Large-span steel truss roof hoisting construction device

By designing adjustment mechanisms and movable mechanisms in the lifting construction device of large-span steel truss, flexible adjustment of the position and angle of the lifting tool is solved, and the problem of being unable to freely adjust the reasonable stress lifting point in the prior art is improved, and the adaptability of the lifting is improved and security.

CN222063847UActive Publication Date: 2024-11-26CHINA CONSTR SEVENTH ENG DIVISION CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420937802.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-11-26
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

The existing large-span steel truss hoisting construction equipment cannot be freely adjusted to the reasonable stress lifting point during the lifting process, which increases the construction complexity and safety risks.

Method used

A lifting construction device including a mounting frame, a support frame, an adjustment mechanism and a movable mechanism is designed. Through the precise coordination of the drive motor, the driven gear, the driven gear and the screw, the flexible adjustment of the position of the spreader is achieved, and through electric pushing The coordinated action of the rod and rack adjusts the angle and distance to enhance lifting adaptability.

Benefits of technology

The precise adjustment of the position of the spreader is achieved, the reasonable selection of lifting points is ensured, the adaptability and safety of the lifting of large-span steel trusses is improved, mechanical failures are avoided, and the stability and efficiency of construction are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222063847U_ABST
    Figure CN222063847U_ABST
Patent Text Reader

Abstract

The utility model discloses a large-span steel truss roof hoisting construction device, which relates to the technical field of steel truss hoisting construction and comprises a mounting frame, a support frame is fixedly connected to the center of the bottom of the mounting frame, adjusting mechanisms are mounted on two sides of an inner cavity of the support frame, and two movable mechanisms are connected to one sides of the adjusting mechanisms. The movable mechanism comprises a movable sleeve and a swing rod, a lead screw is rotatably connected to an inner cavity of the swing rod, a movable block is in threaded connection with the surface of the lead screw, and the movable sleeve is in sliding connection with the swing rod. The large-span steel truss lifting appliance is simple in structure and convenient to use, the requirement of a large-span steel truss can be accurately met, the large-span steel truss lifting appliance can be adjusted to a proper lifting point, meanwhile, through the synergistic effect of the electric push rod and the rack, the angle position of the two lifting appliances can be adjusted, the distance between the two lifting appliances can be changed, and the large-span steel truss lifting adaptability and effect are further enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel truss hoisting construction, in particular to a large-span steel truss roof hoisting construction device. Background Art

[0002] Large-span steel trusses have the advantages of light structure, reasonable force, and material saving, but they also have the problems of difficult construction and high technical requirements. During the construction process, it is necessary to select appropriate construction techniques, such as hoisting, sliding, lifting, etc., and conduct strict technical analysis and stability verification to ensure the safety of construction and the stability of the structure.

[0003] For example, publication number CN219990978U discloses a movable large-span steel truss lifting device, including a gantry and two parallel guide rails, both of which are used to be laid on a concrete floor, the gantry includes two legs and a crossbeam, the crossbeam is equipped with an electric hoist, the hook of the electric hoist is connected with a lifting assembly, the lifting assembly is used to connect the large-span steel truss, the two legs are fixed to the two ends of the crossbeam in a one-to-one correspondence, the bottoms of the two legs are placed on the two guide rails, a number of movable pulleys are installed at the bottom of the legs, the movable pulleys are all engaged with the guide rails, the number of movable pulleys are arranged along the extension direction of the guide rails, and the two guide rails are provided with a driving assembly for driving the legs to move.

[0004] However, in the prior art, existing hoisting construction devices generally adopt the method of aerial splicing. This method not only requires working at high altitude, but also requires multiple large machines to work together during the entire construction process. It is impossible to freely adjust the reasonable force lifting points during hoisting, which not only increases the complexity of construction, but also puts higher requirements on construction safety. Utility Model Content

[0005] The utility model aims to solve the problem in the prior art that reasonable force-bearing lifting points during lifting cannot be freely adjusted, and proposes a large-span steel truss roof lifting construction device.

