Fabricated concrete pipe gallery connecting joint
By designing a simplified prefabricated concrete pipe gallery connection nodes, using prefabricated components and specific structural designs, the problems of long construction cycle, high cost and poor sealing of traditional connection methods are solved, and efficient and convenient pipe gallery connections are achieved, improving the The stability and reliability of the pipeline system are achieved.
Patent Information
- Application Number
- CN202420692670.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-07
AI Technical Summary
The traditional concrete pipe corridor connection method has problems such as long construction cycle, high cost, quality limited by on-site conditions, poor sealing and poor durability. The joints of prefabricated connections are complex and difficult to widely use in actual projects.
Design a prefabricated concrete pipe corridor connection node, including connecting channels, maintenance pipes, reinforcement cushion layers, reinforcement frames, inner and outer water barrier strips, transverse through holes, longitudinal through holes, protruding sections, upper and lower joint teeth, through prefabricated The components are poured uniformly in the factory, simplifying on-site construction and improving the reliability and overall stability of the connection.
It realizes the quality of the connection nodes in a well-controlled factory environment, shortens the construction cycle, reduces technical requirements, improves the sealing and service life of the pipe corridor, reduces construction costs, and improves the construction efficiency and operation reliability of the project. .
Smart Images

Figure CN222044274U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipe gallery assembly construction, in particular to an assembled concrete pipe gallery connection node. Background Art
[0002] With the acceleration of urbanization, underground pipe corridors, as an important part of urban infrastructure, are of great significance for the centralized layout of urban public engineering pipelines, improving urban operation efficiency, and ensuring urban operation safety. Traditional underground pipelines are mostly laid in a single pipeline, which not only occupies a large amount of urban land resources, but also has a great impact on the normal operation of the city once it needs maintenance or upgrading. Therefore, prefabricated concrete pipe corridors have gradually become the mainstream method of urban underground pipeline construction due to their advantages such as centralized layout of pipelines, short construction period, and convenient maintenance.
[0003] However, in the construction of prefabricated concrete pipe corridors, the design and construction quality of the connection nodes directly affect the overall stability and service life of the pipe corridor. There are two main traditional ways to connect concrete pipe corridors: cast-in-place connection and prefabricated connection. Cast-in-place connection requires a large amount of concrete pouring work on site, which not only has a long construction period and high cost, but also has construction quality that is greatly restricted by on-site conditions and is prone to quality problems. Prefabricated connections prefabricate various components in the factory and then transport them to the site for assembly. Although this solves the problem of cast-in-place connection to a certain extent, since the connection between prefabricated components still relies on traditional anchoring and bonding methods, there are disadvantages such as complex joint processing, poor durability, and low sealing.
[0004] In order to solve the above problems, a new type of prefabricated concrete pipe gallery connection node design is needed, which can provide better sealing, durability and construction convenience. The design should simplify the structure of the connection node, reduce the workload of on-site construction, and improve the reliability of the connection and the stability of the overall pipe gallery.
[0005] In the existing technology, various improvement schemes are constantly emerging, actively seeking to improve the performance of connection nodes through structural optimization, material innovation and construction process improvement. However, many schemes still have certain limitations, such as complex structures leading to increased production costs, or too high construction process requirements, which make it difficult to be widely used in actual projects. Therefore, there is an urgent need for a precast concrete pipe gallery connection node solution with a simpler structure, more convenient construction and better performance. Utility Model Content
[0006] In view of the above-mentioned deficiencies existing in the prior art, the purpose of the utility model is to provide a prefabricated concrete pipe gallery connection node, so as to improve the construction efficiency of the pipe gallery project, reduce the construction cost, and greatly improve the operational reliability and safety of the pipe gallery system.
[0007] The technical solution adopted by the utility model to achieve the above-mentioned purpose is: an assembled concrete pipe gallery connection node, including an assembly body, on which are opened a plurality of groups of connecting channels that are interconnected, the connecting channels are arranged to extend in a horizontal direction and are used to connect the pipe gallery structure, a splicing notch is opened on the side wall of the end of the connecting channel, an upper connecting groove is opened on the top surface of the end of the connecting channel, and a lower connecting tooth is fixedly connected to the bottom surface of the end of the connecting channel.
