Upper sliding plate brick for slag stopping of converter

By designing T-shaped semicircular zirconium ring and reinforcement ribs on the converter skate bricks, combining fire mud and iron hoops, the problems of zirconium ring sinking and high cost are solved, and the fastening and safety of the zirconium ring and the upper skate bricks are improved. , reduces the amount of zirconia and extends the life of the skateboard.

CN222043268UActive Publication Date: 2024-11-22MAANSHAN LIER KAIYUAN NEW MATERIAL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420215698.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-11-22
Estimated Expiration
2034-01-29

AI Technical Summary

Technical Problem

Existing converter skateboard bricks are prone to zirconium ring sinking during use, resulting in the problem of zirconium ring clamping steel. At the same time, the amount of zirconium oxide is high, the cost is high, and the zirconium ring is easy to move, which affects safety and life.

Method used

A sled brick for converter slag stopping is designed, and a T-shaped semicircular zirconium ring is used to combine with the brick body. By setting grooves on the brick body to inlay zirconium rings, and reinforcement ribs on the side of the zirconium ring, combining fire mud and iron hoops to Improves fastness and prevents movement.

Benefits of technology

It effectively avoids sinking of zirconium rings, reduces the amount of zirconia, reduces the cost, improves the bonding and fastening of the zirconium ring and the upper skateboard brick, extends the life of the upper skateboard and improves safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043268U_ABST
    Figure CN222043268U_ABST
Patent Text Reader

Abstract

The utility model discloses an upper sliding plate brick for slag stopping of a converter, and relates to the technical field of refractory materials. The upper sliding plate brick comprises a brick body, a zirconium ring, fire clay, an iron hoop and a veneer. The brick body is provided with a through hole penetrating through the brick body, the inner side of the through hole is provided with a groove for accommodating the zirconium ring, the groove is used for embedding the zirconium ring, the zirconium ring is a T-shaped semicircular ring, and the concentricity of the zirconium ring and the brick body is ensured. The T-shaped semi-circular ring design is adopted, the upper edge of the T-shaped ring is in lap joint with the groove formed in the brick body, and the problem that steel is clamped by a zirconium ring due to the fact that the through ring is prone to sinking in the using process is solved. Meanwhile, the size of the zirconium ring is controlled within a reasonable range, and tight combination of the zirconium ring and the brick body is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of refractory materials, and more specifically relates to an upper slide brick used for converter slag blocking. Background Art

[0002] The converter slide slag blocking technology opens or closes the slide mechanically or hydraulically to achieve the purpose of slag blocking. It can effectively control the early and late slag discharge, and the slag blocking success rate can reach 100%. Compared with other slag blocking technologies, the slag blocking rate is significantly improved, and the safety and reliability are greatly improved. Among them, the slide brick is the core component of the refractory material of the converter slag blocking system. Its life and safety directly affect the production efficiency and slag blocking success rate of the converter. During the service of the slide brick, when the slide is closed after the steel is tapped, the lower part of the casting hole of the upper slide needs to withstand the instantaneous slag blocking eddy current, which causes the lower part of the upper slide to be scour faster and the hole to expand larger, which seriously restricts the life and safety of the slide.

[0003] The material of the domestic upper slide is generally an integrally formed aluminum carbon and aluminum zirconium carbon, and its service life is generally 10-15 furnaces; the inlaid zirconium upper slide has a service life of about 15 furnaces. For example, patent CN211848035U discloses a T-shaped zirconium dioxide ceramic ring used in the converter slag retaining mechanism, including a ring seat and a zirconium ring; the ring seat and the zirconium ring are an integrally formed structure; the longitudinal section of the integrally formed structure is T-shaped, and the inside of the ring seat and the inside of the zirconium ring are both provided with channels, and the longitudinal section of the channel is rectangular. The utility model adopts an integrated structure of zirconium ring and ring seat, which can achieve a fast and flexible production and processing effect of zirconium ring. At the same time, with its T-shaped structure, it can increase the relative fastening force of the zirconium ring and the slide at the installation of the slag retaining mechanism, and prevent the zirconium ring from accidentally slipping off. However, its disadvantage is that the amount of zirconium oxide used in the through ring design is high and the cost is high, and the zirconium ring is not designed with an inlay groove, which is easy to move during use.

[0004] For another example, patent CN202671572U discloses an inner and outer slide brick for a converter slide slag blocking and steel-discharging device, which includes a slide brick, the end face of which is penetrated by a steel flow hole for circulating molten steel, a zirconium tube is sleeved at the edge of the steel flow hole, and the zirconium tube and the zirconium plate are in close contact with each other, a zirconium ring is arranged at the edge of one end of the steel flow hole opposite to the zirconium plate, and the center hole of the zirconium ring is the steel flow hole, but its disadvantage is that the through-ring design uses a high amount of zirconium oxide and has a high cost, and does not involve a step to prevent movement, so it is easy to move during use.

