Anchor bearing plate for steel-concrete structure
By using the positioning holes of the beam body pressure bearing plate and casing in the steel-concrete structure, combined with the design of installation holes, corrugated pipes and spiral ribs, the problem of downward deviation of the anchor pad is solved, and the rapid positioning and stability of the anchor pad is achieved Installation reduces production costs and improves construction efficiency and structural stability.
Patent Information
- Application Number
- CN202323509299.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-21
AI Technical Summary
In steel-concrete structure construction, the anchor pad plate is prone to deflect under the action of its own weight, which makes it difficult to completely align the working anchor and the anchor pad plate, which in turn affects the tensioning process of the anchor cable. The position of the anchor pad plate needs to be adjusted many times, which adds Construction difficulty and cost.
A anchor pad plate for steel-concrete structure is designed, using the positioning holes of the beam body pressure bearing plate and the sleeve. Through the dual configuration of the installation hole and the corrugated pipe, the spiral ribs and grouting pipe are combined to ensure the rapidity of the anchor pad plate. Positioning and stable installation drives the fixation of working anchors and steel strands.
It realizes rapid positioning and stable installation of anchor pads, reduces production costs, improves construction efficiency and overall stability of the structure, and ensures project quality.
Smart Images

Figure CN222044717U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of engineering construction, and in particular to an anchor plate for a steel-concrete structure. Background Art
[0002] The anchor plate of the steel-concrete structure refers to an important component used to connect the steel structure and the concrete structure. The steel-concrete structure is usually made of metal materials (such as steel plates). During the construction process, anchors are set in the reserved concrete structure and the anchor plate is connected to it to form a fixed connection point to ensure the safety and stability of the overall structure.
[0003] In the related technology, the steel-concrete structure usually includes anchor pads, working anchors, limit plates, jacks, tool anchors and clips, etc. The anchor pad is located between the slope and the working anchor, and is usually made of a steel plate with a circular hole. Its main function is to further spread the load on the slope surface to avoid the overall load being applied to the edge of the anchor hole.
[0004] With regard to the above-mentioned related technologies, the anchor plate is overall tilted downward under the action of its own weight, and it is difficult to completely align the working anchor with the anchor plate, so that the position of the anchor plate must be adjusted individually for multiple times when tensioning the anchor cable. Summary of the invention
[0005] In order to facilitate the installation and positioning of anchor plates and reduce the production costs of enterprises, the present application provides an anchor plate for steel-concrete structures.
[0006] The present application provides an anchor plate for a steel-concrete structure using the following technical solution:
[0007] An anchor plate for a steel-concrete structure comprises a working anchor, an anchor plate, a beam pressure plate and a steel strand. The beam pressure plate is provided with a positioning hole in the horizontal direction. The anchor plate is fixedly connected with a sleeve, and the sleeve is passed through the positioning hole in the horizontal direction and slidably fits in the positioning hole. The anchor plate is provided with a mounting hole in the horizontal direction. When the sleeve is slidably fits in the positioning hole to a specified position, the anchor plate is installed on one side of the beam pressure plate through the mounting hole. The working anchor is arranged on one side of the anchor plate. The working anchor is used to introduce the steel strand and to position the steel strand.
[0008] By adopting the above technical scheme, a positioning hole is opened in the pressure plate of the beam body, which is conducive to the positioning of the sleeve connected to the anchor plate as a whole. When the sleeve is inserted into the positioning hole and slides to cooperate with the positioning hole to the specified position, the anchor plate is fixed to the specified position through the mounting hole. Therefore, through the cooperation between the sleeve and the positioning hole, the establishment of the mounting hole of the anchor plate is conducive to quickly positioning the relevant position of the anchor plate, which is conducive to ensuring the rapid installation of the anchor plate. When the anchor plate is installed to the specified position, it drives the working anchor to be installed to the specified position, and then fixes the position of the steel strand, thereby reducing the production cost of the enterprise through the rapid installation of the anchor plate.
[0009] Optionally, a plurality of the mounting holes are provided, and the plurality of the mounting holes are symmetrically arranged along the center of the anchor plate, and the plurality of the mounting holes are all used for assisting the installation of the anchor plate.
[0010] By adopting the above technical solution, the provision of several mounting holes is conducive to ensuring the positioning of the anchor plate, thereby ensuring the stability of the anchor plate fixed to one side of the beam pressure plate, and further ensuring the overall stability of the device and the construction quality of the project.