[0008] It also includes a maintenance pipe fixedly connected to the top of the assembly body and maintained in communication with the assembly body, the maintenance pipe is arranged in a vertical direction, a reinforcing cushion layer is fixedly connected to the inside of the assembly body, the reinforcing cushion layer is arranged below the maintenance pipe, a reinforcing frame is fixedly connected to the bottom of the reinforcing cushion layer, and the reinforcing frame is kept in contact with the inner wall of the connecting channel.
[0009] Each group of the connecting channels is also fixedly connected with an inner water retaining strip arranged around the inner wall of the connecting channel.
[0010] In some of the implementations, in order to ensure that the connection channels connected upward on each side of the assembly body can be effectively spliced with the pipe gallery structure corresponding to that direction, it is also necessary to provide the following technical solution for the pipe gallery structure.
[0011] A protruding section is fixedly connected to the side wall of the pipe gallery structure port, and the protruding section is nested and matched with the splicing notch. An upper connecting tooth is fixedly connected to the top surface of the pipe gallery structure port, and the upper connecting tooth is nested and matched with the upper connecting groove. A lower connecting groove is opened on the bottom surface of the port of the pipe gallery structure, and the lower connecting groove is nested and matched with the lower connecting tooth. The pipe gallery structure is also fixedly connected to an external water retaining strip arranged around the inner wall of the pipe gallery structure.
[0012] In some of the implementations, in order to ensure that the connecting channel can be effectively combined with the pipe gallery structure and to ensure the strength and stability of the connection between the two, the following technical solutions are provided.
[0013] The connecting channel and the pipe gallery structure are provided with horizontally arranged transverse through holes and vertically arranged longitudinal through holes, and the transverse through holes and the longitudinal through holes are arranged at the ports of the connecting channel and the pipe gallery structure, and the transverse through holes on the connecting channel and the pipe gallery structure remain butt-jointed, and the longitudinal through holes on the connecting channel and the pipe gallery structure remain butt-jointed.
[0014] In some of the implementations, in order to ensure that the pipeline corridor connection nodes and pipeline corridor structures are stably laid in the soil layer and to ensure that the underlying soil layer can effectively support the pipeline corridor connection nodes and pipeline corridor structures, the following technical solutions are provided.
[0015] The assembly body, the bottom of the connecting channel and the bottom of the pipe gallery structure are fixedly connected with a bearing cushion layer, and the bearing cushion layer at the bottom of the connecting channel is kept in close contact with the bearing cushion layer at the bottom of the corresponding pipe gallery structure.
[0016] In some of the implementations, in order to improve the stability of the connection of the maintenance through pipe on the assembly body and ensure that the top of the maintenance through pipe can be effectively connected to the wellhead, the following technical solutions are provided.
[0017] The bottom outer wall of the maintenance tube is provided with a plurality of groups of evenly distributed wedge-shaped support members, and the wedge-shaped support members are fixedly connected to the maintenance tube and the assembly body; a support gasket is fixedly connected to the top of the maintenance tube, and the thickness of the support gasket is greater than the thickness of the maintenance tube.
[0018] Beneficial effects of the utility model:
[0019] The prefabricated components used in this application can be completed in a well-controlled factory environment, ensuring consistency and reliability of quality. On-site assembly only requires connecting the prefabricated nodes according to the designed position, which greatly shortens the construction period, simplifies the node design, and makes it easy for construction personnel to master installation skills, reducing technical requirements in construction and reducing dependence on highly skilled labor.
[0020] The connection node design includes internal and external water retaining strips to prevent water and other external substances from penetrating during the operation of the corridor, thereby protecting the internal environment of the corridor. The connection grooves, teeth, splicing notches and protruding ends set at the connection channels and corridor structure connections ensure an effective combination of the two, and reinforcing bars and grouting are inserted into the horizontal and longitudinal through holes to improve the structural strength and stability of the connection nodes after connection with the corridor structure, thereby increasing the service life of the corridor.
