Bromine absorption and extraction reaction tower

By using the technology of using motor components and a stirring paddles in the bromine absorption and extraction reaction tower with a blower, the problem of low cleaning efficiency in the prior art is solved, and an efficient cleaning effect without manual operation is achieved.

CN222057355UActive Publication Date: 2024-11-26SHOUGUANG WEIDONG XINGGUAN CHEMICAL CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323588476.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-11-26
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

The cleaning efficiency of the existing bromine absorption and extraction reaction tower is low, and it requires manual entry into the tower body for cleaning, which is inconvenient to operate and inefficient.

Method used

A bromine absorption and extraction reaction tower including a motor assembly and a stirring paddle was designed to peel off the precipitate at the bottom of the tower through the high-speed rotating stirring paddle and compressed air blown out of the blower pipe to achieve efficient dredging without manual cleaning.

Benefits of technology

It improves cleaning efficiency, reduces the need for manual operations, and improves the cleaning effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222057355U_ABST
    Figure CN222057355U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of bromine preparation, in particular to a bromine absorption and extraction reaction tower which comprises a tower body, and a first grid tray, a first bed layer limiting plate, a second grid tray, a second bed layer limiting plate and a liquid distributor are sequentially and fixedly mounted in the tower body from bottom to top. Packing layers are arranged between the first grid plate and the first bed layer limiting plate and between the second grid plate and the second bed layer limiting plate, a plurality of motor assemblies distributed in a surrounding mode are fixedly installed on the outer wall of the tower body, output shafts of the motor assemblies penetrate through the outer wall of the tower body to stretch into the tower body, and the output shafts of the motor assemblies are connected and provided with stirring paddles through couplings; the stirring paddle is close to the bottom of the tower body. When desilting is needed, the motor assembly around the tower body is started, sediments are stripped from the bottom through high-speed rotation of the stirring paddle in cooperation with compressed air blown out by the air blowing pipe, workers do not need to enter the tower for cleaning, and the cleaning efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bromine preparation, in particular to a bromine absorption and extraction reaction tower. Background Art

[0002] Bromine is an important chemical raw material, widely used in flame retardants, fire extinguishing agents, refrigerants, photosensitive materials, medicine, oil fields and other industries, and has special value in the national economy and scientific and technological development.

[0003] In the production process of bromine, an absorption tower is usually used at the end of the process to absorb the gasified bromine to reduce the impact on the environment. The absorbent is added at the top of the tower and flows from top to bottom, contacting the gas flowing from bottom to top. The liquid that absorbs the absorbent is discharged from the bottom of the tower, and the purified gas is discharged from the top of the tower.

[0004] The interior of the absorption tower needs to be regularly desilted to remove solid sediments and detached fillers. In the prior art, the cleaning of the absorption tower requires opening a manhole to enter the tower body for cleaning. Due to the narrow space and dim light inside the tower, it is very inconvenient for operators to clean and the cleaning efficiency is low. Utility Model Content

[0005] In view of the defects pointed out in the background technology, the utility model provides a bromine absorption and extraction reaction tower, aiming to solve the problem of low cleaning efficiency of the existing absorption and extraction reaction tower.

[0006] To achieve the above-mentioned purpose, the technical solution of the utility model is implemented as follows: a bromine absorption and extraction reaction tower comprises a tower body, a gas outlet is arranged on the top of the tower body, an outlet pipe is arranged on the bottom of the tower body, a gas inlet is arranged on the lower side of the tower body, and a liquid inlet is arranged on the upper side of the tower body. A first grid plate, a first bed restriction plate, a second grid plate, a second bed restriction plate, and a liquid distributor are fixedly installed in the interior of the tower body from bottom to top, a packing layer is arranged between the first grid plate and the first bed restriction plate, and between the second grid plate and the second bed restriction plate, the liquid distributor is connected and installed with the liquid inlet, the gas inlet is located below the first grid plate, a plurality of groups of motor assemblies distributed in a surrounding manner are fixedly installed on the outer wall of the tower body, the output shaft of the motor assembly passes through the outer wall of the tower body and extends into the interior of the tower body, and the output shaft of the motor assembly is connected and installed with a stirring paddle through a coupling, and the stirring paddle is close to the bottom of the tower body.

[0007] Preferably, it also includes an annular air pipe, which is sleeved on the outside of the tower body and fixedly installed on the outer wall of the tower body through a bracket. An air inlet is provided on the side of the annular air pipe facing away from the tower body, and an air outlet corresponding to the motor assembly is provided on the side of the annular air pipe facing the tower body. An air blowing pipe is connected to the air outlet, and an end of the air blowing pipe passes through the outer wall of the tower body, extends into the interior of the tower body and faces the stirring paddle.

[0008] Preferably, a liquid redistributor is fixedly installed inside the tower body, and the liquid redistributor is located between the first bed limiting plate and the second grid plate.

[0009] Preferably, the liquid redistributor comprises a casing fixedly mounted inside the tower body, guide grids are arranged between the inner walls of the casing, a plurality of water collecting troughs are arranged below the guide grids, and a plurality of liquid outlets are provided at the bottom of the water collecting troughs.

