Quick assembly type pressurizing pipe
By introducing buttons, power plates and spring structures into the booster pipe, rapid assembly and safe installation are achieved, solving the problems of cumbersome and easy damage to the existing booster pipes, improving assembly efficiency and sealing performance, and preventing air from entering and cleaning district.
Patent Information
- Application Number
- CN202420859787.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-24
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-24
AI Technical Summary
The existing booster tube lacks rapid installation bayonets during assembly, resulting in cumbersome installation and easy damage, and cannot effectively solve the problem of untreated air entering the clean area caused by degraded sealing performance.
A quick-assembled supercharger tube is designed, adopting a button, power plate, spring and bearing structure. By pressing the button, the power plate rotates and drives the spring to shrink, achieving rapid insertion of the card block and installation of the bayonet, simplifying the assembly process.
The rapid and safe installation of the booster pipe is achieved, the risk of damage during the assembly process is reduced, the assembly efficiency and sealing performance are improved, and the air is avoided from entering the cleaning area.
Smart Images

Figure CN222046998U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of booster pipes, in particular to a quick-assembly type booster pipe. Background Art
[0002] The booster pipe extracts positive pressure from the fan outlet to between two closed valves installed in the clean ventilation pipeline to prevent untreated air from entering the clean area due to the degradation of the sealing performance of the two closed valves.
[0003] The existing boost pipes often need to be replaced and repaired due to their characteristics. However, common boost pipes do not have quick-install bayonet joints. They are usually assembled and installed using traditional pipeline installation methods, which are cumbersome to install. During the installation process, the boost pipe body is easily damaged due to problems such as large amplitude. Therefore, we propose a quick-assembly boost pipe. Utility Model Content
[0004] The utility model aims to provide a quick-assembly type booster pipe to solve the problems existing in the above-mentioned background technology.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A quick-assembly boost pipe comprises a boost pipe body, a mounting groove is provided on one side surface of the boost pipe body, a button is installed inside the mounting groove, a power plate is installed on the inner side of the button near the bottom, and a No. 1 bearing is installed on the surface of the power plate.
[0007] Preferably, a No. 1 spring is installed below one end of the power plate, and a force-bearing plate is installed below the other end of the power plate.
[0008] Preferably, a No. 2 spring is installed below one end of the force-bearing plate, and a No. 2 bearing is installed on the surface of the force-bearing plate near the other end.
[0009] Preferably, a block is installed on the surface of the No. 2 bearing.
[0010] Preferably, a mounting pipe is installed on the surface of one end of the boost pipe body, a sealing rubber ring is installed on one end of the mounting pipe, and a bayonet is provided on the inner surface of the mounting pipe.
[0011] Preferably, the bayonet is used for the clamping installation of the clamping block, and the elastic force of the No. 1 spring is greater than that of the No. 2 spring.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. Through the set buttons, when the boost pipe body needs to be quickly assembled, you only need to press the buttons set on both sides inward. At this time, the buttons will act on the power plate, which will then act on the No. 1 spring, causing the No. 1 spring to shrink inward. The power plate is provided with a positioning bearing structure movably installed in the middle position of the power plate, which can enable the power plate to maintain rotational motion in a fixed position, so that the assembly structure can work normally.
[0014] 2. Through the set force plate, when the other end of the force plate moves downward, the block can be driven to move downward under the action of the No. 2 bearing. When the block moves downward, the boost pipe body can be directly inserted into the installation pipe. At this time, release the button. The elastic force of the No. 1 spring is greater than that of the No. 2 spring, so that the other end of the power plate can be moved downward under the action of the No. 1 spring, so that the block can be moved upward and stuck in the bayonet, thereby completing the installation of the boost pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0016] Figure 1 This is a schematic diagram of the overall structure of a quick-assembly type booster pipe described in the utility model;
[0017] Figure 2 This is a schematic diagram of the assembly structure of a quick-assembly type booster pipe described in the utility model;
[0018] Figure 3 The utility model is a cross-sectional schematic diagram of the assembly structure of a quick-assembly type booster pipe.
[0019] In the accompanying drawings: 1. boost pipe body; 2. mounting pipe; 3. sealing rubber ring; 4. mounting groove; 5. button; 6. power plate; 7. bearing No. 1; 8. spring No. 1; 9. force plate; 10. spring No. 2; 11. bearing No. 2; 12. block; 13. bayonet. DETAILED DESCRIPTION
[0020] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0021] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] In this embodiment, please refer to Figure 1-Figure 3 A quick-assembly boost pipe comprises a boost pipe body 1, a mounting groove 4 is provided on one side surface of the boost pipe body 1, a button 5 is installed inside the mounting groove 4, a power plate 6 is installed on the inner side near the bottom of the button 5, and a No. 1 bearing 7 is installed on the surface of the power plate 6. Through the setting of the boost pipe body 1, the required assembly parts can be boosted, the mounting groove 4 can be installed on the assembly structure, the elastic force of the No. 1 spring 8 is greater than the No. 2 spring 10, through the set button 5, when the boost pipe body 1 needs to be quickly assembled, it is only necessary to press the buttons 5 set on both sides inward, at this time, the button 5 will act on the power plate 6, and at this time, the power plate 6 will act on the No. 1 spring 8, causing the No. 1 spring 8 to shrink inward.
