Distributing trolley for tunnel lining trolley
By designing a fabric truck for tunnel lining trolleys, using fabric trucks, chassis, pipe bending systems and sensors, the problem of poor concrete transmission coordination and difficult to determine the condensation situation in tunnel construction is solved, and the precise transmission of concrete is achieved and real-time monitoring have improved construction quality.
Patent Information
- Application Number
- CN202420876092.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-25
AI Technical Summary
During the tunnel construction process, during the concrete transport process of existing tunnel lining trolleys, the casting quality is affected due to poor coordination and the difficulty in determining the concrete settling.
A fabric car for tunnel lining trolleys is designed, including fabric cart, chassis, pipe bending system, slewing reducer mechanism, fabric head and cleaning head, equipped with concrete pressure sensor and flow sensor, and the precise transmission of concrete is achieved through the horn joint. and real-time monitoring reduces workers' labor intensity and improves synergistic effects.
It realizes accurate transmission and real-time monitoring of concrete, improves construction coordination effect, reduces concrete splashing and cement separation, and ensures construction quality.
Smart Images

Figure CN222045795U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of tunnel construction equipment, in particular to a material placing vehicle for a tunnel lining trolley. Background Art
[0002] The tunnel lining trolley is a special equipment that must be used in the secondary lining of the tunnel construction process. During the construction of the lining trolley, multiple positions need to cooperate to deliver concrete to the designated location in the tunnel. However, the existing positions are mainly commanded by humans, with poor coordination, and the concrete setting is difficult to determine, which will affect the quality of the tunnel after pouring. Therefore, a concrete placing vehicle that can monitor the status of the concrete lining in real time is needed. Utility Model Content
[0003] The purpose of the utility model is to solve the problems in the background technology and provide a material distribution vehicle for a tunnel lining trolley, which is easy to operate and effectively reduces the labor intensity of workers. At the same time, data between various workstations are fed back simultaneously to improve the synergy effect.
[0004] The purpose of this utility model is achieved through the following technical solutions:
[0005] A material distribution vehicle for a tunnel lining trolley comprises a material distribution vehicle, a chassis, a bending pipe system, a rotary reduction mechanism, a material distribution head and a cleaning head. The material distribution vehicle is movably mounted on the top of the lining trolley body, the chassis is mounted on the material distribution vehicle, one end of the bending pipe system passes through the chassis and is connected to the rotary reduction mechanism, the material distribution head and the cleaning head are telescopically mounted on the end of the rotary reduction mechanism, the material distribution head and the cleaning head are parallel and located in the same horizontal working plane, a number of horn joints corresponding to the material distribution head and the cleaning head are mounted on both sides of the top of the lining trolley body, a waste recovery groove is mounted on the surface of the lining trolley body below the horn joints, and a pressure sensor and a flow sensor for detecting concrete in the bending pipe system are in the chassis.
[0006] The surface of the lining trolley body is processed with a hidden track for limiting the material distribution trolley, the hidden track is symmetrically C-shaped, and the wheels of the material distribution trolley travel on the inner side of the hidden track.
[0007] A U-shaped or C-shaped cleaning elbow is connected between the two horn joints at both ends of the lining trolley body.
[0008] A wire threading pipe rack is also installed on the lining trolley body.
[0009] The spacing between the horn joints corresponds to the spacing between the cloth head and the cleaning head.
[0010] The material placing vehicle for tunnel lining trolley provided by the utility model has the following beneficial effects:
[0011] (1) Through the material distribution trolley, chassis, bending pipe system, rotary speed reduction mechanism, material distribution head and cleaning vehicle, in conjunction with the speaker interface on the lining trolley body, concrete can be accurately delivered to the designated location, which not only improves the convenience of operation but also reduces the labor intensity of workers. At the same time, the data between each workstation can be collected through sensors, so that the pouring pressure and pouring volume can be mastered in real time, improving the synergy effect;
[0012] (2) By setting up a C-shaped hidden track, concrete can be prevented from splashing onto the hidden track, affecting the progress of the material placing trolley and thus affecting the accuracy of construction;
[0013] (3) By setting up a trumpet joint, concrete can be directly transferred to the already laid concrete surface, which can effectively prevent cement separation and ensure construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 A schematic structural diagram of an embodiment of the utility model is provided.
