Safety protection structure for dam construction

By designing a foldable and rotatable guardrail structure during dam construction, the problem of inconvenient transportation of guardrails is solved, and the effect of increasing the protective area during the construction process is achieved.

CN222045344UActive Publication Date: 2024-11-22TOWER CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420415560.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-11-22
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

During the dam construction process, the guardrail is large in size, which leads to inconvenient transportation and makes it difficult to effectively protect the construction area.

Method used

A safety protection structure for dam construction was designed. By providing a connecting hinge at the connection between the first guardrail and the second guardrail, it can be folded and rotated. It is not only folded during transportation, but also during use. To be open, increase the protection area.

Benefits of technology

It realizes convenient transportation that saves space during transportation, and at the same time increases the protective area during use, solving the problem of inconvenient transportation of guardrails.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045344U_ABST
    Figure CN222045344U_ABST
Patent Text Reader

Abstract

The safety protection structure for dam construction comprises a protection mechanism and a connecting mechanism, and the protection mechanism and the connecting mechanism are detachably installed; wherein the protective mechanism comprises a first protective fence and a second protective fence, a connecting hinge is arranged at the intersection of the first protective fence and the second protective fence and used for folding the first protective fence and the second protective fence, and the protective mechanism relates to the technical field of dam construction and is characterized in that the connecting hinge is arranged at the joint of the first protective fence and the second protective fence and used for folding the first protective fence and the second protective fence. The first protective fence and the second protective fence are connected with each other through the connecting hinges, the position relation of the first protective fence and the second protective fence can be changed through rotation of the connecting hinges, and the first protective fence and the second protective fence are in a folded state in the transportation process; in the using process, the first protective fence and the second protective fence are in an open state, transportation can be convenient, and meanwhile the protective area can be increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of dam construction, in particular to a safety protection structure for dam construction. Background Art

[0002] A dam refers to a dike that blocks water from a river, a water-blocking embankment of a reservoir, a river, etc. Generally, a reservoir dam is mainly composed of a main dam, a secondary dam, a normal spillway, an emergency spillway, a newly added emergency spillway, a Lingzheng Channel culvert and a power station.

[0003] During the dam construction phase, since the dam itself has a large slope during construction, the construction area needs to be protected during the construction process. Guardrails are used for protection. However, since the guardrail is an integrated structure, it is large in size and will occupy a large space during transportation, resulting in inconvenience in transportation. Utility Model Content

[0004] In order to overcome the existing problems, an embodiment of the present application provides a safety protection structure for dam construction, wherein a connecting hinge is provided at the connection between the first guardrail and the second guardrail, the first guardrail and the second guardrail are connected to each other through the connecting hinge, and the first guardrail and the second guardrail can change the positional relationship between the first guardrail and the second guardrail by rotating the connecting hinge. During transportation, the first guardrail and the second guardrail are in a folded state, and during use, the first guardrail and the second guardrail are in an open state, which can facilitate transportation and increase the protection area.

[0005] The technical solution adopted by the embodiment of the present application to solve the technical problem is:

[0006] A safety protection structure for dam construction, comprising a protection mechanism and a connecting mechanism, wherein the protection mechanism and the connecting mechanism are detachably installed;

[0007] Among them, the protective mechanism includes a first guardrail and a second guardrail, and a connecting hinge is provided at the intersection of the first guardrail and the second guardrail for folding the first guardrail and the second guardrail. A connecting hinge is provided at the connection between the first guardrail and the second guardrail, and the first guardrail and the second guardrail are connected to each other through the connecting hinge. The first guardrail and the second guardrail can change the positional relationship between the first guardrail and the second guardrail by rotating the connecting hinge. During transportation, the first guardrail and the second guardrail are in a folded state, and during use, the first guardrail and the second guardrail are in an open state, which can facilitate transportation and increase the protection area.

[0008] Preferably, the connecting mechanism includes a first supporting leg connected to the first guardrail, and the connecting mechanism also includes a second supporting leg connected to the second guardrail.

[0009] Preferably, a first connecting plate is provided at the intersection of the first guardrail and the first supporting leg, and a first guardrail net is provided inside the first guardrail for protection. The first guardrail net is located inside the first guardrail, and the first guardrail net is a grid structure for protection.

[0010] Preferably, a second connecting plate is provided at the intersection of the second guardrail and the second supporting leg, and a second guardrail net is provided inside the second guardrail for protection. The second guardrail net is located inside the first guardrail, and the second guardrail net is a grid structure for protection.

[0011] Preferably, both the first supporting leg and the second supporting leg are provided with a limiting plate, and two limiting plates are provided in total, and connecting bolts penetrate the interiors of the two limiting plates for connecting the first guardrail and the second guardrail to each other through the connecting bolts.