[0021] In summary, the implementation of this application can not only improve the construction efficiency of the pipeline corridor project and reduce construction costs, but also greatly improve the operational reliability and safety of the pipeline corridor system. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram when the pipe gallery connection nodes are arranged in two groups opposite to each other;
[0023] Figure 2 This is a structural diagram of the pipe gallery connection nodes in three groups of T-shaped layouts;
[0024] Figure 3 This is a structural diagram of the pipe gallery connection nodes in a four-group cross layout;
[0025] Figure 4 This is a schematic diagram of the structure after sectioning the pipe gallery connection nodes (four groups of cross layout);
[0026] Figure 5 It is a structural schematic diagram of the pipe gallery structure;
[0027] Figure 6This is a structural diagram of the combination of the corridor structure and corridor connection nodes (three groups of T-shaped layouts).
[0028] In the figure: 1 assembly body, 11 reinforcement cushion layer, 12 reinforcement frame, 2 connection channel, 21 splicing notch, 22 upper connecting groove, 23 lower connecting tooth, 24 inner water retaining strip, 3 maintenance through pipe, 31 wedge-shaped support member, 32 support gasket ring, 4 pipe gallery structure, 41 protruding section, 42 upper connecting tooth, 43 lower connecting groove, 44 outer water retaining strip, 51 transverse through hole, 52 longitudinal through hole, 6 bearing cushion layer. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] See also Figure 1-6 A prefabricated concrete pipe gallery connection node includes an assembly body 1, on which are opened a plurality of groups of connecting channels 2 which are interconnected, the connecting channels 2 are arranged to extend in a horizontal direction and are used to connect a pipe gallery structure 4, a splicing notch 21 is opened on the side wall at the end of the connecting channel 2, an upper connecting groove 22 is opened on the top surface of the end of the connecting channel 2, and a lower connecting tooth 23 is fixedly connected to the bottom surface of the end of the connecting channel 2.
[0031] It also includes a maintenance pipe 3 fixedly connected to the top of the assembly body 1 and connected to the assembly body 1. The maintenance pipe 3 is arranged in the vertical direction. A reinforcing cushion layer 11 is fixedly connected to the inside of the assembly body 1. The reinforcing cushion layer 11 is arranged below the maintenance pipe 3. A reinforcing frame 12 is fixedly connected to the bottom of the reinforcing cushion layer 11. The reinforcing frame 12 is kept in contact with the inner wall of the connecting channel 2.
[0032] Each group of connecting channels 2 is also fixedly connected with an inner water retaining strip 24 arranged around the inner wall of the connecting channel 2 .
[0033] The assembly body 1, connecting channel 2, maintenance pipe 3, reinforced cushion layer 11, reinforced frame 12, and internal water retaining strip 24 involved above are uniformly cast by concrete, and a steel skeleton is buried in the concrete to ensure the overall strength and bearing capacity of the pipe gallery connection node.
[0034] In a specific construction implementation plan, the number of connecting channels 2 includes two sets of opposing structures, three sets of T-shaped structures, and four sets of cross structures, which can effectively splice and combine concrete pipe galleries of various directions buried in the soil layer.
[0035] The connecting pipes involved are used to connect the connection ports of the concrete pipe gallery and ensure the structural stability and sealing effect of the assembly of the two.
[0036] The maintenance pipe 3 is arranged in the vertical direction and is used to connect the wellhead on the road surface, so that the staff can enter the pipe gallery connection nodes and each concrete pipe gallery through the maintenance pipe 3, and perform maintenance and repair operations on the cables, pipelines and other facilities installed therein.
[0037] The reinforced cushion layer 11 can thicken the assembly body 1 to effectively bear the weight of the maintenance pipe 3 designed above, ensuring the overall stability of the corridor connection node, and the reinforced frame 12 can further effectively support the reinforced cushion layer 11 and the maintenance pipe 3 above. At the same time, the side walls of the connecting channel 2 and the reinforced frame 12 can also effectively bear the covering layer above, ensuring its stable assembly and construction below the ground.
[0038] In order to ensure that the connecting channels 2 connected upwardly on each side of the assembly body 1 can be effectively spliced with the pipe gallery structure 4 corresponding to this direction, it is also necessary to provide the following technical solution for the pipe gallery structure 4.