[0011] Optionally, a bellows is provided on one side of the sleeve, and the bellows is used to assist in positioning the pressure plate of the beam body. When the sleeve is inserted into the positioning hole and slides to a specified position, the sleeve is sleeved on the outer circumferential surface of the bellows.
[0012] By adopting the above technical scheme, through the dual setting of the positioning hole and the bellows, it is beneficial to ensure that the positioning hole and the bellows can position the casing together. When the casing is positioned to the specified position, it is beneficial to drive the anchor plate to be positioned to the specified position, thereby facilitating the dual setting of the positioning hole and the bellows to drive the anchor plate to move to the specified position, thereby facilitating the rapid positioning of the anchor plate, thereby facilitating the relative position of the anchor plate and ensuring the quality of the anchor plate.
[0013] Optionally, a spiral rib is provided on one side of the sleeve, and when the sleeve is sleeved on the corrugated pipe, the spiral rib is sleeved on the outer circumferential surface of the sleeve and the corrugated pipe.
[0014] By adopting the above technical scheme, when the casing is sleeved on the corrugated pipe, the spiral ribs are sleeved on the casing and the corrugated pipe. The setting of the spiral ribs is beneficial to ensuring the tensile strength of the structure, and is beneficial to ensuring the stability and effectiveness of the connection between the casing and the corrugated pipe, and is further beneficial to ensuring the stability and effectiveness of the anchor plate fixedly connected to the casing, and is further beneficial to positioning the anchor plate, thereby ensuring the construction quality of the project.
[0015] Optionally, a through hole is opened on one side of the casing, a beam body pressure-bearing hole is opened through one side of the beam body pressure plate, a grouting pipe is arranged on one side of the casing, the grouting pipe is L-shaped, one end of the grouting pipe is connected to the through hole, and the end of the grouting pipe away from the through hole is connected to the beam body pressure-bearing hole.
[0016] By adopting the above technical scheme, the setting of the grouting pipe is conducive to connecting the casing and the beam pressure plate, which is conducive to pouring concrete into the casing through the grouting pipe from the outside. When the concrete enters the casing through the grouting pipe, it is conducive to ensuring the stability and effectiveness of the overall structural forming and ensuring the construction quality of the structure.
[0017] Optionally, the anchor plate is provided with a limit slot in a horizontal direction, the diameter of the limit slot is larger than the diameter of the working anchor, and the working anchor is fixedly connected to the wall of the limit slot.
[0018] By adopting the above technical solution, the diameter of the limiting slot is larger than the diameter of the working anchor, which is conducive to positioning the outer peripheral surface of the working anchor, thereby facilitating the positioning of the working anchor. Furthermore, the setting of the limiting slot ensures the stability of the working anchor and the rapid positioning of the overall structure, which is conducive to reducing the construction cost of the enterprise.
[0019] Optionally, the working anchor is provided with a plurality of anchor cable holes along the horizontal direction, and the walls of the plurality of anchor cable holes are provided with connecting circular holes. The steel strands are provided with a plurality of anchor cable holes corresponding to the anchor cable holes, and a positioning piece is provided on one side of the plurality of steel strands. The steel strands are passed through and slidably engaged in the connecting circular holes. When the steel strands are passed through to a specified position, the positioning piece is snap-fitted into the connecting circular hole.
[0020] By adopting the above technical solution, when the steel strand is passed through the connecting circular hole to the specified position, the connecting circular hole performs preliminary positioning on the circumferential direction of the steel strand. When the steel strand is passed through the connecting circular hole to the specified position, the positioning piece is snap-fitted into the connecting circular hole, thereby positioning the steel strand through the positioning piece through the connecting circular hole, thereby driving the positioning of the steel strand, which is beneficial to fixing the steel strand to the specified position, thereby beneficial to ensuring the stability of the steel strand, thereby beneficial to ensuring the stability of the device as a whole.
[0021] Optionally, the anchor cable holes are arranged in the horizontal direction, and the hole diameter of the anchor cable hole on the side away from the beam pressure plate is larger than the hole diameter of the anchor cable hole on the side close to the beam pressure plate, and the holes of the anchor cable hole on the side close to the beam pressure plate are all set to have the same hole diameter as the connecting circular hole.
[0022] By adopting the above technical scheme, the aperture setting of the anchor hole is conducive to the introduction of the external steel strand through the anchor hole introduction device. The structural setting of large outside and small inside is conducive to the rapid introduction and positioning of the steel strand, which is conducive to ensuring the rapid installation of the steel strand and ensuring the stability and effectiveness of the steel strand.
