Temporary anchoring member

Through the step-by-step tensioning technology of temporary anchoring members, the impact of the bridge structure stability during the replacement of the tied arch bridge hoisting rod is solved, and the replacement process is simplified and cost-reduced. It is suitable for various forms of arch ribs and steel box beams , ensuring the safety and efficiency of the replacement process.

CN222065232UActive Publication Date: 2024-11-26CHANGCHUN MUNICIPAL ENG & RES INST CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420528726.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2024-11-26
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

The existing method of replacing the boom of the tied arch bridge has problems such as having a great impact on the stability of the bridge structure, large workload and high cost. Especially when the segmented replacement method removes the old boom, it will cause excessive local stress, affecting the stability of the bridge structure. sex.

Method used

A temporary anchoring member is designed, including baffle, hoisting belt, U-shaped connector, temporary sling, plug ear and anchoring assembly. By stretching the temporary sling step by step, the stress-free state of the original sling is achieved, reducing the The structure of the bridge is damaged and the equivalent conversion is performed when replacing a new boom to ensure the stability of the bridge structure.

Benefits of technology

This method simplifies the construction process, reduces replacement time and workload, reduces the risk of damage to the bridge structure, and is suitable for various forms of arch ribs and steel box girders, and is economical and has strong applicability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065232U_ABST
    Figure CN222065232U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary anchoring component and belongs to the technical field of bridge engineering. The temporary anchoring component sequentially comprises a baffle, a lifting belt, a U-shaped connector, a temporary sling, an inserting lug and an anchoring assembly from top to bottom, a plurality of conical cylinder connecting pieces are further arranged in the U-shaped connector, the conical cylinder connecting pieces are in a cylinder shape with the upper portions thick and the lower portions thin, the lifting belt bypasses a transverse pin in the U-shaped connector to be connected with the U-shaped connector, and the temporary sling is formed by twisting a plurality of steel cables. The upper end of the temporary sling is scattered, the upper end of each steel rope sequentially penetrates through one through hole in the bottom plate and one conical cylinder connecting piece to be connected with the conical cylinder connecting piece in a knotting mode, the steel rope at the lower end of the temporary sling is fixedly connected with an inserting lug, and the inserting lug is connected with an upper lifting lug in the anchoring assembly through a transverse pin. The construction method is suitable for various forms of arch ribs and steel girders, only part of bridge deck slabs and transverse partition plates need to be perforated during construction, and the construction method is universally applicable to replacement of suspenders of tied-arch bridges.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model discloses a temporary anchoring component belonging to the technical field of bridge engineering. Background Art

[0002] The tied arch bridge is a type of bridge that combines the advantages of both the arch and the beam. It combines the two basic structural forms of arch and beam to bear the load together, giving full play to the structural performance and combined effect of the beam being subjected to bending and the arch being subjected to compression. In addition, the interior of this arch bridge is a statically indeterminate system, while the exterior is a statically determinate structure, which does not generate horizontal thrust on the arch end supports. The hangers in the tied arch bridge are the main tension members in the arch bridge structure, responsible for transferring the bridge deck load to the arch ribs. Due to problems such as overloading of the hangers during service, improper daily operation and maintenance (such as anti-corrosion) measures, etc., the hanger structure will be damaged, resulting in a decrease in the load-bearing capacity of the hangers, and they need to be replaced.

[0003] The existing methods for replacing the suspenders of tied arch bridges include overall replacement method, temporary support replacement method and segmented replacement method. Although each has its own advantages, there are also some shortcomings. Among them, the overall replacement method requires a lot of manpower and material resources, and has a great impact on the structural stability of the bridge; the temporary support replacement method requires additional equipment and manpower to set up temporary supports, which is costly. The specific operation steps of the segmented replacement method are: first formulate the order of suspender replacement, and then according to the established order, without any auxiliary facilities, directly remove a single old suspender, and then install a new suspender and tension it, and complete the replacement of all suspenders one by one according to this step. This method takes a long time to replace and has a large workload. In addition, when removing the old suspenders, no supporting device is used, which will cause a sudden increase in the tension of the surrounding suspenders and excessive local stress on the bridge, affecting the stability of the bridge structure. Utility Model Content

[0004] In order to solve the problems existing in the prior art, such as great impact on the structural stability of the bridge, large workload and high cost, we propose a temporary anchoring component.

