Asphalt smoke treatment system

Through the multi-layer heat exchange technology and the design of the asphalt smoke disposal system, the problem of the existing incineration method failing to utilize heat energy is solved, efficient heat recovery and utilization is achieved, and the thermal energy utilization efficiency of asphalt smoke after incineration is improved.

CN222047750UActive Publication Date: 2024-11-22JIANGSU LIJIN RYDER SOLID WASTE COMPREHENSIVE UTILIZATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420597005.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-22
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

The existing asphalt smoke incineration method fails to fully utilize the heat energy generated after treatment, resulting in lower economic benefits.

Method used

A bituminous smoke disposal system was designed, including dilution tanks, incinerators, heat exchange shells, thermal oil circulation systems and asphalt heat exchangers. The heat of high-temperature exhaust gas is recovered and utilized through multi-layer heat exchange technology to improve combustion efficiency and Thermal energy circulation.

Benefits of technology

It has achieved efficient and stable heat recovery and utilization, improved the thermal energy use efficiency after asphalt smoke incineration, supported the modified production of asphalt and the thermal energy balance of the entire plant, and reduced the emission temperature of combustion exhaust gas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222047750U_ABST
    Figure CN222047750U_ABST
Patent Text Reader

Abstract

According to the asphalt smoke treatment system, an asphalt smoke inlet pipeline is arranged on a dilution tank, the dilution tank is communicated with an incinerator through a first connecting pipeline, a first induced draft fan conveys gas in the dilution tank into a hearth of the incinerator through the first connecting pipeline, a flue pipe is communicated with the hearth, and the flue pipe is communicated with a chimney through a second connecting pipeline; the second induced draft fan conveys waste gas in the flue pipe to the chimney through a second connecting pipeline; the flue pipe is arranged in the first heat exchange shell layer and the second heat exchange shell layer, the second heat exchange shell layer is connected with a heat conduction oil feeding pipeline and a heat conduction oil discharging pipeline, the first connecting pipeline penetrates through the first heat exchange shell layer, and the hearth is communicated with the second connecting pipeline through the heat exchange pipeline. And the third induced draft fan can introduce waste gas at the upper part of the hearth into the tube pass of the asphalt heat exchanger through the heat exchange pipeline and then merge into the second connecting pipeline. The asphalt smoke treatment system can ensure safe incineration of asphalt smoke in the hearth, can fully utilize heat energy generated after incineration of the asphalt smoke, and is efficient and stable in heat recovery and high in economic benefit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of waste gas treatment, and in particular relates to an asphalt fume treatment system. Background Art

[0002] Asphalt smoke is composed of gas phase and liquid phase. The gas phase is a mixture of multiple components. The condensate contained in the liquid phase is volatile and has fine particles, with a particle size of 0.1 to 1.0 um. There are four types of asphalt smoke purification and treatment methods currently in use, namely, electric capture, combustion, adsorption and absorption. The utility model relates to an asphalt smoke treatment system that purifies and treats by incineration.

[0003] Although the incineration method is more convenient and efficient than other disposal methods, it is not economical, and the heat energy generated by the incineration of asphalt smoke cannot be fully utilized. Utility Model Content

[0004] Based on the problems in the background technology, the present application provides an asphalt fume disposal system that can fully utilize the heat of the high-temperature exhaust gas generated after the incineration of the asphalt fume.

[0005] An asphalt smoke disposal system comprises a dilution tank, an asphalt smoke air intake pipeline, an incinerator, a first connecting pipeline, a second connecting pipeline, a chimney, a heat exchange pipeline and an asphalt heat exchanger; the incinerator comprises a furnace, a flue pipe, a first heat exchange shell and a second heat exchange shell.

[0006] The dilution tank is provided with an asphalt smoke intake pipeline, and the collected asphalt smoke enters the dilution tank from the pipeline, and the intake volume is controlled to be 5000m 3 / h. The dilution tank is also provided with a mixing air intake pipeline. Air or nitrogen enters the dilution tank from the mixing air intake pipeline and mixes with the asphalt smoke to reduce the concentration of the asphalt smoke. The concentration of the asphalt smoke is controlled below 25% of the lower explosion limit, thereby solving the risk of the asphalt smoke concentration crossing the explosion zone and ensuring that no flash explosion will occur during the subsequent incineration treatment.

