Sliding platform for hoisting construction of foundation pit components
By designing a slip platform for foundation pits, using concrete support beams and H-shaped steel components, combined with hoist and pulley chute, the problems of low efficiency and safety hazards of traditional tower cranes are solved, and efficient and safe foundations are achieved Pit components are lifted.
Patent Information
- Application Number
- CN202420781175.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-16
AI Technical Summary
In foundation pit construction, traditional tower crane lifting components are inefficient, costly and have safety hazards, especially in the high-voltage circuit area at the edge of the foundation pit.
A slip platform is designed, including concrete support beams, parallel arranged tracks, sliders, longitudinal beams, diagonal braces and electric hoists, driven by hoist and wire rope, and utilizes H-shaped steel members and pulley chutes to improve stability and flexibility.
It reduces construction costs and safety hazards, improves the efficiency and safety of lifting components in foundation pits, and is suitable for lifting large foundation pits and construction waste.
Smart Images

Figure CN222063905U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, and in particular relates to a sliding platform used for hoisting construction of foundation pit components. Background Art
[0002] At present, the lifting of components and some construction waste in large foundation pits generally relies on on-site tower cranes. In order to facilitate the subsequent main structure construction, tower cranes are generally installed on the outer wall of the super-high-rise main structure. Due to the large area of some foundation pits, it is difficult for the tower crane arm to reach the edge of the foundation pit. If a tower crane is temporarily added to lift components inside the foundation pit, the project construction cost will increase; the component lifting operation cycle using a tower crane is long and the efficiency is low; in addition, there are some high-voltage circuits at the edge of the foundation pit, and there are certain safety hazards in the lifting work of some areas of the tower crane arm. In this regard, it is urgent to provide an effective technical solution to adapt to the traditional lifting operation of components inside deep and large foundation pits. Utility Model Content
[0003] The technical problem to be solved by the utility model is to provide a sliding platform for hoisting construction of foundation pit components, which can reduce construction costs, improve construction efficiency and reduce potential safety hazards.
[0004] The technical solution adopted by the utility model to solve its technical problems is: a sliding platform for hoisting construction of foundation pit components, including a concrete support beam, on which are provided parallel tracks, each track is provided with front and rear groups of sliders, and the front and rear groups of sliders are provided with longitudinal beams, the longitudinal beams are connected by lower cross beams at both ends, diagonal braces are symmetrically provided on the longitudinal beams, the diagonal braces are provided with upper cross beams, the upper cross beams are provided with electric hoists, and the lower cross beams at both ends are connected to winches via steel wire ropes.
[0005] Furthermore, the longitudinal beam is a channel steel, the front and rear two sets of sliders are located inside the channel steel and welded to the channel steel, and the top of the channel steel is welded to the bottom of the diagonal brace. The material is easy to manufacture, the cost is low, and the construction cost is low.
[0006] Furthermore, the thickness of the slider is smaller than the leg width of the channel steel, and the top position of the track is higher than the bottom position of the channel steel. In this way, the entire platform can run more stably and reliably.
[0007] Furthermore, the track, diagonal brace, upper cross beam and lower cross beam are all H-shaped steel. Of course, other profile components can also be used.
[0008] Furthermore, a first web member is provided between the longitudinal beam and the diagonal brace, and a second web member is provided between the diagonal braces. Of course, the web members can also be provided in other forms.
[0009] Furthermore, the first web member and the second web member are both H-shaped steel. Of course, other profile components can also be used.
[0010] Furthermore, a pulley and a slide groove may be arranged between the slider and the track, the pulley is arranged at the bottom of the slider, the slide groove is arranged on the track, and the pulley moves along the slide groove.
[0011] Compared with the prior art, the beneficial effects of the utility model are: easy production and material acquisition, high flexibility, low cost, low construction cost, improved construction efficiency, safe construction process, and reduced safety hazards. It is particularly suitable for the lifting of components in large foundation pits and some construction waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 A side view of an embodiment of the utility model;
[0013] Figure 2 for Figure 1 a top view of the illustrated embodiment;
[0014] Figure 3 for Figure 1 a right side view of the illustrated embodiment;
[0015] Figure 4 for Figure 3 Enlarged view of part A in the middle;
[0016] Explanation of the reference numerals: 1. concrete support beam, 2. track, 3. slider, 4. diagonal brace, 5. electric hoist, 6. winch, 7. wire rope, 8. first web member, 9. second web member, 10. longitudinal beam, 11. upper cross beam, 12. lower cross beam. DETAILED DESCRIPTION
[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0018] Reference Figures 1 to 4 A sliding platform for hoisting construction of foundation pit components includes a concrete support beam 1, on which parallel tracks 2 are arranged, each track 2 is provided with front and rear groups of sliders 3, and the front and rear groups of sliders 3 are provided with longitudinal beams 10, the longitudinal beams 10 are connected by lower cross beams 12 at both ends, the longitudinal beams 10 are symmetrically provided with diagonal braces 4, the diagonal braces 4 are provided with upper cross beams 11, the upper cross beams 11 are provided with electric hoists 5, and the lower cross beams 12 at both ends are connected to winches 6 through wire ropes 7.
