Drainage structure of dewatering well

By setting up a water pump and drainage pipe at the bottom of the precipitation well, combined with the structure of sealing sleeves, sleeves and other structures, the problems of leakage and construction complexity of the precipitation well during foundation pit construction are solved, and efficient drainage of the precipitation well and environmental impact reduction are achieved. Small.

CN222044248UActive Publication Date: 2024-11-22CHINA CONSTR EIGHTH BUREAU TIANJIN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322951940.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-01
Publication Date
2024-11-22
Estimated Expiration
2033-11-01

AI Technical Summary

Technical Problem

In construction, when the bottom of the foundation pit is located at the groundwater pressure-bearing aquifer and the aquifer thickness is large, it is difficult to meet the precipitation requirements by setting up a precipitation well just outside the foundation pit, and the construction process of conventional methods is complicated and there is a risk of water leakage.

Method used

Set up a water pump at the bottom of the precipitation well, and pump out the water in the well through the drainage pipe. Combined with the sealing sleeve, sleeve, gravel layer, waterproof layer and raft foundation, ensure the safety and drainage efficiency of the water pump, and add the discharged water. Introduce an overall drainage system in a city or region.

Benefits of technology

The impact of precipitation wells on the surrounding environment is reduced, construction efficiency is improved, leakage risk is reduced, and centralized drainage management is achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044248U_ABST
    Figure CN222044248U_ABST
Patent Text Reader

Abstract

The utility model relates to a dewatering well drainage structure which comprises a water pump arranged at the bottom of a dewatering well. The plugging sleeve is arranged on the dewatering well and is positioned above the water pump; the sleeve is connected to a well opening of the dewatering well in a sleeving mode, an opening is formed in the side wall of the sleeve and connected with a water drainage pipe of the water pump, the water drainage pipe partially penetrates through the plugging sleeve and the opening to extend out of the dewatering well, and water in the dewatering well is drained out of the dewatering well through the water drainage pipe by starting the water pump; and the foundation cushion layer is arranged at the top of the plugging sleeve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a building construction technical device, in particular to a precipitation well drainage structure. Background Art

[0002] With the development of society, in the field of construction, there are more and more super-high-rise and super-scale buildings, and the foundation depth, scope and complexity are also increasing. When the bottom of the foundation pit is located in the groundwater pressure aquifer and the aquifer thickness is large, the water-stop curtain can only be a suspended water-stop curtain, and the precipitation well needs to be set inside the foundation pit to reduce the impact on the surrounding environment and ensure that the groundwater head elevation is below the bottom of the foundation pit during construction.

[0003] Due to the high head of underground pressurized water, it is difficult to meet the dewatering requirements by only setting up dewatering wells on the outside of the foundation pit. Some dewatering wells must be set up in the middle of the foundation pit, and during the construction phase of the raft foundation and underground structure, the dewatering wells cannot be sealed or removed. Uninterrupted and continuous dewatering is required, otherwise there will be risks such as sudden surges at the bottom of the pit.

[0004] The conventional practice is to install a metal casing on the top of the pipe well, weld a water stop ring around it, and finally seal the top of the pipe well with a blind plate. During the construction process of this conventional method, the construction process of the raft foundation at the pipe well location is complicated, and it is necessary to add waterproofing measures at the intersection with the pipe well. There are many processes and it takes a lot of time. In addition, this construction method causes the raft foundation to be not a whole. Although a water stop ring is installed at the intersection, there is still a gap at the intersection of the raft and the pipe well, and there is still a risk of water leakage. At the same time, the foundation waterproof membrane needs to be disconnected at this location, and the waterproof membrane needs to have a trimming position, which cannot form an integral waterproof layer, and there is a risk of leakage. Utility Model Content

[0005] The utility model aims to overcome the defects of the prior art and provide a drainage structure for a precipitation well, in which a water pump is arranged at the bottom of the precipitation well to pump out the water at the bottom of the precipitation well, thereby reducing the impact on the environment around the precipitation well.

[0006] The technical solution to achieve the above purpose is a precipitation well drainage structure, including:

[0007] A water pump installed at the bottom of the precipitation well;

[0008] A plugging sleeve disposed in the dewatering well and located above the water pump;

[0009] A sleeve is sleeved on the wellhead of the precipitation well, and the side wall of the sleeve is formed with an opening

[0010] a drainage pipe connected to the water pump, wherein a portion of the drainage pipe passes through the plugging sleeve and the opening to extend out of the precipitation well, and the water in the precipitation well is discharged from the precipitation well through the drainage pipe by starting the water pump; and

[0011] A base cushion layer is arranged on the top of the blocking sleeve.