[0007] The dilution tank and the incinerator are connected by a first connecting pipeline, on which a first induced draft fan is provided. The first induced draft fan can transport the gas in the dilution tank to the furnace of the incinerator through the first connecting pipeline. The asphalt smoke after dilution and qualification is oxidized and incinerated at a high temperature of 850°C in the furnace of the incinerator, and the VOCs removal rate can reach more than 99.7%.

[0008] The flue pipe is connected to the furnace, and the air outlet end of the flue pipe is connected to the chimney through a second connecting pipeline. A second induced draft fan is also provided on the second connecting pipeline. The second induced draft fan can transport the exhaust gas in the flue pipe to the chimney through the second connecting pipeline for discharge. That is, the exhaust gas generated by the combustion of asphalt smoke in the furnace enters the flue pipe and then enters the chimney through the second connecting pipeline for discharge through the chimney.

[0009] The flue pipe is arranged in the first heat exchange shell layer and the second heat exchange shell layer. Of course, the first heat exchange shell layer and the second heat exchange shell layer are not connected to each other. The second heat exchange shell layer can be specifically arranged above the furnace wall, and the first heat exchange shell layer is arranged above the second heat exchange shell layer.

[0010] The second heat exchange shell is connected with a heat transfer oil feed pipeline and a heat transfer oil discharge pipeline. The heat transfer oil enters the second heat exchange shell through the above pipelines for circulation heat exchange. The heat of the high-temperature exhaust gas in the flue pipe is recovered by the heat transfer oil. The heat transfer oil after heat exchange is used for storage and transportation and heat preservation. The temperature of the heat transfer oil at 180°C can be increased to 210°C after heat exchange.

[0011] The first connecting pipeline also passes through the first heat exchange shell layer, and the first heat exchange shell layer can be filled with heat-conducting media such as water or oil to improve the heat exchange effect. The heat of the high-temperature exhaust gas in the flue pipe is transferred to the diluted asphalt smoke in the first connecting pipeline through the first heat exchange shell layer, which can increase the temperature of the diluted asphalt smoke from 30°C to about 140°C before entering the furnace, thereby improving the combustion effect of the asphalt smoke.

[0012] The second connecting pipeline is also connected to a heat exchange pipeline, and the upper part of the furnace is connected to the second connecting pipeline through the heat exchange pipeline. The heat exchange pipeline is provided with a third induced draft fan and an asphalt heat exchanger. The third induced draft fan can introduce the exhaust gas from the upper part of the furnace into the tube side of the asphalt heat exchanger through the heat exchange pipeline and then merge it into the second connecting pipeline, and finally discharge it into the chimney through the second connecting pipeline for discharge. The shell side of the asphalt heat exchanger is connected to an asphalt feed pipeline and an asphalt discharge pipeline. The asphalt raw material can flow through the shell side of the asphalt heat exchanger through the above-mentioned feed and discharge pipelines to exchange heat with the exhaust gas in the tube side, and the temperature is increased from 140°C to 190°C for subsequent modification production, thereby further utilizing the heat generated after the asphalt smoke is burned.

[0013] Furthermore, the first connecting pipeline is also provided with a LEL safety instrument and connected with an emptying pipeline, which is specifically located at the rear section of the LEL safety instrument. An activated carbon adsorption box is also provided on the emptying pipeline, and the end of the emptying pipeline is connected to the chimney. The first connecting pipeline is also provided with a first interlock control valve, and a second interlock control valve is provided on the emptying pipeline. The LEL safety instrument can detect the concentration of the gas in the first connecting pipeline. If the LEL safety instrument detects that the concentration of diluted asphalt smoke in the first connecting pipeline is higher than the lower explosion limit of 25%, the interlock control system closes the first interlock control valve, opens the second interlock control valve, switches the gas in the first connecting pipeline to the emptying pipeline and passes through the activated carbon adsorption box, and then discharges to the chimney for emptying after being treated with activated carbon adsorption. Of course, the operating logic of the above interlock control system is the existing technology, and the design of the LEL safety instrument and the emptying pipeline can further ensure the combustion safety in the furnace.