[0005] The temporary anchoring member of the utility model is characterized in that: Figure 1 As shown, from top to bottom are a baffle 1, a lifting belt 2, a U-shaped connector 3, a temporary lifting rope 4, an ear 5 and an anchor assembly 6;

[0006] In the baffle 1, a plurality of triangular stiffening ribs 12 are welded on one side of the ring belt 11 in a dispersed manner, such as Figure 2 As shown;

[0007] The two ends of the lifting belt 2 are connected by a locking member 21. Figure 3 As shown;

[0008] In the U-shaped connector 3, as Figure 4As shown, the U-shaped opening faces upward, and a pin hole is opened in the upper half of each of the two side plates 31. The transverse pin passes through the two pin holes. A plurality of through holes are opened on the bottom plate 32. There are also a plurality of conical cylinder connecting members 33 in the U-shaped connector 3. The conical cylinder connecting member 33 is in the shape of a thick upper and thin lower cylinder, as shown in FIG. Figure 5 As shown;

[0009] The lifting belt 2 passes over the cross pin in the U-shaped connector 3 to achieve connection with the U-shaped connector 3, such as Figure 1 As shown;

[0010] The temporary sling 4 is twisted from a number of steel cables, such as Figure 1 As shown, the upper ends of the temporary slings 4 are spread out, and the upper end of each steel cable successively passes through a through hole on the bottom plate 32 and a cone connecting piece 33, and is connected to the cone connecting piece 33 in a knotted manner;

[0011] The plug ear 5 is in an inverted U shape, with the opening facing downward. A pin hole is provided at the lower half of the two vertical plates 51. The horizontal pin passes through the two pin holes. The horizontal plate 52 is fixedly connected to the lower end of the temporary sling 4. Figure 1 As shown;

[0012] like Figure 6 , Figure 7 , Figure 8 As shown, the anchor assembly 6 consists of an upper hanging ear 61 and four lower anchor plates 62; the upper hanging ear 61 is in an inverted T shape, the vertical hanging plate 611 is perpendicular to the horizontal connecting plate 612, a pin hole is opened in the upper half of the vertical hanging plate 611, and a plurality of bolt holes are provided on the horizontal connecting plate 612; the lower anchor plate 62 is in an inverted L shape, as shown in FIG. Figure 7 As shown, the back plate 621 is perpendicular to the upper connecting plate 622, and a plurality of bolt holes are opened on the back plate 621 and the upper connecting plate 622. When the two lower anchor plates 62 are back to back, the two sets of bolt holes on the respective back plates 621 are connected, and when the horizontal connecting plate 612 is connected to the upper connecting plate 622, the two sets of bolt holes on the respective back plates 621 are connected;

[0013] The vertical hanging plate 611 is inserted into the two vertical plates 51 , the pin holes on the vertical hanging plate 611 are aligned with each pin hole on the two vertical plates 51 , and the transverse pin passes through the three pin holes to achieve the connection between the plug ear 5 and the anchor assembly 6 .

[0014] The temporary anchoring member is used in the replacement of the suspender rod of the tied arch bridge in the following manner.

[0015] Step 1: Install the baffle 1 on the upper surface of the arch rib 9 at the position corresponding to the center line of the original suspension rod 8, such as Fig. 9 As shown;

[0016] Step 2: At the connection between the original suspension rod 8 and the steel box beam 7, Figures 9 to 12As shown, there are steel box beam cross diaphragms 72 and steel box beam webs 73 below the steel box beam top plate 71. The steel box beam top plate 71, the steel box beam cross diaphragms 72 and the steel box beam webs 73 are perpendicular to each other and form four corner spaces at the intersection of the three. Four lower anchor plates 62 are respectively placed in the four corner spaces. The back plate 621 is fitted with the steel box beam cross diaphragm 72, and the upper connecting plate 622 is fitted with the steel box beam top plate 71. The steel box beam cross diaphragm 72 and the back plates 621 on both sides are flexibly connected by a plurality of bolts. The transverse connecting plate 612 is fitted with the upper surface of the steel box beam top plate 71. The steel box beam top plate 71 and the transverse connecting plates 612 on the upper and lower sides and each upper connecting plate 622 are flexibly connected by a plurality of bolts.