[0023] In summary, the present application includes at least one of the following beneficial technical effects:
[0024] 1. The beam body pressure plate is provided with positioning holes, which is conducive to the positioning of the sleeve connected with the anchor plate. When the sleeve is inserted into the positioning hole and slides to fit with the positioning hole to the specified position, the anchor plate is fixed to the specified position through the mounting hole. Therefore, through the cooperation of the sleeve and the positioning hole, the establishment of the mounting hole of the anchor plate is conducive to quickly positioning the relevant position of the anchor plate, which is conducive to ensuring the rapid installation of the anchor plate. When the anchor plate is installed to the specified position, it drives the working anchor to be installed to the specified position, and then fixes the position of the steel strand, thereby reducing the production cost of the enterprise through the rapid installation of the anchor plate.
[0025] 2. The dual setting of the positioning hole and the bellows is conducive to ensuring that the positioning hole and the bellows can position the casing together. When the casing is positioned to the specified position, it is conducive to driving the anchor plate to be positioned to the specified position, thereby facilitating the dual setting of the positioning hole and the bellows to drive the anchor plate to move to the specified position, thereby facilitating the rapid positioning of the anchor plate, thereby facilitating the relative position of the anchor plate and ensuring the quality of the anchor plate.
[0026] 3. When the casing is sleeved on the corrugated pipe, the spiral reinforcement is sleeved on the casing and the corrugated pipe. The setting of the spiral reinforcement is conducive to ensuring the tensile strength of the structure, and is conducive to ensuring the stability and effectiveness of the connection between the casing and the corrugated pipe, and is further conducive to ensuring the stability and effectiveness of the anchor plate fixedly connected to the casing, and is further conducive to positioning the anchor plate, thereby ensuring the construction quality of the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of the device of the embodiment of the present application.
[0028] Figure 2 It is a side view of the working anchor according to the embodiment of the present application.
[0029] Explanation of the reference numerals: 1. working anchor; 11. anchor hole; 12. connecting circular hole; 2. anchor plate; 21. mounting hole; 22. casing; 221. through hole; 23. corrugated pipe; 24. spiral reinforcement; 25. limiting slot; 3. beam pressure plate; 31. positioning hole; 32. beam pressure hole; 4. steel strand; 41. positioning piece; 5. grouting pipe. DETAILED DESCRIPTION
[0030] The following is combined with Figure 1-2 This application is described in further detail.
[0031] The embodiment of the present application discloses an anchor plate for a steel-concrete structure.
[0032] Reference Figure 1 An anchor plate 2 for a steel-concrete structure includes a working anchor 1, an anchor plate 2, a beam bearing plate 3 and a steel strand 4.
[0033] Reference Figure 1 and Figure 2 The shape of the anchor plate 2 is cylindrical. In the present embodiment, the material of the anchor plate 2 is set to 40Cr. 40Cr has high strength, strong wear resistance and fatigue strength, good hardening performance and is easy to process. The 40Cr steel material has good machinability and cutting performance. The surface finish of the processed parts is high. After quenching, tempering and other heat treatment processes, 40Cr steel can obtain good hardness and strength, which is suitable for making high-strength parts. 40Cr steel has high yield strength and tensile strength, which makes 40Cr widely used in the field of mechanical manufacturing, which is beneficial to reduce the production cost of the enterprise while ensuring the quality of the product.
[0034] Reference Figure 1 The anchor plate 2 is provided with a mounting hole 21 in the horizontal direction, and the mounting hole 21 is circular in shape. In the present embodiment, two mounting holes 21 are provided, and the two mounting holes 21 are symmetrically arranged along the center of the anchor plate 2. The two mounting holes 21 are arranged in the vertical direction. The anchor plate 2 is integrally connected with a sleeve 22, and the sleeve 22 is annular in shape. The beam body pressure plate 3 is arranged on one side of the anchor plate 2, and the beam body pressure plate 3 is rectangular in shape. The beam body pressure plate 3 is provided with a positioning hole 31 in the horizontal direction, and the positioning hole 31 is circular in shape. The sleeve 22 is penetrated through the positioning hole 31 in the horizontal direction and slides in the positioning hole 31 in the horizontal direction. When the sleeve 22 slides in the positioning hole 31 and moves to the specified position, the anchor plate 2 abuts against one side of the beam mounting plate. The anchor plate 2 is fixed to one side of the beam mounting plate through the mounting hole 21. The anchor plate 2 is fixed to one side of the beam pressure plate 3 through two mounting holes 21. The setting of the mounting holes 21 facilitates fixing the anchor plate 2 to one side of the beam pressure plate 3, thereby facilitating the stability and effectiveness of the device.
