Long-arm rod composite steel bar hook

By designing the composite steel hook of the long boom, the problem of the difficulty of steel hooks being used for the middle and lower part of the beam in the existing technology is solved, and the integrated formwork forming and construction quality improvement is achieved, the scope of use is expanded, and the construction site is reduced. Confusion and risk of arm scratches.

CN222045093UActive Publication Date: 2024-11-22罗建军
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420679781.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-11-22
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

Existing steel bar hooks are difficult to be used for steel bar binding and installation in the middle and lower part of the beam in construction and other projects, resulting in complex construction, poor integrity of the formwork, difficult to install, and easy to be scratched on the arms, making it difficult to meet technical specifications.

Method used

A long-arm composite steel hook is designed, including steel hook arm and wire-tipped embedded arm, allowing technical workers to tie at deeper steel intersections by increasing the length and magnetic pores of the steel hook and wire. Installation solves the problem of difficulty in reaching the arm and scratches.

Benefits of technology

The integrated formwork is realized, the quality and efficiency of steel bar binding installation is improved, the scope of use of steel bar hooks is expanded, the construction quality stability requirements is met, and the chaos at the construction site and the cross-operation of work types is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045093U_ABST
    Figure CN222045093U_ABST
Patent Text Reader

Abstract

The utility model relates to a long arm rod composite steel bar hook which comprises a steel bar hook arm rod and a binding wire embedding arm rod, wherein the steel bar hook arm rod is designed in a double-lengthening mode. The steel bar hook arm rod is provided with a hook used for hooking a binding wire ring head. The binding wire embedding arm rod is provided with two wire embedding parts with magnetic round small holes, and the wire embedding parts are used for being embedded into the two ends of the folded binding wire. According to the construction method, a technician can conveniently stretch a binding wire into a steel bar cross point at a deeper position of a steel bar framework for binding and mounting, the problems of poor integrity, large gap, high mounting difficulty and the like of a template caused by mounting the template and repairing the template for multiple times at a part with complex steel bar distribution of a building component are solved, and the template can be integrally formed. By the adoption of the scheme, the binding rate of the reinforcing steel bars is improved, workers are not prone to being injured, the problems that cross operation of multiple types of work on a construction site is disordered, and the management difficulty of the construction site is large are solved, the process cost of reinforcing steel bar engineering, formwork engineering, scaffold engineering and the like on the construction site is reduced, and economic benefits are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a construction tool, in particular to a long arm composite steel bar hook. Background Art

[0002] The statements in this section only provide background information related to the present disclosure, and these statements may constitute prior art. In the process of implementing the present utility model, the inventor found that there are at least the following problems in the prior art.

[0003] In many construction engineering fields such as housing construction, tunnel and bridge engineering, port engineering, industrial construction engineering, slope protection engineering, etc., steel bar hooks are used for the installation and tying of steel bars in reinforced concrete structures. Steel bar hooks are commonly used tying tools. They are usually made of round steel bars with a diameter of 6 to 8 mm and a length of 160 to 200 mm. A sleeve is added to the tail as a handle, such as Figure 1 shown.

[0004] At present, the steel bar hooks on the market are relatively simple and have limited use. For example, in house construction projects, they can only be used for binding and installing steel bar intersections on the surface of steel bar projects in column, beam and slab structures. It is inconvenient to use them for binding and installing deeper steel bar intersections, especially for binding and installing steel bars in the middle and lower parts of beams. Because the steel bars at the intersection of beams and columns and the ends of beams are arranged crosswise and crisscrossed, such as Figure 8 As shown in the figure, the spacing between the steel bars is dense, and it is difficult to reach in with your arms, and it is even more difficult to tie and install, which makes the operation very difficult. In order to ensure the installation quality, the formwork of the beam, the intersection of the beam and the column, and the end of the beam can only be installed in multiple times (the specific construction process is: first complete the installation of one side and the bottom formwork, then install the steel bar structure, and finally close the formwork on the other side). This construction process will cause scaffolders and formwork workers to enter and exit the site many times, and the cross-operation of multiple types of work on the construction site will be chaotic, which is not conducive to construction site management. In addition, the formwork is not formed in one piece, and it involves multiple mold repair installations, resulting in poor integrity of the formwork. The gaps between the formworks in these parts are large, which increases the difficulty of installation, and even mold expansion and mold explosion occur when pouring concrete, and the quality of the structure after forming is relatively poor. The formwork installation of such complex reinforcement parts adopts a one-time forming construction process, and it is difficult for technical workers to reach the deeper intersection of steel bars, which makes it difficult for the quality of steel bar binding installation to meet technical specifications, and the arms are easily scratched. In the reinforced concrete structure of a building, the steel frame plays the role of a skeleton. If the binding and installation quality of the steel frame does not meet the technical specifications, the quality grade of the building will be reduced. Summary of the invention

[0005] In view of the above problems, the purpose of the present invention is to solve some of the problems in the prior art, or at least alleviate these problems.