[0017] Step 3: Assemble and connect the U-shaped connector 3, the temporary sling 4, the plug ear 5, and the upper lifting ear 61;

[0018] Step 4: Lift the temporary anchoring member, and connect the two ends of the lifting belt 2 by the locking member 21 above the arch rib 9; install a through-hole jack above the position of the plug ear 5, and tension and load the temporary sling 4 step by step according to the constant load cable force of the original suspending rod 8 obtained by monitoring, until the original suspending rod 8 is in a stress-free state, and at this time, the steel box girder 7 is suspended by the temporary anchoring member at this place;

[0019] Step 5: Remove the original suspender 8, install a new suspender, then install a through-hole jack at the lower end of the new suspender, tension the new suspender step by step to the constant load cable force, and complete the equivalent conversion between the cable force of the temporary sling 4 and the constant load cable force of the new suspender;

[0020] Step 6: Release the connection between the anchor assembly 6 and the steel box girder 7, release the connection between the lifting belt 2 and the arch rib 9, remove the temporary anchoring member, and complete the replacement of an original suspension rod 8.

[0021] The beneficial effects of the utility model are:

[0022] 1. The utility model has a simple structure and is easy to construct. The same bridge and the same type of bridge can be reused, and the economy is good.

[0023] 2. The method of the utility model only requires opening holes in part of the bridge deck and the diaphragm, which has little effect on the structural strength. The upper baffle can be removed after welding, which does not affect the overall stress performance of the structure.

[0024] 3. The construction method can prevent excessive local stress after the local lifting lugs are unloaded, which can prevent the instability of the bridge from occurring, reduce damage to the bridge structure, and reduce the time and workload for replacement.

[0025] 4. The utility model has strong applicability, and the temporary anchoring member is suitable for various forms of arch ribs and steel box girders, and the construction method is generally applicable to the replacement of the hanger rods of the tied arch bridge. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a three-dimensional schematic diagram of the overall structure of the temporary anchoring component of the utility model, which also serves as an abstract drawing.

[0027] Figure 2 It is a schematic structural stereoscopic diagram of the baffle 1 in the temporary anchoring member of the present invention.

[0028] Figure 3 It is a schematic structural stereogram of the lifting belt 2 in the temporary anchoring member of the utility model.

[0029] Figure 4 It is a schematic structural stereogram of the U-shaped connector 3 in the temporary anchoring member of the present invention.

[0030] Figure 5 It is a structural stereoscopic diagram of the cone-tube connector 33 in the temporary anchoring member of the utility model.

[0031] Figure 6 It is a schematic structural stereogram of the anchor assembly 6 in the temporary anchoring member of the present invention.

[0032] Figure 7 It is a schematic structural stereogram of the lower anchor plate 62 in the temporary anchoring member of the present invention.

[0033] Figure 8 It is a left side schematic diagram of the anchoring assembly 6 in the temporary anchoring member of the present invention.

[0034] Fig. 9 It is an overall schematic diagram of a replacement method for replacing the hanger rod of a tied arch bridge using a temporary anchoring member of the utility model.

[0035] Fig.10 It is a partial stereoscopic schematic diagram of step 2 of using the temporary anchoring member of the utility model for replacing the hanger rod of a tied arch bridge.

[0036] Fig.11 It is a partial left view schematic diagram of step 2 of using the temporary anchoring member of the utility model for replacing the hanger rod of a tied arch bridge.

[0037] Fig.12 It is an overall three-dimensional schematic diagram of step 2 of replacing the hanger rod of a tied arch bridge using a temporary anchoring member of the utility model. DETAILED DESCRIPTION

[0038] The following is a specific implementation example of the utility model in conjunction with the accompanying drawings, and the structure and implementation method of the utility model are described in detail. It should be noted that the scope of application of the utility model is not limited to the following embodiments, and all similar structures based on the utility model are within the scope of application of the utility model.