[0010] Preferably, the guide grid includes a group of central guide plates and a plurality of groups of side guide plates respectively arranged on both sides of the central guide plates. The water collecting troughs correspond to the side guide plates one by one, and the water collecting troughs are fixedly installed at the bottom of the corresponding side guide plates.

[0011] Preferably, connecting plates are provided between the water collecting tanks.

[0012] Preferably, a demister is fixedly installed inside the tower body, and the demister is located above the liquid distributor.

[0013] Preferably, a filter screen is fixedly installed inside the tower body, the filter screen is located below the first grid plate, and the gas inlet is located between the first grid plate and the filter screen.

[0014] After adopting the above technical solution, the beneficial effects of the utility model are:

[0015] When silt removal is required, start the motor assembly around the tower body, and the sediment is peeled off from the bottom through high-speed stirring and compressed air blown out from the air pipe. There is no need for manual entry into the tower for cleaning, and the cleaning efficiency is high. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0017] Figure 1 It is a structural schematic diagram of the utility model;

[0018] Figure 2 is a schematic diagram of the distribution of motor components;

[0019] Figure 3 is a three-dimensional diagram of a liquid redistributor;

[0020] Figure 4 is a cross-sectional view of a liquid redistributor;

[0021] Figure 5 A top view of the liquid redistributor.

[0022] Description of the drawings: 1-tower body, 2-motor assembly, 3-annular gas pipeline, 4-first grid plate, 5-first bed limiting plate, 6-liquid redistributor, 7-second grid plate, 8-liquid distributor, 9-demister, 10-gas outlet, 11-liquid inlet, 12-second bed limiting plate, 13-packing layer, 14-gas inlet, 15-filter screen, 16-lead-out pipe, 17-stirring paddle, 18-air inlet, 19-air blowing pipe, 20-casing, 21-center guide plate, 22-side guide plate, 23-water collecting trough, 24-connecting plate, 25-liquid outlet. DETAILED DESCRIPTION

[0023] The features and exemplary embodiments of various aspects of the present invention will be described in detail below. In order to make the purpose, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only configured to explain the present invention and are not configured to limit the present invention. For those skilled in the art, the present invention can be implemented without the need for some of these specific details. The following description of the embodiments is only intended to provide a better understanding of the present invention by illustrating examples of the present invention.

[0024] The directional words appearing in the following description are all directions shown in the figure, and do not limit the specific structure of the utility model. In the description of the utility model, it should also be noted that, unless otherwise clearly specified and limited, the terms "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to the specific circumstances.

[0025] like Figure 1-5 As shown, a bromine absorption and extraction reaction tower includes a tower body 1 and an annular gas transmission pipe 3. A gas outlet 10 is provided at the top of the tower body 1, a lead-out pipe 16 for discharging bottom liquid is provided at the bottom of the tower body 1, a gas inlet 14 is provided at the lower side of the tower body 1, and a liquid inlet 11 is provided at the upper side of the tower body 1. The first grid plate 4, the first bed layer restriction plate 5, the second grid plate 7, the second bed layer restriction plate 12, and the liquid distributor 8 are fixedly installed in the tower body 1 from bottom to top, and a packing layer 13 is provided between the first grid plate 4 and the first bed layer restriction plate 5, and between the second grid plate 7 and the second bed layer restriction plate 12. The liquid distributor 8 is connected and installed with the liquid inlet 11, and the gas inlet 14 is located below the first grid plate 4.

[0026] A demister 9 for reducing liquid foam entrained in the gas is fixedly installed inside the tower body 1, and the demister 9 is located above the liquid distributor 8. A filter screen 15 is fixedly installed inside the tower body 1, and the filter screen 15 is located below the first grid plate 4, and the gas inlet 14 is located between the first grid plate 4 and the filter screen 15. The filter screen 15 can filter out a part of the solid particles and block the falling filler.

[0027] The outer wall of the tower body 1 is fixedly installed with multiple groups of motor assemblies 2 distributed in a surrounding manner. The output shaft of the motor assembly 2 passes through the outer wall of the tower body 1 and extends into the interior of the tower body 1. The output shaft of the motor assembly 2 is connected to a stirring paddle 17 through a coupling, and the stirring paddle 17 is close to the bottom of the tower body 1. The annular air pipe 3 is sleeved on the outside of the tower body 1 and fixedly installed on the outer wall of the tower body 1 through a bracket. The side of the annular air pipe 3 facing away from the tower body 1 is provided with an air inlet 18, and the side of the annular air pipe 3 facing the tower body 1 is provided with an air outlet corresponding to the motor assembly 2 one by one. The air inlet 18 of the annular air pipe 3 is connected to the air compressor. The air outlet is connected to an air blowing pipe 19, and the end of the air blowing pipe 19 passes through the outer wall of the tower body 1 and extends into the interior of the tower body 1 and faces the stirring paddle 17. During dredging, the motor assembly 2 and the air compressor around the tower body 1 are started. The high-speed rotation of the agitator 17 will disturb the water flow at the bottom of the tower. The air compressor will transport the compressed air along the pipeline and finally spray it out from the blowing pipe 19. The cooperation between the agitator 17 and the blowing pipe 19 allows the sediment at the bottom of the tower to be quickly peeled off. There is no need for manual entry into the tower for cleaning, and the cleaning efficiency is high and the cleaning effect is ideal.