[0039] A protruding section 41 is fixedly connected to the side wall of the port of the pipe gallery structure 4, and the protruding section 41 is nested and matched with the splicing notch 21. An upper connecting tooth 42 is fixedly connected to the top surface of the port of the pipe gallery structure 4, and the upper connecting tooth 42 is nested and matched with the upper connecting groove 22. A lower connecting groove 43 is opened on the bottom surface of the port of the pipe gallery structure 4, and the lower connecting groove 43 is nested and matched with the lower connecting tooth 23. The pipe gallery structure 4 is also fixedly connected to an external water retaining strip 44 arranged around the inner wall of the pipe gallery structure 4.
[0040] The pipe gallery structure 4 and the outer water retaining strip 44 are cast in a unified manner through concrete, and a steel bar skeleton is embedded in the concrete to ensure the squeaking strength and bearing capacity of the pipe gallery structure 4 .
[0041] The port position of the pipe gallery structure 4 is provided with a protruding section 41, an upper connecting tooth 42, and a lower connecting groove 43, which can be nested and matched with the connecting channel 2 in the corresponding direction and effectively docked, thereby ensuring the effective combination of the pipe gallery connection node and the pipe gallery structure 4 and ensuring that the cables and pipelines are stably installed therein.
[0042] The design of the splicing notch 21 and the protruding section 41 facilitates the installation of the pipe gallery connection node from top to bottom at the port of the pipe gallery structure 4 and realizes the effective connection between the two.
[0043] In order to ensure that the connecting channel 2 can be effectively combined with the pipe gallery structure 4 and to ensure the strength and stability of the connection between the two, the following technical solution is provided.
[0044] The connecting channel 2 and the pipe gallery structure 4 are provided with horizontally arranged transverse through holes 51 and vertically arranged longitudinal through holes 52. The transverse through holes 51 and the longitudinal through holes 52 are arranged at the ports of the connecting channel 2 and the pipe gallery structure 4, and the transverse through holes 51 on the connecting channel 2 and the pipe gallery structure 4 remain butt-jointed, and the longitudinal through holes 52 on the connecting channel 2 and the pipe gallery structure 4 remain butt-jointed.
[0045] After the connecting channel 2 is hoisted and docked with the pipe gallery structure 4 in the corresponding direction, steel bars are inserted into each transverse through hole 51 and the longitudinal through hole 52, and grouting is injected into the transverse through hole 51 and the longitudinal through hole 52 to form a stable whole with the connecting channel 2 and the pipe gallery structure 4. Then, a waterproof layer is coated on the inner wall of the connecting channel 2 and the pipe gallery structure 4, and the waterproof layer is placed between the inner water retaining strip 24 and the outer water retaining strip 44 to further seal the joint between the two to prevent groundwater from extending into the interior of the pipe gallery through the joint and affecting the stable application of the pipelines and cables therein.
[0046] In order to ensure that the pipeline gallery connection nodes and the pipeline gallery structure 4 are stably laid in the soil layer and to ensure that the underlying soil layer can effectively support the pipeline gallery connection nodes and the pipeline gallery structure 4, the following technical solutions are provided.
[0047] The assembly body 1 , the bottom of the connecting channel 2 and the bottom of the pipe gallery structure 4 are fixedly connected with a bearing cushion layer 6 , and the bearing cushion layer 6 at the bottom of the connecting channel 2 is kept in close contact with the bearing cushion layer 6 at the bottom of the corresponding pipe gallery structure 4 .
[0048] The bearing cushion layer 6 can increase the stress-bearing area of the underlying soil layer, so as to effectively distribute the deadweight of the pipeline gallery connection nodes and the pipeline gallery structure 4 to a soil layer with a larger area, thereby ensuring that the underlying soil layer can stably bear the pipeline gallery connection nodes and the pipeline gallery structure 4.
[0049] According to the number and arrangement of the connecting channels 2, the bearing cushion layer 6 at the bottom of the assembly body 1 and the connecting channels 2 is set in a corresponding shape, aiming to improve the bearing effect of the underlying soil layer on the pipeline corridor connection node.
[0050] In order to improve the stability of the connection of the maintenance through pipe 3 on the assembly body 1 and ensure that the top of the maintenance through pipe 3 can be effectively connected to the wellhead, the following technical solution is provided.