[0016] Figure 2 for Figure 1 Enlarged view of point A in the middle.
[0017] Figure 3 A schematic diagram of a top view of the structure provided for an embodiment of the utility model.
[0018] Figure 4 A side structural schematic diagram provided for an embodiment of the utility model.
[0019] Figure numerals: 1. Fabric trolley; 2. Chassis; 3. Pipe bending system; 4. Rotary reduction mechanism; 5. Fabric head; 6. Cleaning head; 7. Horn connector; 8. Waste recovery trough; 9. Hidden track; 10. Cleaning elbow; 11. Threading pipe rack; 12. Lining trolley body. DETAILED DESCRIPTION
[0020] Example
[0021] like Figure 1 to Figure 4As shown, the present embodiment provides a material distribution vehicle for a tunnel lining trolley. The lining trolley is a special device for realizing secondary lining concrete in existing tunnels, diversion tunnels, etc. The present solution is improved on the existing lining trolley body 12, and includes a material distribution vehicle 1, a chassis 2, a bending pipe system 3, a rotary reduction mechanism 4, a material distribution head 5 and a cleaning head 6. The material distribution vehicle 1 is movably mounted on the top of the lining trolley body 12, and the chassis 2 is mounted on the material distribution vehicle 1. The material distribution vehicle 1 is used to walk on the top of the lining trolley body 12. Since the material distribution vehicle 1 needs to move on the top of the lining trolley body 12 and take into account the concrete pouring work at the same time, in order to avoid concrete splashing on the track and affecting the material distribution vehicle 1 The surface of the lining trolley body 12 is processed with a hidden track 9 for limiting the material distribution trolley 1. The hidden track 9 is symmetrically C-shaped. The wheels of the material distribution trolley 1 travel on the inner side of the hidden track 9, so that when concrete falls, it directly falls on the surface of the hidden track 9 instead of falling on the travel route of the material distribution trolley 1, thereby ensuring the movement accuracy of the material distribution trolley 1. One end of the bending pipe system 3 passes through the chassis 2 and is connected to the rotary reduction mechanism 4. The bending pipe system 3 is a conveying channel for concrete. This is a prior art and will not be described here. The material distribution head 5 and the cleaning head 6 are telescopically mounted at the end of the rotary reduction mechanism 4. The material distribution head 5 and the cleaning head 6 are parallel and located at the same working level. In the plane, the material distribution head 5 is connected with the elbow system 3, and the concrete transported by the elbow system 3 flows out from the material distribution head 5. The extension and retraction of the material distribution head 5 and the cleaning head 6 are realized by a hydraulic cylinder, an air cylinder or a mechanism with linear motion. This part of the structure is already a very common implementation method in the field of engineering equipment, so it will not be repeated here. The cleaning head 6 is cleaned in the chassis 2 by air washing. The power source of the cleaning head 6 is installed inside the lining trolley body 12. The rotary reduction mechanism 4 can drive the material distribution head 5 and the cleaning head 6 to rotate horizontally, thereby controlling the working angles of the material distribution head 5 and the cleaning head 6. In order to improve efficiency, two sets of material distribution systems are provided on the top of the lining trolley body 12 to carry out material distribution from both sides at the same time. The lining trolley body 1 Several horn joints 7 corresponding to the material distribution head 5 and the cleaning head 6 are installed on both sides of the top. The horn joints 7 at different positions correspond to concrete pouring at different heights. Adjacent horn joints 7 can be separated by templates. The spacing between the horn joints 7 corresponds to the spacing between the material distribution head 5 and the cleaning head 6. A waste recovery groove 8 is installed on the surface of the lining trolley body 12 below the horn joints 7. The waste recovery groove 8 is used to catch the concrete dropped between the material distribution head 5 and the horn joints 7. The pressure sensor and flow sensor for detecting the concrete in the bend pipe system 3 are in the chassis 2. The pressure sensor and flow sensor can detect the state of the concrete in the bend pipe system 3, and then grasp the pouring pressure and pouring volume.
