Round pipe culvert mortar wiping belt structure

By dividing the connecting joints of the circular tube culvert into three parts: the first mortar belt, the second mortar belt and the wire mesh, and combining asphalt coating, the problems of low construction efficiency and poor quality in the prior art are solved. A more efficient and controllable mortar tape effect is achieved, improving the overall performance of the round tube culvert.

CN222043956UActive Publication Date: 2024-11-22MCC COMM CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323581439.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-11-22
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

In the prior art, the construction efficiency of the mortar plaster of round culverts is low, resulting in poor accuracy of the thickness and width of the plaster, which is prone to cracking and water seepage problems, affecting the waterproof performance.

Method used

A circular tube culvert mortar tape structure is adopted, and the first mortar tape, a steel wire mesh and a second mortar tape are arranged along the extension direction of the circular tube culvert, combined with the preferred width and asphalt coating, and through a special arc panel tool The construction is carried out and sealed in three parts.

Benefits of technology

It improves construction efficiency and quality control, reduces construction difficulty, enhances the overall strength, watertightness and stability of the circular pipe culvert, and reduces construction time and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043956U_ABST
    Figure CN222043956U_ABST
Patent Text Reader

Abstract

The utility model provides a circular pipe culvert mortar troweling structure, and relates to the technical field of pipeline construction, a first pipe joint and a second pipe joint are sequentially arranged along the extension direction of a circular pipe culvert, a connecting seam is arranged between the first pipe joint and the second pipe joint, and the circular pipe culvert mortar troweling structure seals the connecting seam between the pipe joints of the circular pipe culvert; comprising a first mortar wiping belt, a second mortar wiping belt and a steel wire mesh for connecting the first mortar wiping belt and the second mortar wiping belt, in the extending direction of the round pipe culvert, a first mortar wiping belt is arranged at the first pipe joint, a steel wire mesh is arranged on the first mortar wiping belt, and a second mortar wiping belt is arranged at the steel wire mesh and the second pipe joint. The connecting seam between the pipe joints is divided into the first mortar wiping belt, the second mortar wiping belt and the steel wire mesh, so that the construction difficulty is reduced, the construction efficiency is improved, and the quality of the circular pipe culvert mortar wiping belt structure is controllable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline construction, and more specifically, to a circular pipe culvert mortar strip structure. Background Art

[0002] Circular culvert is the most commonly used culvert structure type in highway roadbed drainage. The most common is reinforced concrete circular culvert, which is connected by multiple pipes. It not only has good mechanical properties, but also has the characteristics of simple structure, convenient construction, short construction period and low cost. When constructing a circular culvert, a 1.5cm-2cm joint is generally left at the interface of two adjacent pipes. The joint must be waterproofed, which needs to be achieved manually through smearing tape construction.

[0003] In the prior art, a steel trowel is used to manually apply the mixed mortar along the joints of the pipe sections to form a 4cm strip, ensuring the thickness and width of the strip, and manually trimming the edges to control the linear shape. However, it takes two workers more than half an hour to complete a 4cm strip of mortar; and the longer the mortar strip, the worse the accuracy of its thickness and width. The quality of the mortar strip is difficult to guarantee, resulting in cracking and water seepage problems in the later stage, which in turn affects the overall waterproof performance of the circular culvert.

[0004] Therefore, there is an urgent need for a circular pipe culvert mortar strip structure with high construction efficiency. Utility Model Content

[0005] In view of the above problems, an object of the present invention is to provide a circular culvert mortar strip structure to solve at least one problem existing in the prior art.

[0006] According to one aspect of the utility model, a circular pipe culvert mortar tape structure is provided, wherein a first pipe section and a second pipe section are sequentially arranged along the extension direction of the circular pipe culvert, a connection seam is arranged between the first pipe section and the second pipe section, and the circular pipe culvert mortar tape structure seals the connection seam between the pipe sections of the circular pipe culvert; the structure comprises a first mortar tape and a second mortar tape, and a steel mesh connecting the first mortar tape and the second mortar tape;

[0007] A first mortar tape is arranged at the first pipe section along the extension direction of the circular culvert, a steel mesh is arranged on the first mortar tape, and a second mortar tape is arranged at the steel mesh and the second pipe section.

