trend to vigorously promote the construction of national smart grids.
[0004] In power grid projects, drone technology is mostly used in route inspection, line inspection, safety monitoring, etc., and there is basically no research on its direct application in the layout of layout points. Existing construction layout is mostly done through surveying and mapping instruments such as pit splitters and total stations, which are cumbersome and time-consuming. Summary of the invention
[0005] The technical problem solved by the utility model is to provide an overhead line tower UAV-guided layout system, which reduces the difficulty of construction layout work and reduces the field workload of surveying personnel while ensuring the layout accuracy.
[0006] The utility model is realized by the following technical solutions:
[0007] An overhead line tower UAV-guided layout system comprises a ground control station and a layout UAV. A gimbal is provided at the bottom of the layout UAV. A laser transmitter is connected to the gimbal via a gimbal adapter ring and shares a power supply with the layout UAV. A balancing component is also provided on the laser transmitter.
[0008] The balancing component is connected to the top of the laser transmitter through a clamp.
[0009] The balancing component comprises a control board, a gyro sensor, a buzzer and a power module which are arranged in a shell; the gyro sensor and the buzzer are respectively connected to the control board, and the power module is connected to the control board and supplies power to it.
[0010] The ground control station is provided with a wireless communication module, which sends instructions to the lofting drone and the laser transmitter through the wireless communication module;
[0011] When the layout UAV flies to the layout point and hovers, the ground control station controls the laser transmitter to emit laser to guide and mark the layout point.
[0012] Furthermore, it also includes RTK equipment, which is connected to the ground control station via Bluetooth. After the connection is successful, the ground control station can achieve centimeter-level positioning accuracy.
[0013] Furthermore, it also includes a centering rod, and the ground control station is installed on the centering rod through a clamp or a bracket; the centering rod is placed at the layout point mark to perform positioning verification on the layout point.
[0014] Compared with the prior art, the utility model has the following beneficial technical effects:
[0015] The utility model provides an overhead line tower UAV guidance layout system, which controls the layout UAV to accurately locate the target point through a ground control station, and then performs fixed-point guidance of the target point through the laser transmitter carried by the layout UAV, which simplifies the layout point positioning method and reduces the difficulty of the layout work.
[0016] The utility model provides an overhead line tower UAV guided layout system, wherein a balancing component with a gyro sensor is designed on the laser transmitter, thereby ensuring the balance state of the small laser transmitter and the accuracy of the laser projection.
[0017] The overhead line tower UAV-guided layout system provided by the utility model uses a UAV in combination with a laser transmitter to guide the positioning of the layout points, thereby eliminating the traditional steps of using a pit divider to determine the orientation of the tower legs and then using surveying instruments such as theodolite to locate the layout points. This greatly reduces the time required for the layout of the layout points, improves work efficiency, reduces manual layout errors caused by factors such as terrain, improves the traditional construction layout operation method, and improves the level of intelligent application. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the structure of the layout UAV of the utility model;
[0019] Figure 2 It is a structural schematic diagram of the balancing component of the utility model;
[0020] Figure 3 It is a schematic diagram of the ground control station of the utility model installed on the centering pole;
[0021] Among them, 1 is a ground control station, 2 is a layout UAV, 3 is a laser transmitter, 4 is a balance component, 5 is a centering rod; 41 is a control board, 42 is a gyroscope sensor, 43 is a buzzer, and 44 is a power module. DETAILED DESCRIPTION
[0022] The present invention is further described in detail below in conjunction with the accompanying drawings, which are intended to explain the present invention rather than to limit it.
[0023] In the layout operation of overhead line construction of power grid engineering, the layout of layout points is based on the tower base. When the coordinates of the center pile are known, each tower needs to be laid out with 4 tower leg piles and 16 tower leg corner piles. The drone-guided layout system in overhead line engineering provided by the utility model is positioned by the layout drone and guided by the laser transmitter it carries, eliminating the traditional steps of using a pit divider to determine the tower leg orientation and then using surveying instruments such as theodolites to locate the layout points.