[0012] Preferably, there are two first connecting plates and two second connecting plates, and the spacing between the two first connecting plates and the two second connecting plates is the same as the spacing between the two limiting plates. When the two first connecting plates are placed inside the first supporting leg, the two first connecting plates are respectively located inside the two limiting plates, which on the one hand are limited by the limiting plates, and on the other hand make the connection more convenient.

[0013] The advantages of the embodiments of the present application are:

[0014] A connecting hinge is provided at the connection between the first guardrail and the second guardrail, and the first guardrail and the second guardrail are connected to each other through the connecting hinge. The first guardrail and the second guardrail can change the positional relationship between the first guardrail and the second guardrail by rotating the connecting hinge. During transportation, the first guardrail and the second guardrail are in a folded state, and during use, the first guardrail and the second guardrail are in an open state, which is convenient for transportation and can also increase the protection area. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0016] Figure 1 This is a schematic diagram of the overall structure of the safety protection structure for dam construction of the utility model;

[0017] Figure 2 It is a schematic diagram of the overall structure of the first guardrail and the second guardrail connected in the safety protection structure for dam construction of the utility model;

[0018] Figure 3 It is a schematic diagram of the overall structure of the first guardrail in the safety protection structure for dam construction of the utility model;

[0019] Figure 4 It is a schematic diagram of the overall structure of the second guardrail in the safety protection structure for dam construction of the utility model;

[0020] Figure 5 It is a schematic diagram of the overall structure of the connection between the first supporting leg and the limit plate in the safety protection structure for dam construction of the utility model.

[0021] Description of main reference numerals:

[0022] 1. First supporting leg; 2. First guardrail; 3. Second guardrail; 4. Connecting hinge; 5. Second supporting leg; 6. First connecting plate; 7. First guardrail net; 8. Second guardrail net; 9. Second connecting plate; 10. Limiting plate. DETAILED DESCRIPTION

[0023] The embodiment of the present application solves the problems in the prior art by providing a safety protection structure for dam construction. A connecting hinge is provided at the connection between the first guardrail and the second guardrail. The first guardrail and the second guardrail are connected to each other through the connecting hinge. The first guardrail and the second guardrail can change the positional relationship between the first guardrail and the second guardrail by rotating the connecting hinge. During transportation, the first guardrail and the second guardrail are in a folded state. During use, the first guardrail and the second guardrail are in an open state, which is convenient for transportation and can also increase the protection area.

[0024] The technical solution in the embodiment of the present application is to solve the above problems, and the overall idea is as follows:

[0025] Embodiment 1:

[0026] This embodiment provides a specific structure of a safety protection structure for dam construction, such as Figure 1-5 As shown, it includes a protection mechanism and a connecting mechanism, and the protection mechanism and the connecting mechanism are detachably installed;

[0027] Among them, the protective mechanism includes a first protective fence 2 and a second protective fence 3. A connecting hinge 4 is provided at the intersection of the first protective fence 2 and the second protective fence 3, which is used to fold the first protective fence 2 and the second protective fence 3. A connecting hinge 4 is provided at the connection between the first protective fence 2 and the second protective fence 3. The first protective fence 2 and the second protective fence 3 are connected to each other through the connecting hinge 4. The first protective fence 2 and the second protective fence 3 can change the positional relationship between the first protective fence 2 and the second protective fence 3 by rotating the connecting hinge 4. During transportation, the first protective fence 2 and the second protective fence 3 are in a folded state. During use, the first protective fence 2 and the second protective fence 3 are in an open state, which can facilitate transportation and increase the protection area.

[0028] By adopting the above technical solution:

[0029] A connecting hinge 4 is provided at the connection between the first guardrail 2 and the second guardrail 3. The first guardrail 2 and the second guardrail 3 are connected to each other through the connecting hinge 4. The first guardrail 2 and the second guardrail 3 can change the positional relationship between the first guardrail 2 and the second guardrail 3 by rotating the connecting hinge 4. During transportation, the first guardrail 2 and the second guardrail 3 are in a folded state. During use, the first guardrail 2 and the second guardrail 3 are in an open state, which can facilitate transportation and increase the protection area.

[0030] Embodiment 2:

[0031] This embodiment provides a specific structure of a safety protection structure for dam construction, such as Figure 1-5 As shown, the connection mechanism includes a first supporting leg 1 connected to the first guardrail 2 , and the connection mechanism also includes a second supporting leg 5 connected to the second guardrail 3 .