[0039] The temporary anchoring component of the utility model is characterized in that, from top to bottom, it comprises a baffle 1, a lifting belt 2, a U-shaped connector 3, a temporary lifting rope 4, an ear 5 and an anchoring assembly 6.

[0040] In the baffle 1 , a plurality of triangular stiffening ribs 12 are dispersedly welded on one side of the ring belt 11 to prevent the lifting belt 2 from sliding and shifting.

[0041] The lifting belt 2 is a structure used to connect the arch rib 9 and the U-shaped connector 3. Both ends of the lifting belt 2 are connected by a locking piece 21. The lifting belt 2 is generally made of polyester fiber material and is flat in shape with a certain width.

[0042] In the U-shaped connector 3, the U-shaped opening faces upward, and the side panels 31 are steel plates with a semicircular upper part and a rectangular lower part, and are provided in two. A pin hole is opened in the upper half of each of the two side panels 31, and a cross pin passes through the two pin holes and is fixed by a matching nut. The cross pin is a cylindrical steel material, and the lower part thereof passes through the lifting belt 2, and is responsible for bearing the tension of the lifting belt 2. A number of through holes are opened on the bottom plate 32, and a number of conical cylinder connectors 33 are also provided in the U-shaped connector 3. The conical cylinder connector 33 is a hollow steel pipe with a thick upper part and a thin lower part, wherein the hollow circle at the upper part is larger, and the hollow circle at the lower part is smaller.

[0043] The temporary sling 4 refers to a temporary suspender that can meet the temporary tensioning conditions of the bridge. It is formed by twisting a number of steel cables and is provided with a polyethylene sleeve. The upper end of the temporary sling 4 is spread out, and the upper end of each steel cable successively passes through a through hole on the bottom plate 32 and a cone connector 33, and is tightened downward to achieve connection with the cone connector 33 in a knotted manner, so that it can be confined in the cone connector 33 without falling off.

[0044] The ear 5 is in an inverted U shape with its opening facing downwards. A pin hole is respectively provided at the lower half of the two vertical plates 51 . The horizontal pin passes through the two pin holes. The horizontal plate 52 is fixedly connected to the lower end of the temporary sling 4 .

[0045] The anchor assembly 6 consists of an upper hanging ear 61 and four lower anchor plates 62; the upper hanging ear 61 is in an inverted T shape, the vertical hanging plate 611 is perpendicular to the horizontal connecting plate 612, the horizontal connecting plate 612 is a rectangular steel plate, which is used to connect the upper hanging ear 61 and the lower anchor assembly during construction, a pin hole is opened in the upper half of the vertical hanging plate 611, and a plurality of bolt holes are provided on the horizontal connecting plate 612 for anchoring with the steel box girder top plate 71 and the upper connecting plate 622. The lower anchor plate 62 is in an inverted L shape, and three stiffening ribs are welded on the left and right sides of the upper hanging ear 61. The stiffening rib is a nearly triangular steel plate, and a flush cut is made at the acute angle end of the triangle to prevent stress concentration.

[0046] The back plate 621 is a rectangular steel plate, which is used to anchor the steel box girder cross diaphragm 72 during construction. It is perpendicular to the upper connecting plate 622. The upper connecting plate 622 is also a rectangular steel plate. During construction, it is distributed at the junction of the steel box girder cross diaphragm 72 and the steel box girder web 73, and is anchored to the steel box girder top plate 71 and the cross connecting plate 612 by bolts.

[0047] A stiffening rib is welded under the connecting plate 622, and the other side of the stiffening rib is welded to the back plate 621 to enhance the strength and stability of the lower anchor assembly. A number of bolt holes are provided on the back plate 621 and the upper connecting plate 622. When the two lower anchor plates 62 are back to back, the two sets of bolt holes on their respective back plates 621 are connected. When the transverse connecting plate 612 is docked with the upper connecting plate 622, their respective two sets of bolt holes are connected. The vertical hanging plate 611 is inserted into the two vertical plates 51 through high-strength bolts, and the pin holes on the vertical hanging plate 611 are aligned with each pin hole on the two vertical plates 51. The transverse pin passes through the three pin holes to achieve the connection between the plug ear 5 and the anchor assembly 6.