[0022] In order to improve the convenience of pouring, a U-shaped or C-shaped cleaning elbow 10 is connected between the two horn joints 7 at both ends of the lining trolley body 12. The cleaning elbow 10 is used to air wash the curved pipe system 3 after the construction is completed to ensure the cleanliness of the curved pipe system 3.
[0023] A pipe threading rack 11 is also installed on the lining trolley body 12, and the pipe threading rack 11 is used to cast the pipelines that need to be pre-buried in the wall.
[0024] The method of using the utility model is:
[0025] When in use, the material distribution trolley 1 adjusts its position so that the material distribution head 5 and the cleaning head 6 are aligned with the corresponding horn joints 7, and then the material distribution head 5 and the cleaning head 6 are extended, and the cleaning head 6 performs air washing on the horn joint 7, and then the bending pipe system 3 is controlled to feed the material, and the horn joint 7 is used to directly feed the concrete into the corresponding position, which can effectively avoid the separation of mud and water in the concrete. During the concrete pouring process, the concrete dropped between the material distribution head 5 and the cleaning head 6 falls into the waste collection tank for recovery.
[0026] The above is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any modification and replacement based on the technical solution and the utility model concept provided by the present invention shall be included in the protection scope of the present invention. It should be noted that the structures or components illustrated in the drawings are not necessarily drawn to scale, and the present invention omits the description of known components and processing technologies and processes to avoid unnecessary limitations on the present invention.
Claims
1. A material placing vehicle for a tunnel lining trolley, characterized in that: The invention comprises a material distribution trolley (1), a chassis (2), a pipe bending system (3), a rotary speed reducing mechanism (4), a material distribution head (5) and a cleaning head (6); the material distribution trolley (1) is movably mounted on the top of a lining trolley body (12); the chassis (2) is mounted on the material distribution trolley (1); one end of the pipe bending system (3) passes through the chassis (2) and is connected to the rotary speed reducing mechanism (4); the material distribution head (5) and the cleaning head (6) are telescopically mounted on the end of the rotary speed reducing mechanism (4); the material distribution head (5) and the cleaning head (6) are parallel and located in the same horizontal working plane; a plurality of horn joints (7) corresponding to the material distribution head (5) and the cleaning head (6) are mounted on both sides of the top of the lining trolley body (12); a waste material recovery tank (8) is mounted on the surface of the lining trolley body (12) below the horn joints (7); and a pressure sensor and a flow sensor for detecting concrete in the pipe bending system (3) are mounted in the chassis (2).
2. The material placing vehicle for tunnel lining trolley according to claim 1, characterized in that: The surface of the lining trolley body (12) is processed with a hidden track (9) for limiting the position of the material distribution trolley (1); the hidden track (9) is symmetrically C-shaped, and the wheels of the material distribution trolley (1) travel on the inner side of the hidden track (9).
3. The material placing vehicle for tunnel lining trolley according to claim 1, characterized in that: A U-shaped or C-shaped cleaning elbow (10) is connected between the two horn joints (7) at both ends of the lining trolley body (12).
4. The material placing vehicle for tunnel lining trolley according to claim 1, characterized in that: A wire threading pipe rack (11) is also installed on the lining trolley body (12).
5. The material placing vehicle for tunnel lining trolley according to claim 1, characterized in that: The spacing between the horn joints (7) corresponds to the spacing between the cloth head (5) and the cleaning head (6).