[0005] And because the embedded zirconium ring is large in size, the overall cost of the upper slide brick is relatively high. At the same time, the shape of the zirconium ring embedded in the upper slide is generally a through ring, and the zirconium ring is prone to sinking during use, causing the problem of the zirconium ring clamping the steel. Summary of the invention

[0006] 1. Problems to be solved

[0007] Aiming at the problem that the zirconium ring is prone to sinking and thus the zirconium ring clamps the steel when the existing through-ring is inlaid on the upper slide brick, the utility model provides an upper slide brick for converter slag blocking, and the zirconium ring of the upper slide brick is firmly combined with the upper slide brick.

[0008] 2. Technical solution

[0009] To solve the above problems, the utility model adopts the following technical solutions.

[0010] The utility model discloses an upper slide brick for converter slag retaining, comprising a brick body, a zirconium ring, fire clay, an iron hoop and a veneer.

[0011] The brick body is provided with a through hole penetrating the brick body for slag discharge, and a groove for accommodating a zirconium ring is provided inside the through hole for embedding the zirconium ring, and the groove has a depth of 1 to 2 mm and a width of 1 to 3 mm.

[0012] The zirconium ring is embedded in the groove inside the through hole and is a T-shaped semicircular ring. The zirconium ring and the brick body are concentric. The width a of the zirconium ring is 1 The width b of the overlapped brick is 40~60mm. 1 10~15mm, height h 1 The width is 15-20mm, and the arc is l is 10-15mm. If the width is too large, the aperture will be too large. If the width is too small, it will be not conducive to overlap and the bonding strength will be low. The utility model adopts the design of a T-shaped semicircular ring, and uses the upper edge of the T-shaped ring to overlap with the groove opened on the brick body to avoid the problem of the through ring sinking easily during use, causing the zirconium ring to clamp the steel. The thickness of the brick body of the upper slide brick of the utility model is 70-75mm, the diameter of the through hole is 140-160mm, and the height of the zirconium ring is designed to be 70-75mm. The reason is that the flow steel holes at the lower part of the casting hole of the upper slide are all inlaid with semicircular zirconium rings. Compared with the T-shaped through ring in the prior art, the utility model adopts the design of a semicircular ring. On the one hand, it reduces the production cost of the slide brick. On the other hand, the semicircular zirconium ring is located at the lower part of the casting hole of the lower slide, which solves the problem of large hole expansion at the lower part of the lower slide. At the same time, the semicircular zirconium ring is designed with an inlay groove and a T shape, which can solve the problem of movement of the zirconium ring during use.

[0013] Furthermore, at least one reinforcing rib is provided on the side surface of the zirconium ring, and the reinforcing rib is parallel to the upper edge of the T-shaped ring.

[0014] Preferably, the width b of the reinforcing rib is 2 2~3mm, height h 2 2 to 3 mm.

[0015] Furthermore, the zirconium ring is bonded to the brick body by fire clay, and the fire clay is phosphate fire clay or phosphoric acid combined with corundum fire clay. When phosphoric acid combined with corundum fire clay is used, preferably, the mass ratio of phosphoric acid to corundum in the phosphoric acid combined with corundum fire clay is 15% to 25% phosphoric acid and 75% to 85% corundum, and the thickness of the fire clay is 1-2 mm.

[0016] Furthermore, in order to prevent the upper slide plate from cracking, an iron hoop is wrapped around the brick body. The width of the iron hoop is 35-40mm and the thickness is 4-5mm. If the size is too large, it will be higher than the slide plate, and if it is too small, it will not play the role of fastening the slide plate. In order to achieve a better fastening effect, the iron hoop is located in the middle part of the slide plate and shall not be higher than the plate surface and the back side. The gap between the iron hoop and the brick body is 0-0.5mm. If it is too large, the iron hoop will not fit tightly against the brick body and will not play the role of fastening the slide plate.

[0017] Furthermore, the surface of the brick body is also covered with a veneer with a thickness of 3±0.2 mm, which is used to relieve the stress between the inner cavity of the mechanism and the skateboard during use. If it is too thin, it will not relieve the stress, and if it is too thick, it will affect the force of the skateboard inside the mechanism.

