Suspender device of integrated suspended ceiling
By designing a boom device with integrated ceilings, connecting the connecting flange, adjustment plate and high-strength bolts to the keel, the problem of low construction efficiency of traditional ceilings is solved, and the installation, firm connection and low cost of the boom device is achieved, improving the installation of the boom device Construction efficiency and quality.
Patent Information
- Application Number
- CN202420593438.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-25
AI Technical Summary
In traditional ceiling construction, the on-site installation efficiency of air conditioning ducts, fans, cable brackets and water pipes is low, and multiple long screws are required to be drilled and fixed, resulting in unstable construction efficiency and quality.
Design a boom device with integrated ceiling, including connecting flanges, connecting arms, horizontal adjustment plates, connecting bolts, connecting spacers and nuts, fixed to building beams or floor slabs by expansion screws, and utilizes waist-shaped connecting holes and heights The strength bolts are connected to the keel, and the adjustment plate and shackle plate are added for easy lifting and adjustment.
The boom device has a simple structure, quick installation, firm connection and low cost, which reduces the use of long screws, improves construction efficiency and quality, and enhances load-bearing capacity and fault tolerance.
Smart Images

Figure CN222044674U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a connecting device of an integrated suspended ceiling, in particular to a suspension rod device of the integrated suspended ceiling. Background Art
[0002] The air ducts, fans, cable racks, water pipes and other pipelines above the ceiling of traditional equipment need to be hung on the bottom of the floor slab using full-length screws or angle steels. This is a traditional on-site construction method. Since several long screws need to be installed per unit length, and the long screws are installed on the building by drilling holes, the construction efficiency is low. Utility Model Content
[0003] In order to solve the problem of low construction efficiency, the utility model provides a suspension rod device for an integrated ceiling, and the specific technical solution is as follows:
[0004] A suspension rod device for an integrated suspended ceiling includes: a connecting flange, which is arranged on a building beam or a floor slab; a connecting arm, which is arranged on the connecting flange; a horizontal adjustment plate, which is arranged on the connecting arm and has a plurality of connecting holes; a plurality of connecting bolts, which are movably arranged on the connecting holes and connected to the keel; a plurality of connecting gaskets, which are arranged on the connecting bolts and are located above the connecting holes; and a plurality of connecting nuts, which are arranged on the connecting bolts and are located above the connecting gaskets.
[0005] Preferably, it also includes a long gasket, which is provided with a plurality of gasket holes and is arranged between the connecting bolt and the keel.
[0006] Preferably, the connecting hole is a waist-shaped hole.
[0007] Preferably, it further comprises a shackle plate, which is arranged on the connecting arm and has a shackle hole.
[0008] Preferably, the connecting flange is provided with a plurality of flange holes.
[0009] Preferably, the connecting flange is a rectangular plate.
[0010] Preferably, the connecting arm is a channel steel.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] The utility model provides an integrated ceiling suspension rod device which has a simple structure, is convenient and quick to install, is firmly connected to the building, and has a low manufacturing cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 is a front view of the present application;
[0014] Figure 2is a side view of the present application;
[0015] Figure 3 is along Figure 1 Sectional view along line AA;
[0016] Figure 4 yes Figure 1 A partial enlarged view of point I in the middle;
[0017] Figure 5 It is a schematic diagram of the structure of a long gasket. DETAILED DESCRIPTION
[0018] The utility model is now further described with reference to the accompanying drawings.
[0019] Embodiment 1
[0020] like Figures 1 to 4 As shown, a suspension rod device for an integrated ceiling includes a connecting flange 1, a connecting arm 2, a horizontal adjustment plate 3, a connecting bolt 4, a connecting gasket 5, and a connecting nut 6. The connecting flange 1 is a rectangular iron plate, and four flange holes 11 are symmetrically arranged on the connecting flange 1. The connecting flange 1 is fixed to the floor slab or building beam 90 by expansion bolts. The two ends of the connecting arm 2 are respectively welded to the connecting flange 1 and the horizontal adjustment plate 3, and the connecting arm 2 is made of channel steel. Two connecting holes 31 are arranged on the horizontal adjustment plate 3, and the connecting holes 31 are waist-shaped holes and are located on both sides of the connecting arm 2. The keel 9 is located below the horizontal adjustment plate 3 and is connected to the connecting hole 31 by the connecting bolt 4, that is, the connecting bolt 4 passes through the keel 9 and is inserted into the connecting hole 31, the connecting gasket 5 is inserted on the connecting bolt 4, and is located above the horizontal adjustment plate 3, and the connecting nut 6 is installed on the connecting bolt 4, and is located above the connecting gasket 5. The connecting hole 31, the connecting bolt 4, the connecting gasket 5 and the connecting nut 6 correspond to each other.
