Device for erecting small-clearance underpass bridge by utilizing winch and pulley block
Through the combination device of the winch and the pulley group and the precise control system, the problem of bridge erection under small clearance conditions is solved, efficient and safe construction of bridges in limited spaces is achieved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202420672819.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-03
AI Technical Summary
Under small clearance conditions, traditional bridge erection methods are difficult to achieve efficient and safe construction, especially in urban centers or areas with dense traffic lines. Inadequate clearance and space limitations lead to inapplicable construction equipment.
The combination device of the winch and the pulley group is used to provide power through the winch, and the pulley group disperses and transmits tension. Combined with an accurate control system, the precise movement and positioning of the bridge components is achieved, and the double-guided beam bridge stud, hydraulic mid-legs and four-dimensional The line pulley set forms a traction system to ensure the stable and efficient erection of the bridge in a limited space.
It improves construction efficiency, reduces construction costs and safety risks, ensures the safety and accuracy of bridge erection, and is suitable for bridge construction under small clearance conditions.
Smart Images

Figure CN222043934U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of bridge engineering, in particular to a device for erecting a small clearance underpass bridge by utilizing a winch and a pulley group. Background Art
[0002] With the acceleration of urbanization and the increasing shortage of land resources, bridge construction often faces complex geographical environments and space constraints. Especially in urban centers or areas with dense existing traffic routes, bridge construction often needs to be carried out in limited space, which puts higher requirements on construction technology and equipment. Traditional bridge erection methods, such as using large cranes or bridge erection machines, may become unsuitable due to insufficient clearance and small construction areas.
[0003] In order to achieve efficient and safe bridge erection under small clearance conditions, the combination of winch and pulley group is such an innovative solution. The winch is a mechanical device that can provide strong pulling force, while the pulley group can effectively disperse and transmit this pulling force, so that heavy objects can be accurately moved and positioned in a limited space. Through the well-designed pulley group and winch control system, the lifting and installation of bridge components can be completed without taking up too much space.
[0004] The development and application of this device can not only improve construction efficiency and reduce the impact on surrounding traffic and environment, but also reduce construction costs and ensure the safe progress of the project. This technology has broad application prospects and is of great significance for solving the problem of building underpasses with small clearances. Utility Model Content
[0005] The purpose of this patent is to develop an innovative bridge erection device which is particularly suitable for bridge construction under small clearance conditions.
[0006] The purpose of this device is to achieve efficient and safe erection of bridge structures under limited headroom. By using the power provided by the winch and the guiding and supporting functions of the pulley group, the device can accurately control the movement and positioning of bridge components.
[0007] This patent aims to provide a new and efficient solution for bridge erection under small clearance conditions through innovative mechanical combination and precise control system.
[0008] The utility model is realized by providing a device for erecting a small clearance underpass bridge by using a winch and a pulley group, which is characterized by comprising a bridge erecting machine, a pulley group and a winch;
[0009] The bridge erecting machine is a double-beam bridge erecting machine, the pulley group is a 100t four-wire pulley, and the winch is a 10t winch and anchoring structure;
[0010] The winch is anchored on the erected beam section by bolts and connected to the pulley block by steel wire ropes.
[0011] Furthermore, the double-guide-beam bridge-erecting machine is a small-radius bridge-erecting machine, and also includes a middle support leg, which is arranged on the erected beam section, and the middle support leg adopts a hydraulic system detachable bridge-erecting machine middle support leg.
[0012] Furthermore, the pulley group is composed of a pulley and a steel wire rope, and is connected to the double guide beam main truss through the steel wire rope.
[0013] The implementation process of the utility model is:
[0014] Step 1: Assemble the bridge erector
[0015] On the erected bridge, the guide beam and main beam of the bridge erection machine are installed, the walking device is set up, the lifting equipment is debugged, and strict safety measures are implemented to achieve efficient installation of the double-guide beam bridge erection machine to ensure the safety and efficiency of subsequent T-beam erection operations.
[0016] Step 2: Winch Installation
[0017] Installing the winch at the end of the erected beam involves selecting a suitable installation location, ensuring the winch is stable and reliable, connecting the cables and control system, and conducting safety checks and test runs to support subsequent bridge component lifting and moving operations. The winch is welded to the anchors of the installed beam segment.
[0018] Step 3: Lower the middle outrigger and the front outrigger
[0019] The bridge erector adopts a hydraulic system to lower the middle outrigger, slowly adjusting the height of the middle outrigger 3 to ensure that the bridge erector has sufficient space.
[0020] Step 4: Pulley assembly installation
[0021] The pulley block is connected to the winch through a steel wire rope, which serves as the traction system during the erection process.
[0022] Step 5: Prefabricated beam installation
[0023] The prefabricated beams are precisely positioned, lifted, moved and fixed to the predetermined position by lifting steel wire ropes to complete the construction of the bridge structure.
[0024] The advantages of this device are: 1. The winch will be used to lift and move the bridge components, while the pulley group ensures that the components remain stable during the erection process and can be flexibly adjusted in a limited space. 2. The device is also designed with a precise control system to ensure that the bridge components can be accurately installed according to the predetermined path and position during the erection process. This not only improves construction efficiency, but also greatly reduces the safety risks caused by space limitations. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a schematic diagram of the installation of the winch and the pulley assembly.