[0024] See also Figure 1 , Figure 2 A UAV-guided layout system for an overhead line tower includes a ground control station 1 and a layout UAV 2. A gimbal is provided at the bottom of the layout UAV 1. A laser transmitter 3 is connected to the gimbal through a gimbal adapter ring and shares a power supply with the layout UAV 1. A balancing component 4 is also provided on the laser transmitter 3.
[0025] Specifically, the balancing assembly 4 is connected to the top of the laser emitter 3 via a clamp.
[0026] Furthermore, the balancing component 4 includes a control board 41, a gyro sensor 42, a buzzer 43 and a power module 44 arranged in the shell; the gyro sensor 42 and the buzzer 43 are respectively connected to the control board 41, and the power module 44 is connected to the control board 41 and supplies power to it.
[0027] The ground control station is provided with a wireless communication module, which sends instructions to the lofting drone and the laser transmitter through the wireless communication module;
[0028] When the layout UAV flies to the layout point and hovers, the ground control station controls the laser transmitter to emit laser to guide and mark the layout point.
[0029] In order to ensure the accuracy of the stakeout, the coordinates of the marked points are checked after the stakeout points are marked: the RTK device is connected to the stakeout console via Bluetooth. After the connection is successful, the stakeout console can achieve centimeter-level positioning accuracy;
[0030] Install the layout console on the centering rod through clamps or brackets, place the centering rod at the layout point mark, and when the horizontal bubble on the centering rod is centered, perform precise positioning check on the layout point to ensure that the error between the current layout coordinates and the design coordinates is within 0.1 meters.
[0031] An embodiment is given below and each component is described in detail.
[0032] The staking drone 2 uses the DJI M300 RTK, which has an RTK differential positioning module. When the differential data of the custom network RTK is acquired and used, the horizontal position accuracy can reach 1cm±1ppm.
[0033] A gimbal is installed at the bottom of the layout UAV 2, and the laser transmitter 3 is connected to the UAV gimbal 21 through a gimbal adapter ring and shares the power supply with the UAV 2; when the layout UAV 2 flies to the layout point and hovers to a stable posture, the staff controls the laser 3 to emit laser through the ground control station 12 to complete the guide marking of the layout point.
[0034] The balancing component 4 is composed of a control board 41, a gyro sensor 42, a buzzer 43, a power module 44 and a housing 45; the control board 41 uses a single-sided circuit board; the gyro sensor 42 uses an MPU6050 gyro sensor, which is connected to the control board 41 through a copper wire, and the control board 41 exchanges data with the gyro sensor 42 through the IIC bottom layer communication protocol;
[0035] The buzzer 43 is connected to the control board 41 through a copper wire, and the power module 44 is connected to the control board 41 through a copper wire for power supply. The housing 45 is an external structure for mounting the balancing component, and the housing is made of aluminum alloy.
[0036] After the surveying drone 2 flies to the target point and hovers, the laser transmitter 3 installed at the gimbal 21 may not be in an ideal horizontal plane, and may produce a slight tilt, resulting in a projection point position error; the balance component 4 installed in the center of the top of the laser transmitter 3 determines whether the laser light is in a vertical downward state by obtaining the value of the gyroscope sensor 42.
[0037] If the balance component is in a horizontal state, the current laser light is in a vertical downward state, and the buzzer 43 of the balance component sounds a buzzer alarm to remind the staff to mark the current laser projection point;
[0038] If the balance component 4 is not in a horizontal state, the staff needs to correct the position of the laser light through the ground control station so that the laser light is in a vertical downward state until the balance component 4 sends out a buzzer alarm to ensure the accuracy of the laser projection on the ground.
