Slag blocking device of RH furnace vacuum tank hot bend pipe

By designing an arc-shaped upper and lower slag retaining wall in the RH vacuum trough hot bend, and using refractory material to form a molding to prevent the slag from entering the vacuum equipment, the problem of slag entry caused by the perforation of the vacuum trough hot bend pipe is solved, and the slag entry problem is achieved Protection and normal use of the equipment.

CN222064600UActive Publication Date: 2024-11-26HBIS LAOTING STEEL CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323376079.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-11-26
Estimated Expiration
2033-12-12

AI Technical Summary

Technical Problem

The RH vacuum trough hot bending pipe is prone to perforation during smelting, causing the slag to enter the vacuum equipment and causing equipment damage. It is difficult for the prior art to effectively block the entry of the slag.

Method used

Design a device that includes upper slag retaining wall and lower slag retaining wall. Both are arc-shaped walls, and are cast in one piece with refractory materials, adding high-temperature-resistant steel fibers, walls and vacuum trough hot bending pipes. Built into one, forming a distance of 200mm-300mm to block the path of the slag.

Benefits of technology

It effectively blocks the slag from entering the vacuum equipment, protects the equipment from damage, and does not affect the normal use of the vacuum tank hot bend pipe. It has good fire resistance and strength, simple structure, low cost and simple construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222064600U_ABST
    Figure CN222064600U_ABST
Patent Text Reader

Abstract

The utility model discloses a slag blocking device for a hot elbow pipe of a vacuum tank of an RH (Ruhrstahl Heraeus) furnace, belongs to the technical field of RH refining furnace equipment, and is used for blocking slag from entering vacuum equipment after a slag suction accident of the RH furnace. According to the technical scheme, an upper slag stopping wall and a lower slag stopping wall are built in an inner cavity of a horizontal section of the RH vacuum tank hot bent pipe respectively, the planes of the wall bodies are perpendicular to the length direction of the horizontal section of the RH vacuum tank hot bent pipe respectively, the wall bodies of the upper slag stopping wall and the lower slag stopping wall are in major arc shapes respectively, the upper slag stopping wall is close to the RH vacuum tank, and the lower slag stopping wall is close to the lower section of the RH vacuum tank. The major-arc-shaped wall body of the upper slag stopping wall is located on the upper portion of the horizontal section of the RH vacuum tank hot bent pipe, the lower slag stopping wall is far away from the RH vacuum tank, the major-arc-shaped wall body of the lower slag stopping wall is located on the lower portion of the horizontal section of the RH vacuum tank hot bent pipe, and major arcs of the upper slag stopping wall and the lower slag stopping wall are symmetrical on the two sides of the central vertical line of the horizontal section of the RH vacuum tank hot bent pipe respectively. The device is simple in structure, good in effect and capable of preventing molten steel slag from entering vacuum equipment through the RH vacuum tank hot elbow pipe and preventing the equipment from being damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a device capable of blocking slag in a hot bending pipe of a vacuum tank of an RH furnace, which prevents the slag from entering vacuum equipment after a slag suction accident of the RH furnace occurs, and belongs to the technical field of RH refining furnace equipment. Background Art

[0002] The RH vacuum tank is an important part of the RH refining furnace. It is the place where molten steel is decarburized and degassed. It is affected by factors such as high temperature melting loss, molten steel erosion and slag erosion during production, and the environment is harsh. The immersion pipe of the RH vacuum tank is easily perforated due to the influence of the smelting environment. When the immersion pipe is perforated, the density of the slag is about 2.4g / cm 3 , much lower than about 7.0g / cm 3 Due to the density of molten steel, the slag is easily sucked into the RH vacuum tank and reaches the interior of the vacuum equipment through the hot bent pipe, causing burning of the equipment.

[0003] Therefore, it is necessary to design a device that can prevent the slag from entering the vacuum equipment through the vacuum tank hot bend pipe and causing melting loss when the RH furnace slag suction accident occurs. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a device for blocking slag in a hot-bent pipe of a vacuum tank of an RH furnace. After a slag suction accident occurs during the RH refining process, the device can block the slag in the hot-bent pipe of the vacuum tank to prevent the slag from entering the vacuum equipment through the bent pipe of the vacuum tank and causing damage to the equipment.