[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a large-span steel truss roof hoisting construction device, comprising a mounting frame, a support frame is fixedly connected to the center of the bottom of the mounting frame, and adjustment mechanisms are installed on both sides of the inner cavity of the support frame, and two movable mechanisms are connected to one side of the adjustment mechanism;

[0007] The movable mechanism comprises a movable sleeve and a swing rod, the inner cavity of the swing rod is rotatably connected with a screw rod, the surface of the screw rod is threadedly connected with a moving block, the movable sleeve is slidably connected to the swing rod, and the inner wall of the movable sleeve is fixedly connected to the moving block, one end of the moving block is fixedly connected to a hanger, both sides of the swing rod are fixedly connected to rails, the inner wall of the movable sleeve is provided with a limiting groove, and the limiting groove is slidably connected to the rail;

[0008] The adjusting mechanism comprises a rack, and both sides of one end of the rack are meshedly connected with half gears, the bottom of the half gear is rotatably connected to the support frame, and the side wall of the half gear is fixedly connected to the swing rod.

[0009] Preferably, a sliding groove is provided on the surface of the support frame, and limiting holes are provided on both sides of the sliding groove.

[0010] Preferably, two electric push rods are fixedly connected to the inner wall of the support frame, the output ends of the electric push rods are fixedly connected to the rack, and the bottom end of the rack is slidably connected to the sliding groove.

[0011] Preferably, a moving rod is fixedly connected to the bottom of the swing rod, and a baffle is fixedly connected to the bottom of the moving rod.

[0012] Preferably, the moving rod is slidably connected to the limiting hole, and the diameter of the baffle is greater than the width of the limiting hole.

[0013] Preferably, a driving motor is installed on the top of the swing arm, and a driving gear is fixedly connected to the output end of the driving motor.

[0014] Preferably, one end of the swing lever is fixedly connected to a driven gear, and the driven gear is meshingly connected to the driving gear.

[0015] Compared with the prior art, the advantages and positive effects of the utility model are:

[0016] 1. In the utility model, the position of the sling can be flexibly adjusted through the precise coordination of the driving motor, the active gear, the driven gear and the screw rod, ensuring that it can accurately adapt to the needs of the large-span steel truss and adjust to the appropriate lifting point. At the same time, the synergistic effect of the electric push rod and the rack enables the two slings to not only adjust the angle position, but also change the distance between each other, further enhancing the adaptability and effect of the large-span steel truss lifting.

[0017] 2. In the utility model, when the rack starts to move under the precise drive of the electric push rod, it ensures the coordination and stability of the mechanical system. The smooth sliding of the rack in the sliding groove ensures its linear motion and avoids mechanical failure. At the same time, the close combination of the half gear and the swing arm enables the swing arm to swing stably. The vertical sliding of the bottom moving rod in the limit hole, combined with the restriction of the baffle, further enhances the stability of the swing arm. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 The utility model provides a schematic diagram of the overall three-dimensional structure of a large-span steel truss roof hoisting construction device;

[0019] Figure 2A partial three-dimensional structural schematic diagram of a large-span steel truss roof hoisting construction device is proposed for the utility model;

[0020] Figure 3 The utility model provides a three-dimensional structural schematic diagram of an adjustment mechanism in a large-span steel truss roof hoisting construction device;

[0021] Figure 4 The utility model provides a schematic diagram of the split three-dimensional structure of a large-span steel truss roof hoisting construction device in a movable mechanism.

[0022] Legend: 1. Mounting frame; 2. Support frame; 21. Sliding slot; 22. Limiting hole; 3. Lifting device; 4. Movable mechanism; 41. Swing rod; 411. Track; 412. Moving rod; 413. Baffle; 42. Movable sleeve; 421. Limiting slot; 43. Driving motor; 44. Driven gear; 45. Driving gear; 46. Screw; 47. Moving block; 5. Adjusting mechanism; 51. Electric push rod; 52. Rack; 53. Half gear. DETAILED DESCRIPTION

[0023] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0024] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0025] Embodiment 1

[0026] like Figure 1-4 As shown, the utility model provides a large-span steel truss roof hoisting construction device, including a mounting frame 1, a support frame 2 is fixedly connected to the center of the bottom of the mounting frame 1, and adjustment mechanisms 5 are installed on both sides of the inner cavity of the support frame 2, and two movable mechanisms 4 are connected to one side of the adjustment mechanism 5;