[0021] The connection flange 1 is connected to the building through a plurality of expansion screws, which effectively ensures the reliability and stability of the connection and greatly enhances the load-bearing capacity. The level adjustment plate 3 is used for the installation of the keel 9, and the waist-shaped connection hole 31 facilitates the adjustment of the horizontal position of the keel 9, and has a strong fault tolerance, reducing the accuracy requirements for the installation position. The connection bolt 4 adjusts the height of the keel 9.
[0022] The connecting flange 1 can be made of a 220×200×10mm steel plate, and the diameter of the flange hole 11 is 18mm; the connecting arm 2 is made of No. 10 channel steel. The horizontal adjustment plate 3 is a 150×120×16mm steel plate. The connecting nut 6 is an M12 nut. The connecting bolt 4 is a high-strength bolt with a specification of M12×110 and 8.8 grade.
[0023] Since the overall strength of the suspension rod device is relatively high and the load-bearing capacity is relatively strong, the use of existing long screws can be greatly reduced, that is, the use of long screws per unit length can be reduced, which effectively reduces the workload, improves efficiency, and has reliable connection and strong load-bearing capacity.
[0024] Among them, a long gasket 7 is installed between the connecting bolt 4 and the keel 9, and two gasket holes 71 are provided on the long gasket 7, and the hole spacing of the gasket holes 71 is the same as the hole spacing of the two connecting holes 31. The long gasket 7 increases the contact area between the connecting bolt 4 and the keel 9, improves the strength between the connecting bolt 4 and the keel 9, and prevents the keel 9 from deforming after being subjected to gravity. The long gasket 7 is made of a 150×30×6mm steel plate, and the diameter of the gasket hole 71 is 14mm.
[0025] The connection gasket 5 can be a square gasket with a specification of 30×30×6mm.
[0026] The original method was to use full-length bolts for on-site hanging design. However, due to the large number of long screws, the construction efficiency was low and the construction quality was unstable. The hanging rod device increases the cross-section of the hanging rod, greatly reduces the number of hanging rods on site, improves work efficiency, is simple to install on site, and is convenient for tolerance adjustment.
[0027] Embodiment 2
[0028] like Figures 1 to 3 as well as Figure 5 As shown, in order to facilitate the lifting of the keel 9, a shackle plate 8 is welded on the connecting arm 2, and a shackle hole 81 is provided on the shackle plate 8. The shackle hole 81 is used to install the shackle, and the shackle is used to install the hoist. The hoist lifts the keel 9, which improves the installation efficiency of the keel 9 as a whole.
[0029] During installation, first fix the connecting flange 1 to the floor or secondary beam by means of expansion screws, then connect the buckle plate 8 to the wire rope or hoist, and hoist the keel 9. After the height of the keel 9 is lifted into place, adjust the level and elevation, and after confirmation, connect the keel 9 to the horizontal adjustment plate 3 by means of the connecting bolts 4 and tighten them to complete the hoisting operation.
[0030] The suspension rod device solves the stress problem of the integrated ceiling, the hanging problem during the installation of the integrated ceiling, the lifting problem during the installation of the integrated ceiling, and the adjustment problem of the horizontal and height directions of the integrated ceiling after it is in place, and is suitable for on-site installation of the integrated ceiling.
[0031] The technical principle of the present invention is described above in combination with specific embodiments. These descriptions are only for explaining the principle of the present invention and cannot be interpreted as limiting the protection scope of the present invention in any way. Based on the explanations here, technicians in this field can think of other specific implementation methods of the present invention without creative work, and these methods will fall within the protection scope of the claims of the present invention.
Claims
1. A suspension rod device for an integrated ceiling, characterized in that: include: A connecting flange (1) is provided on a building beam (90) or a floor slab; A connecting arm (2) is arranged on the connecting flange (1); A horizontal adjustment plate (3) is arranged on the connecting arm (2) and is provided with a plurality of connecting holes (31); A plurality of connecting bolts (4) are movably arranged on the connecting holes (31) and connected to the keel (9); A plurality of connection gaskets (5) are arranged on the connection bolts (4) and are located above the connection holes (31); as well as A plurality of connecting nuts (6) are arranged on the connecting bolts (4) and are located above the connecting gasket (5).
2. The integrated ceiling suspension rod device according to claim 1, characterized in that: It also includes a long gasket (7) provided with a plurality of gasket holes (71) and arranged between the connecting bolt (4) and the keel (9).
3. The integrated ceiling suspension rod device according to claim 1, characterized in that: The connecting hole (31) is a waist-shaped hole.
4. The integrated ceiling suspension rod device according to claim 1, characterized in that: It also comprises a shackle plate (8) which is arranged on the connecting arm (2) and is provided with a shackle hole (81).
5. The integrated ceiling suspension rod device according to claim 1, characterized in that: The connecting flange (1) is provided with a plurality of flange holes (11).
6. The integrated ceiling suspension rod device according to claim 1, characterized in that: The connecting flange (1) is a rectangular plate.
7. The integrated ceiling suspension rod device according to claim 1, characterized in that: The connecting arm (2) is a channel steel.