[0005] The technical solution to solve the above technical problems is:

[0006] A slag blocking device for an RH furnace vacuum hot-bending pipe comprises an upper slag blocking wall and a lower slag blocking wall. The upper slag blocking wall and the lower slag blocking wall are respectively built in the inner cavity of the horizontal section of the RH vacuum slot hot-bending pipe. The wall planes of the upper slag blocking wall and the lower slag blocking wall are respectively perpendicular to the length direction of the horizontal section of the RH vacuum slot hot-bending pipe. The wall bodies of the upper slag blocking wall and the lower slag blocking wall are respectively in the shape of major arcs. The periphery of the major arc-shaped wall bodies is built as a whole with the circumferential refractory bricks of the horizontal section of the RH vacuum slot hot-bending pipe. The upper slag blocking wall is close to the RH vacuum slot, and the major arc-shaped wall body of the upper slag blocking wall is located at the upper part of the horizontal section of the RH vacuum slot hot-bending pipe. The lower slag blocking wall is far away from the RH vacuum slot, and the major arc-shaped wall body of the lower slag blocking wall is located at the lower part of the horizontal section of the RH vacuum slot hot-bending pipe. The major arcs of the upper slag blocking wall and the lower slag blocking wall are symmetrical on both sides of the vertical center line of the horizontal section of the RH vacuum slot hot-bending pipe.

[0007] The slag blocking device of the above-mentioned RH furnace vacuum hot bending pipe, the wall thickness of the upper slag blocking wall and the lower slag blocking wall is the same as the thickness of the refractory bricks of the horizontal section of the RH vacuum tank hot bending pipe, the upper slag blocking wall and the lower slag blocking wall are embedded in the working layer of the horizontal section of the RH vacuum tank hot bending pipe during masonry, and the wall spacing between the upper slag blocking wall and the lower slag blocking wall is 200mm-300mm.

[0008] The slag blocking device for the RH furnace vacuum hot bending tube is characterized in that the upper slag blocking wall and the lower slag blocking wall are integrally cast by refractory materials, and high temperature resistant steel fibers are added to the refractory casting material.

[0009] Beneficial effects of the utility model:

[0010] The upper slag retaining wall and the lower slag retaining wall of the utility model can prevent molten slag from entering the vacuum equipment through the vacuum tank hot bending pipe and causing damage to the equipment; the superior arc-shaped wall bodies of the upper slag retaining wall and the lower slag retaining wall are relatively staggered up and down, and do not affect the normal use of the vacuum tank hot bending pipe; the upper slag retaining wall and the lower slag retaining wall are integrally cast and formed by refractory materials, high-temperature resistant steel fibers are added to the refractory castables, and high-temperature drying treatment is performed after molding, and the wall body and the circumferential refractory bricks of the horizontal section of the RH vacuum tank hot bending pipe are built as a whole, and have good fire resistance and strength.

[0011] The utility model has the advantages of simple structure, good effect, low cost and simple construction process. When the slag line of the immersion pipe is perforated and slag is sucked during the RH furnace steel refining operation, the molten steel slag can be blocked from passing through the RH vacuum tank hot bending pipe and entering the vacuum equipment to prevent damage to the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the utility model;

[0013] Figure 2 yes Figure 1 Left view of

[0014] Figure 3 , 4 , 5 are the front view, side view and top view of the lower slag retaining wall.

[0015] The markings in the figure are as follows: RH vacuum tank hot bending pipe 1, RH vacuum tank hot bending pipe horizontal section 2, refractory brick 3, upper slag retaining wall 4, lower slag retaining wall 5. DETAILED DESCRIPTION

[0016] The utility model is composed of an upper slag retaining wall 4 and a lower slag retaining wall 5.

[0017] The figure shows that the upper slag retaining wall 4 and the lower slag retaining wall 5 are respectively built in the inner cavity of the horizontal section 2 of the RH vacuum tank hot bending pipe, and the wall planes of the upper slag retaining wall 4 and the lower slag retaining wall 5 are respectively perpendicular to the length direction of the horizontal section 2 of the RH vacuum tank hot bending pipe. The wall thickness of the upper slag retaining wall 4 and the lower slag retaining wall 5 is the same as the thickness of the refractory bricks 3 of the horizontal section 2 of the RH vacuum tank hot bending pipe. The upper slag retaining wall 4 and the lower slag retaining wall 5 are embedded in the working layer of the horizontal section 2 of the RH vacuum tank hot bending pipe during masonry, and the wall spacing of the upper slag retaining wall 4 and the lower slag retaining wall 5 is 200mm-300mm. The walls of the upper slag retaining wall 4 and the lower slag retaining wall 5 can prevent the slag from passing through the vacuum tank hot bending pipe 1 into the vacuum equipment and causing equipment damage.