[0006] Long arm composite steel bar hook, including:

[0007] The steel bar hook arm rod comprises a steel bar hook long thin rod and a curved hook; the first end of the steel bar hook long thin rod is connected to the curved hook;

[0008] The tie wire is embedded in the arm rod, comprising a tie wire embedded in a long thin rod and a wire embedding component; the wire embedding component is located at the first end of the tie wire embedded in the long thin rod and is provided with two fine holes; the fine holes are used to adapt to the tie wire, and when no specific external force is applied, the two ends of the tie wire are respectively embedded in the fine holes and do not fall off.

[0009] Optionally, the pores are circular holes.

[0010] Furthermore, the circular holes are magnetic holes.

[0011] Furthermore, the diameter of the circular hole is 2 mm.

[0012] The steel bar hook arm rod also includes a hook arm rod handle connected to the second end of the steel bar hook long thin rod; the wire binding embedded arm rod also includes a long arm rod handle connected to the second end of the wire binding embedded long thin rod.

[0013] Furthermore, the hook arm lever handle and the long arm lever handle are made of metal or rubber and have a rough surface.

[0014] The steel bar hook long thin rod and the wire-embedded long thin rod are solid metal rods with a length between 500 mm and 800 mm.

[0015] Optionally, the shape of the long and thin rod of the steel bar hook is circular; the shape of the long and thin rod into which the binding wire is embedded is elliptical.

[0016] Furthermore, the hook tip of the curved hook is small and does not prick people.

[0017] The utility model has the following beneficial effects:

[0018] This application adopts a double-lengthened design of the steel bar hook arm and the wire-embedded arm, and cooperates with the two fine holes at the end of the wire-embedded arm that can be embedded in the wire-embedded arm, so that technical workers can simultaneously extend the steel bar hook arm and the wire-embedded arm into the steel bar intersection deeper in the steel skeleton for binding and installation, solving the problems of multiple installations of templates and supplementary templates in parts with complex reinforcement of building components, poor template integrity, large gaps, and high installation difficulty, so that the template can be formed in one piece, and the quality of steel bar binding and installation meets technical specifications. The adoption of this solution not only improves the binding rate of steel bars and meets technical requirements such as stable construction quality of steel structure, but also solves the problems of multiple entry and exit of scaffold workers and template workers, chaotic cross-operation of multiple types of work on the construction site, and difficulty in construction site management, which greatly increases the use of steel bar hooks and expands the scope of use of composite steel bar hooks. Technical workers are also not prone to scratching their arms. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The above structure of the present invention can be further illustrated by the non-limiting embodiments given in the following drawings.

[0020] Figure 1 is a schematic diagram of an existing hook arm;

[0021] Figure 2 It is a schematic diagram of the wire-binding arm of the utility model;

[0022] Figure 3 It is a schematic diagram of the steel bar hook arm rod of the utility model;

[0023] Figure 4 It is an enlarged view of the wire-embedded component;

[0024] Figure 5 It is a schematic diagram of a single tie wire being folded into two sections;

[0025] Figure 6 This is a schematic diagram of the wire being folded in half;

[0026] Figure 7 It is a schematic diagram of the insertion of the tie wire into the tie wire embedding arm;

[0027] Figure 8 It is a schematic diagram of the steel bar structure and the formwork structure;

[0028] Fig. 9 It is a schematic diagram of the utility model during binding.

[0029] Among them: 1-rebar hook arm rod; 2-tie wire embedded in the arm rod; 3-wire embedded component; 4-long arm rod handle; 5-bend hook; 6-hook arm rod handle; 7-circular small hole; 8-tie wire; 9-template structure; 10-rebar structure; 11-rebar intersection. DETAILED DESCRIPTION

[0030] The present invention is further described below in conjunction with the accompanying drawings. The embodiments of the present invention are only used to illustrate the present invention rather than to limit the present invention. Without departing from the technical concept of the present invention, various substitutions and changes can be made based on common technical knowledge and customary means in the field, which should all be included in the scope of the present invention.

[0031] In order to solve the problem of inconvenience in manual binding at deeper steel bar intersections, the present application has designed the following solution.