[0027] The movable mechanism 4 includes a movable sleeve 42 and a swing rod 41. The inner cavity of the swing rod 41 is rotatably connected with a screw rod 46. The surface of the screw rod 46 is threadedly connected with a moving block 47. The movable sleeve 42 is slidably connected to the swing rod 41, and the inner wall of the movable sleeve 42 is fixedly connected to the moving block 47. One end of the moving block 47 is fixedly connected to the sling 3. Both sides of the swing rod 41 are fixedly connected with rails 411. The inner wall of the movable sleeve 42 is provided with a limiting groove 421, and the limiting groove 421 is slidably connected to the rail 411.

[0028] The adjusting mechanism 5 includes a rack 52 , and both sides of one end of the rack 52 are meshedly connected with a half gear 53 . The bottom of the half gear 53 is rotatably connected to the support frame 2 , and the side wall of the half gear 53 is fixedly connected to the swing rod 41 .

[0029] The specific settings and functions of this embodiment are described in detail below. During the hoisting adjustment process, after the drive motor 43 is started, it provides sufficient power to drive the driving gear 45 to rotate. The close fit between the driving gear 45 and the driven gear 44 causes the driven gear 44 to also start to rotate, thereby driving the screw rod 46 to rotate together. The clever design of the screw rod 46 lies in that there is a moving block 47 on its surface, and this moving block 47 moves with the rotation of the screw rod 46. The movement of the moving block 47 drives the movable sleeve 42 to slide on the surface of the swing rod 41, so that the position of the sling 3 can be changed. This adjustment method enables the sling 3 to flexibly adapt to the adjustment requirements of the large-span steel truss and adjust to a reasonable lifting point, thereby ensuring the smooth progress of the hoisting operation.

[0030] In addition to the position adjustment, the angular position of the hanger 3 and the distance between the two hangers 3 are also very important. In order to achieve precise control of these parameters, the design adopts a combination of an electric push rod 51 and a rack 52. When the electric push rod 51 pushes the rack 52 to move, it will simultaneously apply a force to the two half gears 53. This force causes the two half gears 53 to rotate in opposite directions. During the rotation of the half gear 53, the angular position of the hanger 3 can be adjusted, and the distance between the two hangers 3 will also change. This design not only improves the adaptability of hoisting large-span steel trusses, but also further enhances the hoisting effect, ensuring the efficiency and safety of the hoisting operation.

[0031] Embodiment 2

[0032] like Figure 2-4 As shown, a sliding groove 21 is provided on the surface of the support frame 2, and limiting holes 22 are provided on both sides of the sliding groove 21. Two electric push rods 51 are fixedly connected to the inner wall of the support frame 2, and the output end of the electric push rod 51 is fixedly connected to the rack 52, and the bottom end of the rack 52 is slidably connected to the sliding groove 21. A moving rod 412 is fixedly connected to the bottom of the swing rod 41, and a baffle 413 is fixedly connected to the bottom of the moving rod 412. The moving rod 412 is slidably connected to the limiting hole 22, and the diameter of the baffle 413 is larger than the width of the limiting hole 22. A driving motor 43 is installed on the top of the swing rod 41, and a driving gear 45 is fixedly connected to the output end of the driving motor 43. A driven gear 44 is fixedly connected to one end of the swing rod 41, and the driven gear 44 is meshed and connected with the driving gear 45.

[0033] The effect achieved by the entire embodiment is that when the rack 52 starts to move under the drive of the electric push rod 51, its precise linear motion not only drives the rotation of the two half gears 53, but also ensures the coordination and stability of the entire mechanical system. The rack 52 slides smoothly inside the sliding groove 21. This design cleverly ensures that the rack 52 always maintains linear motion during the movement process, thereby avoiding mechanical failures that may be caused by bending or offset.

[0034] At the same time, the close combination of the half gear 53 and the swing rod 41 enables the swing rod 41 to swing accordingly. In this process, the bottom moving rod 412 slides stably inside the limiting hole 22, and the baffle 413 effectively limits the range of motion of the moving rod 412, ensuring that it always remains vertical during movement without tilting. The stability of the swing rod 41 during movement is greatly enhanced, making the entire adjustment process both convenient and reliable.