[0008] Furthermore, a preferred structure is that the width of the first mortar tape and the second mortar tape is 1.5 to 2.5 centimeters.

[0009] Furthermore, a preferred structure is that a pipe belt is sleeved on the outer side of the connecting seam.

[0010] Furthermore, a preferred structure is that the outside of the pipe belt is coated with asphalt.

[0011] Furthermore, a preferred structure is that the width of the first mortar tape and the second mortar tape is 2 cm.

[0012] Furthermore, a preferred structure is that the asphalt is a two-layer coating structure.

[0013] Furthermore, a preferred structure is that the pipe section is a 1.5-meter round tube or a 2.0-meter round tube.

[0014] Furthermore, a preferred structure is that the first mortar tape and the second mortar tape are made of 1:3 cement mortar.

[0015] Furthermore, a preferred structure is that the mortar tape tool used to make the first mortar tape and the second mortar tape includes an upper panel and wing plates arranged on both sides of the upper panel, and the wing plates are arc panels.

[0016] Furthermore, a preferred structure is that the curvature of the wing plate is set corresponding to the diameter of the pipe segment.

[0017] The circular pipe culvert mortar tape structure of the utility model divides the connection seam between pipe sections into three parts: a first mortar tape, a second mortar tape and a steel mesh, thereby reducing construction difficulty, improving construction efficiency and making the quality of the circular pipe culvert mortar tape structure controllable. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic structural diagram of a circular pipe culvert mortar strip structure of Embodiment 1 of the utility model is shown; and

[0019] Figure 2 A schematic structural diagram of a mortar tape tool according to an embodiment of the utility model is shown.

[0020] The same reference numerals throughout the drawings indicate similar or corresponding features or functions. DETAILED DESCRIPTION

[0021] In the following description, for the purpose of illustration, in order to provide a comprehensive understanding of one or more embodiments, many specific details are set forth. However, it is apparent that these embodiments may also be implemented without these specific details. In other examples, for ease of describing one or more embodiments, known structures and devices are shown in the form of block diagrams.

[0022] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0023] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0024] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0025] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0026] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.

[0027] Example 1

[0028] During the road construction process, multiple circular culverts are arranged in the roadbed along the width direction of the roadbed, and multiple circular culverts are arranged at intervals along the extension direction of the roadbed. The circular culverts are tubular structures with openings at both ends, and the openings at both ends of the circular culverts are connected to the outside.

[0029] Figure 1 The schematic diagram of the structure of the circular pipe culvert mortar strip structure of the embodiment of the utility model is shown. Figure 1 As shown, a circular pipe culvert mortar tape structure is provided, wherein a first pipe section and a second pipe section are sequentially arranged along the extension direction of the circular pipe culvert, and a connecting seam is arranged between the first pipe section and the second pipe section; the circular pipe culvert mortar tape structure comprises a first mortar tape 1, a second mortar tape 2 and a steel mesh 3 connecting the first mortar tape 1 and the second mortar tape 2; the circular pipe culvert mortar tape structure is used to fill the connecting seam; along the extension direction of the circular pipe culvert, a first mortar tape 1 is arranged at the first pipe section, a steel mesh 3 is arranged on the first mortar tape 1, and a second mortar tape 2 is arranged at the steel mesh 3 and the second pipe section.

[0030] That is to say, the mortar tapes suitable for ordinary pipe sections of circular culverts need to be constructed according to the first mortar tape + a wire mesh + a second mortar tape according to the mortar tape construction process requirements. After the mortar is placed on the upper surface of the circular culvert, the first mortar tape is cut preliminarily in the direction of travel on one side through a fixed-size tape frame (existing technology) to form a tape section with a fixed size and a smooth surface to facilitate the placement of the wire mesh and the fitting of the mortar surface; then the wire mesh is placed on the first mortar tape, and then the second mortar tape is constructed on the wire mesh; while ensuring the construction quality, the construction speed can also be accelerated. The circular culvert mortar tape structure of the utility model divides the connection seam between pipe sections into three parts: the first mortar tape, the second mortar tape and the wire mesh, which reduces the construction difficulty, improves the construction efficiency, and makes the quality of the circular culvert mortar tape structure controllable.

