Suspension type simple and convenient supporting temporary steel bridge system

Through the suspended and simple support steel bridge system, the problems of long construction period and water leakage during excavation of the subway station foundation pit are solved, pipeline protection and road traffic are achieved, construction costs and construction periods are reduced, and project quality is ensured.

CN222065142UActive Publication Date: 2024-11-26ZHEJIANG HUAHENG TRAFFIC CONSTR SUPERVISION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420666576.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-11-26
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

When excavating the foundation pit of the subway station, the construction of permanent cover plates and pipeline protection are usually carried out separately, resulting in long construction periods and high costs, and weak flexible waterproofing and concrete self-waterproofing, which can easily cause water leakage.

Method used

Adopt a suspended simple support steel bridge system, and through the hollow bridge structure of the main body, bridge deck, bottom bracket and crown beam, the passage function of the gas pipeline is realized, the driving cover plate construction and pipeline protection structure are abolished, and the main truss is spliced ​​with Bere beams. and suspension beams, suspending protection measures and inspection wells are installed to ensure pipeline safety.

Benefits of technology

Pipeline protection and road traffic passage in limited sites or multiple pipeline areas are achieved, reducing the impact of permanent cover construction on water leakage, saving construction period, and ensuring project quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065142U_ABST
    Figure CN222065142U_ABST
Patent Text Reader

Abstract

The utility model relates to a suspension type convenient supporting temporary steel bridge system. The temporary steel bridge mainly comprises a main body, a bridge floor arranged at the top of the main body, a bottom bracket and a top beam, wherein the main body is of a hollow bridge structure formed by erecting a main truss and a suspension beam, and the bottoms of the two sides of the main body are erected on two crown beams respectively; the bottom brackets are perpendicular to the axis of the main body and fixed in the main body, and the interior of the main body serves as channels of various gas pipelines, so that the various gas pipelines can directly cross a foundation pit through the suspension type simple and convenient supporting temporary steel bridge system. According to the temporary steel bridge, the road traffic function is achieved through the temporary steel bridge, the interior of the temporary steel bridge serves as a pipeline channel to protect pipelines from passing through foundation pits or other large-span areas, and the pipeline protection and road traffic passing functions are achieved when a limited site or many pipelines penetrate through an excavation area. And crane cover plate construction and pipeline protection structure construction are omitted, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of subway station construction methods, in particular to a suspended simple supporting steel temporary bridge system used in subway station construction. Background Art

[0002] When excavating the foundation pit of a subway station, pipeline protection and the addition of driving covers are usually faced with the working conditions of meeting the passage of vehicles. However, the construction of permanent covers is extremely unfavorable to the waterproofing of the side walls and the construction joints between the top plate and the side walls in the later stage. It is a weak link in flexible waterproofing and concrete self-waterproofing, which is easy to cause water leakage, causing great inconvenience to the later plugging and operation. Pipeline protection construction is also relatively time-consuming. At present, the protection of pipelines and the setting of driving lanes are usually carried out separately. The construction of permanent driving covers and pipeline protection or relocation construction will result in a longer construction period and higher construction costs. Utility Model Content

[0003] The main purpose of the utility model is to overcome the deficiencies in the prior art and provide a suspended simple supporting steel temporary bridge system.

[0004] The purpose of this utility model is achieved through the following technical solutions:

[0005] A suspended simple support steel temporary bridge system, the suspended simple support steel temporary bridge system includes a main body, a bridge deck arranged on the top of the main body, a bottom bracket and a crown beam; wherein the main body is a hollow bridge structure composed of a main truss and a suspension beam, and the bottoms on both sides of the main body are respectively erected on two crown beams; a plurality of bottom brackets are fixed inside the main body perpendicular to the main body axis, and the inside of the main body is used as a passage for various gas pipelines, so that various gas pipelines can directly cross the foundation pit through the suspended simple support steel temporary bridge system.

