Protective mounting base for gas-phase heat exchange device

By designing a protective installation base on the vertical air preheater, using the air supply unit to sweep dust removal and magnetic protection net to provide protection, the problems of trace ash accumulation and external force damage of the heat exchange tube are solved, and the operation stability of the equipment is improved. Security.

CN222047790UActive Publication Date: 2024-11-22HUNAN XIANGHENG SALT CHEM
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420698843.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-11-22
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

There is a problem of trace ash accumulation on the heat exchange pipe of the vertical air preheater, and the pipe distance is large, which is easily damaged by external forces, resulting in unstable equipment operation and reduced heat exchange efficiency.

Method used

Design a protective mounting base, including the base body, bottom frame, fan, air supply duct, clamping assembly, protective net and magnetic bracket assembly, which can be swept and removed by the air supply unit and use a folding protective net to provide side protection to prevent External objects enter.

Benefits of technology

Automatic dust cleaning is achieved, avoiding the hassle of manual cleaning, improving the safety and stability of the equipment, and preventing damage to the heat exchange tube.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222047790U_ABST
    Figure CN222047790U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of gas-phase heat exchange devices, in particular to a protective mounting base for a gas-phase heat exchange device, and solves the technical problems that a small amount of dust is accumulated on a heat exchange pipe of an existing vertical air preheater, the pipe distance is large, and external force is prone to entering the heat exchange pipe to cause damage to the heat exchange pipe. According to the technical scheme, the protective mounting base for the gas phase heat exchange device comprises a base body, a bottom frame, a fan, an air supply pipe, an air supply hole, a clamping and fixing assembly, a protective net, a magnetic support assembly and a storage bin; the air supply unit capable of conveying the air flow to the gaps of the heat exchange tubes of the vertical air preheater is arranged on the mounting base, the side walls of the heat exchange tubes which are arranged side by side are subjected to wind blowing dust removal, and the protective net plays a role in shielding and protecting the two sides of the heat exchange tubes of the vertical air preheater in a magnetic attraction fixed mounting mode. The problems that a small amount of dust is accumulated on a heat exchange pipe of an existing vertical air preheater, the pipe distance is large, and external force easily enters the heat exchange pipe to cause damage to the heat exchange pipe are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of gas phase heat exchange devices, in particular to a protective installation base for gas phase heat exchange devices. Background Art

[0002] Thermal power plants generally use air preheaters as gas-phase heat exchange devices for boilers. Air preheaters exist in two structures: horizontal and vertical. Most of the current thermal power plant boilers use horizontal air preheaters. In this horizontal air preheater, air flows inside the tubes, and flue gas flushes the tubes horizontally outside the tubes. The preheater tubes are designed to be arranged in series, with a horizontal pitch of 65mm and a longitudinal pitch of 52mm. The net distance between tubes is small, and the designed flue gas flow rate is 7.5m / s. When the flue gas goes downward, it is blocked by the lower row of tubes, which is easy to accumulate dust and difficult to stop the furnace for cleaning, resulting in a decrease in heat exchange efficiency. The heat exchange device operates at high load, which does not meet the requirements of energy saving and consumption reduction and green production.

[0003] Because of the dust accumulation problem of horizontal air preheaters, the current solution is to use vertical air preheaters instead of horizontal air preheaters. In vertical air preheaters, flue gas flows in the tubes, and air flushes the tubes horizontally outside the tubes. The designed flue gas flow rate is greater than 10m / s. There is no obstruction when the flue gas goes down, and the dust in the flue gas can be taken away with it. Therefore, it is not easy to accumulate dust, thereby ensuring the long-term economical and stable operation of the boiler. Although vertical air preheaters are not prone to large-scale dust accumulation, there will still be a small amount of dust on the surface of the heat exchange tubes during long-term operation. When cleaning, it is still necessary to stop the equipment, disassemble it, and then manually clean the heat exchange tubes one by one, which is more troublesome. In addition, the heat exchange tubes of the vertical air preheater are larger than those of the horizontal air preheater, and it is easier for external forces to enter and cause damage to the heat exchange tubes.

[0004] Therefore, in view of the fact that there is a small amount of dust accumulation on the heat exchange tubes of the current vertical air preheater, the tube spacing is large, and the heat exchange tubes are easily damaged by external forces, a protective mounting base is designed to provide a stable mounting platform for the vertical air preheater while having automatic dust cleaning function and heat exchange tube side protection function, thereby improving the safe use of the heat exchanger. Utility Model Content

[0005] In order to overcome the problem of trace dust accumulation on the heat exchange tubes of the current vertical air preheater, the tube spacing is large, and external forces are easily introduced to cause damage to the heat exchange tubes.