[0012] Furthermore, it also includes: a gravel layer arranged in the precipitation well and located on the top of the plugging sleeve.

[0013] Furthermore, the top elevation of the gravel layer is flush with the top elevation of the precipitation well.

[0014] Furthermore, the portion of the drain pipe extending out of the opening is connected to an external water pipe.

[0015] Furthermore, a conversion joint is connected between the external water pipe and the drain pipe.

[0016] Furthermore, a waterproof layer is laid on the top of the base cushion layer.

[0017] Furthermore, a raft foundation is laid on the top of the waterproof layer.

[0018] Furthermore, the drain pipe is fixed to the sleeve by welding.

[0019] Furthermore, the length of the drainage pipe is adapted to the height of the precipitation well.

[0020] Furthermore, the sleeve includes: a baffle plate and a surrounding plate arranged along the edge of the baffle plate, the surrounding plate is attached to the side wall of the precipitation well, and the baffle plate is placed on the top of the precipitation well.

[0021] Compared with the prior art, the utility model has the following beneficial effects:

[0022] A water pump is arranged at the bottom of the precipitation well to pump out the water at the bottom of the precipitation well, thereby reducing the impact on the environment around the precipitation well. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 The utility model is a structural schematic diagram of a precipitation well drainage structure.

[0024] Legend: 1. Dewatering well; 2. Water pump; 3. Drainage pipe; 31. External water pipe; 32. Conversion joint; 4. Foundation cushion layer; 41. Waterproof layer; 42. Raft foundation; 5. Gravel layer. DETAILED DESCRIPTION

[0025] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0026] See also Figure 1 A drainage structure for a precipitation well comprises: a water pump 2 arranged at the bottom of the precipitation well 1; a sealing sleeve arranged in the precipitation well 1 and located above the water pump 2; a sleeve sleeved on the wellhead of the precipitation well 1, the side wall of the sleeve being formed with an opening connecting a drainage pipe 3 of the water pump 2, a portion of the drainage pipe 3 passes through the sealing sleeve and the opening to extend out of the precipitation well 1, and by starting the water pump 2, the water in the precipitation well 1 is discharged from the precipitation well 1 through the drainage pipe 3; and a base cushion layer 4 arranged on the top of the sealing sleeve.

[0027] In the present utility model, a preferred implementation is: construct the precipitation well 1 at the bottom of the foundation pit, the top elevation of the precipitation well 1 covers the bottom elevation of the foundation pit, the top elevation of the precipitation well 1 and the bottom elevation of the foundation pit are inserted to match the diameter of the drainage pipe 3, the water pump 2 is installed at the bottom of the precipitation well 1, and the drainage pipe 3 is used for connection, and after the installation is completed, a plugging sleeve is arranged above the water pump 2, and the plugging sleeve can prevent soil or stones generated by the construction from falling into the precipitation well 1 during subsequent construction. The water pump 2 is smashed, and a sleeve is arranged on the top of the precipitation well 1 to seal the precipitation well 1. Preferably, the precipitation well 1 is formed with an outlet at a position corresponding to the opening. When the sleeve is installed, the outlet and the opening are overlapped, so that the drain pipe 3 is drilled out from the outlet and the opening. The drilled end of the drain pipe 3 is placed in a pool for receiving water from the precipitation well 1. By starting the water pump 2, the water in the precipitation well 1 flows into the pool through the drain pipe 3. The drain pipe 3 is made of metal.

[0028] Furthermore, it also includes: a gravel layer 5 arranged in the drainage well 1 and located on the top of the plugging sleeve. The gravel layer 5 supports the side wall of the drainage well 1 to increase the stability of the drainage well 1 and prevent it from tilting or collapsing.

[0029] Furthermore, the top elevation of the gravel layer 5 is flush with the top elevation of the precipitation well 1 .

[0030] Furthermore, the portion of the drain pipe 3 extending out of the opening is connected to an external water pipe 31. The external water pipe 31 increases the drainage comfort of the drain pipe 3 and can prevent the discharged water from flowing back. The external water pipe 31 of the precipitation well 1 is made of plastic. Preferably, the external water pipe 31 can be connected to the overall drainage system of the city or region to achieve centralized drainage, and the drainage is introduced into the main drainage pipes of the city or region to better manage and utilize the accumulated water resources.

[0031] Furthermore, a conversion joint 32 is connected between the external water pipe 31 and the drain pipe 3. The conversion joint 32 can solve the problem that the calibers of the drain pipe 3 and the external water pipe 31 are different. In the present utility model, the external water pipe 31 may be made of PVC or HDPE, while the drain pipe 3 is made of metal. The conversion joint 32 can connect pipes of different materials to ensure the stability and sealing of the connection.

