Assembly structure of assembly type comprehensive pipe gallery
By adopting a combined structure of cast-in-place reinforced concrete base plate, prefabricated wall plate and overlapping plate in the prefabricated integrated pipe corridor, combining waterproofing and steel bar connections, the problems of complex assembly methods and equipment requirements are solved, and a rapid and economical Installation and structural stability.
Patent Information
- Application Number
- CN202420003758.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-01-02
AI Technical Summary
The assembly method of the existing prefabricated integrated pipe gallery is complex, the prefabricated components are heavy, and large-tonnage lifting equipment is required. The existing industrial and civil construction prefabricated factories cannot process it, resulting in high production costs and equipment upgrade and transformation needs.
Using a combined structure of cast-in-place reinforced concrete base plate, prefabricated wall plate, stacked board and cast-in-place reinforced concrete roof plate, prefabricated wall plate is hoisted by reserving grooves on the bottom plate, and using waterproof material, asphalt material and cement mortar at the connection. Enclosed, connected by crisscrossing steel bars, combined with vertical steel plate water stops to achieve structural stability.
The assembly process is simplified, the installation speed and work efficiency are improved, and the demand for large-tonnage lifting equipment is reduced. The existing manufacturers can directly process it, reduce production costs, and improve the reliability and stress clearness of the structure.
Smart Images

Figure CN222044269U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of integrated pipe corridors, and in particular relates to an assembly structure of an assembled integrated pipe corridor. Background Art
[0002] The country is promoting the technology of prefabricated buildings (structures). Some regions have requirements for the assembly rate of buildings (structures) in engineering construction, and some regions require the use of prefabricated technology in the construction of integrated pipe corridors. The assembly methods of prefabricated integrated pipe corridors include prefabricated segmental type, piece prefabricated type, and superimposed type. Various prefabrication methods have different requirements for the scale of prefabricated component factories. The existing assembly methods are relatively complicated, and the prefabricated components are heavy, requiring large-tonnage lifting equipment. In addition, the technology and equipment of existing ordinary industrial and civil building prefabrication plants cannot process such prefabricated components, and the factories need to be upgraded and renovated. Utility Model Content
[0003] The utility model aims to provide an assembly structure of an assembled comprehensive pipe gallery to solve the problem that the existing assembly method is relatively complicated.
[0004] The technical solution of the utility model is: an assembly structure of an assembled comprehensive pipe gallery, including a cast-in-place reinforced concrete bottom plate, a prefabricated wall plate, a composite plate and a cast-in-place reinforced concrete top plate, grooves are provided on both sides of the cast-in-place reinforced concrete bottom plate, the bottom of the prefabricated wall plate is connected in the groove, the composite plate is located at the top of the prefabricated wall plate, a casting groove is opened on the outer periphery of the top of the prefabricated wall plate, and the cast-in-place reinforced concrete top plate is cast on the top of the composite plate and in the casting groove.
[0005] As a further improvement of the utility model, a waterproof material is coated on the inner wall of the groove.
[0006] As a further improvement of the utility model, the gap between the prefabricated wall panel and the groove is filled with asphalt material.
[0007] As a further improvement of the utility model, the top of the gap between the prefabricated wall panel and the groove is filled with caulking material.
[0008] As a further improvement of the utility model, cement mortar is applied at the connection corners between the prefabricated wall panel and the groove.
[0009] As a further improvement of the utility model, crisscrossed wall panel steel bars are provided in the prefabricated wall panel, and crisscrossed top panel steel bars are provided in the cast-in-place reinforced concrete top panel. The wall panel steel bars extend out of the upper end of the prefabricated wall panel and are connected to the top panel steel bars.
[0010] As a further improvement of the utility model, the composite plate is provided with crisscross composite plate steel bars, which extend out of both sides of the composite plate and are anchored in the cast-in-place reinforced concrete top plate.
[0011] As a further improvement of the utility model, a vertical steel plate waterstop is provided between the bottom of the casting trough and the cast-in-place reinforced concrete top plate, and the steel plate waterstop is provided along the entire length of the cast-in-place reinforced concrete top plate.
[0012] The beneficial effects of the utility model are as follows: the utility model adopts a combination of single-piece prefabricated wall panels, composite panels, and cast-in-place reinforced concrete for assembly. The bottom plate adopts a cast-in-place reinforced concrete structure, and a groove is reserved during pouring, and then the prefabricated wall panels are hoisted, which solves the disadvantage of the existing assembly method that the concrete is not dense when pouring and connecting. The on-site plug-in installation structure has a fast installation speed and high work efficiency. The single-piece prefabricated wall panels and composite panels are light in weight and do not require large-tonnage hoisting equipment. In addition, the existing prefabrication plants for ordinary industrial and civil buildings can process prefabricated components without upgrading and reconstruction. The utility model saves production costs, and the connection structure is simple and reliable, and the force is clear. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a structural schematic diagram of the utility model;
[0014] Figure 2 It is a schematic diagram of the connection between the cast-in-place reinforced concrete base plate and the prefabricated wall plate in the utility model;
[0015] Figure 3 It is a schematic diagram of the steel bar connection of the prefabricated wall panel, the composite panel and the cast-in-place reinforced concrete top panel in the utility model.
[0016] In the figure: 1-cast-in-place reinforced concrete bottom plate; 2-prefabricated wall panel; 201-wall panel steel bar; 3-composite plate; 301-composite plate steel bar; 4-cast-in-place reinforced concrete top plate; 401-top plate steel bar; 5-groove; 6-casting trough; 7-asphalt material; 8-caulking material; 9-cement mortar; 10-waterproof material; 11-steel plate waterstop. DETAILED DESCRIPTION
[0017] The utility model is described in detail below in conjunction with the accompanying drawings.