[0039] The following is the layout operation of the overhead line tower drone-guided layout system, which specifically includes the following steps:
[0040] (1) Connect the balancing assembly 4 to the top of the laser transmitter 3 through a clamp, and connect the laser transmitter 3 to the drone gimbal 21 through a gimbal adapter ring;
[0041] Turn on the network RTK of the differential positioning module of the sample UAV 2 through the ground control station 1 to ensure that the UAV 2 has obtained and can use the differential data of the customized network RTK; perform pre-flight inspection and test flight tests on the sample UAV according to the pre-flight inspection items of the UAV, and perform operation tests of the laser transmitter 3 through the ground control station.
[0042] (2) Control the layout drone 2 to fly to the layout target point. During the flight, the drone differential positioning module will update the position information between the drone and the target point in real time. When the error between the drone coordinates and the target point coordinates is within the tolerance range, the drone will hover; otherwise, error correction will continue, reducing the positioning error caused by the drone hovering.
[0043] (3) After the user reaches the hovering position of the drone 2, he turns on the laser transmitter 3 through the ground control station 1. If the balancing component 4 emits a buzzing alarm, it is considered that the laser transmitter 3 is in a vertical downward state. The laser projects a point on the ground to form a circular light spot. The user marks the layout point based on the light spot.
[0044] If the balancing component 4 does not sound a buzzer alarm at this time, the position of the laser transmitter 3 is corrected until the balancing component 4 sounds a buzzer alarm. The staff then marks the point according to the laser projection guidance on the ground to complete the marking of the current stakeout point.
[0045] (4) After the current stakeout point is marked, the stakeout drone restarts and moves to the next target point for stakeout point positioning guidance; after all target points to be staked out have been staked out, the stakeout drone returns to the take-off point along the flight route.
[0046] The overhead line tower UAV-guided layout system provided by the utility model uses a UAV in combination with a laser transmitter to guide the positioning of the layout points, thereby eliminating the traditional steps of using a pit divider to determine the orientation of the tower legs and then using surveying instruments such as theodolite to locate the layout points. This greatly reduces the time required for the layout of the layout points, improves work efficiency, reduces manual layout errors caused by factors such as terrain, improves the traditional construction layout operation method, and improves the level of intelligent application.
[0047] The above embodiments are preferred examples for implementing the present invention, and the present invention is not limited to the above embodiments. Any non-essential additions and substitutions made by those skilled in the art based on the technical features of the present invention are within the protection scope of the present invention.
Claims
1. An overhead line tower drone-guided layout system, characterized in that: It includes a ground control station and a layout UAV. A gimbal is provided at the bottom of the layout UAV. A laser transmitter is connected to the gimbal through a gimbal adapter ring and shares a power supply with the layout UAV. A balancing component is also provided on the laser transmitter.
2. The overhead line tower drone-guided layout system according to claim 1, characterized in that: The balancing component is connected to the top of the laser transmitter through a clamp.
3. The overhead line tower UAV-guided layout system according to claim 1 or 2, characterized in that: The balancing component comprises a control board, a gyro sensor, a buzzer and a power module which are arranged in a shell; the gyro sensor and the buzzer are respectively connected to the control board, and the power module is connected to the control board and supplies power to it.
4. The overhead line tower drone-guided layout system according to claim 1, characterized in that: The ground control station is provided with a wireless communication module, which sends instructions to the lofting drone and the laser transmitter through the wireless communication module; When the layout UAV flies to the layout point and hovers, the ground control station controls the laser transmitter to emit laser to guide and mark the layout point.
5. The overhead line tower drone-guided layout system according to claim 1, characterized in that: It also includes RTK equipment, which is connected to the ground control station via Bluetooth. After the connection is successful, the ground control station can achieve centimeter-level positioning accuracy.
6. The overhead line tower drone-guided layout system according to claim 1 or 5, characterized in that: It also includes a centering rod, and the ground control station is installed on the centering rod through a clamp or a bracket; the centering rod is placed at the layout point mark to perform positioning verification on the layout point.