Rapid carrying platform for road emergency steel bridge

By designing a fast delivery platform for highway emergency steel bridges, using liftable platform support and crawler-type transport devices, the problems of low transportation efficiency and safety hazards of steel bridges in the existing technology are solved, and fast, safe and efficient transportation is achieved, reducing the number of transportation in the current technology. Transportation costs.

CN222043920UActive Publication Date: 2024-11-22陕西省公路应急中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420525638.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2024-11-22
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

The storage method, outbound efficiency, transportation distance, transportation time and on-site erection time of existing highway emergency steel bridges have been limited, resulting in limited emergency rescue progress and safety hazards and high costs during transportation.

Method used

A fast delivery platform for highway emergency steel bridges is designed, using liftable platform support and platform base to quickly and stably connect with the transport vehicle. The fast and stable transportation of the steel bridge is achieved through a crawler-type transport device, reducing manual operations and improving transportation. Efficiency and cost reduction.

Benefits of technology

It significantly shortens the outbound time of steel bridges, reduces labor costs, improves transportation safety, reduces space waste, improves emergency response efficiency, and reduces transportation costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043920U_ABST
    Figure CN222043920U_ABST
Patent Text Reader

Abstract

A rapid carrying platform for a road emergency steel bridge comprises a platform base, platform supports are arranged at the four corners of the bottom of the platform base, a moving and transporting device is arranged on the platform base, and the length and the width of the platform base are kept consistent with those of a transport vehicle compartment of the road emergency steel bridge; the liftable platform support and the platform base are rapidly and stably connected with a road emergency steel bridge transport vehicle, the emergency steel bridge is stably and rapidly moved from the vehicle through the moving and transporting device, the speed is high, labor is saved, manpower is saved, standardized operation is facilitated, and the efficiency of road emergency rescue is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of emergency steel bridge equipment transportation, and specifically relates to a modular rapid transportation platform for a highway emergency steel bridge. Background Art

[0002] As an emergency bridge that can be quickly assembled, the highway emergency steel bridge plays an important role in emergency traffic security in response to various emergencies. In the process of highway emergency, the storage method of steel bridge components, the efficiency of steel bridge outbound storage, the transportation distance, the transportation time, the on-site erection and installation time, etc. will affect the progress of emergency rescue to a certain extent. In the existing outbound method, when using a gantry crane for lifting, it is necessary to lift the assembled components in sequence, which is time-consuming, has many steps, and has high safety risks. When using a transport and erection vehicle for transportation, multiple operations are required, which is labor-intensive, requires a lot of manpower, and takes a long time. In addition, the loading process is not standardized, the placement position of the steel bridge components is not pre-designed, and the internal space of the carriage is wasted, resulting in a significant increase in transportation costs. When modular storage and transportation containers are used, steel bridge components are stored and transported in categories, and no pre-installation and containerization are carried out in advance. There are many components, which leads to a long time to build the emergency rescue site, affecting emergency rescue. Therefore, modular storage of steel bridge components and scientific outbound storage can significantly improve the efficiency of highway emergency rescue. Summary of the invention

[0003] In order to overcome the defects of the above-mentioned prior art, the purpose of the utility model is to provide a highway emergency steel bridge rapid transportation platform, which is quickly and stably connected to the highway emergency steel bridge transport vehicle through a liftable platform support and a platform base, and the emergency steel bridge is smoothly and quickly moved from the vehicle through a mover, which is fast and labor-saving, saves manpower, and is conducive to standardized operation, greatly improving the efficiency of highway emergency rescue and reducing costs at the same time.

[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0005] A highway emergency steel bridge rapid transport platform includes a platform base 2, platform supports 1 are arranged at the four corners of the bottom of the platform base 2, a transporter 3 is arranged on the platform base 2, and the length and width of the platform base 2 are consistent with the length and width of the transport vehicle compartment of the highway emergency steel bridge.

[0006] The platform support 1 adopts a synchronous jack, preferably an electric hydraulic synchronous jack, and reset and locking are achieved through hydraulic pressure.

[0007] The load of the synchronous jack is greater than or equal to 30 tons, and the extension height range is 0.5m-2m.

[0008] The load of the platform base 2 is greater than or equal to 20 tons, and a weight sensor 4 is installed on the panel of the platform base 2.

[0009] The front ends of the platform base 2 are provided with connection buckles 5 for connecting with the transport vehicle; the two sides of the platform base 2 are provided with a plurality of base steel bridge fixing holes 6 respectively.

[0010] Tracks 7 are provided on both sides of the panel of the platform base 2 .

[0011] The transporter 3 is a crawler-type transporter, and a plurality of guide wheels 10 are evenly arranged on both sides of the bottom of the transporter 3 , and the guide wheels 10 move along the track 7 of the platform base 2 .

[0012] A plurality of steel bridge fixing holes 9 are evenly arranged on both sides of the transporter 3 .