[0031] In the specific implementation process, a connection joint is provided between the first pipe section and the second pipe section, that is, a joint of about 1.5 cm - 2 cm is generally left at the interface of two adjacent pipes; if there is a connection joint of about 2 cm, then the total width of the mortar bandage needed is about 4 cm. That is to say, the widths of the first mortar bandage and the second mortar bandage are 1.5 - 2.5 cm. As the most preferred, the widths of the first mortar bandage and the second mortar bandage are 2 cm. That is, the 4 cm mortar bandage needs to be constructed in the form of 2 cm + wire mesh + 2 cm.

[0032] In the specific implementation process, a pipe band is sleeved outside the connection joint. The outside of the pipe band is coated with asphalt, and the asphalt has a two-layer coating structure. The outside of the pipe section is coated with two layers of asphalt to increase the watertightness of the pipe section. The first mortar bandage and the second mortar bandage are made of 1:3 cement mortar. The joints between the pipe sections are leveled with mortar, and a pipe band is sleeved outside the joints. Two layers of asphalt are coated between the inner side of the pipe band and the pipe section for sealing between the pipe band and the pipe section.

[0033] Figure 2 The structural schematic diagram of the mortar bandage tool according to an embodiment of the present invention is shown. As Figure 2 shown, in order to facilitate obtaining the circular culvert mortar bandage structure of the present invention, the mortar bandage tool for making the first mortar bandage and the second mortar bandage includes an upper panel 11 and wing plates 12 arranged on both sides of the upper panel 11. The wing plates 12 are arc-shaped panels. It adopts a structure with a cross-section approximately "凵", but the wing plates have a radian design. Further, the radian of the wing plates 12 is correspondingly set with the diameter of the pipe section. The pipe section is a 1.5-meter circular pipe or a 2.0-meter circular pipe. Specifically, when the application scenario is a 2.0-meter circular pipe, the radian diameter of the wing plates is 2.4 meters; when the application scenario is a 1.5-meter circular pipe, the radian diameter of the wing plates is 1.5 meters. In the specific implementation process, the mortar bandage tool is a steel piece. The upper panel is made of a 2-mm-thick stainless steel sheet, and the wing plates are made of a 5-mm-thick stainless steel plate to ensure the sharpness of the wing body cutting and the plasticity of the upper panel. Specifically, double-sided welding is adopted between the upper panel and the wing plates of the mortar bandage tool, and the welding length is made according to the principle of full welding with the lap length.

[0034] The circular pipe culvert mortar tape structure of the utility model divides the connection seam between pipe sections into three parts: the first mortar tape, the second mortar tape and the wire mesh, which reduces the construction difficulty, improves the construction efficiency, and makes the quality of the circular pipe culvert mortar tape structure controllable. The circular pipe culvert with the above mortar tape structure has strong integrity, improves the strength, water tightness and stability of the auxiliary culvert structure, and has the technical effect of simple construction. In the prior art, mortar tape construction requires two workers and about half an hour (plus mixing of mortar); after the improvement, two-section mortar tape construction requires one worker and about half an hour (plus mixing of mortar); the improved two-section mortar tape saves one worker and half an hour. Taking a 42-meter circular culvert as an example, there are 14 ordinary pipe joints, and a worker's daily salary is 300 yuan. The day's foreman is 8 hours. Normally, it takes one day to complete the mortar tape treatment of the ordinary pipe joints of a 42-meter circular culvert, and the total cost is 525 yuan. The total cost of the current method is 262.5 yuan, saving 262.5 yuan in labor costs.