[0032] Long arm composite steel bar hook, including:

[0033] Steel bar hook arm 1, such as Figure 3 As shown, it comprises a long thin rod of a steel bar hook and a curved hook 5; the first end of the long thin rod of the steel bar hook is connected to the curved hook 5;

[0034] The wire is embedded in the arm 2, such as Figure 2 As shown, it includes a wire-embedded long thin rod and a wire-embedded component 3; the wire-embedded component 3 is located at the first end of the wire-embedded long thin rod and is provided with two fine holes, such as Figure 4 As shown; the fine hole is adapted to the wire 8, and when no specific external force is applied, the two ends of the wire 8 are respectively embedded in the fine hole and do not separate, as shown Figure 7 shown.

[0035] Because a long and thin rod is used, the steel bar hook arm rod 1 and the tie wire embedded arm rod 2 can be inserted into the intersection of steel bars where it is difficult for a skilled worker to insert his arm. Combined with the embedded wire part 3 that can easily fix and separate the tie wire, the tie wire embedded arm rod 2 can well replace the skilled worker's arm to complete the binding operation, solve the problem of the steel bar hook being limited to a single use surface, and expand the use range of the composite steel bar hook. In addition, it is not the skilled worker's arm that penetrates into the steel bar, which also avoids scratches and the like, and the operation is also very simple.

[0036] The long thin rod of the steel bar hook and the long thin rod embedded with the wire are solid metal rods with a length between 500 mm and 800 mm. The long thin rod can be made of round steel with a diameter of about 6 mm to 10 mm. The wire 8 is generally a thin iron wire used for tying steel bars. The shape of the long thin rod of the steel bar hook is circular; the shape of the long thin rod embedded with the wire is elliptical.

[0037] The first end of the long thin rod of the steel bar hook can be connected to the hook 5 by welding or the like. Figure 3 The one-piece design shown in the figure. The hook tip of the hook 5 is small and does not prick people, thus avoiding injuries to workers as much as possible.

[0038] The wire embedding component 3 can be a cylinder with two fine holes, such as Figure 4As shown, it can also be in other shapes. The wire embedding component 3 can be connected to the wire-embedded long thin rod by welding or the like, or it can be integrally formed with the wire-embedded long thin rod, and a fine hole can be made at the end. The fine hole can have a certain depth, such as Figure 4 As shown, the binding wire 8 is not easy to fall off when embedded therein.

[0039] The specific external force is mainly the pulling force of pulling the wire embedding arm 2 outward after the tying is completed. The two ends of the wire 8 are initially embedded in the fine hole with force, and are restricted by the fine hole. Before the tying is completed, they will not be driven out of the fine hole by the cross-tightening force. After the tying is completed, the two ends of the wire 8 are separated from the fine hole by pulling the wire embedding arm 2 outward, thereby completing the tying operation.

[0040] Generally, if the operation is done properly, the binding force will not have a significant impact on the fine hole, and the binding wire 8 is not easy to be separated from the fine hole of the wire embedding component 3. In a few cases of improper operation, the binding force may cause the binding wire 8 to be separated from the fine hole. Therefore, the present application sets a certain depth for the fine hole, or uses the following methods to prevent the binding wire 8 from being separated from the fine hole.

[0041] There are many ways to create pores. Figure 4 As shown, the fine hole is a circular small hole 7, and the tension of the wires 8 after being folded and the friction with the fine hole are used to ensure that the wires 8 do not fall off when not subjected to a specific external force. Of course, the fine hole can also be made of flat metal.

[0042] In order to further ensure that the wire 8 is not easy to fall out of the fine hole, the circular small hole 7 is a magnetic small hole. By increasing the magnetic force to increase the external force of separation, the wire end can be better embedded, which effectively solves the probability of the wire 8 falling out of the fine hole during improper operation.

[0043] In addition, there are many existing ways to increase the external force of separation, such as setting a controllable clamping mechanism inside or outside the fine hole to tighten the end of the wire entering the fine hole, and then loosen it after the binding is completed. Or setting a sawtooth structure in the fine hole to increase the friction, etc. Similar schemes all belong to the protection scope of this application.

[0044] The diameter of the circular hole 7 is 2 mm, which is compatible with the diameter of the general tying wire 8. Of course, the diameter of the tying wire 8 can also be selected accordingly.