[0035] Reference Figure 1 A bellows 23 is provided on one side of the sleeve 22. When the sleeve 22 slides in the horizontal direction and cooperates with the positioning hole 31 to move to the specified position, the sleeve 22 is sleeved on the outer circumferential surface of the bellows 23, thereby fixing the bellows 23 in position. A spiral rib 24 is provided on one side of the sleeve 22. When the sleeve 22 is sleeved on the bellows 23, the spiral rib 24 is wound around the outer circumferential surfaces of the bellows 23 and the sleeve 22, thereby ensuring the stability and effectiveness of the connection between the sleeve 22 and the bellows 23, which is beneficial to ensuring the quality of the project.
[0036] Reference Figure 1A through hole 221 is provided on one side of the casing 22, and the shape of the through hole 221 is circular. A grouting pipe 5 is arranged on one side of the top of the through hole 221, and the shape of the grouting pipe 5 is L-shaped. One end of the grouting pipe 5 is connected with the through hole 221. A beam body pressure-bearing hole 32 is provided on the top of the beam body pressure-bearing plate 3. The shape of the beam body pressure-bearing hole 32 is circular. The beam body pressure-bearing hole 32 is arranged at the top of the positioning hole 31, and the end of the grouting pipe 5 away from the through hole 221 is connected with the beam body pressure-bearing hole 32. In the present embodiment application, the inner diameter of the grouting pipe 5 is set to 25 mm, the wall thickness of the grouting pipe 5 is not less than 2 mm, and the tube diameter of the grouting pipe 5 is larger than the diameters of the through hole 221 and the beam body pressure-bearing hole 32. Through the setting of the grouting pipe 5, it is beneficial to connect the beam body pressure-bearing hole 32 and the through hole 221, which is beneficial for external staff to confirm the internal environment of the casing 22 and to ensure the stability and effectiveness of the device.
[0037] Reference Figure 1 The anchor plate 2 is provided with a limiting slot 25 in the horizontal direction, and the limiting slot 25 is circular in shape. In the present embodiment, the depth of the limiting slot 25 is set to 3MM, and the working anchor 1 is fixedly connected to the slot wall of the limiting slot 25. The setting of the limiting slot 25 is conducive to limiting the working anchor 1, thereby ensuring the stability and effectiveness of the limiting of the working anchor 1. The material of the working anchor 1 is also set to 40Cr, the same as the anchor plate 2.
[0038] Reference Figure 1 The working anchor 1 is cylindrical in shape, and the working anchor 1 is arranged in the horizontal direction. The working anchor 1 is provided with an anchor hole 11 in the horizontal direction. There are a plurality of anchor holes 11, and the plurality of anchor holes 11 are evenly distributed along the circumference of one side of the working anchor 1. The shape of the anchor hole 11 is set to be conical. The shape of the anchor hole 11 is set to be larger on the left and smaller on the right in the horizontal direction. The hole walls of the plurality of anchor holes 11 are provided with connecting circular holes 12 in the horizontal direction. The shapes of the plurality of connecting circular holes 12 are all circular. The connecting circular holes 12 extend to one side of the bottom of the working anchor 1 in the horizontal direction. In the present embodiment application, the number of the anchor holes 11 is set to eight, and the number of the connecting circular holes 12 corresponds to the number of the anchor holes 11 being set to eight. The steel strand 4 is arranged horizontally. Direction setting, one end of the steel strand 4 is fixedly connected with a positioning piece 41, the shape of the positioning piece 41 is annular, the steel strand 4 is inserted into the anchor hole 11 and slidably fits in the anchor hole 11, when the steel strand 4 slides to the specified position along the horizontal direction, the positioning piece 41 snaps and fits in the connecting circular hole 12, and the shape setting of the anchor hole 11 is conducive to introducing the steel strand 4 into the anchor hole 11. When the steel strand 4 is introduced into the anchor hole 11, the positioning piece 41 snaps and fits in the connecting circular hole 12. Through the snap-fitting of the positioning piece 41 and the connecting circular hole 12, it is conducive to fixing the steel strand 4 to the specified position, thereby ensuring the stability and effectiveness of the placement of the steel strand 4, and ensuring the stability and effectiveness of the device as a whole.