[0028] When the spray liquid sprayed by the liquid distributor 8 flows downward along the packing layer 13, the liquid has a tendency to flow toward the tower wall, which affects the uniformity of the fluid distribution along the tower cross section and reduces the mass transfer efficiency. In order to reduce the wall flow effect and improve the mass transfer effect, a liquid redistributor 6 is fixedly installed inside the tower body 1, and the liquid redistributor 6 is located between the first bed restriction plate 5 and the second grid plate 7.

[0029] The liquid re-distributor 6 includes a casing 20 fixedly installed inside the tower body 1, a guide grid is provided between the inner walls of the casing, a plurality of water collecting grooves 23 are provided below the guide grid, a connecting plate 24 for strengthening the connection strength is provided between adjacent water collecting grooves 23, and a plurality of liquid outlets 25 are provided at the bottom of the water collecting grooves 23. The guide grid includes a group of central guide plates 21 and a plurality of side guide plates 22 respectively arranged on both sides of the central guide plate 21, the water collecting grooves 23 correspond to the side guide plates 22 one by one, and the water collecting grooves 23 are fixedly installed at the bottom of the corresponding side guide plates 22.

[0030] According to the embodiments of the present invention as described above, these embodiments do not describe all the details in detail, nor do they limit the present invention to specific embodiments. Obviously, many modifications and changes can be made based on the above description. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can make good use of the present invention and the modified use based on the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A bromine absorption and extraction reaction tower, comprising a tower body (1), characterized in that: A gas outlet (10) is provided at the top of the tower body (1), an outlet pipe (16) is provided at the bottom of the tower body (1), a gas inlet (14) is provided at the lower side of the tower body (1), and a liquid inlet (11) is provided at the upper side of the tower body (1). A first grid plate (4), a first bed limiting plate (5), a second grid plate (7), a second bed limiting plate (12), and a liquid distributor (8) are fixedly installed in the tower body (1) in order from bottom to top. A gas outlet (10) is provided at the bottom of the tower body (1), and a gas outlet (11) is provided at the lower side of the tower body (1). A packing layer (13) is provided between the first and second bed limiting plates (12); a liquid distributor (8) is connected to the liquid inlet (11); a gas inlet (14) is located below the first grid plate (4); a plurality of motor assemblies (2) are fixedly mounted on the outer wall of the tower body (1) and are distributed in a circumferential manner; an output shaft of the motor assembly (2) passes through the outer wall of the tower body (1) and extends into the interior of the tower body (1); a stirring paddle (17) is connected to the output shaft of the motor assembly (2) via a coupling; and the stirring paddle (17) is close to the bottom of the tower body (1).

2. The bromine absorption and extraction reaction tower according to claim 1, characterized in that: It also includes an annular air delivery pipe (3), which is sleeved on the outside of the tower body (1) and fixedly mounted on the outer wall of the tower body (1) through a bracket, an air inlet (18) is provided on the side of the annular air delivery pipe (3) facing away from the tower body (1), and an air outlet corresponding to the motor assembly (2) is provided on the side of the annular air delivery pipe (3) facing the tower body (1), and an air blowing pipe (19) is connected to the air outlet, and an end of the air blowing pipe (19) passes through the outer wall of the tower body (1), extends into the interior of the tower body (1) and faces the stirring paddle (17).

3. The bromine absorption and extraction reaction tower according to claim 1, characterized in that: A liquid redistributor (6) is fixedly installed inside the tower body (1), and the liquid redistributor (6) is located between the first bed limiting plate (5) and the second grid plate (7).

4. The bromine absorption and extraction reaction tower according to claim 3, characterized in that: The liquid redistributor (6) comprises a casing (20) fixedly mounted inside the tower body (1), guide grids being arranged between the inner walls of the casing, a plurality of water collecting grooves (23) being arranged below the guide grids, and a plurality of liquid outlets (25) being arranged at the bottom of the water collecting grooves (23).

5. The bromine absorption and extraction reaction tower according to claim 4, characterized in that: The guide grid comprises a group of central guide plates (21) and a plurality of groups of side guide plates (22) respectively arranged on both sides of the central guide plate (21); the water collecting troughs (23) correspond to the side guide plates (22) one by one, and the water collecting troughs (23) are fixedly mounted on the bottom of the corresponding side guide plates (22).

6. The bromine absorption and extraction reaction tower according to claim 5, characterized in that: A connecting plate (24) is provided between the water collecting grooves (23).

7. The bromine absorption and extraction reaction tower according to claim 1, characterized in that: A demister (9) is fixedly installed inside the tower body (1), and the demister (9) is located above the liquid distributor (8).

8. The bromine absorption and extraction reaction tower according to claim 1, characterized in that: A filter screen (15) is fixedly installed inside the tower body (1), the filter screen (15) is located below the first grid plate (4), and the gas inlet (14) is located between the first grid plate (4) and the filter screen (15).