[0032] Furthermore, a waterproof layer 41 is laid on the top of the base cushion layer 4 .

[0033] Furthermore, a raft foundation 42 is laid on the top of the waterproof layer 41. The raft foundation is arranged above the precipitation well, which can prevent large pieces of sewage and debris from entering the well, while allowing rainwater to flow in smoothly, thereby reducing the blockage and maintenance work of the precipitation well and ensuring the normal operation of the precipitation system. In addition, the raft can also prevent harmful substances from entering the groundwater system and protect the water quality of the environment.

[0034] Furthermore, the drain pipe 3 is fixed to the sleeve by welding.

[0035] Furthermore, the length of the drainage pipe 3 is adapted to the height of the precipitation well 1 .

[0036] Furthermore, the sleeve includes: a baffle plate and a surrounding plate arranged along the edge of the baffle plate, the surrounding plate is attached to the side wall of the precipitation well 1, and the baffle plate is placed on the top of the precipitation well 1. Preferably, the diameter of the baffle plate is larger than the diameter of the precipitation well 1, and the diameter of the annular structure enclosed by the surrounding plate is smaller than the diameter of the baffle plate and larger than the diameter of the precipitation well 1.

[0037] The following is an explanation of the use process of the precipitation well drainage structure of the utility model.

[0038] The drainage well 1 is constructed at the bottom of the foundation pit, the top elevation of the drainage well 1 covers the bottom elevation of the foundation pit, the top elevation of the drainage well 1 and the bottom elevation of the foundation pit are inserted to match the diameter of the drainage pipe 3, the water pump 2 is installed at the bottom of the drainage well 1, and the drainage pipe 3 is used for connection. After the installation is completed, a plugging sleeve is arranged above the water pump 2. The plugging sleeve can prevent soil or stones generated by the construction from falling into the drainage well 1 and damaging the water pump 2 during subsequent construction. A sleeve is provided at the top of the precipitation well 1 to seal the precipitation well 1. Preferably, the precipitation well 1 is formed with an outlet at a position corresponding to the opening. When the sleeve is installed, the outlet and the opening are overlapped, so that the drain pipe 3 is drilled out from the outlet and the opening. The drilled end of the drain pipe 3 is placed in a pool for receiving water from the precipitation well 1. By starting the water pump 2, the water in the precipitation well 1 flows into the pool through the drain pipe 3. The drain pipe 3 is made of metal.

[0039] The utility model is described in detail above in conjunction with the embodiments of the drawings. A person skilled in the art can make various variations of the utility model according to the above description. Therefore, some details in the embodiments should not constitute a limitation of the utility model, and the scope of protection of the utility model shall be defined by the scope of the attached claims.

Claims

1. A precipitation well drainage structure, characterized in that: include: A water pump installed at the bottom of the precipitation well; A plugging sleeve disposed in the dewatering well and located above the water pump; A sleeve is sleeved on the wellhead of the precipitation well, and the side wall of the sleeve is formed with an opening A drainage pipe connected to the water pump, wherein a portion of the drainage pipe passes through the plugging sleeve and the opening to extend out of the precipitation well, and the water in the precipitation well is discharged from the precipitation well through the drainage pipe by starting the water pump; as well as A base cushion layer disposed on the top of the plugging sleeve; It also includes: a gravel layer arranged in the precipitation well and located on the top of the plugging sleeve; The top elevation of the gravel layer is flush with the top elevation of the precipitation well.

2. A precipitation well drainage structure according to claim 1, characterized in that: The portion of the drain pipe extending out of the opening is connected with an external water pipe.

3. A precipitation well drainage structure according to claim 2, characterized in that: A conversion joint is connected between the external water pipe and the drain pipe.

4. A precipitation well drainage structure according to claim 1, characterized in that: A waterproof layer is laid on the top of the basic cushion layer.

5. A precipitation well drainage structure according to claim 4, characterized in that: A raft foundation is laid on the top of the waterproof layer.

6. A precipitation well drainage structure according to claim 1, characterized in that: The drain pipe is fixed to the sleeve by welding.

7. The precipitation well drainage structure according to claim 1 is characterized by: The length of the drainage pipe is matched with the height of the precipitation well.

8. The precipitation well drainage structure according to claim 1 is characterized by: The sleeve comprises: a baffle plate and a surrounding plate arranged along the edge of the baffle plate, the surrounding plate is attached to the side wall of the precipitation well, and the baffle plate is placed on the top of the precipitation well.