[0018] like Figure 1-3 As shown, an assembly structure of an assembled comprehensive pipe gallery includes a cast-in-place reinforced concrete bottom plate 1, a prefabricated wall panel 2, a composite plate 3 and a cast-in-place reinforced concrete top plate 4. Grooves 5 are provided on both sides of the cast-in-place reinforced concrete bottom plate 1. The bottom of the prefabricated wall panel 2 is connected in the groove 5. The composite plate 3 is located at the top of the prefabricated wall panel 2. A casting groove 6 is opened on the outer periphery of the top of the prefabricated wall panel 2. The cast-in-place reinforced concrete top plate 4 is cast on the top of the composite plate 3 and in the casting groove 6.
[0019] The inner wall of the groove 5 is coated with a waterproof material 10 .
[0020] The gap between the prefabricated wall panel 2 and the groove 5 is filled with asphalt material 7. The top of the gap between the prefabricated wall panel 2 and the groove 5 is filled with caulking material 8. Cement mortar 9 is applied to the connection corner between the prefabricated wall panel 2 and the groove 5.
[0021] The prefabricated wall panel 2 is provided with crisscrossed wall panel reinforcements 201 , and the cast-in-place reinforced concrete top panel 4 is provided with crisscrossed top panel reinforcements 401 . The wall panel reinforcements 201 extend out of the upper end of the prefabricated wall panel 2 and are overlapped and connected with the top panel reinforcements 401 .
[0022] The composite plate 3 is provided with crisscross composite plate steel bars 301 , which extend out of both sides of the composite plate 3 and are anchored in the cast-in-place reinforced concrete top plate 4 .
[0023] A vertical steel plate water stop 11 is provided between the bottom of the casting trough 6 and the cast-in-place reinforced concrete top slab 4 , and the steel plate water stop 11 is provided along the entire length of the cast-in-place reinforced concrete top slab 4 .
[0024] During construction, first cast the cast-in-place reinforced concrete bottom plate 1, and cast the groove 5 on the cast-in-place reinforced concrete bottom plate 1. After applying waterproof material 10 in the groove 5, the prefabricated wall panel 2 is directly hoisted into the reserved groove 5. The gap between the prefabricated wall panel 2 and the groove 5 is filled with asphalt material 7, and then sealed with caulking material 8, and then 1:1 self-stressed cement mortar 9 is applied at the connection corner. Finally, the composite plate 3 is installed on the top of the prefabricated wall panel 2, the top plate steel bars 401 are tied to the wall panel steel bars 201, and then the cast-in-place reinforced concrete top plate 4 is cast. The composite plate 3 and the cast-in-place reinforced concrete top plate 4 constitute the concrete composite layer integrated pipe gallery top plate. After the cast-in-place reinforced concrete top plate 4, the integrated pipe gallery top plate and the prefabricated wall panel 2 form a whole. The connection structure of the utility model is simple and reliable, and the force is clear.
[0025] The utility model is an assembly structure that combines piece-by-piece assembly and superimposed assembly, and can fully utilize the technology and equipment of existing general industrial and civil building prefabrication plants to process prefabricated components. There is no need to upgrade and transform the prefabricated component processing plant. The single-piece components have a light weight, and small-tonnage lifting equipment can meet construction needs.
Claims
1. An assembly structure of an assembled integrated pipe gallery, characterized in that: The invention comprises a cast-in-place reinforced concrete bottom plate (1), a prefabricated wall plate (2), a composite plate (3) and a cast-in-place reinforced concrete top plate (4), wherein grooves (5) are provided on both sides of the cast-in-place reinforced concrete bottom plate (1), the bottom of the prefabricated wall plate (2) is connected to the groove (5), the composite plate (3) is located on the top of the prefabricated wall plate (2), a casting groove (6) is provided on the outer periphery of the top of the prefabricated wall plate (2), and the cast-in-place reinforced concrete top plate (4) is cast on the top of the composite plate (3) and in the casting groove (6).
2. The assembly structure of an assembled integrated pipe gallery according to claim 1 is characterized in that: The inner wall of the groove (5) is coated with a waterproof material (10).
3. The assembly structure of an assembled integrated pipe gallery according to claim 2 is characterized in that: The gap between the prefabricated wall panel (2) and the groove (5) is filled with asphalt material (7).
4. The assembly structure of an assembled integrated pipe gallery according to claim 3 is characterized in that: The top of the gap between the prefabricated wall panel (2) and the groove (5) is filled with caulking material (8).
5. The assembly structure of an assembled integrated pipe gallery according to claim 4 is characterized in that: Cement mortar (9) is applied to the connection corners between the prefabricated wall panel (2) and the groove (5).
6. An assembly structure of an assembled integrated pipe gallery according to any one of claims 1 to 5, characterized in that: The prefabricated wall panel (2) is provided with crisscrossed wall panel reinforcement bars (201), the cast-in-place reinforced concrete top panel (4) is provided with crisscrossed top panel reinforcement bars (401), and the wall panel reinforcement bars (201) extend out of the upper end of the prefabricated wall panel (2) and are connected to the top panel reinforcement bars (401).
7. The assembly structure of an assembled integrated pipe gallery according to claim 6 is characterized in that: The composite plate (3) is provided with composite plate steel bars (301) that are crisscrossed in both directions. The composite plate steel bars (301) extend out of both sides of the composite plate (3) and are anchored in the cast-in-place reinforced concrete top plate (4).
8. The assembly structure of an assembled integrated pipe gallery according to claim 7 is characterized in that: A vertical steel plate water stop (11) is provided between the bottom of the casting trough (6) and the cast-in-place reinforced concrete top plate (4), and the steel plate water stop (11) is provided along the entire length of the cast-in-place reinforced concrete top plate (4).