[0035] The specific steps of circular culvert construction include: using a total station to measure the center line of the circular culvert and determine the excavation boundary piles of the foundation pit. In order to prevent rainwater from damaging the pit wall, drainage should be done around the top of the foundation pit to intercept surface water. The size of the foundation pit excavation should meet the requirements of foundation construction. The foundation excavation width is twice the diameter of the culvert, which is convenient for installing templates and setting drainage ditches. The foundation excavation is mainly mechanical, supplemented by manual cleaning. The foundation soil is excavated away from the edge of the foundation pit to avoid landslides and affect construction. After the base is manually cleaned, it is manually compacted. The foundation cushion layer uses gravel cushion layer. Pipe culvert installation: After the prefabricated pipe enters the site, the finished product is first inspected and can only be used after passing the inspection. The end face of the prefabricated pipe should be flat and perpendicular to its axis, without damage or cracks, and the surface should not have serious honeycombs, pockmarks, loose concrete, or exposed steel bars. The installation of prefabricated pipes adopts the construction method of on-site splicing. The installation of the pipe culvert starts from the downstream and faces upstream. Make each section of the culvert fit tightly against the cushion layer so that the culvert is evenly stressed. All pipe sections should be laid along the correct axis and at the slope shown in the drawings.

[0036] The width of the culvert joint is no more than 2mm. According to the design drawings, the 4cm mortar tape needs to be constructed as 2cm + one steel wire mesh + 2cm. After the mortar is placed on the upper surface of the circular culvert, the first mortar tape is cut by a fixed-size tape frame in the direction of travel on one side to form a mortar tape with a fixed size and a smooth surface, which is convenient for the placement of the steel wire mesh and a good fit with the mortar surface, ensuring the construction quality while speeding up the construction speed. After the first section of the mortar tape is finalized and the steel wire mesh is placed, the second mortar tape is constructed. The construction sequence is the same as the first mortar tape, and then it is moved in the opposite direction to finish the shaped mortar to ensure the appearance construction quality of the mortar tape.

[0037] As above Figure 1-Figure 2The circular pipe culvert mortar strip structure according to the utility model is described in an exemplary manner. However, those skilled in the art should understand that various improvements can be made to the circular pipe culvert mortar strip structure proposed by the utility model without departing from the content of the utility model. Therefore, the protection scope of the utility model should be determined by the content of the attached claims.

Claims

1. A circular pipe culvert mortar strip structure, It is characterized in that A first pipe section and a second pipe section are sequentially arranged along the extension direction of the circular pipe culvert, a connection seam is arranged between the first pipe section and the second pipe section, and the circular pipe culvert mortar tape structure seals the connection seam between the pipe sections of the circular pipe culvert; it includes a first mortar tape, a second mortar tape, and a steel mesh connecting the first mortar tape and the second mortar tape; A first mortar tape is arranged at the first pipe section along the extension direction of the circular culvert, a steel mesh is arranged on the first mortar tape, and a second mortar tape is arranged at the steel mesh and the second pipe section.

2. The circular pipe culvert mortar strip structure according to claim 1, It is characterized in that The width of the first mortar strip and the second mortar strip is 1.5 to 2.5 centimeters.

3. The circular pipe culvert mortar strip structure according to claim 1, It is characterized in that A pipe belt is sleeved on the outer side of the connecting seam.

4. The circular pipe culvert mortar strip structure according to claim 3, It is characterized in that The exterior of the pipe strip is coated with asphalt.

5. The circular pipe culvert mortar strip structure according to claim 2, It is characterized in that The width of the first mortar tape and the second mortar tape is 2 cm.

6. The circular pipe culvert mortar strip structure according to claim 4, It is characterized in that The asphalt has a two-layer coating structure.

7. The circular pipe culvert mortar strip structure according to claim 4, It is characterized in that The pipe section is a 1.5-meter round pipe or a 2.0-meter round pipe.

8. The circular pipe culvert mortar strip structure according to claim 7, It is characterized in that The first mortar tape and the second mortar tape are made of 1:3 cement mortar.

9. The circular pipe culvert mortar strip structure according to claim 1, It is characterized in that The mortar tape tool used for making the first mortar tape and the second mortar tape comprises an upper panel and wing plates arranged on both sides of the upper panel, and the wing plates are arc panels.

10. The circular pipe culvert mortar strip structure according to claim 9, It is characterized in that The curvature of the wing plate is set corresponding to the diameter of the pipe section.