[0048] like Figures 1 to 12 As shown, the temporary anchoring member is used in the replacement of the hanger rod of the tied arch bridge in the following manner.

[0049] Step 1: When an old hanger 8 needs to be replaced, first weld the ring belt 11 and the triangular stiffening rib 12 together on the ground to form a baffle 1. The bottom surfaces of the ring belt 11 and the triangular stiffening rib 12 should fit tightly with the steel pipe arch rib 9 with a catenary line shape. The two baffles 1 are respectively installed on both sides of the center line of the original hanger 8 and fixed above the arch rib 9 by welding.

[0050] Step 2: Drill holes on the steel box girder top plate 71 and the steel box girder cross diaphragm 72, and then install the anchor assembly 6; before installation, one upper lifting ear 61, three stiffening ribs, and one cross connecting plate 612 need to be welded first, and 24 bolt holes are left on the cross connecting plate 612 to install high-strength bolts; a back plate 621, a stiffening rib and an upper connecting plate 622 need to be welded, and a total of 4 sets of welded parts need to be completed, which are arranged in the 4 corner areas where the steel box girder top plate 71, the steel box girder cross diaphragm 72 and the steel box girder web 73 meet, the back plate 621 fits with the steel box girder cross diaphragm 72, the upper connecting plate 622 fits with the steel box girder top plate 71, the steel box girder cross diaphragm 72 and the back plates 621 on both sides of the steel box girder are flexibly connected by a number of bolts, the cross connecting plate 612 fits with the upper surface of the steel box girder top plate 71, and the steel box girder top plate 71 and the cross The connecting plate 612 and each upper connecting plate 622 are flexibly connected by a number of bolts; next, the upper lifting ears 61 and other welded parts are installed. The installation of the back plate 621 and the cross connecting plate 612 requires construction personnel to enter the steel box girder box chamber through the manhole below the steel box girder for construction and installation. The above components are installed at the same cross-sectional position of the connection between the lower end of the original hanger 8 and the steel box girder body. The same cross-sectional position refers to being in the same cross-sectional area as the connection, but not the same position. It is the intersection of the nearest steel box girder top plate 71, steel box girder web 73 and steel box girder cross diaphragm 72. When there is only the steel box girder web 73, it is about 1-3m away from the original connection (this is determined by the specific characteristics of the arch rib and the steel box girder body structure. The purpose is to ensure that the temporary sling 4 and the original hanger 8 will not cross in space to avoid mutual influence during the tensioning process).

[0051] Step 3: Assemble the remaining part of the temporary anchoring component; assemble the U-shaped connector 3, the temporary sling 4, and the upper lifting ear 61. The two side plates 31 and the bottom plate 32 are welded to form the skeleton of the U-shaped connector 3. A conical cylinder connector 33 for connecting the temporary sling 4 is welded on the top of the bottom plate 32. At the same time, 8 round holes are left on the bottom plate 32 to allow the 8 steel cables of the temporary sling 4 to pass through. The upper ends of the multiple strands of steel cables in the temporary sling 4 are partially thickened, and pass through the conical cylinder connector 33 on the U-shaped connector 3 from top to bottom, and force is applied to tighten so that the ends of the steel cables are embedded in the conical cylinder connector 33; then the steel cables in the temporary sling 4 are bundled to form a cable, which is then dispersed again at the lower end of the temporary sling 4. After the multiple strands of steel cables are separated, they are inserted into the anchor plate in the ear 5 and fixed with bolts. Finally, the ear 5 is connected to the upper lifting ear 61 through a pin shaft to form a whole.

[0052] Step 4: Use a crane to lift the temporary anchoring member to below the connection position between the original hanger 8 and the arch rib 9, use two lifting belts 2 to pass through the pin on the U-shaped connector 3 at the bottom and through the arch rib 9 at the top, and finally use the locking piece 21 to connect the two ends of each lifting belt 2 to form a closed loop for force; then install a through-hole jack above the position of the ear 5, and tension the temporary sling 4 step by step by monitoring the constant load cable force of the original hanger 8, and tension the internal force step by step to control 0, 20%, 40%, 60%, 80%, and 100% in sequence until the original hanger 8 is in a stress-free state.