[0018] 3. Beneficial effects

[0019] Compared with the prior art, the beneficial effects of the utility model are:

[0020] (1) The utility model discloses an upper slide brick for converter slag retaining, in which the zirconium ring is designed to be T-shaped and semicircular, thereby solving the problem that the zirconium ring of the ordinary upper slide brick inlaid with the through ring easily sinks during use, causing the zirconium ring to clamp the steel. The zirconium ring is firmly combined with the upper slide brick;

[0021] (2) The utility model discloses a converter slag retaining upper slide brick designed as a split type, and the lower part of the upper slide is designed as a T-shaped semicircular zirconium ring. The excellent anti-corrosion performance of zirconium oxide is utilized to solve the problem of rapid scouring of the lower part of the casting hole and large hole expansion during the service of the upper slide, thereby ensuring the safety of the upper slide;

[0022] (3) Compared with the common zirconium-inlaid upper slide plate, the utility model reduces the amount of zirconium oxide product used by 50%, greatly reducing the cost of the zirconium-inlaid slide plate, while ensuring that the use effect of the zirconium-inlaid slide plate is equivalent. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The technical solution of the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments, but it should be understood that these drawings are designed only for the purpose of explanation and are not intended to limit the scope of the utility model. In addition, unless otherwise specified, these drawings are only intended to conceptually illustrate the structural configurations described herein and are not necessarily drawn to scale.

[0024] Figure 1 It is a front view schematic diagram of the upper sliding plate brick of Example 1 of the utility model;

[0025] Figure 2 This is a schematic diagram of the assembly structure of the upper sliding plate brick of Example 1 of the utility model;

[0026] Figure 3 This is a schematic diagram of the three-dimensional structure of the zirconium ring of Example 1 of the utility model;

[0027] Figure 4 It is a structural schematic diagram of the upper sliding plate brick of Example 4 of the utility model;

[0028] Figure 5 This is a schematic diagram of the three-dimensional structure of the zirconium ring of Example 4 of the utility model;

[0029] In the figure: 1. Brick body; 2. Zirconium ring; 3. Iron hoop; 4. Veneer; 5. Through hole. DETAILED DESCRIPTION

[0030] The following detailed description and example embodiments of the present invention may be better understood in conjunction with the accompanying drawings, in which elements and features of the present invention are identified by reference numerals.

[0031] The physical and chemical indexes of the brick body 1 of the utility model are Al 2 O 3 ≥70%, ZrO 2 ≥4%, C≥3%, bulk density≥3.0g / cm 3 , apparent porosity ≤10%, room temperature compressive strength ≥110MPa.

[0032] Physical and chemical indicators of zirconium ring 2: ZrO 2 ≥93%, volume density ≥4.9g / cm 3 , apparent porosity ≤14%, room temperature compressive strength ≥200MPa.

[0033] Example 1

[0034] like Figure 1-3 As shown, an upper slide brick for converter slag blocking in Example 1 comprises a brick body 1 and a zirconium ring 2. The brick body 1 is provided with a through hole 5 penetrating the brick body 1. A groove for accommodating the zirconium ring 2 is provided inside the through hole 5. The zirconium ring 2 is embedded in the groove inside the through hole 5 and is a T-shaped semicircular ring, which maintains concentricity with the brick body 1. The width a of the zirconium ring 2 is 1 The width a of the overlapped brick body 1 is 40 mm. 2 40mm, height h 1 The diameter is 20mm and the arc l is 12mm.

[0035] The groove for accommodating the zirconium ring 2 matches the zirconium ring, and the upper edge of the zirconium ring 2 overlaps in the groove.

[0036] The zirconium ring 2 and the brick body 1 are bonded together by fire clay, wherein the fire clay is phosphate fire clay and the thickness of the fire clay is 1.5 mm.

[0037] The brick body 1 is covered with an iron hoop 3 on its outer periphery, the iron hoop 3 is 35 mm wide and 5 mm thick, the iron hoop 3 is located in the middle of the brick body 1, the gap between the iron hoop 3 and the brick body 1 is 0.5 mm, the surface of the brick body 1 is covered with a veneer 4, the thickness of the veneer 4 is 3.2 mm.

[0038] Example 2

[0039] The upper slide brick for converter slag blocking in Example 2 is basically the same as that in Example 1, except that the width a of the zirconium ring 2 is 1 The width a of the overlapped brick body 1 is 50 mm. 2 12mm, height h 1 The radius is 15mm and the arc l is 15mm.

[0040] The thickness of the fire clay is 1 mm.

[0041] The iron hoop 3 has a width of 38 mm and a thickness of 4 mm. The iron hoop 3 is located in the middle of the brick body 1. The gap between the iron hoop 3 and the brick body 1 is 0.3 mm. The surface of the brick body 1 is covered with a veneer 4. The thickness of the veneer 4 is 2.8 mm.

[0042] Example 3

[0043] The upper slide brick for converter slag blocking of embodiment 3 is basically the same as that of embodiment 1, except that the width a of the zirconium ring 2 is 1 The width a of the overlapped brick body 1 is 60 mm. 2 15mm, height h 1 The diameter is 18mm and the arc l is 10mm.

[0044] The thickness of the fire clay is 2 mm.