[0032] A first connecting plate 6 is provided at the intersection of the first guardrail 2 and the first supporting leg 1. A first guardrail net 7 is provided inside the first guardrail 2 for protection. The first guardrail net 7 is located inside the first guardrail 2 and is a grid-like structure for protection.

[0033] A second connecting plate 9 is provided at the intersection of the second guardrail 3 and the second supporting leg 5. A second guardrail net 8 is provided inside the second guardrail 3 for protection. The second guardrail net 8 is located inside the first guardrail 2 and is a grid-like structure for protection.

[0034] The first supporting leg 1 and the second supporting leg 5 are both provided with a limiting plate 10 . There are two limiting plates 10 in total, and connecting bolts penetrate through the inside of the two limiting plates 10 for connecting the first guardrail 2 and the second guardrail 3 to each other through the connecting bolts.

[0035] There are two first connecting plates 6 and two second connecting plates 9. The spacing between the two first connecting plates 6 and the two second connecting plates 9 is the same as the spacing between the two limiting plates 10. When the two first connecting plates 6 are placed inside the first supporting leg 1, the two first connecting plates 6 are respectively located inside the two limiting plates 10, which are limited by the limiting plates 10 on the one hand and make the connection more convenient on the other hand.

[0036] By adopting the above technical solution:

[0037] A first guardrail net 7 is provided inside the first guardrail 2 for protection. The first guardrail net 7 is located inside the first guardrail 2 and has a grid-like structure for protection. A second connecting plate 9 is provided at the intersection of the second guardrail 3 and the second supporting leg 5. A second guardrail net 8 is provided inside the second guardrail 3 for protection. The second guardrail net 8 is located inside the first guardrail 2 and has a grid-like structure for protection.

[0038] Working principle: When the protection mechanism and the connection mechanism need to be connected to each other, the two first connection plates 6 are respectively located inside the two limiting plates 10. On the one hand, they are limited by the limiting plates 10, and on the other hand, the connection is more convenient.

[0039] In addition, a first guardrail net 7 is provided inside the first guardrail 2 for protection. The first guardrail net 7 is located inside the first guardrail 2 and has a grid-like structure for protection. A second guardrail net 8 is provided inside the second guardrail 3 for protection. The second guardrail net 8 is located inside the first guardrail 2 and has a grid-like structure for protection.

[0040] A connecting hinge 4 is provided at the connection between the first guardrail 2 and the second guardrail 3. The first guardrail 2 and the second guardrail 3 are connected to each other through the connecting hinge 4. The first guardrail 2 and the second guardrail 3 can change the positional relationship between the first guardrail 2 and the second guardrail 3 by rotating the connecting hinge 4. During transportation, the first guardrail 2 and the second guardrail 3 are in a folded state. During use, the first guardrail 2 and the second guardrail 3 are in an open state, which can facilitate transportation and increase the protection area.

[0041] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.

Claims

1. A safety protection structure for dam construction, It is characterized in that It includes a protection mechanism and a connection mechanism, and the protection mechanism and the connection mechanism are detachably installed; The protection mechanism comprises a first protection fence (2) and a second protection fence (3); a connecting hinge (4) is provided at the intersection of the first protection fence (2) and the second protection fence (3) for folding the first protection fence (2) and the second protection fence (3).

2. A safety protection structure for dam construction as claimed in claim 1, It is characterized in that The connection mechanism comprises a first supporting leg (1) connected to the first guardrail (2), and the connection mechanism further comprises a second supporting leg (5) connected to the second guardrail (3).

3. A safety protection structure for dam construction as claimed in claim 2, It is characterized in that A first connecting plate (6) is provided at the intersection of the first guardrail (2) and the first supporting leg (1).

4. A safety protection structure for dam construction as claimed in claim 3, It is characterized in that A second connecting plate (9) is provided at the intersection of the second guardrail (3) and the second supporting leg (5).

5. A safety protection structure for dam construction as claimed in claim 4, It is characterized in that The first supporting leg (1) and the second supporting leg (5) are both provided with a limiting plate (10), and a total of two limiting plates (10) are provided.

6. A safety protection structure for dam construction as claimed in claim 5, It is characterized in that There are two first connecting plates (6) in total, and there are two second connecting plates (9) in total. The spacing between the two first connecting plates (6) and the two second connecting plates (9) is the same as the spacing between the two limiting plates (10).

7. A safety protection structure for dam construction as claimed in claim 1, It is characterized in that A first guardrail net (7) is provided inside the first guardrail (2) for protection.

8. A safety protection structure for dam construction as claimed in claim 1, It is characterized in that A second guardrail net (8) is provided inside the second guardrail (3) for protection.