[0051] The bottom outer wall of the maintenance tube 3 is provided with multiple groups of evenly distributed wedge-shaped support members 31, which are fixedly connected to the maintenance tube 3 and the assembly body 1; a support gasket ring 32 is fixedly connected to the top of the maintenance tube 3, and the thickness of the support gasket ring 32 is greater than the thickness of the maintenance tube 3.
[0052] The wedge-shaped support member 31, the maintenance pipe 3 and the assembly body 1 are cast together, and the wedge-shaped support member 31 can improve the strength of the connection position between the assembly body 1 and the maintenance pipe 3 to prevent the maintenance pipe 3 from being deformed or cracked due to the shear force of the soil layer.
[0053] The support washer 32 is equivalent to thickening the top port of the maintenance through pipe 3, and bricks can be built above the maintenance through pipe 3 to form a wellhead structure and stably support the bricks built above.
[0054] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0055] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. An assembled concrete pipe gallery connection node, characterized in that: The invention comprises an assembly body (1), the assembly body (1) is provided with a plurality of groups of connecting channels (2) which are interconnected, the connecting channels (2) extending in a horizontal direction and used to connect to a pipe gallery structure (4), a splicing notch (21) being provided on the side wall of the end of the connecting channel (2), an upper connecting groove (22) being provided on the top surface of the end of the connecting channel (2), and a lower connecting tooth (23) being fixedly connected to the bottom surface of the end of the connecting channel (2); and further comprising a device fixedly connected to the top of the assembly body (1) and connected to the assembly body ( 1) a maintenance through pipe (3) maintained in communication, the maintenance through pipe (3) being arranged in a vertical direction, a reinforcement cushion layer (11) being fixedly connected inside the assembly body (1), the reinforcement cushion layer (11) being arranged below the maintenance through pipe (3), a reinforcement frame (12) being fixedly connected to the bottom of the reinforcement cushion layer (11), the reinforcement frame (12) being kept in contact with the inner wall of the connecting channel (2); each group of the connecting channels (2) is also fixedly connected with an inner water retaining strip (24) arranged around the inner wall of the connecting channel (2).
2. The assembled concrete pipe gallery connection node according to claim 1, characterized in that: A protruding section (41) is fixedly connected to the side wall of the port of the pipe gallery structure (4), and the protruding section (41) is nested and matched with the splicing notch (21). An upper connecting tooth (42) is fixedly connected to the top surface of the port of the pipe gallery structure (4), and the upper connecting tooth (42) is nested and matched with the upper connecting groove (22). A lower connecting groove (43) is provided on the bottom surface of the port of the pipe gallery structure (4), and the lower connecting groove (43) is nested and matched with the lower connecting tooth (23). The pipe gallery structure (4) is also fixedly connected to an external water retaining strip (44) arranged around the inner wall of the pipe gallery structure (4).
3. The assembled concrete pipe gallery connection node according to claim 2 is characterized in that: The connecting channel (2) and the pipe gallery structure (4) are provided with horizontally arranged transverse through holes (51) and vertically arranged longitudinal through holes (52); the transverse through holes (51) and the longitudinal through holes (52) are arranged at the ends of the connecting channel (2) and the pipe gallery structure (4); the transverse through holes (51) on the connecting channel (2) and the pipe gallery structure (4) are kept butted against each other, and the longitudinal through holes (52) on the connecting channel (2) and the pipe gallery structure (4) are kept butted against each other.
4. The assembled concrete pipe gallery connection node according to claim 2, characterized in that: The assembly body (1), the bottom of the connecting channel (2) and the bottom of the pipe gallery structure (4) are fixedly connected with a bearing cushion layer (6), and the bearing cushion layer (6) at the bottom of the connecting channel (2) is kept in close contact with the bearing cushion layer (6) at the bottom of the corresponding pipe gallery structure (4).
5. The assembled concrete pipe gallery connection node according to claim 1, characterized in that: The outer wall of the bottom of the maintenance tube (3) is provided with a plurality of groups of evenly distributed wedge-shaped support members (31), the wedge-shaped support members (31) being fixedly connected to the maintenance tube (3) and the assembly body (1); a support gasket ring (32) is fixedly connected to the top of the maintenance tube (3), the thickness of the support gasket ring (32) being greater than the thickness of the maintenance tube (3).