[0045] The steel bar hook arm rod 1 also includes a hook arm rod handle 6. Figure 3 As shown, it is connected to the second end of the long thin rod of the steel bar hook; the wire-binding arm 2 also includes a long arm handle 4, as shown Figure 2As shown, it is connected to the second end of the long thin rod embedded with the tying wire. The provision of a handle can facilitate the operation of skilled workers. The handle can be fixedly connected to the long thin rod of the steel bar hook or the long thin rod embedded with the tying wire, or can be integrally formed. The hook arm handle 6 and the long arm handle 4 are made of metal or rubber, and have a rough surface to increase the friction of the handle, making it easier to tie. The handle is about 100 mm long.

[0046] Operation process:

[0047] First, the worker folds a wire 8 into two halves to form a loop. Figure 5 As shown, the folded wire 8 is then bent, as shown in FIG. Figure 6 Then insert the two unconnected wire ends into the two magnetic holes of the wire embedding arm 2, as shown Figure 7 As shown; the left and right hands hold the handles of the steel bar hook arm rod 1 and the wire-binding arm rod 2 respectively, avoid the template structure 9 and the steel bar structure 10, and reach into the steel bar intersection 11 that needs to be tied; then, the wire-binding arm rod 2 carries the bent wire 8 and passes through the diagonal outside of the steel bar intersection 11, and then the hook 5 of the steel bar hook arm rod 1 is used to hook the loop head of the wire 8, as shown in FIG. Fig. 9 As shown, the loop head is hooked over and crossed with the tie wire on the other side, and a few turns are made to tie the tie wire 8. Finally, the tie wire is pulled outward to embed the arm 2, so that the tie wire 8 can be separated from the fine hole of the wire embedding part 3.

[0048] The design of this application has the following advantages: (1) It greatly increases the binding surface of the steel bar hook and expands the scope of use of the composite steel bar hook. (2) It solves the quality problems such as the poor integrity of the template forming, large gaps between the templates, difficulty in installation, and even mold expansion and explosion during concrete pouring caused by the need to install templates and supplementary templates multiple times in parts of building components with complex reinforcement, and poor structural forming. (3) It solves the problems of scaffolders and template workers entering and exiting the site multiple times, chaotic cross-operation of multiple types of work on the construction site, and difficult construction site management. (4) It solves the problem that after the templates of complex structural parts are integrally formed, it is difficult for technical workers to extend their arms to deeper intersections of steel bars with complex reinforcement, criss-crossing, and dense spacing, and the quality of steel bar binding and installation is difficult to meet technical specifications. This application greatly improves the binding rate of parts with complex reinforcement, makes the construction quality of steel skeleton structures more stable, and prevents technical workers from getting their arms scratched.

[0049] The fixed connection not specifically mentioned above may be a connection method such as riveting, welding, bolt connection, etc., and the movable connection may be a connection method such as hinged connection.

Claims

1. Long arm composite steel bar hook, characterized in that: include: The steel bar hook arm rod (1) comprises a steel bar hook long thin rod and a curved hook (5); the first end of the steel bar hook long thin rod is connected to the curved hook (5); The wire-embedded arm rod (2) comprises a wire-embedded long thin rod and a wire embedding component (3); the wire embedding component (3) is located at the first end of the wire-embedded long thin rod and is provided with two fine holes; the fine holes are used to match the wire (8), and when no specific external force is applied, the two ends of the wire (8) are respectively embedded in the fine holes and do not fall out.

2. The long arm composite steel bar hook according to claim 1, characterized in that: The fine holes are circular small holes (7).

3. The long arm composite steel bar hook according to claim 2, characterized in that: The circular small hole (7) is a magnetic small hole.

4. The long arm composite steel bar hook according to claim 2 or 3, characterized in that: The diameter of the circular small hole (7) is 2 mm.

5. The long arm composite steel bar hook according to claim 1, characterized in that: The steel bar hook arm rod (1) also includes a hook arm rod handle (6) connected to the second end of the steel bar hook long thin rod; the wire binding embedded arm rod (2) also includes a long arm rod handle (4) connected to the second end of the wire binding embedded long thin rod.

6. The long arm composite steel bar hook according to claim 5, characterized in that: The hook arm lever handle (6) and the long arm lever handle (4) are made of metal or rubber and have rough surfaces.

7. The long arm composite steel bar hook according to claim 1, characterized in that: The steel bar hook long thin rod and the wire-embedded long thin rod are solid metal rods with a length between 500 mm and 800 mm.

8. The long arm composite steel bar hook according to claim 1 or 7, characterized in that: The shape of the long thin rod of the steel bar hook is circular; the shape of the binding wire embedded in the long thin rod is elliptical.

9. The long arm composite steel bar hook according to claim 1, characterized in that: The hook tip of the curved hook (5) is small and does not prick people.