[0024] Among them, a spring No. 8 is installed below one end of the power plate 6, and a force plate 9 is installed below the other end of the power plate 6. Through the setting of the power plate 6, a positioning bearing structure is movably installed in the middle position of the power plate 6, which enables the power plate 6 to maintain rotational movement in a fixed position. When the end close to the spring No. 8 moves downward, the other end will move upward.
[0025] Among them, a No. 2 spring 10 is installed below one end of the force-bearing plate 9, and a No. 2 bearing 11 is installed on the surface of the force-bearing plate 9 near the other end. When the other end of the power plate 6 moves upward, since the elastic force of the No. 2 spring 10 is smaller than that of the No. 1 spring 8, when the No. 1 spring 8 contracts inward, the No. 2 spring 10 will exert a force on one end of the force-bearing plate 9, thereby allowing the other end to move downward.
[0026] Among them, a clamping block 12 is installed on the surface of the No. 2 bearing 11. When the other end of the force plate 9 moves downward, the clamping block 12 can be driven to move downward under the action of the No. 2 bearing 11, so that the boost pipe body 1 can be installed normally.
[0027] Among them, a mounting pipe 2 is installed on the surface of one end of the boost pipe body 1, a sealing rubber ring 3 is installed on one end of the mounting pipe 2, and a bayonet 13 is opened on the inner surface of the mounting pipe 2, and the bayonet 13 is used for the clamping installation of the clamping block 12. When the clamping block 12 moves downward, the boost pipe body 1 can be directly inserted into the mounting pipe 2. At this time, the button 5 is released, and the elastic force of the No. 1 spring 8 is greater than that of the No. 2 spring 10, so that the other end of the power plate 6 can be moved downward under the action of the No. 1 spring 8, so that the clamping block 12 can be moved upward and clamped in the bayonet 13, thereby completing the installation of the boost pipe.
[0028] Working principle: through the set button 5, when the boost pipe body 1 needs to be quickly assembled, it is only necessary to press the buttons 5 set on both sides inward, at this time, the button 5 will act on the power plate 6, and at this time, the power plate 6 will act on the No. 1 spring 8, causing the No. 1 spring 8 to shrink inward. Through the set power plate 6, a positioning bearing structure is movably installed in the middle position of the power plate 6, so that the power plate 6 can maintain the rotational movement at a fixed position. When one end close to the No. 1 spring 8 moves downward, the other end will move upward. When the other end of the power plate 6 moves upward, since the elastic force of the No. 2 spring 10 is less than No. 1 spring 8, when the No. 1 spring 8 contracts inward, the No. 2 spring 10 will generate a force on one end of the force-bearing plate 9, so that the other end can move downward. When the other end of the force-bearing plate 9 moves downward, the block 12 can be driven to move downward under the action of the No. 2 bearing 11. When the block 12 moves downward, the boost pipe body 1 can be directly inserted into the installation pipe 2. At this time, release the button 5. The elastic force of the No. 1 spring 8 is greater than that of the No. 2 spring 10, so that the other end of the power plate 6 can be moved downward under the action of the No. 1 spring 8, so that the block 12 can move upward and be stuck in the bayonet 13, thereby completing the installation of the boost pipe.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A quick-assembly booster pipe, comprising a booster pipe body (1), characterized in that: A mounting groove (4) is provided on one side surface of the boost pipe body (1), a button (5) is installed inside the mounting groove (4), a power plate (6) is installed near the inner side of the bottom of the button (5), and a No. 1 bearing (7) is installed on the surface of the power plate (6).
2. The quick-assembly booster pipe according to claim 1, characterized in that: A first spring (8) is installed below one end of the power plate (6), and a force-bearing plate (9) is installed below the other end of the power plate (6).
3. The quick-assembly booster pipe according to claim 2, characterized in that: A No. 2 spring (10) is installed below one end of the force-bearing plate (9), and a No. 2 bearing (11) is installed on the surface of the force-bearing plate (9) near the other end.
4. The quick-assembly booster pipe according to claim 3, characterized in that: A clamping block (12) is installed on the surface of the No. 2 bearing (11).
5. The quick-assembly booster pipe according to claim 4, characterized in that: A mounting pipe (2) is installed on one end surface of the boost pipe body (1), a sealing rubber ring (3) is installed on one end of the mounting pipe (2), and a bayonet (13) is provided on the inner surface of the mounting pipe (2).
6. The quick-assembly booster pipe according to claim 5, characterized in that: The bayonet (13) is used for the clamping installation of the clamping block (12), and the elastic force of the No. 1 spring (8) is greater than that of the No. 2 spring (10).