[0006] The technical solution of the utility model is: a protective mounting base for a gas phase heat exchange device, comprising a base body, a bottom frame, a fan, an air supply pipe, an air supply hole, a clamping assembly, a protective net, a magnetic bracket assembly, and a storage bin; the bottom frame is integrally fixedly connected to the lower end of the base body, a fan is installed in the bottom frame, the base body is a hollow structure and is connected to the air supply channel of the fan, 30-50 air supply pipes that pass through the bottom plate of the air preheater and are located between the heat exchange pipes are installed on the upper end of the base body, air supply holes are opened on the outer walls of the air supply pipes, a storage bin for storing a folded protective net is provided on the inner side of the base body, a clamping assembly that is supported on both sides of the bottom plate of the air preheater is provided on the base body, magnetic bracket assemblies are installed on the front and rear ends of the base body through a rotating connector, the protective net is composed of three meshes and the connected meshes are fixed by hinges, the unfolded protective net is magnetically mounted on the magnetic bracket assembly and is located on one side of the heat exchange pipe of the air preheater.

[0007] Preferably, the air supply unit arranged on the base body delivers air flow to the gaps of the heat exchange tubes of the vertical air preheater, and blows and removes dust from the side walls of the heat exchange tubes arranged side by side. After flipping open the magnetic bracket assembly, the protective net is taken out from the storage bin and unfolded, and magnetically installed on the magnetic bracket assembly to provide shielding and protection for both sides of the heat exchange tubes of the vertical air preheater.

[0008] Preferably, flip-opening covers are installed at the openings at the front and rear ends of the storage bin, the storage bin is connected between the air supply channel of the fan and the air inlet channel of the air supply duct, 4-8 air supply holes are opened around the outer wall of the air supply duct and the air supply holes are evenly spaced along the longitudinal axis of the air supply duct. After taking the protective net out of the storage bin, close the cover to seal the storage bin, and a closed ventilation duct can be formed in the base body. Air is supplied by the fan and enters the air supply duct through the storage bin.

[0009] Preferably, the fixing assembly includes a baffle plate and a corner plate; two baffle plates are symmetrically arranged on the left and right, and the front and rear ends of each baffle plate are integrally welded and fixed with corner plates that match the corners of the bottom plate of the air preheater. The corner plate is a right-angle structure, supported at the corners of the bottom plate of the air preheater, locking the bottom plate of the air preheater so that it cannot slide on the horizontal plane, and the fixing effect is good.

[0010] Preferably, the fixing assembly further includes a handle and a roller; a handle is fixedly connected to the back side of the baffle plate, and the lower end of the baffle plate has a slider slidably connected to a groove opened on the base body, and a roller is installed at the lower end of the slider. The handle is pulled to control the baffle plate to approach or move away from the bottom plate of the air preheater, and the rolling action of the roller is used to reduce the friction between the structures, so that the baffle plate moves more smoothly.

[0011] Preferably, the fixing assembly also includes a rotating shaft, a spring pin, and a limit plate; the rotating shaft is fixedly connected to the upper end of the baffle plate, a pin hole is opened in the rotating shaft, and a hole groove corresponding to the pin hole is opened at the upper end of the base body, the spring pin is inserted into the pin hole and the corresponding hole groove, and the rotating shaft is rotatably connected to a limit plate located on the upper side of the bottom plate of the air preheater. After the angle plate limits and fixes the bottom plate of the air preheater, the spring pin is automatically pushed into the pin hole and the corresponding hole on the base body under the action of the spring, locking the baffle plate on the base body and preventing it from moving, and then the limit plate is rotated to the bottom plate of the air preheater, so that the air preheater cannot be longitudinally separated from the base body.

[0012] Preferably, the magnetic bracket assembly includes a support frame; two support frames are rotatably installed on the front and rear sides of the base body via a rotating shaft, and magnetic sheets are installed on the side walls of the support frames. The flipped and unfolded protective net is magnetically fixed on the two support frames on the same side, and the support frame is rotated into an upright shape with the rotating shaft at its bottom end. After the protective net is unfolded, it is magnetically adsorbed and fixed on the support frame, forming a protective cover in front and behind the heat exchange tubes of the air preheater.

[0013] Preferably, the magnetic bracket assembly also includes a locking pin; the shaft head at the lower end of the support frame and the corresponding shaft seat on the base body are provided with holes, and the locking pin is inserted into the hole to lock the shaft head and the shaft seat. In order to prevent the support frame from flipping downward due to gravity, the locking pin is used to lock the shaft head and the shaft seat so that it will not rotate outward and flip open during the process of carrying the protective net.