[0035] The use method and working principle of this device: When performing hoisting adjustment, we start the driving motor 43 to drive the driving gear 45 to rotate, and then drive the driven gear 44 to rotate. The rotation of the driven gear 44 will cause the screw rod 46 to rotate together, and the moving block 47 on the surface of the screw rod 46 will move accordingly, driving the movable sleeve 42 to slide on the surface of the swing rod 41, so as to flexibly adjust the position of the hoist 3 to adapt to the adjustment requirements of the large-span steel truss and facilitate the hoisting operation.

[0036] At the same time, the electric push rod 51 pushes the rack 52 to move, exerting a force on the two half gears 53 to make them rotate in opposite directions. Driven by the electric push rod 51, the rack 52 not only drives the two half gears 53 to rotate, but also keeps moving in a straight line inside the sliding groove 21. When the half gear 53 drives the swing rod 41 to swing, the moving rod 412 at the bottom slides inside the limiting hole 22, and the width of the baffle 413 limits the moving rod 412 to ensure that it moves stably without being skewed. Therefore, under the coordinated action of the moving rod 412 and the limiting hole 22, the swing rod 41 achieves stable swinging, which improves the convenience and stability of adjustment.

[0037] The two half gears 53 rotate in opposite directions, thereby adjusting the angular position of the hanger 3 and changing the distance between the two hangers 3. This flexible adjustment mechanism further improves the adaptability and effect of hoisting large-span steel trusses.

[0038] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A large-span steel truss roof hoisting construction device, comprising a mounting frame (1), wherein a support frame (2) is fixedly connected to the center of the bottom of the mounting frame (1), characterized in that: Adjustment mechanisms (5) are installed on both sides of the inner cavity of the support frame (2), and one side of the adjustment mechanism (5) is connected to two movable mechanisms (4); The movable mechanism (4) comprises a movable sleeve (42) and a swing rod (41); the inner cavity of the swing rod (41) is rotatably connected to a screw rod (46); the surface of the screw rod (46) is threadedly connected to a moving block (47); the movable sleeve (42) is slidably connected to the swing rod (41); the inner wall of the movable sleeve (42) is fixedly connected to the moving block (47); one end of the moving block (47) is fixedly connected to a sling (3); both sides of the swing rod (41) are fixedly connected to rails (411); a limiting groove (421) is provided on the inner wall of the movable sleeve (42); the limiting groove (421) is slidably connected to the rail (411); The adjustment mechanism (5) comprises a rack (52), and both sides of one end of the rack (52) are meshingly connected with a half gear (53), the bottom of the half gear (53) is rotatably connected to the support frame (2), and the side wall of the half gear (53) is fixedly connected to the swing rod (41).

2. A large-span steel truss roof hoisting construction device according to claim 1, characterized in that: A sliding groove (21) is provided on the surface of the support frame (2), and limiting holes (22) are provided on both sides of the sliding groove (21).

3. The large-span steel truss roof hoisting construction device according to claim 1 is characterized in that: Two electric push rods (51) are fixedly connected to the inner wall of the support frame (2); the output ends of the electric push rods (51) are fixedly connected to the rack (52); and the bottom end of the rack (52) is slidably connected to the sliding groove (21).

4. The large-span steel truss roof hoisting construction device according to claim 1 is characterized in that: The bottom of the swing rod (41) is fixedly connected to a moving rod (412), and the bottom of the moving rod (412) is fixedly connected to a baffle (413).

5. A large-span steel truss roof hoisting construction device according to claim 4, characterized in that: The moving rod (412) is slidably connected to the limiting hole (22), and the diameter of the baffle (413) is greater than the width of the limiting hole (22).

6. The large-span steel truss roof hoisting construction device according to claim 1 is characterized by: A driving motor (43) is installed on the top of the swing rod (41), and a driving gear (45) is fixedly connected to the output end of the driving motor (43).

7. The large-span steel truss roof hoisting construction device according to claim 1 is characterized by: One end of the swing rod (41) is fixedly connected to a driven gear (44), and the driven gear (44) is meshingly connected to a driving gear (45).