[0019] In this embodiment, the longitudinal beam 10 is a channel steel, the front and rear sets of sliders 3 are located inside the channel steel and welded to the channel steel, and the top of the channel steel is welded to the bottom of the diagonal brace 4.
[0020] In this embodiment, the thickness of the slider 3 is smaller than the leg width of the channel steel, and the top position of the track 2 is higher than the bottom position of the channel steel.
[0021] In this embodiment, the track 2, the diagonal brace 4, the upper cross beam 11 and the lower cross beam 12 are all H-shaped steels. Of course, other profile components can also be used.
[0022] In this embodiment, a first web member 8 is provided between the longitudinal beam 10 and the diagonal brace 4 , and a second web member 9 is provided between the diagonal braces 4 .
[0023] In this embodiment, the first web member 8 and the second web member 9 are both H-shaped steel. Of course, other profile components can also be used.
[0024] In this embodiment, the slider 3 is a member with a smooth surface, and a certain amount of lubricant can be applied between the slider 3 and the track 2 to reduce friction resistance. Of course, a pulley and a slide groove can also be set between the slider 3 and the track 2, the pulley is set at the bottom of the slider 3, the slide groove is set on the track 2, and the pulley moves along the slide groove.
[0025] Working process: When in use, the lower cross beam 12 is pulled by the winch 6 and the wire rope 7, and then the longitudinal beam 10 and the slider 3 are moved, so that the electric hoist 5 of the upper cross beam 11 is moved to the lifting position, and the components in the foundation pit are lifted by the electric hoist 5 and located above the concrete support beam 1, and then the lower cross beam 12 is pulled by the winch 6 and the wire rope 7, and then the longitudinal beam 10 and the slider 3 are moved, so that the electric hoist 5 of the upper cross beam 11 is moved to the destination, and the subsequent removal or lowering construction is carried out according to the actual working conditions.
Claims
1. A sliding platform for hoisting construction of foundation pit components, characterized by: It includes a concrete support beam, on which parallel tracks are arranged, each track is provided with two groups of front and rear sliders, and the two groups of front and rear sliders are provided with longitudinal beams, the longitudinal beams are connected by lower cross beams at both ends, the longitudinal beams are symmetrically provided with diagonal braces, the diagonal braces are provided with upper cross beams, the upper cross beams are provided with electric hoists, and the lower cross beams at both ends are connected to winches via steel wire ropes.
2. The sliding platform for hoisting construction of foundation pit components according to claim 1 is characterized in that: The longitudinal beam is a channel steel, the front and rear two sets of sliding blocks are located inside the channel steel and are welded to the channel steel, and the top of the channel steel is welded to the bottom of the diagonal brace.
3. The sliding platform for hoisting construction of foundation pit components according to claim 2 is characterized in that: The thickness of the sliding block is smaller than the leg width of the channel steel, and the top position of the track is higher than the bottom position of the channel steel.
4. The sliding platform for hoisting construction of foundation pit components according to claim 1, 2 or 3, characterized in that: The rails, diagonal braces, upper crossbeams and lower crossbeams are all H-shaped steels.
5. The sliding platform for hoisting construction of foundation pit components according to claim 1, 2 or 3, characterized in that: A first web member is provided between the longitudinal beam and the diagonal brace, and a second web member is provided between the diagonal braces.
6. The sliding platform for hoisting construction of foundation pit components according to claim 5 is characterized in that: The first web member and the second web member are both H-shaped steels.
7. The sliding platform for hoisting construction of foundation pit components according to claim 1, 2 or 3, characterized in that: A pulley and a slide groove are arranged between the slider and the track, the pulley is arranged at the bottom of the slider, the slide groove is arranged on the track, and the pulley moves along the slide groove.