[0014] Beneficial effects of the utility model:

[0015] 1. An air supply unit that can deliver air flow to the gaps of the heat exchange tubes of the vertical air preheater is arranged on the installation base, and the side walls of the heat exchange tubes arranged side by side are blown and dusted by wind, so as to avoid the trouble of removing the air preheater and manually cleaning the heat exchange tubes one by one. A foldable and storable protective net is arranged on the base body. During the use of the equipment, the two sides of the heat exchange tubes of the vertical air preheater are shielded and protected by a magnetic fixed installation method, so as to prevent foreign objects from entering the gaps of the heat exchange tubes and causing damage to the equipment.

[0016] 2. The protective net is fixed by magnetic attraction, which can be quickly installed and removed, and is flexible and convenient to use;

[0017] 3. The protective net adopts a multi-layer folding structure, which can be easily stored in the storage compartment when not in use, so it is convenient to use together with the base body. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 Shown is a schematic diagram of the three-dimensional structure of the protective mounting base for the gas phase heat exchange device of the utility model;

[0019] Figure 2The first three-dimensional structure schematic diagram of the air supply unit of the protective mounting base for the gas phase heat exchange device of the utility model is shown;

[0020] Figure 3 The second three-dimensional structure schematic diagram of the air supply unit of the protective mounting base for the gas phase heat exchange device of the utility model is shown;

[0021] Figure 4 The first three-dimensional structure schematic diagram of the protective mounting base clamping assembly for the gas phase heat exchange device of the utility model is shown;

[0022] Figure 5 The second three-dimensional structure schematic diagram of the protective mounting base clamping assembly for the gas phase heat exchange device of the utility model is shown;

[0023] Figure 6 Shown is a schematic diagram of the three-dimensional structure of the protective net and magnetic bracket assembly for the protective installation base of the gas phase heat exchange device of the utility model.

[0024] Explanation of the accompanying drawings: 1. base body; 2. bottom frame; 3. fan; 4. air supply duct; 5. air supply hole; 7. protective net; 9. storage bin; 601. enclosure plate; 602. corner plate; 603. handle; 604. roller; 605. rotating shaft; 606. spring pin; 607. limit plate; 801. support frame; 802. locking pin. DETAILED DESCRIPTION

[0025] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0026] See also Figure 1-3The utility model provides an embodiment: a protective mounting base for a gas phase heat exchange device, comprising a base body 1, a bottom frame 2, a fan 3, an air supply pipe 4, an air supply hole 5, a fixing assembly, a protective net 7, a magnetic bracket assembly, and a storage bin 9; the bottom frame 2 is integrally fixedly connected to the lower end of the base body 1, and the fan 3 is installed in the bottom frame 2. The base body 1 is a hollow structure and is connected to the air supply channel of the fan 3. 30-50 air supply pipes 4 that pass through the bottom plate of the air preheater and are located between the heat exchange tubes are installed on the upper end of the base body 1. The air supply holes 5 are opened on the outer wall of the air supply pipe 4. A storage bin 9 for storing the folded protective net 7 is arranged on the inner side of the base body 1. The base body 1 is provided with a There are fixing components supported on both sides of the bottom plate of the air preheater, and magnetic bracket components are installed at the front and rear ends of the base body 1 through rotating connectors. The protective net 7 is composed of three meshes and the connected meshes are fixed by hinges. The unfolded protective net 7 is magnetically mounted on the magnetic bracket assembly and is on one side of the heat exchange tube of the air preheater. The air supply unit arranged on the base body 1 transports air flow to the gap of the heat exchange tube of the vertical air preheater, and blows and dusts the side walls of the heat exchange tubes arranged side by side. After flipping open the magnetic bracket assembly, take out the protective net 7 from the storage bin 9 and unfold it, and magnetically mount it on the magnetic bracket assembly to shield and protect both sides of the heat exchange tube of the vertical air preheater.

[0027] See also Figure 2-3 In this embodiment, flip-opening covers are installed at the open ends of the storage bin 9 at the front and rear ends. The storage bin 9 is connected between the air supply channel of the fan 3 and the air inlet channel of the air supply pipe 4. 4-8 air supply holes 5 are opened around the outer wall of the air supply pipe 4, and the air supply holes 5 are equidistantly distributed along the longitudinal axis of the air supply pipe 4. After the protective net 7 is taken out from the storage bin 9, the cover is closed to close the storage bin 9, so that a closed ventilation duct can be formed in the base body 1, and the air is supplied by the fan 3 and enters the air supply pipe 4 through the storage bin 9.