[0013] Rollers 8 are also arranged at the bottom of the transporter 3 and between the steel bridge fixing holes 9 on both sides.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] 1. The transport platform has a simple structure, which improves the transport speed and shortens the time to leave the warehouse. Taking the practical results of transporting a 321-type assembled steel bridge with two transporters as an example, the fast transport platform of the utility model can quickly complete a transport. It only takes 4 operations to assemble a 321-type steel bridge component, and each operation takes only 5 minutes. If the site allows, multiple transport platforms can be taken off and landed at the same time, which can further reduce the time to leave the warehouse for the steel bridge, which is conducive to the rapid handling of highway emergency incidents.

[0016] 2. Reduce labor costs. Some components of the steel bridge in the transport vehicle are pre-installed and moved mechanically using a transport platform. The operation is simple, requires fewer operators, and has low labor intensity.

[0017] 3. To ensure the safety of the operation, the lifting height of the carrying platform shall not exceed 2m, eliminating the potential safety hazards such as abrasions, smashing, and crushing caused by manual heavy physical work and high-altitude lifting operations.

[0018] 4. The operating space of the transport platform is small and does not require large lifting equipment for transportation. It is more flexible to operate, saves space, and increases the storage warehouse space.

[0019] 5. The plane of the transfer device 3 can place the steel bridge components of the entire vehicle on the transfer device, and through the steel bridge fixing holes 9 on both sides, the steel bridge components of the entire vehicle will not collapse or fall. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a diagram of the low-position state of the carrying platform of the utility model.

[0021] Figure 2 This is a diagram of the high-position state of the carrier platform of the utility model.

[0022] Figure 3It is a schematic structural diagram of the transporter 3 of the utility model.

[0023] Figure 4 It is a bottom schematic diagram of the transporter 3 of the present utility model.

[0024] In the figure: 1. Platform support; 2. Platform base; 3. Transfer device; 4. Weight sensor; 5. Connecting buckle; 6. Base steel bridge fixing hole; 7. Track; 8. Roller; 9. Transfer device steel bridge fixing hole; 10. Guide wheel; 11. Bracket. DETAILED DESCRIPTION

[0025] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0026] See also Figure 1 A highway emergency steel bridge rapid transportation platform includes a platform base 2, platform supports 1 are arranged at the four corners of the bottom of the platform base 2, and a transporter 3 is arranged on the platform base 2. The platform base 2 is 9.6 meters long and 2.3 meters wide, which is consistent with the length and width of the 20-ton transport vehicle compartment of the highway emergency steel bridge.

[0027] The platform support 1 adopts a synchronous jack, preferably an electric hydraulic synchronous jack, and reset and locking are achieved through hydraulic pressure.

[0028] See also Figure 2 The load of the synchronous jack is greater than or equal to 30 tons, and the extension height range is 0.5m-2m.

[0029] Each synchronous jack is equipped with a synchronous diverter valve, a safety valve pressure-maintaining and overflow device. The synchronous diverter valve ensures that the load of each jack is balanced and the lifting and lowering speeds are synchronized; the pressure-maintaining and overflow devices prevent overload, and the safety valve protects the synchronous jack to achieve safe operation.

[0030] The synchronous jack also has a self-locking function, which can support the platform base and steel bridge components for a long time and maintain the same position to prevent soft legs when the platform base is raised.

[0031] The load of the platform base 2 is greater than or equal to 20 tons, and connecting buckles 5 are installed on both sides of the front end of the platform base 2 to fix it to the bottom of the loading compartment.

[0032] A weight sensor 4 is installed on the panel of the platform base 2, which can weigh and display the steel bridge components carried by the base to avoid overloading of the transport vehicle; a plurality of base steel bridge fixing holes 6 are installed on both sides of the platform base 2 for fixing the steel bridge components so that the steel bridge components do not move during the lifting process of the base and remain stable.

[0033] Tracks 7 are provided on both sides of the platform base 2. First, they are used to limit the travel direction of the transporter 3, so that the transporter 3 travels in one direction and completely fits the track 7 to prevent deviation during travel and avoid deviating and damaging the wheels; second, the track 7 is used to disperse the direct pressure of the steel bridge on the platform base.

[0034] See also Figure 3 The transporter 3 is a crawler-type transporter, and a plurality of guide wheels 10 are evenly arranged on both sides of the bottom of the transporter 3 , and the guide wheels 10 move along the track 7 of the platform base 2 .

[0035] The plane of the transporter 3 can place the entire vehicle's steel bridge components on the transporter without collapsing or falling.

[0036] The transporter 3 is evenly provided with a plurality of transporter steel bridge fixing holes 9 on both sides. Rope tools or other tools are passed through the transporter steel bridge component fixing holes on the left and right sides to ensure the stability of the steel bridge component when it is transported from the platform base to the carriage.

[0037] See also Figure 4 Rollers 8 are also arranged at the bottom of the conveyor 3 and between the steel bridge fixing holes 9 of the conveyor on both sides.