[0053] Step 5: Remove the old suspender and install the new one; after the original suspender is unloaded, the construction personnel remove the fixing measures at the connection position between the original suspender 8 and the arch rib 9 and the connection position between the original suspender 8 and the steel box girder, remove the original suspender 8, put it in the designated position, and then install the new suspender. Then install the through-hole jack at the lower end of the new suspender, and tension the new suspender step by step to the constant load cable force, so as to achieve the equivalent conversion between the cable force of the temporary sling 4 and the constant load cable force of the new suspender.

[0054] Step 6: After the new hanger is tensioned, release the connection between the anchor assembly 6 and the steel box girder 7, release the connection between the lifting belt 2 and the arch rib 9, remove the temporary anchoring member, and complete the replacement of the original hanger 8.

Claims

1. Temporary anchoring components, It is characterized in that The temporary anchoring component comprises: a baffle (1), a lifting belt (2), a U-shaped connector (3), a temporary lifting rope (4), an insert ear (5) and an anchoring assembly (6); In the baffle (1), a plurality of triangular stiffening ribs (12) are dispersedly welded on one side of the ring belt (11); The two ends of the lifting belt (2) are connected by a locking member (21); In the U-shaped connector (3), the U-shaped opening faces upward, a pin hole is respectively formed in the upper half of the two side plates (31), and the transverse pin passes through the two pin holes. A plurality of through holes are formed in the bottom plate (32), and a plurality of conical tube connecting pieces (33) are also formed in the U-shaped connector (3), and the conical tube connecting pieces (33) are in the shape of a tube with a thick top and a thin bottom. The lifting belt (2) passes around the transverse pin in the U-shaped connector (3) to achieve connection with the U-shaped connector (3); The temporary sling (4) is twisted together from a plurality of steel cables, the upper ends of the temporary sling (4) are spread out, and the upper end of each steel cable successively passes through a through hole on the bottom plate (32) and a cone connecting piece (33), and is connected to the cone connecting piece (33) in a knotted manner; The plug ears (5) are in an inverted U shape, with the opening facing downwards. A pin hole is respectively provided at the lower half of the two vertical plates (51), and the horizontal pin passes through the two pin holes. The horizontal plate (52) is fixedly connected to the lower end of the temporary sling (4); The anchor assembly (6) is composed of an upper hanging ear (61) and four lower anchor plates (62); the upper hanging ear (61) is in an inverted T shape, the vertical hanging plate (611) is perpendicular to the horizontal connecting plate (612), a pin hole is opened in the upper half of the vertical hanging plate (611), and a plurality of bolt holes are arranged on the horizontal connecting plate (612); the lower anchor plate (62) is in an inverted L shape, the back plate (621) is perpendicular to the upper connecting plate (622), and a plurality of bolt holes are opened on the back plate (621) and the upper connecting plate (622); when the two lower anchor plates (62) are back to back, the two groups of bolt holes on the respective back plates (621) are connected, and when the horizontal connecting plate (612) is connected to the upper connecting plate (622), the two groups of bolt holes on the respective back plates (621) are connected; The vertical hanging plate (611) is inserted into the two vertical plates (51), the pin hole on the vertical hanging plate (611) is aligned with each pin hole on the two vertical plates (51), and the transverse pin passes through the three pin holes to achieve the connection between the plug ear (5) and the anchor assembly (6).

2. The temporary anchoring member according to claim 1, It is characterized in that The lifting belt (2) is made of polyester fiber material and is flat in shape with a certain width.

3. The temporary anchoring member according to claim 1, It is characterized in that The left and right sides of the upper lifting lug (61) and the inner side of the lower anchor plate (62) are all provided with stiffening ribs, and the stiffening ribs are a nearly triangular steel plate with flush cuts made at the acute angle ends of the triangle.

4. The temporary anchoring member according to claim 1, It is characterized in that The temporary sling (4) is provided with a polyethylene sleeve.

Citation Information

Cited By

  • Temporary anchoring component and tied-arch bridge suspender replacement method adopting temporary anchoring component

    CN118007529A