[0006] The suspended simple support steel temporary bridge system of the utility model realizes the road traffic function through the steel temporary bridge. The interior is used as a pipeline channel to protect the pipeline passing through the foundation pit or other large-span areas. It realizes the pipeline protection and road traffic passage in a limited site or when a large number of pipelines pass through the excavation area, eliminates the construction of the driving cover plate and the construction of the pipeline protection structure, and saves construction time.

[0007] Furthermore, the main truss and the suspension beam are respectively formed by splicing a number of upper-supported Bailey beams, and each Bailey beam adopts a prefabricated highway steel bridge truss plate in the form of a single-layer close-packed truss.

[0008] Furthermore, the lateral spacing between the plurality of upper-supported Bailey beams is 0.5m, 0.6m or 0.7m.

[0009] Furthermore, the bottom bracket is made of section steel.

[0010] Furthermore, the crown beam and the main body are an integrated structure.

[0011] Furthermore, it also includes a number of suspension protection measures for preventing rigid collision of pipelines, and the suspension protection measures are arranged in the main body according to the distribution of pipelines.

[0012] Furthermore, it also includes an inspection well arranged on both sides of the main body.

[0013] Compared with the prior art, the utility model has the following beneficial effects: by using Bailey beams to form a steel temporary bridge and the suspension measures thereunder, the steel temporary bridge can meet the driving needs and pipeline protection needs, reducing the impact of permanent driving cover construction on foundation pit water leakage, while saving construction time. The inspection wells and pipeline suspension protection measures set up can ensure the safety of the pipelines, saving construction time and ensuring the quality of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is the front view of the suspended steel temporary bridge.

[0015] Figure 2 This is the left side cross-sectional view of the suspended steel temporary bridge.

[0016] Figure 3 This is the top view of the suspended steel temporary bridge.

[0017] The reference numerals in the figure are: 1. Bridge deck; 2. Main truss; 3. Suspension beam; 4. Bottom bracket; 5. Inspection well; 6. Suspension protection measures; 7. Crown beam. DETAILED DESCRIPTION

[0018] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments:

[0019] A suspended simple support steel temporary bridge system used in subway station construction, such as Figure 1-3 As shown, the suspended simple support steel temporary bridge system includes a bridge deck 1, a main body for supporting the bridge deck 1, a bottom bracket 4 and a crown beam 7; wherein the main body is a hollow bridge structure composed of a main truss 2 and a suspension beam 3, as shown in FIG. Figure 1-3 As shown, the main body provides the bearing capacity for vehicles on the bridge deck 1, and the interior of the main body is used as a passage for various gas pipelines, so that various gas pipelines can directly cross the foundation pit through a suspended simple support steel temporary bridge system, providing protection for the pipelines around the foundation pit; the bottoms of both sides of the main body are respectively mounted on two crown beams 7, and the two crown beams 7 support, distribute and transfer the load of the upper main structure; a number of bottom brackets 4 are fixed inside the main body perpendicular to the main body axis to support and protect the pipelines.

[0020] In a specific implementation case, the bottom bracket 4 is made of 200-section steel with a spacing of 1.2 meters, which can support and protect the pipeline while saving costs.

[0021] In a specific implementation case, several suspension protection measures 6 are also provided. The suspension protection measures 6 are provided in the main body according to the distribution of the pipelines to prevent the pipelines from rigid collision. The suspension protection measures 6 are selected according to the pipelines passing through. For example, the suspension protection measures 6 provided on the bottom bracket use wedge-shaped pads to fix the pipelines, such as Figure 2 As shown, prevent rigid collision, or use 5*10cm square wood between the pipe and the main body as a protective measure.

[0022] In a specific implementation case, an inspection well 5 is provided on both sides of the main body, and the inspection well 5 is used for pipeline maintenance, etc. Specifically, a switch valve is provided in the inspection well 5 to facilitate emergency repairs of pipeline problems.

[0023] In a specific implementation case, the bridge deck 1 provides a smooth road surface for vehicles to pass through, and can be implemented using structures such as steel plates or concrete plates.