[0038] The number of transfer devices can be flexibly set according to the different containerization schemes of the steel bridge components on each vehicle.

[0039] Each synchronous jack is equipped with a synchronous diverter valve, a safety valve pressure-maintaining and overflow device. The synchronous diverter valve ensures that the load of each jack is balanced and keeps the lifting and lowering speeds synchronized; the pressure-maintaining and overflow devices prevent overload, and the safety valve protects the synchronous jack to achieve safe operation.

[0040] The working principle of the utility model is:

[0041] The steel bridge rapid transport platform is in a state of combat readiness on a daily basis. First, the steel bridge components are pre-installed and assembled in advance, and the steel bridge components on each transport platform are scientifically distributed so that they do not exceed the spatial dimensions of a 20-ton transport vehicle with a length, width and height of 9.6 meters * 2.3 meters * 2.7 meters, and the load of the transport platform is evenly distributed. Secondly, according to the loading plan of the whole vehicle, the steel bridge components are placed on the rapid transport platform. Finally, the steel bridge components are fixed with tools such as chains and the base steel bridge fixing holes 6 and the transferor steel bridge fixing holes 9 to ensure that the components of each part of the steel bridge are stable when the synchronous jack and the transferor 3 are working, and no position movement occurs. When receiving the highway emergency rescue and emergency steel bridge outbound tasks, the transport vehicle is quickly deployed to the combat readiness warehouse. After the transport vehicle arrives, the position of the transport vehicle is adjusted so that the rear side of the carriage is aligned with the front end of the rapid transport platform, and the connecting buckle 5 is used to fix it with the rear side of the carriage to ensure that when the transferor 3 is working, the transport platform and the carriage do not have relative displacement, and then the steel bridge component transportation work begins.

[0042] The rapid transport platform starts working, and the synchronous jack is started. Under the action of the synchronous jack, the platform base 2 of the rapid transport platform is lifted to a plane consistent with the height of the carriage. At this time, the transport platform is in a high position. Figure 2 , use the hydraulic system of the synchronous jack to lock and ensure the stability of the synchronous jack legs. Then release the fixing effect of the base steel bridge fixing hole 6 and disconnect the connection between the platform base 2 and the steel bridge component. Start the transfer device 3. Under the action of the transfer device 3, the steel bridge component and the transfer device 3 enter the interior of the carriage together to complete the steel bridge component transportation task. Finally, retract the synchronous jack and the carrying platform returns to the low position. Figure 1 According to actual needs, the carrying platform can be loaded into the transport vehicle using lifting tools. After arriving at the site, the steel bridge components can be transported to the open space at the emergency rescue site in the same way to facilitate unloading of the steel bridge components.

Claims

1. A highway emergency steel bridge rapid transport platform, comprising a platform base (2), characterized in that: The platform base (2) is provided with platform supports (1) at the four corners at the bottom, and a transporter (3) is provided on the platform base (2). The length and width of the platform base (2) are consistent with the length and width of the transport vehicle compartment of the highway emergency steel bridge.

2. The highway emergency steel bridge rapid transport platform according to claim 1 is characterized by: The platform support (1) adopts synchronous jacks.

3. The highway emergency steel bridge rapid transport platform according to claim 2 is characterized by: The load of the synchronous jack is greater than or equal to 30 tons, and the extension height range is 0.5m-2m.

4. The highway emergency steel bridge rapid transport platform according to claim 1 is characterized by: The load of the platform base (2) is greater than or equal to 20 tons, and a weight sensor (4) is installed on the panel of the platform base (2).

5. A highway emergency steel bridge rapid transport platform according to claim 1 or 4, characterized in that: Both sides of the front end of the platform base (2) are provided with connection buckles (5) connected to the transport vehicle; and both sides of the platform base (2) are respectively provided with a plurality of base steel bridge fixing holes (6).

6. A highway emergency steel bridge rapid transport platform according to claim 1 or 4, characterized in that: Tracks (7) are provided on both sides of the panel of the platform base (2).

7. The highway emergency steel bridge rapid transport platform according to claim 1 is characterized by: The transporter (3) is a crawler-type transporter, and a plurality of guide wheels (10) are evenly arranged on both sides of the bottom of the transporter (3), and the guide wheels (10) move along the track (7) of the platform base (2).

8. A highway emergency steel bridge rapid transport platform according to claim 1 or 7, characterized in that: A plurality of steel bridge fixing holes (9) are evenly arranged on both sides of the transporter (3).

9. The highway emergency steel bridge rapid transport platform according to claim 8, characterized in that: Rollers (8) are also arranged at the bottom of the transporter (3) and between the steel bridge fixing holes (9) on both sides.

10. The highway emergency steel bridge rapid transport platform according to claim 2 is characterized by: The synchronous jack adopts an electric hydraulic synchronous jack, and reset and locking are achieved through hydraulic pressure.