[0039] The implementation principle of an anchor plate 2 for a steel-concrete structure in an embodiment of the present application is as follows: a positioning hole 31 is provided on the beam body pressure plate 3, which is conducive to positioning the sleeve 22 integrally connected to the anchor plate 2. When the sleeve 22 is inserted into the positioning hole 31 and slides to cooperate with the positioning hole 31 to a specified position, the anchor plate 2 is fixed to the specified position through the mounting hole 21. Thus, through the cooperation between the sleeve 22 and the positioning hole 31, the establishment of the mounting hole 21 of the anchor plate 2 is conducive to quickly positioning the relevant position of the anchor plate 2, and is conducive to ensuring the rapid installation of the anchor plate 2. When the anchor plate 2 is installed to the specified position, it drives the working anchor 1 to be installed to the specified position, and then fixes the position of the steel strand 4, thereby reducing the production cost of the enterprise through the rapid installation of the anchor plate 2.
[0040] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An anchor plate (2) for a steel-concrete structure, characterized in that: The invention comprises a working anchor (1), an anchor pad (2), a beam pressure plate (3) and a steel strand (4); the beam pressure plate (3) is provided with a positioning hole (31) in the horizontal direction; the anchor pad (2) is fixedly connected with a sleeve (22); the sleeve (22) is passed through the positioning hole (31) in the horizontal direction and is slidably matched with the positioning hole (31); the anchor pad (2) is provided with a mounting hole (21) in the horizontal direction; when the sleeve (22) is slidably matched with the positioning hole (31) to a specified position, the anchor pad (2) is mounted on one side of the beam pressure plate (3) through the mounting hole (21); the working anchor (1) is arranged on one side of the anchor pad (2); and the working anchor (1) is used to introduce the steel strand (4) and to position the steel strand (4).
2. The anchor plate (2) for a steel-concrete structure according to claim 1, characterized in that: A plurality of the mounting holes (21) are provided, and the plurality of the mounting holes (21) are symmetrically arranged along the center of the anchor plate (2), and the plurality of the mounting holes (21) are all used for assisting the installation of the anchor plate (2).
3. The anchor plate (2) for a steel-concrete structure according to claim 1, characterized in that: A bellows (23) is provided on one side of the sleeve (22), and the bellows (23) is used to assist in positioning the beam body pressure plate (3). When the sleeve (22) is inserted into the positioning hole (31) and slides to a specified position, the sleeve (22) is sleeved on the outer peripheral surface of the bellows (23).
4. The anchor plate (2) for a steel-concrete structure according to claim 1, characterized in that: A spiral rib (24) is provided on one side of the sleeve (22); when the sleeve (22) is sleeved on the corrugated tube (23), the spiral rib (24) is sleeved on the outer circumferential surfaces of the sleeve (22) and the corrugated tube (23).
5. The anchor plate (2) for a steel-concrete structure according to claim 1, characterized in that: A through hole (221) is provided on one side of the sleeve (22), a beam body pressure-bearing hollow hole (32) is provided through one side of the beam body pressure-bearing plate (3), a grouting pipe (5) is provided on one side of the sleeve (22), the grouting pipe (5) is L-shaped, one end of the grouting pipe (5) is connected to the through hole (221), and the end of the grouting pipe (5) away from the through hole (221) is connected to the beam body pressure-bearing hollow hole (32).
6. The anchor plate (2) for a steel-concrete structure according to claim 1, characterized in that: The anchor pad (2) is provided with a limit slot (25) in the horizontal direction, the working anchor (1) is fixedly connected to the slot wall of the limit slot (25), and the diameter of the limit slot (25) is greater than the diameter of the working anchor (1).
7. The anchor plate (2) for a steel-concrete structure according to claim 6, characterized in that: The working anchor (1) is provided with a plurality of anchor cable holes (11) in the horizontal direction, and the walls of the plurality of anchor cable holes (11) are provided with interconnecting circular holes (12). The steel strands (4) are provided with a plurality of anchor cable holes (11) corresponding to the anchor cable holes (11), and a positioning piece (41) is provided on one side of the plurality of steel strands (4). The steel strands (4) are passed through and slidably engaged with the interconnecting circular holes (12). When the steel strands (4) are passed through to a specified position, the positioning piece (41) is snap-fitted with the interconnecting circular holes (12).
8. The anchor plate (2) for a steel-concrete structure according to claim 7, characterized in that: The anchor cable holes (11) are arranged in the horizontal direction, the hole diameter of the anchor cable holes (11) on the side away from the beam body pressure plate (3) is larger than the hole diameter of the anchor cable holes (11) on the side close to the beam body pressure plate (3), and the holes of the anchor cable holes (11) on the side close to the beam body pressure plate (3) are all arranged to have the same hole diameter as the connecting circular hole (12).
Citation Information
Cited By
Fixing device for bridge group anchor and construction method
CN119615761A