[0028] See also Figure 4-5In this embodiment, the fixing assembly includes a baffle plate 601 and an angle plate 602; the baffle plate 601 is symmetrically provided with two angle plates 602 that are adapted to the corners of the bottom plate of the air preheater and are welded and fixed in one piece at the front and rear ends of each baffle plate 601; the angle plates 602 are of a right-angle structure, supported at the corners of the bottom plate of the air preheater, locking the bottom plate of the air preheater so that it cannot slide on the horizontal plane, and the fixing effect is good. The fixing assembly also includes a handle 603 and a roller 604; the baffle plate 601 is fixedly connected to the back side with a handle 603, and the lower end of the baffle plate 601 has a slider slidably connected to the groove provided on the base body 1, and the lower end of the slider is installed with a roller 604, and the baffle plate 601 is controlled to approach or move away from the bottom plate of the air preheater by pulling the handle 603, and the roller 604 is used to roll the baffle plate 601 to move the baffle plate 601 closer to or away from the bottom plate of the air preheater. The fixing assembly further comprises a rotating shaft 605, a spring pin 606 and a limit plate 607; the rotating shaft 605 is fixedly connected to the upper end of the surrounding plate 601, a pin hole is provided in the rotating shaft 605, a hole groove corresponding to the pin hole is provided at the upper end of the base body 1, the spring pin 606 is inserted into the pin hole and the corresponding hole groove, the rotating shaft 605 is rotatably connected with a limit plate 607 on the upper side of the bottom plate of the air preheater, after the angle plate 602 limits and fixes the bottom plate of the air preheater, the spring pin 606 is automatically pushed into the pin hole and the corresponding hole on the base body 1 under the action of the spring, the surrounding plate 601 is locked on the base body 1 and will not move, and then the limit plate 607 is rotated to the bottom plate of the air preheater, so that the air preheater cannot be separated from the base body 1 longitudinally.

[0029] See also Figure 6 In this embodiment, the magnetic bracket assembly includes a support frame 801; two support frames 801 are rotatably installed on the front and rear sides of the base body 1 through a rotating shaft 605, and a magnetic suction sheet is installed on the side wall of the support frame 801. The flipped and unfolded protective net 7 is magnetically fixed to the two support frames 801 on the same side, and the support frame 801 is rotated into an upright state with the rotating shaft 605 at its bottom end. After the protective net 7 is unfolded, it is magnetically adsorbed and fixed on the support frame 801, forming a protective cover in front and behind the heat exchange tubes of the air preheater. The magnetic bracket assembly also includes a locking pin 802; the shaft head at the lower end of the support frame 801 and the corresponding shaft seat on the base body 1 are both provided with holes, and the locking pin 802 is inserted into the hole to lock the shaft head and the shaft seat. In order to prevent the support frame 801 from flipping downward due to gravity, the locking pin 802 is used to insert and lock the shaft head and the shaft seat so that it will not rotate outward and flip open during the process of carrying the protective net 7.

[0030] When working, the user places the bottom plate of the air preheater on the base body 1, and inserts the air supply pipe 4 into the holes preset on the bottom plate of the air preheater, so that the air supply pipe 4 is between the heat exchange pipes of the air preheater;

[0031] Then, the roller 604 rolls on the base body 1 to push the baffle plate 601 toward each other, and the angle plate 602 is supported at the corner of the bottom plate of the air preheater. The spring pin 606 is automatically pushed into the pin hole and the corresponding hole on the base body 1 under the action of the spring, and the baffle plate 601 is locked on the base body 1, so that the bottom plate of the air preheater cannot slide on the horizontal plane.

[0032] Next, the limit plate 607 is rotated to the bottom plate of the air preheater through the rotation connection between the limit plate 607 and the rotating shaft 605, so that the air preheater cannot be separated from the base body 1 longitudinally. At this time, the air preheater is completely installed.

[0033] Next, take out the protective net 7 from the storage bin 9, close the cover to seal the storage bin 9, flip the protective net 7 to open it into a flat surface, and fix it on the two support frames 801 on the same side by magnetic adsorption, flip the support frames 801 to an upright state, and then insert the locking pin 802 into the shaft head and shaft seat between the support frame 801 and the base body 1 to lock it, so that the protective net 7 forms a protective cover in front and behind the heat exchange tubes of the air preheater.