[0045] The iron hoop 3 has a width of 40 mm and a thickness of 4.8 mm. The iron hoop 3 is located in the middle of the brick body 1. There is no gap between the iron hoop 3 and the brick body 1. The surface of the brick body 1 is covered with a veneer 4. The thickness of the veneer 4 is 3.1 mm.

[0046] Example 4

[0047] like Figure 4-5As shown, an upper slide brick for converter slag blocking in Example 1 comprises a brick body 1 and a zirconium ring 2. The brick body 1 is provided with a through hole 5 penetrating the brick body 1. A groove for accommodating the zirconium ring 2 is provided inside the through hole 5. The zirconium ring 2 is embedded in the groove inside the through hole 5 and is a T-shaped semicircular ring, which maintains concentricity with the brick body 1. The width a of the zirconium ring 2 is 1 The width a of the overlapped brick body 1 is 40 mm. 2 40mm, height h 1 The diameter is 20mm and the arc l is 12mm.

[0048] The side surface of the zirconium ring 2 is provided with two reinforcing ribs, and the reinforcing ribs are parallel to the upper edge of the T-shaped semicircular ring.

[0049] The width b of the reinforcing rib 2 2mm, height h 2 The distance between the reinforcing rib close to the upper edge of the T-shaped semicircular ring and the upper edge of the T-shaped semicircular ring is 20 mm, and the distance between two adjacent reinforcing ribs is 20 mm.

[0050] The groove for accommodating the zirconium ring 2 matches the zirconium ring, and the upper edge of the zirconium ring 2 and two reinforcing ribs are overlapped in the groove.

[0051] Since the zirconium ring 2 is only engaged with the upper edge of the T-shaped semicircular ring, it is easy to cause the bottom of the zirconium ring 2 to shake, affecting the positioning effect. At the same time, the semicircular zirconium ring is located at the lower part of the casting hole of the lower slide plate, and the upper part is under great pressure. During the continuous flushing of molten steel, the edge is easy to break, causing production accidents and causing the zirconium ring 2 to fall off. Therefore, the present application provides at least one reinforcing rib on the side of the zirconium ring 2 to increase its longitudinal bearing capacity and the structural strength of the zirconium ring 2. At the same time, there is a certain interval between each reinforcing rib to improve the positioning effect in the horizontal direction.

[0052] The zirconium ring 2 and the brick body 1 are bonded together by fire clay, wherein the fire clay is phosphate fire clay and the thickness of the fire clay is 1.5 mm.

[0053] The brick body 1 is covered with an iron hoop 3 on its outer periphery, the iron hoop 3 is 35 mm wide and 5 mm thick, the iron hoop 3 is located in the middle of the brick body 1, the gap between the iron hoop 3 and the brick body 1 is 0.5 mm, the surface of the brick body 1 is covered with a veneer 4, the thickness of the veneer 4 is 3.2 mm.

[0054] Example 5

[0055] The upper slide brick for converter slag blocking of embodiment 5 is basically the same as that of embodiment 4, except that the width b of the reinforcing rib is 2 3mm, height h 2 is 3mm.

Claims

1. An upper slide brick for converter slag blocking, comprising a brick body (1) and a zirconium ring (2), wherein the brick body (1) is provided with a through hole (5) penetrating the brick body (1), characterized in that: A groove for accommodating the zirconium ring (2) is provided on the inner side of the through hole (5), and the zirconium ring (2) is embedded in the groove. The zirconium ring (2) is a T-shaped semicircular ring.

2. The upper sliding plate brick for converter slag blocking according to claim 1 is characterized in that: The zirconium ring (2) and the brick body (1) maintain concentricity.

3. The upper sliding plate brick for converter slag blocking according to claim 1 is characterized in that: The width of the zirconium ring (2) is 40-60 mm, the width of the zirconium ring (2) overlapped on the brick body (1) is 10-15 mm, and the height of the zirconium ring (2) is 15-20 mm.

4. The upper sliding plate brick for converter slag blocking according to claim 1 is characterized in that: The zirconium ring (2) and the brick body (1) are bonded together by fire clay, and the fire clay is phosphate fire clay or phosphoric acid-bonded corundum fire clay.

5. The upper sliding plate brick for converter slag blocking according to claim 4 is characterized in that: The thickness of the fire clay is 1-2 mm.

6. The upper sliding plate brick for converter slag blocking according to claim 1 is characterized in that: The outer periphery of the brick body (1) is covered with an iron hoop (3), the iron hoop (3) is located in the middle of the brick body (1), and the gap between the iron hoop (3) and the brick body (1) is 0-0.5 mm.

7. The upper sliding plate brick for converter slag blocking according to claim 6 is characterized in that: The iron hoop (3) has a width of 35-40 mm and a thickness of 4-5 mm.

8. The upper sliding plate brick for converter slag blocking according to claim 1 is characterized in that: The surface of the brick body (1) is also covered with a veneer (4).