[0014] Preferably, an auxiliary induced draft fan and a flame arrester are also provided on a section of the first connecting pipeline close to the furnace. Since the first connecting pipeline needs to pass through the first heat exchange shell, its length is relatively long. The auxiliary induced draft fan can better adjust the air intake of the diluted asphalt smoke in the furnace.

[0015] Furthermore, the bottom of the furnace is also connected to a natural gas pipeline, a compressed air pipeline and a fresh air pipeline. In order to ensure that the furnace temperature maintains the incineration temperature of asphalt smoke at 850°C, the above pipelines are used to supplement natural gas and air to the furnace for combustion, so as to maintain the thermal balance of the temperature in the furnace. The fresh air pipeline is connected to the second connecting pipeline through an air heat exchanger. The structure of the air heat exchanger is prior art, and the specific connection method of the heat exchange connection is also prior art. The air in the fresh air pipeline can exchange heat with the exhaust gas of the second connecting pipeline. The air in the fresh air pipeline can be raised from 30°C to 140°C before being sent to the furnace for combustion, which can better improve the combustion effect.

[0016] Furthermore, a hot water heat exchanger is also provided on the second connecting pipeline, and the hot water heat exchanger is specifically located in the rear section of the air heat exchanger. The exhaust gas in the second connecting pipeline flows through the tube side of the hot water heat exchanger. The shell side of the hot water heat exchanger is connected with an inlet pipeline and an outlet pipeline. The temperature of 30°C water entering the shell side of the hot water heat exchanger and exchanging heat with the exhaust gas can be increased to 60°C. The industrial hot water can also be used in daily production.

[0017] The high-temperature exhaust gas of 850℃ generated after the asphalt smoke is burned in the furnace has a temperature of 240℃ after heat exchange in the second heat exchange shell layer in the flue pipe, and a temperature of 148℃ after heat exchange in the first heat exchange shell layer. Secondly, the temperature is reduced to 180℃ after heat exchange in the asphalt heat exchanger in the heat exchange pipeline. Then the exhaust gas is gathered in the second connecting pipeline and the temperature is 160℃ after mixing. The exhaust gas is further cooled to 140℃ after heat exchange in the air heat exchanger in the second connecting pipeline, and the temperature is reduced to 60℃ after heat exchange in the hot water heat exchanger. Finally, the low-temperature exhaust gas is sent to the chimney for discharge. In this way, the heat generated by the combustion of asphalt smoke can be fully utilized after heat exchange layer by layer, and the economic benefit is high.

[0018] Through the above technical solution, the utility model at least has the following beneficial effects:

[0019] An asphalt fume disposal system described in the present application can ensure the safe incineration of asphalt fume in the furnace through the design of equipment components such as dilution tanks and exhaust pipes. When safely disposing of asphalt fume, the heat energy generated after the incineration of asphalt fume can be fully utilized through the design of related equipment components such as the second heat exchange shell, the first heat exchange shell, the asphalt heat exchanger, the air heat exchanger and the hot water heat exchanger. The heat recovery system is efficient and stable, and the heat of the exhaust gas generated by the combustion can be used for asphalt modification production, storage and transportation insulation, and balancing the thermal energy cycle of the entire plant, with high economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of an asphalt fume treatment system corresponding to Example 1 of the present application;

[0021] Figure 2 A schematic diagram of an asphalt fume treatment system corresponding to Example 2 of the present application; DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. These drawings are simplified schematic diagrams that only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the structures related to the present invention.

[0023] In the description of this application, it should be understood that if there are terms such as "upper", "lower", "left", "right", "front", "rear", etc. indicating the orientation or positional relationship, they are based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the terms describing the positional relationship are only used for exemplary description and cannot be understood as limiting this patent; if there are terms such as "first", "second", etc., they are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", etc. may explicitly or implicitly include one or more of the said features. For those of ordinary skill in the art, the specific meanings of the above terms can be understood according to the specific circumstances.

[0024] In the description of the utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to specific circumstances.