[0034] Through the above steps, an air supply unit is arranged on the installation base, which can deliver air flow to the gaps of the heat exchange tubes of the vertical air preheater, and the side walls of the heat exchange tubes arranged side by side are blown and dusted by wind, so as to avoid the trouble of dismantling the air preheater and manually cleaning the heat exchange tubes one by one, and a protective net 7 that can be folded and stored is arranged on the base body 1. During the use of the equipment, the heat exchange tubes of the vertical air preheater are shielded and protected by a magnetic fixed installation method, so as to avoid foreign objects from entering the gaps of the heat exchange tubes and causing damage to the equipment, so as to solve the problem of trace dust accumulation on the heat exchange tubes of the current vertical air preheater, large tube spacing, and easy entry of external forces causing damage to the heat exchange tubes.

[0035] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the purpose of the present invention.

Claims

1. A protective mounting base for a gas phase heat exchange device, comprising a base body (1); characterized in that: The invention also comprises a bottom frame (2), a fan (3), an air supply pipe (4), an air supply hole (5), a fixing assembly, a protective net (7), a magnetic bracket assembly, and a storage bin (9); the bottom frame (2) is integrally fixedly connected to the lower end of the base body (1); the fan (3) is installed in the bottom frame (2); the base body (1) is a hollow structure and is connected to the air supply channel of the fan (3); 30 to 50 air supply pipes (4) are installed on the upper end of the base body (1) and pass through the bottom plate of the air preheater and are located between the heat exchange pipes; the air supply pipes (4) An air supply hole (5) is provided on the outer wall, a storage bin (9) for storing a foldable protective net (7) is provided on the inner side of the base body (1), a clamping assembly is provided on the base body (1) and is supported on both sides of the bottom plate of the air preheater, a magnetic bracket assembly is installed at the front and rear ends of the base body (1) through a rotating connecting piece, the protective net (7) is composed of three mesh pieces and the connected mesh pieces are connected and fixed by hinges, and the unfolded protective net (7) is magnetically mounted on the magnetic bracket assembly and is located on one side of the heat exchange tube of the air preheater.

2. The protective mounting base for a gas phase heat exchange device according to claim 1, characterized in that: The openings at the front and rear ends of the storage bin (9) are provided with flip-opening covers. The storage bin (9) is connected between the air supply passage of the fan (3) and the air inlet passage of the air supply pipe (4). Four to eight air supply holes (5) are arranged around the outer wall of the air supply pipe (4), and the air supply holes (5) are evenly spaced along the longitudinal axis of the air supply pipe (4).

3. The protective mounting base for a gas phase heat exchange device according to claim 1, characterized in that: The fixing assembly comprises a baffle plate (601) and a corner plate (602); two baffle plates (601) are symmetrically arranged on the left and right, and the front and rear ends of each baffle plate (601) are integrally welded and fixed with a corner plate (602) adapted to the bottom corner of the air preheater.

4. The protective mounting base for a gas phase heat exchange device according to claim 3, characterized in that: The clamping assembly further comprises a handle (603) and a roller (604); the baffle plate (601) is fixedly connected to the handle (603) on the back side thereof, the lower end of the baffle plate (601) comprises a slider slidably connected to a groove provided on the base body (1), and the lower end of the slider is provided with a roller (604).

5. The protective mounting base for a gas phase heat exchange device according to claim 4, characterized in that: The fixing assembly further comprises a rotating shaft (605), a spring pin (606), and a limit plate (607); the rotating shaft (605) is fixedly connected to the upper end of the enclosure plate (601); a pin hole is provided in the rotating shaft (605); a hole groove corresponding to the pin hole is provided at the upper end of the base body (1); the spring pin (606) is inserted into the pin hole and the corresponding hole groove; and a limit plate (607) located on the upper side of the bottom plate of the air preheater is rotatably connected to the rotating shaft (605).

6. The protective mounting base for a gas phase heat exchange device according to claim 1, characterized in that: The magnetic bracket assembly comprises a support frame (801); two support frames (801) are rotatably mounted on both the front and rear sides of the base body (1) via a rotating shaft (605); magnetic sheets are mounted on the side walls of the support frames (801); and the flipped and unfolded protective net (7) is magnetically fixed to the two support frames (801) on the same side.

7. The protective mounting base for a gas phase heat exchange device according to claim 6, characterized in that: The magnetic bracket assembly also includes a locking pin (802); the shaft head at the lower end of the support frame (801) and the corresponding shaft seat on the base body (1) are both provided with holes, and the locking pin (802) is inserted into the hole to lock the shaft head and the shaft seat.