[0026] Among them: 1 is the winch; 2 is the erected beam section; 3 is the middle leg of the double-guide beam bridge erecting machine; 4 is the pulley group; 5 is the lifting wire rope; 6 is the erected beam section; 7 is the front leg of the double-guide beam bridge erecting machine. DETAILED DESCRIPTION
[0027] The following will be combined with the attached Figure 1 The device is described in detail, and the technical solution in the embodiment of the device is described clearly and completely. Obviously, the described embodiment is only a part of the embodiment of this patent, not all of the embodiments. Based on the embodiments in this patent, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this patent.
[0028] The present application describes a device that utilizes a winch and a pulley group to solve the problem of erecting a small clearance underpass bridge. By using the power provided by the winch and cooperating with the guiding and supporting function of the pulley group, the bridge structure can be erected efficiently and safely under limited clearance height.
[0029] like Figure 1 As shown, the present application uses a winch and a pulley group to solve the problem of erecting a small clearance underpass bridge; including
[0030] The device has a bridge erecting machine, a pulley block 4 and a winch 1;
[0031] The bridge erecting machine is a double-beam bridge erecting machine, the pulley group 4 is a 100t four-wire pulley, and the winch 1 is a 10t winch and anchoring structure;
[0032] The winch 1 is anchored on the erected beam section 2 by bolts and connected to the pulley block 4 by a steel wire rope 5 .
[0033] In the present application, the double-guide-beam bridge erecting machine is a small-radius bridge erecting machine, and the middle leg 3 adopts a hydraulic system detachable bridge erecting machine.
[0034] In the present application, the pulley assembly 4 is composed of a pulley and a steel wire rope 5, and is connected to the double guide beam main truss through the steel wire rope.
[0035] The specific implementation method of this patent is further described below:
[0036] Step 1: Assemble the bridge erector
[0037] On the erected bridge, install the guide beam and main beam accurately according to the design requirements, set up the walking device, including the track and support system, to ensure that the bridge erector can move smoothly on the erected beam section. Debug the lifting equipment to ensure that the bridge erector is stable and safe, and prepare for the erection of the T-beam.
[0038] Step 2: Winch Installation
[0039] Select a suitable location at the end of the erected beam to install the 10t winch 1, ensure that its base is firm, and use high-strength materials and fastening methods to prevent displacement during operation. The cables and control system of the winch are carefully connected and tested to ensure that the electrical connection is safe and correct and the control system is responsive. Check the mechanical structure, hydraulic system, electrical connections, and operating handles of the winch to ensure that all components are in good working condition. Subsequently, a trial run is carried out to simulate actual operating conditions and check the lifting speed, stability, and performance of the braking system of the winch. At the same time, the welding points between the winch and the beam end anchor are strength tested to ensure that the welding quality meets the high requirements of the lifting operation and provides stable and reliable power support for subsequent bridge component lifting operations.
[0040] Step 3: Lower the middle outrigger and the front outrigger
[0041] Operate the hydraulic system of the bridge erector, slowly and accurately adjust the height of the middle outrigger, ensure that the bridge erector remains horizontal during the lifting process, and ensure that there is enough space for the installation and movement of the prefabricated beams. After the middle outrigger is firmly fixed, fix the pulleys on the beams one by one, install the pulleys at the correct position of the pulleys, ensure that the pulleys can move smoothly along the track, and then connect the pulleys to the winch through a 36mm 4-wire steel wire rope to form a complete traction system to provide support for the movement of the prefabricated beams.
[0042] Step 4: Prefabricated beam installation
[0043] Use the lifting equipment of the bridge erection machine to accurately lift the prefabricated beam to the specified height through the lifting wire rope, slowly move it to the installation position, and fix it after precise alignment to complete the construction of the bridge structure.
[0044] The advantages of this device are:
[0045] 1. The winch will be used to lift and move the bridge components, while the pulley block will ensure that the components remain stable during the erection process and can be flexibly adjusted in a limited space.
[0046] 2. The device is also designed with a precise control system to ensure that during the erection process, the bridge components can be accurately installed according to the predetermined path and position. This not only improves construction efficiency, but also greatly reduces the safety risks caused by space limitations.
Claims
1. A device for erecting a small clearance underpass bridge using a winch and a pulley group, characterized in that: It comprises a bridge erecting machine, a pulley block (4) and a winch (1); The bridge erecting machine is a double-beam bridge erecting machine, the pulley group (4) is a 100t four-wire pulley, and the winch (1) is a 10t winch and anchoring structure; The winch (1) is anchored on the erected beam section (2) by means of bolts and is connected to the pulley block (4) by means of a steel wire rope (5).
2. According to claim 1, a device for erecting a small clearance bridge using a winch and a pulley group, characterized in that: The double-guide-beam bridge erecting machine is a small-radius bridge erecting machine, and further comprises a middle support leg (3), wherein the middle support leg (3) is arranged on the erected beam section (2), and the middle support leg (3) is a hydraulic system detachable bridge erecting machine middle support leg.
3. The device for erecting a bridge with a small clearance by using a winch and a pulley assembly according to claim 1, characterized in that: The pulley assembly (4) is composed of a pulley and a steel wire rope (5), and is connected to the double guide beam main truss via the steel wire rope.