[0025] Example 1

[0026] refer to Figure 1 An asphalt smoke treatment system includes a dilution tank 3, an asphalt smoke air intake pipeline 4, an incinerator 5, a first connecting pipeline 1, a second connecting pipeline 2, a chimney 6, a heat exchange pipeline 7 and an asphalt heat exchanger 8; the incinerator 5 includes a furnace 503, a flue pipe 504, a first heat exchange shell 501 and a second heat exchange shell 502;

[0027] The dilution tank 3 is provided with an asphalt smoke intake pipeline 4, through which the collected asphalt smoke enters the dilution tank 3, and the intake volume is controlled to be 5000m 3 / h, the dilution tank 3 is also provided with a mixed air intake pipeline 301, and air or nitrogen enters the dilution tank 3 from the mixed air intake pipeline 301 and mixes with the asphalt smoke to reduce the concentration of the asphalt smoke, so that the concentration of the asphalt smoke is controlled below 25% of the lower explosion limit, thereby solving the risk of the asphalt smoke concentration crossing the explosion zone and ensuring that no flash explosion will occur during the subsequent incineration treatment.

[0028] The dilution tank 3 and the incinerator 5 are connected through a first connecting pipeline 1, on which a first induced draft fan 101 is provided. The first induced draft fan 101 can transport the gas in the dilution tank 3 to the furnace 503 of the incinerator 5 through the first connecting pipeline 1. The asphalt smoke after being diluted and qualified is oxidized and incinerated at a high temperature of 850°C in the furnace 503 of the incinerator 5, and the VOCs removal rate can reach more than 99.7%.

[0029] The flue pipe 504 is connected to the furnace 503, and the air outlet end of the flue pipe 504 is connected to the chimney 6 through the second connecting pipeline 2. The second connecting pipeline 2 is also provided with a second induced draft fan 202. The second induced draft fan 202 can transport the exhaust gas in the flue pipe 504 to the chimney 6 through the second connecting pipeline 2 for discharge. That is, the exhaust gas generated by the combustion of asphalt smoke in the furnace 503 enters the flue pipe 504 and then enters the chimney 6 through the second connecting pipeline 2 and is discharged through the chimney 6.

[0030] The flue pipe 504 is arranged in the first heat exchange shell 501 and the second heat exchange shell 502. Of course, the first heat exchange shell 501 and the second heat exchange shell 502 are not connected to each other. The second heat exchange shell 502 can be specifically arranged above the wall of the furnace 503, and the first heat exchange shell 501 is arranged above the second heat exchange shell 502.

[0031] The second heat exchange shell 502 is connected with a heat transfer oil feed pipeline 5021 and a heat transfer oil discharge pipeline 5022. The heat transfer oil enters the second heat exchange shell 502 at 40 t / h through the above pipelines for circulation and heat exchange. The heat transfer oil is used to recover the heat of the high-temperature exhaust gas in the flue pipe 504. The heat transfer oil after heat exchange is used for storage and heat preservation. The temperature of the heat transfer oil at 180°C can be increased to 210°C after heat exchange.

[0032] The first connecting pipeline 1 also passes through the first heat exchange shell 501. The first heat exchange shell 501 can be filled with heat-conducting media such as water or oil to improve the heat exchange effect. The heat of the high-temperature exhaust gas in the flue pipe 504 is transferred to the diluted asphalt smoke in the first connecting pipeline 1 through the first heat exchange shell 501, which can increase the temperature of the diluted asphalt smoke from 30°C to about 140°C before entering the furnace 503, thereby improving the combustion effect of the asphalt smoke.

[0033] The second connecting pipeline 2 is also connected to a heat exchange pipeline 7, and the upper part of the furnace 503 is connected to the second connecting pipeline 2 through the heat exchange pipeline 7. The heat exchange pipeline 7 is provided with a third induced draft fan 703 and an asphalt heat exchanger 8. The third induced draft fan 703 can introduce the exhaust gas from the upper part of the furnace 503 into the tube side of the asphalt heat exchanger 8 through the heat exchange pipeline 7 and then merge it into the second connecting pipeline 2, and finally discharge it into the chimney 6 through the second connecting pipeline 2 for discharge. The shell side of the asphalt heat exchanger 8 is connected to an asphalt feed pipeline 801 and an asphalt discharge pipeline 802. The asphalt raw material can flow through the shell side of the asphalt heat exchanger 8 at 20t / h through the above-mentioned feed and discharge pipelines to exchange heat with the exhaust gas in the tube side, and the temperature is raised from 140°C to 190°C for subsequent modification production, thereby further utilizing the heat generated after the incineration of asphalt smoke.