[0018] The figure shows that the walls of the upper slag retaining wall 4 and the lower slag retaining wall 5 are respectively in the shape of a major arc, and the periphery of the major arc arch-shaped wall is built as a whole with the circumferential refractory bricks 3 of the horizontal section 2 of the RH vacuum tank hot bending pipe. The upper slag retaining wall 4 is close to the RH vacuum tank, and the major arc arch-shaped wall of the upper slag retaining wall 4 is located at the upper part of the horizontal section 2 of the RH vacuum tank hot bending pipe. The lower slag retaining wall 5 is far away from the RH vacuum tank, and the major arc arch-shaped wall of the lower slag retaining wall 5 is located at the lower part of the horizontal section 2 of the RH vacuum tank hot bending pipe. The major arc arches of the upper slag retaining wall 4 and the lower slag retaining wall 5 are symmetrical on both sides of the central vertical line of the horizontal section 2 of the RH vacuum tank hot bending pipe. The major arc arches of the upper slag retaining wall 4 and the lower slag retaining wall 5 are relatively staggered up and down inside the horizontal section 2 of the RH vacuum tank hot bending pipe, which does not affect the normal use of the vacuum tank hot bending pipe 1.

[0019] As shown in the figure, the wall bodies of the upper slag retaining wall 4 and the lower slag retaining wall 5 are integrally casted with refractory materials, high temperature resistant steel fibers are added to the refractory castables, and high temperature drying treatment is performed after molding. The wall bodies of the upper slag retaining wall 4 and the lower slag retaining wall 5 are integrally built with the circumferential refractory bricks of the horizontal section 2 of the RH vacuum tank hot bending pipe, and have good refractory performance and strength.

[0020] An embodiment of the present utility model is as follows:

[0021] Taking a steel plant's 120-ton RH refining equipment as an example, the inner diameter of the horizontal section 2 of the RH vacuum tank hot-bending pipe is 1560mm (including refractory materials) and 1800mm (excluding refractory materials).

[0022] The diameter of the superior arc of the upper slag retaining wall 4 and the lower slag retaining wall 5 is 1760 mm, the center height is 1250 mm, the thickness is 250 mm, and the wall interval between the upper slag retaining wall 4 and the lower slag retaining wall 5 is 250 mm.

Claims

1. A device for blocking slag for hot bending of vacuum tanks in RH furnaces, characterized in that: The utility model comprises an upper slag retaining wall (4) and a lower slag retaining wall (5), wherein the upper slag retaining wall (4) and the lower slag retaining wall (5) are respectively built in the inner cavity of the horizontal section (2) of the RH vacuum tank hot bending pipe, the wall planes of the upper slag retaining wall (4) and the lower slag retaining wall (5) are respectively perpendicular to the length direction of the horizontal section (2) of the RH vacuum tank hot bending pipe, and the wall bodies of the upper slag retaining wall (4) and the lower slag retaining wall (5) are respectively in the shape of a major arc, and the periphery of the major arc wall is resistant to the circumference of the horizontal section (2) of the RH vacuum tank hot bending pipe. The fire bricks (3) are built as a whole, the upper slag retaining wall (4) is close to the RH vacuum tank, the major arc arch wall of the upper slag retaining wall (4) is located at the upper part of the horizontal section (2) of the hot bending pipe of the RH vacuum tank, the lower slag retaining wall (5) is far away from the RH vacuum tank, the major arc arch wall of the lower slag retaining wall (5) is located at the lower part of the horizontal section (2) of the hot bending pipe of the RH vacuum tank, and the major arc arch walls of the upper slag retaining wall (4) and the lower slag retaining wall (5) are symmetrical on both sides of the central vertical line of the horizontal section (2) of the hot bending pipe of the RH vacuum tank.

2. The device for blocking slag of hot-bending tubes in vacuum tanks of RH furnaces according to claim 1, characterized in that: The wall thickness of the upper slag retaining wall (4) and the lower slag retaining wall (5) is the same as the thickness of the refractory bricks (3) of the horizontal section (2) of the RH vacuum tank hot bending pipe. When the wall bodies of the upper slag retaining wall (4) and the lower slag retaining wall (5) are built, they are embedded in the working layer of the horizontal section (2) of the RH vacuum tank hot bending pipe. The wall spacing between the upper slag retaining wall (4) and the lower slag retaining wall (5) is 200 mm-300 mm.

3. The device for blocking slag of hot-bending tubes in vacuum tanks of RH furnaces according to claim 1, characterized in that: The wall bodies of the upper slag retaining wall (4) and the lower slag retaining wall (5) are integrally casted with refractory material, and high-temperature resistant steel fibers are added to the refractory castable.