[0024] In a specific implementation case, the main truss 2 and the suspension beam 3 are composed of several upper-bearing Bailey beams, each Bailey beam adopts a prefabricated highway steel bridge truss plate, a single-layer close-packed truss form, and the lateral spacing between several upper-bearing Bailey beams can be set according to actual needs, and generally three widths of 0.5m, 0.6m, and 0.7m can be used. In general, the main body and the crown beam 7 are an integrated structure to further enhance their function. Usually, during construction, the two ends of the bottom of the main body are anchored into the crown beam 7, and the main body is placed before the crown beam construction. The steel bars of the crown beam 7 pass through the main body, so that the main body and the crown beam 7 form a whole.

[0025] The following is a specific engineering example to illustrate the construction steps of the suspended simple support steel temporary bridge system of the utility model:

[0026] The first step is to assemble the Bailey plates on site into the required main trusses 2 and suspension beams 3 and erect them to form the main body.

[0027] In the second step, the debris near the crown beam 7 is cleaned up, the protective cover on the embedded bolt is removed, and then the surveying personnel use the total station to measure the main position and the level to measure the elevation.

[0028] The third step is to use a car crane to adjust the positions of the two ends of the main body, and anchor the two ends of its bottom into the crown beam 7 by 30 cm. Before the construction of the crown beam 7, the main body is placed, and the steel bars of the crown beam 7 pass through the main body, so that the main body and the crown beam 7 form a whole.

[0029] The fourth step is to install the bottom bracket 4 inside the main body. The bottom bracket 4 is constructed at a spacing of 1.2m.

[0030] The fifth step is to set up inspection wells 5 on both sides of the suspended simple support steel temporary bridge system, pass the pipeline through the inside of the main body, place it on the bottom bracket 4, and install pipeline protection measures 6.

[0031] Step 6: Install the bridge deck 1 on the top of the main body.

[0032] Since the suspended steel temporary bridge has the function of protecting the pipelines through the foundation pit and providing driving capacity, the construction period can be greatly reduced. After the foundation pit project is completed, the suspended simple supporting steel temporary bridge system can be dismantled, and then the pipeline protection and driving lane construction can be carried out to ensure the overall waterproofness of the subway station.

[0033] Finally, it should be noted that the above examples are only specific embodiments of the present invention. Obviously, the present invention is not limited to the above examples, and there are many variations. All variations that can be directly derived or associated with the content disclosed by a person skilled in the art from the present invention should be considered as the protection scope of the present invention.

Claims

1. A suspended simple support steel temporary bridge system, characterized in that: The suspended simple support steel temporary bridge system comprises a main body, a bridge deck (1) arranged on the top of the main body, a bottom bracket (4) and a crown beam (7); wherein the main body is a hollow bridge structure composed of a main truss (2) and a suspension beam (3), and the bottoms of both sides of the main body are respectively erected on two crown beams (7); a plurality of bottom brackets (4) are fixed inside the main body perpendicular to the main body axis, and the inside of the main body is used as a passage for various gas pipelines, so that various gas pipelines can directly cross the foundation pit through the suspended simple support steel temporary bridge system.

2. The suspended simple support steel temporary bridge system according to claim 1 is characterized in that: The main truss (2) and the suspension beam (3) are respectively formed by splicing a plurality of upper-bearing Bailey beams, and each Bailey beam adopts an assembled highway steel bridge truss plate in the form of a single-layer close-packed truss.

3. The suspended simple support steel temporary bridge system according to claim 2 is characterized in that: The lateral spacing between several upper-supported Bailey beams is 0.5m, 0.6m or 0.7m.

4. The suspended simple support steel temporary bridge system according to claim 1 is characterized in that: The bottom bracket (4) is made of profiled steel.

5. The suspended simple support steel temporary bridge system according to claim 1 is characterized in that: The crown beam (7) and the main body are an integrated structure.

6. The suspended simple support steel temporary bridge system according to claim 1 is characterized in that: It also includes a number of suspension protection measures (6) for preventing rigid collision of pipelines. The suspension protection measures (6) are arranged in the main body according to the distribution of pipelines.

7. The suspended simple support steel temporary bridge system according to claim 1 is characterized in that: It also includes an inspection well (5) arranged on both sides of the main body, wherein the inspection well (5) contains pipeline maintenance tools.