[0034] An auxiliary induced draft fan 102 and a flame arrester 103 are also provided on a section of the first connecting pipeline 1 close to the furnace 503. Since the first connecting pipeline 1 needs to pass through the first heat exchange shell, its length is relatively long. The auxiliary induced draft fan 102 can more stably adjust the air intake of the furnace 503 to dilute the asphalt smoke.

[0035] The bottom of the furnace 503 is also connected to a natural gas pipeline 9, a compressed air pipeline 10 and a fresh air pipeline 11. In order to ensure that the temperature of the furnace 503 maintains the asphalt smoke combustion temperature of 850°C, the above pipelines are used to supplement natural gas and air to the furnace 503 to maintain the thermal balance of the temperature in the furnace 503.

[0036] Example 2

[0037] This embodiment is based on embodiment 1. Figure 2 The first connecting pipeline 1 is also provided with a LEL safety instrument 12 and is connected to an emptying pipe 13. The emptying pipe 13 is specifically located at the rear section of the LEL safety instrument 12. An activated carbon adsorption box 14 is also provided on the emptying pipe 13. The end of the emptying pipe 13 is connected to the chimney 6. The first connecting pipeline 1 is also provided with a first interlock control valve 15, and the emptying pipe 13 is provided with a second interlock control valve 16. The LEL safety instrument 12 can detect the concentration of the gas in the first connecting pipeline 1. If the LEL safety instrument 12 detects that the diluted asphalt smoke concentration in the first connecting pipeline 1 is higher than the lower explosion limit of 25%, the interlock control system will close the first interlock control valve 15 and open the second interlock control valve 16, and switch the gas in the first connecting pipeline 1 to the exhaust pipe 13 and pass through the activated carbon adsorption box 14. After the activated carbon adsorption treatment, it is discharged to the chimney 6 for exhaust. Of course, the operating logic of the above-mentioned interlock control system is the existing technology. The design of the LEL safety instrument 12 and the exhaust pipe 13 can further ensure the combustion safety in the furnace 503.

[0038] The fresh air pipeline 11 is connected to the second connecting pipeline 2 through an air heat exchanger 17. The structure of the air heat exchanger 17 is prior art, and the specific connection method of the heat exchange connection is also prior art. The air in the fresh air pipeline 11 can exchange heat with the exhaust gas in the second connecting pipeline 2. The 1000Nm 3 / h air can be raised from 30°C to 140°C and then sent into the furnace 503 for combustion assistance, which can better improve the combustion assistance effect.

[0039] A hot water heat exchanger 18 is also provided on the second connecting pipeline 2. The hot water heat exchanger 18 is specifically located in the rear section of the air heat exchanger 17. The exhaust gas in the second connecting pipeline 2 flows through the tube side of the hot water heat exchanger 18. The shell side of the hot water heat exchanger 18 is connected with an inlet pipeline 1801 and an outlet pipeline 1802. The temperature of 30°C water entering the shell side of the hot water heat exchanger 18 and exchanging heat with the exhaust gas can be increased to 60°C. The industrial hot water can also be used in daily production.

[0040] The high-temperature exhaust gas of 850°C generated after the asphalt smoke is incinerated in the furnace 503, firstly, the temperature is reduced to 240°C after heat exchange in the second heat exchange shell 502 in the flue pipe 504, and the temperature is reduced to 148°C after heat exchange in the first heat exchange shell 501. Secondly, the temperature is reduced to 180°C after heat exchange in the asphalt heat exchanger 8 in the heat exchange pipe 7. Then the exhaust gas is converged in the second connecting pipeline 2 and the temperature is 160°C after mixing. The exhaust gas is further reduced to 140°C after heat exchange in the air heat exchanger 17 in the second connecting pipeline 2, and the temperature is reduced to 60°C after heat exchange in the hot water heat exchanger 18. Finally, the low-temperature exhaust gas is sent to the chimney 6 for discharge. Such layer-by-layer heat exchange can make full use of the heat generated by the incineration of asphalt smoke, and has high economic benefits.

[0041] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Based on the present invention and the above description, relevant personnel can make various changes and modifications without departing from the technical idea of ​​the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An asphalt fume treatment system, characterized in that: The invention comprises a dilution tank (3), an asphalt smoke air intake pipeline (4), an incinerator (5), a first connecting pipeline (1), a second connecting pipeline (2), a chimney (6), a heat exchange pipeline (7) and an asphalt heat exchanger (8); the incinerator (5) comprises a furnace (503), a flue pipe (504), a first heat exchange shell layer (501) and a second heat exchange shell layer (502); the dilution tank (3) is provided with an asphalt smoke air intake pipeline (4), the dilution tank (3) is also provided with a mixed air intake pipeline (301), the dilution tank (3) and the incinerator (5) are connected via a first connecting pipeline (1), and the first connecting pipeline (2) is connected to the incinerator (5). The pipeline (1) is provided with a first induced draft fan (101), and the first induced draft fan (101) can transport the gas in the dilution tank (3) to the furnace (503) of the incinerator (5) through the first connecting pipeline (1); the flue pipe (504) is connected to the furnace (503), and the gas outlet end of the flue pipe (504) is connected to the chimney (6) through the second connecting pipeline (2); the second induced draft fan (202) is also provided on the second connecting pipeline (2), and the second induced draft fan (202) can transport the waste gas in the flue pipe (504) to the chimney (6) through the second connecting pipeline (2) for discharge; The flue pipe (504) is arranged in the first heat exchange shell (501) and the second heat exchange shell (502); the second heat exchange shell (502) is connected to a heat transfer oil feed pipeline (5021) and a heat transfer oil discharge pipeline (5022); the first connecting pipeline (1) also passes through the first heat exchange shell (501); the second connecting pipeline (2) is also connected to a heat exchange pipeline (7); the upper part of the furnace (503) is connected to the heat exchange pipeline ( 7) is connected to the second connecting pipeline (2), and a third induced draft fan (703) and an asphalt heat exchanger (8) are arranged on the heat exchange pipeline (7). The third induced draft fan (703) can introduce the exhaust gas from the upper part of the furnace (503) into the tube side of the asphalt heat exchanger (8) through the heat exchange pipeline (7) and then merge into the second connecting pipeline (2). The shell side of the asphalt heat exchanger (8) is connected to an asphalt feed pipeline (801) and an asphalt discharge pipeline (802).

2. The asphalt fume treatment system according to claim 1, characterized in that: The first connecting pipeline (1) is also provided with an LEL safety instrument (12) and is connected to an exhaust pipe (13); an activated carbon adsorption box (14) is also provided on the exhaust pipe (13); the end of the exhaust pipe (13) is connected to the chimney (6); the first connecting pipeline (1) is also provided with a first interlock control valve (15); and a second interlock control valve (16) is provided on the exhaust pipe (13).

3. The asphalt fume treatment system according to claim 1, characterized in that: An auxiliary induced draft fan (102) and a flame arrester (103) are also provided on a section of the first connecting pipeline (1) close to the furnace (503).

4. A asphalt fume disposal system according to claim 1, 2 or 3, characterized in that: The bottom of the furnace (503) is also connected to a natural gas pipeline (9), a compressed air pipeline (10) and a fresh air pipeline (11); the fresh air pipeline (11) is connected to the second connecting pipeline (2) via an air heat exchanger (17); the air in the fresh air pipeline (11) can exchange heat with the exhaust gas in the second connecting pipeline (2).

5. The asphalt fume treatment system according to claim 4, characterized in that: A hot water heat exchanger (18) is also provided on the second connecting pipeline (2), and the exhaust gas in the second connecting pipeline (2) flows through the tube side of the hot water heat exchanger (18), and the shell side of the hot water heat exchanger (18) is connected to an inlet pipeline (1801) and an outlet pipeline (1802).